Attachment_G_-_GSA_R8_BAS_Graphic_Format_Standard_v2_0_0_20140822.pdf

PDF 5 MB Posted

Attached to
BUILDING AUTOMATION SYSTEM INTEGRATION FOR EIGHT FEDERAL BUILDINGS IN NORTH DAKOTA
Solicitation number
47PJ0019Q0044
Issued by

About this file

Attachment G - GSA R8 BAS Graphic Format Standard v2_0_0_20140822

View the file

Other files

File Type Posted
Minutes_Pre-Bid_6-6-19.pdf PDF
Notice_of_second_site_visit.pdf PDF
Notice_of_cancellation_of_site_visit.pdf PDF
Attachment_L_-_REQUEST_FOR_SBU_BUILDING_INFO.pdf PDF
Attachment_P_-_Existing_Controller_and_Object_Counts.pdf PDF
Attachment_B_-_Badging___Security_Requirements_5.31.2017.pdf PDF
Attachment_C_-_GSA_PBS_Telecommunications_Distribution_Design_Guide.pdf PDF
Attachment_J_-_ND-BAS_Upgrades_Pricing_Template.xlsx XLSX spreadsheet
Attachment_I_-_Object_Naming_Submittal_TEMPLATE-v2.xlsx XLSX spreadsheet
Attachment_N_-_GSA_R8_Smart_Building_Technology_Guide_v0_0_3.pdf PDF
Attachment_H_-_Device_Schedule_TEMPLATE-v2.xlsx XLSX spreadsheet
RFQ_ND_BAS_Phase_II.pdf PDF
Attachment_K_-_CMMS_Inventory_Uploader_Template.xlsx XLSX spreadsheet
Attachment_D_-_GSA_R8_BAS_Technology_Implementation_Guide.pdf PDF
Attachment_A_-_Universal_Scope_Requirements_v2.1_6.8.18.pdf PDF
Attachment_F_-_GSA_Data_Normalization_for_Building_Automation_Systems_v2.5.pdf PDF
ND-BAS_Upgrades_Phase_2_SOW_v2_03152019.pdf PDF
Attachment_O_-_SCA_Wage_Determinations.pdf PDF
Attachment_E_-_GSA_R8_Open_Protocol_Implementation_Guide_-_BACnet_-_v1_0_0_FINAL.pdf PDF
Attachment_M_-_GSA_OFM_Standards_for_Installing_Network_Cabling_in_Electrical_Equipment.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA Region 8GSA Region 8

BAS Graphic Format BAS Graphic Format

The The following pages represent the required following pages represent the required The The following pages represent the required following pages represent the required BAS graphics format.BAS graphics format.

Strict adherence to this format will maintain Strict adherence to this format will maintain consistency throughout the region consistency throughout the region regardless regardless of the of the BAS vendor or system BAS vendor or system integrator working on the integrator working on the systems.systems.

General notesGeneral notes

�� The following pages represent the minimum requirements for the Graphic Display Pages on the The following pages represent the minimum requirements for the Graphic Display Pages on the Region 8 BAS. Region 8 BAS.

�� Each Integrator is responsible for maintaining continuity within the system. All pages must be Each Integrator is responsible for maintaining continuity within the system. All pages must be formatted for 1024 x 768 dpi.formatted for 1024 x 768 dpi.

�� All Graphic displays All Graphic displays created for Tridium NiagaraAXcreated for Tridium NiagaraAX//based GUIs must based GUIs must be created using be created using elements from the elements from the NiagaraAX NiagaraAX ““kitPxHvackitPxHvac” library located on the GSA Region 8 Server. ” library located on the GSA Region 8 Server.

�� All Graphic elements created by any one integrator must be stored on the server for use by all other All Graphic elements created by any one integrator must be stored on the server for use by all other integrators.integrators. Before creating a new graphic, check the library to determine if there is already a Before creating a new graphic, check the library to determine if there is already a representation of the equipment in the library folder for your use representation of the equipment in the library folder for your use

•• For example, Throughout GSA Region 8, all Cooling only VAV Boxes will use the same graphic, All Parallel Fan For example, Throughout GSA Region 8, all Cooling only VAV Boxes will use the same graphic, All Parallel Fan Powered Boxes will use the same graphic, etc. Powered Boxes will use the same graphic, etc. Careful attention to point naming will be required in order that Careful attention to point naming will be required in order that Powered Boxes will use the same graphic, etc. Powered Boxes will use the same graphic, etc. Careful attention to point naming will be required in order that Careful attention to point naming will be required in order that the same graphic can be used by multiple integrators.the same graphic can be used by multiple integrators.

