SF30,_47PJ0019R0035_0002.pdf
PDF 568 KB Posted
- Solicitation number
- 47PJ0019R0035
About this file
Amendment 0002 to GSA Solicitation No. 47PJ0019R0035
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
Description of Amendment/Modification
The following amendments to GSA Solicitation No. 47PJ0019R0035 are hereby incorporated by reference into the solicitation documents. Any amendments to the Contract Documents included shall be incorporated into the agreed Contract. Any amendments described herein take precedence over previously issued documents.
1. The Standard Form 1442 with the issue date of 01/04/2019 is hereby replaced in its entirety by Standard Form 1442 with the amended issue date of 02/01/2019.
2. The period of performance for the base period of services is hereby amended from 05/07/2019 - 05/06/2020 to 06/07/2019 - 06/06/2020.
3. The period of performance for the option 1 period of services is hereby amended from 05/07/2020 - 05/06/2021 to 06/07/2020 - 06/06/2021.
4. The period of performance for the option 2 period of services is hereby amended from 05/07/2021 - 05/06/2022 to 06/07/2021 - 06/06/2022.
5. The period of performance for the option 3 period of services is hereby amended from 05/07/2022 - 05/06/2023 to 06/07/2022 - 06/06/2023.
6. The period of performance for the option 4 period of services is hereby amended from 05/07/2023 - 05/06/2024 to 06/07/2023 - 06/06/2024.
7. The proposal deadline is hereby extended from 02/15/2019 no later than 3:00 p.m. Mountain Standard Time to 03/15/2019 no later than 3:00 p.m. Mountain Daylight Time, an increase of 28 calendar days.
8. The site visit date is hereby rescheduled for February 13, 2019 to start at the Wallace F. Bennett Federal Building at 8:30 a.m. MST with a brief pre-solicitation meeting. The site walk at the Wallace F. Bennett will begin around 9:00 a.m. MST following the pre-solicitation meeting. All times for the scheduled site visits are approximations and may require slight adjustments to accommodate the coordination and logistics of conducting the site visits at multiple locations. Reference Section I.G. of GSA Solicitation No. 47PJ0019R0035 as amended February 1, 2019 for more information.
9. Attachment 1 - Example Scopes of Work to GSA Solicitation No. 47PJ0019R0035 is hereby amended to remove Example #3 Scope of Work, Hansen Door Project, 11/1/2017. Any adjustments in page numbers and formatting to incorporate the changes is also incorporated by reference through this Amendment.
10. The Solicitation dated January 4, 2019 for GSA Solicitation No. 47PJ0019R0035 is hereby amended to update information on the site visits in Section I.G. and on the proposal deadline in Section I.H. Amendment 0002 hereby replaces in its entirety Section I.G. and Section I.H. of GSA Solicitation No. 47PJ0019R0035, dated January 4, 2019 as amended February 1, 2019. Any adjustments in page numbers and formatting to incorporate the changes to GSA Solicitation No. 47PJ0019R0035 are also incorporated through this Amendment. The date of GSA Solicitation No.
47PJ0019R0035 is amended from January 4, 2019 to February 1, 2019 to reflect the amendments described in Amendment 0002. Section II.D. Technical Proposal, subsection (3) Offeror's Management Plan, of GSA Solicitation No. 47PJ0019R0035 is hereby amended to change the referenced number of task orders in Attachment 1 from four
(4) to three (3).
47PJ0019R0035/0002
| topmostSubform[0]: |
| Page2[0]: |
| TextField1[5]: |
| TextField1[2]: |
| TextField1[1]: |
| TextField1[4]: |
| TextField1[3]: |
| TextField1[0]: |
| Page1[0]: |
| Code[0]: 8PSMMU |
| Copies[0]: 1 |
| CheckBox9[0]: 1 |
| Code[2]: 8PSMMU |
| NameandTitleOfficer[0]: Courtney Westlie, Contracting Officer |
| Is[0]: Off |
| CheckBox10[0]: Off |
| NameandAddress[0]: |
| DateSigned[1]: |
| Pages[0]: 3 |
| AmendmentNo[0]: 0002 |
| Dated10B[0]: |
| ModificationNo[0]: |
| AdministeredBy[0]: GSA, PBS, Utah Property Mgmt Team 8PSMMU |
125 South State Street Rm 5201 Salt Lake City, UT 84138-1199 USA
| FacilityCode[0]: |
| CheckBox13B[0]: Off |
| CheckBox13D[0]: Off |
| ReqNumber[0]: EQ8PSMMU-19-0003 |
| Dated9B[0]: 12/21/2018 |
| C13[0]: |
| Description[0]: Please see attached |
| NotExtended[0]: Off |
| Code[1]: |
| AmendmentNo[1]: 47PJ0019R0035 |
| ContractIDCode[0]: |
| DateSigned[0]: |
| CheckBox11[0]: 1 |
| Page[0]: 1 |
| AccountingData[0]: |
| CopiesReturned[0]: |
| CheckBox13A[0]: Off |
| IsNot[0]: Off |
| EffectiveDate[0]: 2/1/2019 |
| A13[0]: |
| ProjectNo[0]: |
| CheckBox13C[0]: Off |
| Extended[0]: 1 |
| D13[0]: |
| IssuedBy[0]: GSA, PBS, Utah Property Mgmt Team 8PSMMU |
125 South State Street Rm 5201 Salt Lake City, UT 84138-1199 USA NameandTitleSigner[0]:
File details come from the government source that posted it.