�� Photos of equipment and Photos of equipment and Manufacturer’s Manufacturer’s graphics of actual Chillers and Boilers are graphics of actual Chillers and Boilers are acceptable where the likeness can not be created from the acceptable where the likeness can not be created from the kitPxHvackitPxHvac library. Photos or library. Photos or manufacturer’s manufacturer’s drawings are to be scaled to be in proportion to the mechanical plantdrawings are to be scaled to be in proportion to the mechanical plant

� Please note that these graphics must reside on both the JACE and the GSA Region 8 NiagaraAX Web Supervisor Server.

�� Hotlinks to sites outside of the GSA Firewall are not allowedHotlinks to sites outside of the GSA Firewall are not allowed..

�� Graphic displays that are static and or copies of old BAS system graphics are not Graphic displays that are static and or copies of old BAS system graphics are not permitted permitted without the express permission of Region 8 FMSP representatives. without the express permission of Region 8 FMSP representatives.

�� All Floor Plan Graphic pages are to be approved by the GSA Property Manager prior to All Floor Plan Graphic pages are to be approved by the GSA Property Manager prior to installation on the Server or in the JACE installation on the Server or in the JACE controller.controller.

JACE and Station NamingJACE and Station Naming

�� Each integrator is to follow the Station and JACE Each integrator is to follow the Station and JACE

Naming Naming StandardStandard

�� (For a full list of GSA IT Location Codes, please contact (For a full list of GSA IT Location Codes, please contact doug.rothgeb@gsa.govdoug.rothgeb@gsa.gov ..

JACE and Station Login and JACE and Station Login and

PasswordsPasswords �� The JACE and Station Login and The JACE and Station Login and

Passwords are prePasswords are pre//established for the established for the programmers use. Please contact programmers use. Please contact doug.rothgeb@gsa.govdoug.rothgeb@gsa.gov to receive these to receive these doug.rothgeb@gsa.govdoug.rothgeb@gsa.gov to receive these to receive these login and passwords.login and passwords.

JACE and Web Supervisor JACE and Web Supervisor

Station User PrototypesStation User Prototypes �� JACE and Web Supervisor Station User JACE and Web Supervisor Station User

Prototypes once established/ created on Prototypes once established/ created on the web supervisor shall be used to create the web supervisor shall be used to create consistency in integration.consistency in integration.consistency in integration.consistency in integration.

Single SignSingle Sign//on for multiple on for multiple

JACEsJACEs

�� Each integrator is to provide the GSA with Each integrator is to provide the GSA with the name, IP address and MAC address of the name, IP address and MAC address of each building JACE. The GSA will have each building JACE. The GSA will have each building JACE. The GSA will have each building JACE. The GSA will have this data entered into the GSA DNS this data entered into the GSA DNS

Server so that only a single login is Server so that only a single login is required per required per site.site.

Utility Data PageUtility Data Page

� The GSA requires a separate graphics page for utility data.

� For instance photovoltaic, gas, electric, water, pulse meters and

BACnet/LON/Modbus chemical treatment/cooling tower bleed data points that are a part of the BAS are to be displayed in a Utility Data Page

� Graphic displays on this page shall be constructed from elements in the

NiagaraAX NiagaraAX ““kitPxHvackitPxHvac” library, from digital pictures of the actual meter or from ” library, from digital pictures of the actual meter or from manufacturer's manufacturer's graphicsgraphicsmanufacturer's manufacturer's graphicsgraphics

�� All Graphic elements created by any one integrator must be stored on the All Graphic elements created by any one integrator must be stored on the server for use by all other integrators.server for use by all other integrators.

� The Utility Data page shall be accessible by a hotlink from the home page.

R8 BAS Home Page ExampleR8 BAS Home Page Example

Building Home PageBuilding Home Page Example of required building Home PageExample of required building Home Page

�� Example of building Example of building “Home Page” shown at “Home Page” shown at rightright

�� Link from this page to Link from this page to overall building plan with overall building plan with links to each floor planlinks to each floor plan

�� Display the Building kWh Display the Building kWh and kW Demand on the and kW Demand on the “Home Page” with hotlink “Home Page” with hotlink to the points history trendto the points history trend “Home Page” with hotlink “Home Page” with hotlink to the points history trendto the points history trend

�� Include Hotlink to Energy Include Hotlink to Energy page.page.

�� Display the Outdoor Air Display the Outdoor Air Temperature and Outdoor Temperature and Outdoor Humidity on the “Home Humidity on the “Home Page” with hotlink to the Page” with hotlink to the points history trendpoints history trend

�� Display a link to the Display a link to the building Weather Pagebuilding Weather Page

�� Set Picture size to 600 x Set Picture size to 600 x 400400

Building Number

Building Name

Weather PageWeather Page � The GSA requires a separate graphics page for weather data.

� The page shown below exists on the AX Server for use by all ESCO and their integrators. Once the page is loaded into the JACE and the configuration modified to show the correct weather station information, remove the three blocks that allow the ability to change the station and insert the Solar Radiation, Rainfall Gauge and Soil Moisture Sensor points.

Example of Floor Plan GraphicExample of Floor Plan Graphic Note Note –– Color Spectrum display of Room Temperature Color Spectrum display of Room Temperature

Deviation from SetpointDeviation from Setpoint

All Floor Plan All Floor Plan

Graphic pages are Graphic pages are to be approved by to be approved by

Include One Click Hot/Link to each Equipment Graphic page from Floor plan pages to be approved by to be approved by the GSA Property the GSA Property

Manager prior to Manager prior to installation on the installation on the

Server or in the Server or in the

JACE controllerJACE controller

Color Spectrum display representing deviation from Set

Point is to be shown on Floor Plan drawings

Hot Links from Page to PageHot Links from Page to Page

�� Hotlinks are to follow the path described here.Hotlinks are to follow the path described here.

�� Hotlink from overall “Home Page” to Floor PlansHotlink from overall “Home Page” to Floor Plans

�� Hotlink from Floor Plan to Air Terminal Device Hotlink from Floor Plan to Air Terminal Device (ATD) controlling space (VAV, FPVAV, VVR, FCU, (ATD) controlling space (VAV, FPVAV, VVR, FCU, CVCV//AHU, RTUAHU, RTU))CVCV//AHU, RTUAHU, RTU))

�� Hotlink from ATD to VAV Hotlink from ATD to VAV AHUAHU

�� Hotlinks from AHU to Chilled Water and Heating Hotlinks from AHU to Chilled Water and Heating PlantPlant

�� On each graphic page, provide Hot Link back to the On each graphic page, provide Hot Link back to the Floor Plan or Building Home Floor Plan or Building Home Page.Page.

Required Display pages for buildings greater than 5 floors with

HotLink from Home or Floor Plan Graphic Page

B 202 FPB/2/02 74 73.3

B 204 FPB/2/04 74 75.2

B 207 FPB/2/09 74 76.5

B 212 FPB/2/18 74 74.1

C 301 FPB/3/07 74 72.0

C 303 AHU/17 74 74.7

C 322 VAV/3/17 74 73.7

B 202 FPB/2/02 74 73.3

B 204 FPB/2/04 74 75.2

B 207 FPB/2/09 74 76.5

Rm # TCU # SetPt Temp

B 202 FPB/2/02 74 73.3

B 204 FPB/2/04 74 75.2

B 207 FPB/2/09 74 76.5

B 212 FPB/2/18 74 74.1

C 301 FPB/3/07 74 72.0

C 303 AHU/17 74 74.7

C 322 VAV/3/17 74 73.7

B 202 FPB/2/02 74 73.3

B 204 FPB/2/04 74 75.2

B 207 FPB/2/09 74 76.5

Rm # TCU # SetPt Temp

B 202 FPB/2/02 74 73.3

B 204 FPB/2/04 74 75.2

B 207 FPB/2/09 74 76.5

B 212 FPB/2/18 74 74.1

C 301 FPB/3/07 74 72.0

C 303 AHU/17 74 74.7

C 322 VAV/3/17 74 73.7

B 202 FPB/2/02 74 73.3

B 204 FPB/2/04 74 75.2

B 207 FPB/2/09 74 76.5

Rm # TCU # SetPt Temp

Indicate deviation from set point by color spectrum.

Apply as many TCU boxes as possible per page. Create as many pages as required to display all TCU setpoint and Room Temperature

C 322 VAV/3/17 74 73.7

B 202 FPB/2/02 74 73.3

B 204 FPB/2/04 74 75.2

B 207 FPB/2/09 74 76.5

B 212 FPB/2/18 74 74.1

C 301 FPB/3/07 74 72.0

C 303 AHU/17 74 74.7

C 322 VAV/3/17 74 73.7

Hot Links to

Floor Plan

Graphics pages

B 212 FPB/2/18 74 74.1

C 301 FPB/3/07 74 72.0

C 303 AHU/17 74 74.7

C 322 VAV/3/17 74 73.7

C 322 VAV/3/17 74 73.7

B 202 FPB/2/02 74 73.3

B 204 FPB/2/04 74 75.2

B 207 FPB/2/09 74 76.5

B 212 FPB/2/18 74 74.1

C 301 FPB/3/07 74 72.0

C 303 AHU/17 74 74.7

C 322 VAV/3/17 74 73.7

B 212 FPB/2/18 74 74.1

C 301 FPB/3/07 74 72.0

C 303 AHU/17 74 74.7

C 322 VAV/3/17 74 73.7

C 322 VAV/3/17 74 73.7

B 202 FPB/2/02 74 73.3

B 204 FPB/2/04 74 75.2

B 207 FPB/2/09 74 76.5

B 212 FPB/2/18 74 74.1

C 301 FPB/3/07 74 72.0

C 303 AHU/17 74 74.7

C 322 VAV/3/17 74 73.7

B 212 FPB/2/18 74 74.1

C 301 FPB/3/07 74 72.0

C 303 AHU/17 74 74.7

C 322 VAV/3/17 74 73.7

point by color spectrum.

White at 0.0 df, Dark Blue at /

5 df and Bright Red at +5 df

Hot Links to

Equipment

Graphics pages

Required Overview Page for AH UnitsRequired Overview Page for AH Units

NOTE – Create link to AHU alarms and turn text box Red when AHU is in alarm.

NOTE – Color of box

Indicate deviation from set point by color spectrum. White at 0.0 df, Dark Blue at /5 df and Bright

Red at +5 df

Hot Link to Floor Plan

Graphic page

Hot Links to

Equipment Graphic page

NOTE – Color of box indicates the unit status.

Green = AHU running

Red = AHU in Alarm

Gray = AHU off

NOTE – Create link to AHU

Schedule and indicate Schedule

Status by graphic element.

Occupied

Un/Occupied

Required Overview Page for LightingRequired Overview Page for Lighting

Required Overview Page for LightingRequired Overview Page for Lighting

Object Object Naming StandardsNaming Standards

�� Refer to Refer to GSA R8 BAS Object Naming Standard GSA R8 BAS Object Naming Standard ��

Application DiagramsApplication Diagrams for mandatory object naming for mandatory object naming guidelines. guidelines. This document is available by eThis document is available by e//mail from mail from doug.rothgeb@gsa.govdoug.rothgeb@gsa.gov..

�� The Object The Object Naming Naming Standard Standard shall be used shall be used to name to name

BAS objects (points) BAS objects (points) on all R8 Projects.on all R8 Projects.BAS objects (points) BAS objects (points) on all R8 Projects.on all R8 Projects.

�� For For minor additions to legacy systems, adhere to existing minor additions to legacy systems, adhere to existing naming convention at that site. New BAS installations naming convention at that site. New BAS installations and retrofits must follow the Object Naming Standard.and retrofits must follow the Object Naming Standard.

�� Objects mapped into integration systems must use Objects mapped into integration systems must use names that adhere to the Object Naming Standard names that adhere to the Object Naming Standard regardless of the names used in the target system.regardless of the names used in the target system.

Set Point Set Point and Override Land Override Limitingimiting

�� Setpoint Limiting as well as BO Command points that are to have Setpoint Limiting as well as BO Command points that are to have the override capability should be set with the following the override capability should be set with the following limits: limits:

�� Permanent Permanent // Disabled and not displayed Disabled and not displayed

�� 1 Minute 1 Minute

�� 15 Minutes 15 Minutes

�� 30 Minutes 30 Minutes

�� 1 Hour 1 Hour

�� 2 Hours 2 Hours

�� 3 Hours 3 Hours

�� Custom configured to a maximum of 8 Hours Custom configured to a maximum of 8 Hours

�� "Set" to be programmed to limit the range of adjustment of a setpoint "Set" to be programmed to limit the range of adjustment of a setpoint to 70 minimum and 80 maximum. We understand that there will be to 70 minimum and 80 maximum. We understand that there will be some areas and individuals that will require different ranges. These some areas and individuals that will require different ranges. These exceptions will be addressed on a case by case basis.exceptions will be addressed on a case by case basis.

Set Point Set Point and Override and Override LimitingLimiting

�� US Court House Court RoomsUS Court House Court Rooms [Parameters used to sub cool space prior to court [Parameters used to sub cool space prior to court room proceedings]room proceedings]

�� Disable Optimal Start (if applicable)Disable Optimal Start (if applicable)

�� Set point Limiting as well as BO Command points that are to have the override Set point Limiting as well as BO Command points that are to have the override capability should be set with the following limits capability should be set with the following limits

�� Permanent Permanent // Disabled and not displayed Disabled and not displayed �� Permanent Permanent // Disabled and not displayed Disabled and not displayed

�� 1 Minute1 Minute

�� 30 Minute30 Minute

�� 1 Hour 1 Hour

�� 2 Hours 2 Hours

�� 3 Hours 3 Hours

�� Custom configured to a maximum of 12 Hours Custom configured to a maximum of 12 Hours

�� "Set" to be programmed to limit the Space temp override"Set" to be programmed to limit the Space temp override minimumminimum set point set point temperature oftemperature of 65 degrees. After 12 hour override 70 degree65 degrees. After 12 hour override 70 degree minimumminimum temperature temperature default.default.

Point TrendingPoint Trending

�� From the BAS and accessible from a unit graphic page, there shall be hot From the BAS and accessible from a unit graphic page, there shall be hot links to stored Chart Logs for points useful and relevant for troubleshooting links to stored Chart Logs for points useful and relevant for troubleshooting the equipment displayed and monitored. At a minimum, links to the Chart the equipment displayed and monitored. At a minimum, links to the Chart

Logs for the following points shall be accessible from the graphic page. The Logs for the following points shall be accessible from the graphic page. The local trended data shall be stored for 14 days in the local trended data shall be stored for 14 days in the local BAS panel. local BAS panel.

Trended data shall be archived to Trended data shall be archived to NiagaraAX once NiagaraAX once each 24 hours for use each 24 hours for use with with M&V M&V verification.verification.

FPVAV Box with HeatFPVAV Box with Heat

Space TemperatureSpace Temperature

Discharge/Supply Air TemperatureDischarge/Supply Air Temperature

Air Flow CFMAir Flow CFM

Valve positionValve position

Fan StatusFan Status

VAV BoxVAV Box

Space TemperatureSpace Temperature

Discharge/Supply Air Discharge/Supply Air

TemperatureTemperature

Air Flow CFM Air Flow CFM

VAV Box with HeatVAV Box with Heat

Space TemperatureSpace Temperature

Discharge/Supply air Discharge/Supply air

TemperatureTemperature

Air Flow CFM Air Flow CFM

Valve positionValve position

Point Trending Point Trending continuedQcontinuedQ

�� VAV AHUVAV AHU

�� Fan StatusFan Status

�� Fan SpeedFan Speed

�� Space TemperatureSpace Temperature

�� Discharge/Supply Air Discharge/Supply Air

TemperatureTemperature

�� Constant Volume AHUConstant Volume AHU �� Fan StatusFan Status

�� Space TemperatureSpace Temperature

�� Discharge/Supply Air Discharge/Supply Air

TemperatureTemperature

�� Chilled Water Valve positionChilled Water Valve positionTemperatureTemperature

�� Duct Static Pressure Duct Static Pressure

�� Chilled Water Valve positionChilled Water Valve position

�� Co2 ppmCo2 ppm

�� OAD/Economizer Damper OAD/Economizer Damper

PositionPosition

�� Mixed Air TemperatureMixed Air Temperature

�� Chilled Water Valve positionChilled Water Valve position

�� Hot Water Valve positionHot Water Valve position

�� Co2 ppmCo2 ppm

�� OAD/Economizer Damper OAD/Economizer Damper

PositionPosition

�� Mixed Air TemperatureMixed Air Temperature

�� Multi Zone AHUMulti Zone AHU �� Fan StatusFan Status

�� Space TemperatureSpace Temperature

�� Cold Deck Air TemperatureCold Deck Air Temperature

�� Hot Deck Air TemperatureHot Deck Air Temperature

�� Chilled Water Valve positionChilled Water Valve position

�� Fan Coil UnitFan Coil Unit �� Fan StatusFan Status

�� Space TemperatureSpace Temperature

�� Discharge/Supply Air Discharge/Supply Air

TemperatureTemperature

�� OAD Damper PositionOAD Damper Position �� Chilled Water Valve positionChilled Water Valve position

�� Hot Water Valve positionHot Water Valve position

�� Co2 ppmCo2 ppm

�� OAD/Economizer Damper OAD/Economizer Damper

PositionPosition

�� Mixed Air TemperatureMixed Air Temperature

�� OAD Damper PositionOAD Damper Position

�� Chilled Water Valve positionChilled Water Valve position

�� Hot Water Valve positionHot Water Valve position

Point Trending continuedPoint Trending continued

Chilled Water PlantChilled Water Plant �� Chiller Status (for each Chiller)Chiller Status (for each Chiller)

�� Chiller AmpsChiller Amps

�� Chilled Water Pump Status (for each CHWP)Chilled Water Pump Status (for each CHWP)

�� Condenser Water Pump Status (for each Condenser Water Pump Status (for each

CWP)CWP)

�� Entering Chilled Water Temperature (at each Entering Chilled Water Temperature (at each

Chiller)Chiller)

Plate Frame Heat ExchangerPlate Frame Heat Exchanger (If Building so equipped)(If Building so equipped)

�� Chilled Water Isolation Valve positionChilled Water Isolation Valve position

�� Condenser Water Isolation Valve positionCondenser Water Isolation Valve position

�� Entering Chilled Water TemperatureEntering Chilled Water Temperature

�� Leaving Chilled Water TemperatureLeaving Chilled Water Temperature

�� Entering Condenser Water TemperatureEntering Condenser Water Temperature Chiller)Chiller)

�� Leaving Chilled Water Temperature (at each Leaving Chilled Water Temperature (at each

Chiller)Chiller)

�� Entering Condenser Water Temperature (at Entering Condenser Water Temperature (at each Chiller)each Chiller)

�� Leaving Condenser Water Temperature (at Leaving Condenser Water Temperature (at each Chiller)each Chiller)

�� Secondary CHWP StatusSecondary CHWP Status

�� Secondary CHWP SpeedSecondary CHWP Speed

�� Secondary CHW Loop Supply and Return Secondary CHW Loop Supply and Return

TemperatureTemperature

�� Tower Fan Status (for each fan)Tower Fan Status (for each fan)

�� Tower Fan Speed (for each fan)Tower Fan Speed (for each fan)

�� Condenser Water Bypass Valve positionCondenser Water Bypass Valve position

�� Leaving Condenser Water TemperatureLeaving Condenser Water Temperature

�� Chilled Water Mixing ValveChilled Water Mixing Valve

Hot Water PlantHot Water Plant �� Boiler Status (for each Boiler)Boiler Status (for each Boiler)

�� Hot Water Pump Status (for each HWP)Hot Water Pump Status (for each HWP)

�� Entering Hot Water Temperature (at each Entering Hot Water Temperature (at each

Boiler)Boiler)

�� Leaving Hot Water Temperature (at each Leaving Hot Water Temperature (at each

Boiler)Boiler)

Secondary HWP StatusSecondary HWP Status

Miscellaneous PointsMiscellaneous Points �� Exhaust Fan(s) StatusExhaust Fan(s) Status

�� Outdoor Air Temperature Outdoor Air Temperature

�� Outdoor Humidity or Dew PointOutdoor Humidity or Dew Point

�� Heat Recovery Unit(s) Fan StatusHeat Recovery Unit(s) Fan Status

�� HRU Entering Building Air TemperatureHRU Entering Building Air Temperature

�� HRU Building Exhaust Air TemperatureHRU Building Exhaust Air Temperature �� Secondary HWP StatusSecondary HWP Status

�� Secondary HWP SpeedSecondary HWP Speed

�� Secondary HW Loop Supply and Return Secondary HW Loop Supply and Return

TemperatureTemperature

�� Hot Water Mixing Valve positionHot Water Mixing Valve position

�� HRU Building Exhaust Air TemperatureHRU Building Exhaust Air Temperature

�� HRU Outdoor Air Temperature after HRUHRU Outdoor Air Temperature after HRU

�� The The previous previous slides list Hot Links to trend values for slides list Hot Links to trend values for various types of equipment. various types of equipment.

�� In no way is this listing meant to define all of the In no way is this listing meant to define all of the points that are to be logged and trended for a points that are to be logged and trended for a specific type of equipment. specific type of equipment.

These slides are only showing the minimum number These slides are only showing the minimum number �� These slides are only showing the minimum number These slides are only showing the minimum number of points that are to be accessed and plotted from of points that are to be accessed and plotted from the graphic page.the graphic page.

�� Trends shall be configured for all pertinent pointsTrends shall be configured for all pertinent points

�� All Trends shall have the ability to be manually All Trends shall have the ability to be manually enabled and once enabled shall automatically enabled and once enabled shall automatically terminate after 14 days of collecting terminate after 14 days of collecting data.data.

Point Trending NavigationPoint Trending Navigation

Point Trending LogPoint Trending Log

Point Trending GraphingPoint Trending Graphing

Critical Alarms and ReportingCritical Alarms and Reporting Below is the list of alarms that are critical and need to be transmitted by AlphaBelow is the list of alarms that are critical and need to be transmitted by Alpha//

Numeric pagers or email to specific individuals for each building.Numeric pagers or email to specific individuals for each building.

�� NiagaraAX JACE and Web NiagaraAX JACE and Web Supervisor communication failure.Supervisor communication failure.

�� Chiller failure Chiller failure –– Each Chiller (Failed to respond to program command)Each Chiller (Failed to respond to program command)

�� Chilled Water Pump failure Chilled Water Pump failure –– Each Pump (Failed to respond to program Each Pump (Failed to respond to program command)command)

�� Condenser Water Pump failure Condenser Water Pump failure –– Each Pump (Failed to respond to program Each Pump (Failed to respond to program �� Condenser Water Pump failure Condenser Water Pump failure –– Each Pump (Failed to respond to program Each Pump (Failed to respond to program command)command)

�� Tower Fan Motor Failure Tower Fan Motor Failure –– Each Fan (Failed to respond to program command)Each Fan (Failed to respond to program command)

�� Boiler(s) failure Boiler(s) failure –– Each Boiler Each Boiler

�� Hot Water Pump(s) failure Hot Water Pump(s) failure –– Each Pump (Failed to respond to program Each Pump (Failed to respond to program command)command)

�� AHU Fan Motor Failure AHU Fan Motor Failure –– Each AHU (Failed to respond to program command)Each AHU (Failed to respond to program command)

�� High Sump Pump Pit Level AlarmHigh Sump Pump Pit Level Alarm

�� Fire AlarmFire Alarm

�� Chiller(s) and Boiler(s) running simultaneously Chiller(s) and Boiler(s) running simultaneously

�� Chillers or Boilers running more than 12 hours a day, on weekends or holidaysChillers or Boilers running more than 12 hours a day, on weekends or holidays

�� Upon Request, GSA will provide a list of names to whom the remote Upon Request, GSA will provide a list of names to whom the remote notifications need to be sent such as GSA Property Manager, notifications need to be sent such as GSA Property Manager, Mechanical Inspector, and Operations and Maintenance Project Mechanical Inspector, and Operations and Maintenance Project

Manager.Manager.

�� The following information may help when setting up remote The following information may help when setting up remote notifications to Smart Phone devices:notifications to Smart Phone devices:notifications to Smart Phone devices:notifications to Smart Phone devices:

TT��Mobile:Mobile: phonenumberphonenumber@@tmomail.net tmomail.net

Virgin Mobile:Virgin Mobile: phonenumberphonenumber@@vmobl.com vmobl.com

Cingular:Cingular: phonenumberphonenumber@@cingularme.com cingularme.com

Sprint:Sprint: phonenumberphonenumber@@messaging.sprintpcs.commessaging.sprintpcs.com

Verizon: Verizon: phonenumberphonenumber@@vtext.comvtext.com

Nextel: Nextel: phonenumberphonenumber@@messaging.nextel.commessaging.nextel.com

AlltelAlltel

[10[10//digit phone number]@digit phone number]@message.alltel.commessage.alltel.com

AT&T Wireless AT&T Wireless (now part of Cingular)(now part of Cingular)

[10[10//digit phone number]@digit phone number]@mmode.commmode.com

Boost MobileBoost Mobile

[10[10//digit phone digit phone number]@number]@myboostmobile.commyboostmobile.com

CingularCingular

[10[10//digit phone digit phone number]@number]@mobile.mycingular.commobile.mycingular.com

TT��MobileMobile

[10[10//digit phone digit phone number]@number]@tmomail.nettmomail.net

VerizonVerizon number]@number]@mobile.mycingular.commobile.mycingular.com

OR OR

[10[10//digit number]@digit number]@cingularme.comcingularme.com

Nextel Nextel (now part of Sprint Nextel) (now part of Sprint Nextel)

[10[10//digit telephone digit telephone number]@number]@messaging.nextel.commessaging.nextel.com

Sprint PCSSprint PCS (now Sprint Nextel)(now Sprint Nextel)

[10[10//digit phone digit phone number]@number]@messaging.sprintpcs.commessaging.sprintpcs.com

VerizonVerizon

[10[10//digit phone number]@digit phone number]@vtext.comvtext.com

Virgin Mobile USAVirgin Mobile USA

[10[10//digit phone digit phone number]@number]@vmobl.comvmobl.com us us cellularcellular

[10[10//digit phone digit phone number(@number(@email.uscc.netemail.uscc.net).).

NiagaraAX NiagaraAX ProvisioningProvisioning

�� Referencing Referencing NiagaraNiagaraAXAX Provisioning Guide for Provisioning Guide for NiagaraAX NiagaraAX Networks, install and Networks, install and configure Provisioning on the configure Provisioning on the NiagaraAX NiagaraAX Supervisor . Supervisor .

�� Configure a provisioning job step to create a “Backup Station Step”. Configure Configure a provisioning job step to create a “Backup Station Step”. Configure this step to backup all JACE controllers in all buildings no less than once every this step to backup all JACE controllers in all buildings no less than once every this step to backup all JACE controllers in all buildings no less than once every this step to backup all JACE controllers in all buildings no less than once every thirty days.thirty days.

�� Configure a provisioning job step to create a “Copy Supervisor Step”. Configure Configure a provisioning job step to create a “Copy Supervisor Step”. Configure this step to backup the Supervisor no less than once every thirty days.this step to backup the Supervisor no less than once every thirty days.

Sample of Tridium GraphicsSample of Tridium Graphics

�� The following pages show screen captures of Unit Graphic Displays created using the The following pages show screen captures of Unit Graphic Displays created using the NiagaraAX NiagaraAX graphics librarygraphics library. All unit displays must adhere to the use of elements from this library in the creation of . All unit displays must adhere to the use of elements from this library in the creation of the new graphic displays. the new graphic displays.

�� All graphic page backgrounds are to be white.All graphic page backgrounds are to be white.

�� Each Integrator is responsible for maintaining continuity within the system. All pages must be formatted Each Integrator is responsible for maintaining continuity within the system. All pages must be formatted for 1024 x 768 dpi.for 1024 x 768 dpi.

�� All Graphic displays must be created using elements from the Tridium AX “All Graphic displays must be created using elements from the Tridium AX “kitPxHvackitPxHvac” library. ” library.

�� All Graphic elements created by any one integrator must be stored on the server for use by all other integrators.All Graphic elements created by any one integrator must be stored on the server for use by all other integrators.

•• Throughout GSA Region 10, all Cooling only VAV Boxes will use the same graphic, All Parallel Fan Powered Boxes will use the sThroughout GSA Region 10, all Cooling only VAV Boxes will use the same graphic, All Parallel Fan Powered Boxes will use the sameame graphic, etc.graphic, etc.

�� All Graphic Elements and Displays are to be approved by the GSA prior to placing them on the Server or All Graphic Elements and Displays are to be approved by the GSA prior to placing them on the Server or

JACE.JACE.

�� From each equipment graphic page there shall be a hotlink to a From each equipment graphic page there shall be a hotlink to a PDF PDF file with the unit Sequence of file with the unit Sequence of Operation.Operation.

�� Every control valve or damper shall indicate the fail position as NO or NC on the graphic Every control valve or damper shall indicate the fail position as NO or NC on the graphic page.page.

�� Each graphic page shall accurately display all devices and Each graphic page shall accurately display all devices and data.data.

�� Display all sensors and safeties that control or protect the equipment whether the device is a part of the BAS or not.Display all sensors and safeties that control or protect the equipment whether the device is a part of the BAS or not.

NiagaraAX Graphics ExamplesNiagaraAX Graphics Examples

�� The next series of slides represent The next series of slides represent graphics displays for various types of graphics displays for various types of

HVAC Equipment and Lighting. All of HVAC Equipment and Lighting. All of these drawings have been created using these drawings have been created using these drawings have been created using these drawings have been created using the the NiagaraAX NiagaraAX library of graphic elementslibrary of graphic elements

NiagaraAX NiagaraAX NavigationNavigation

NiagaraAX NiagaraAX NavigationNavigation

NiagaraAX Navigation NiagaraAX Navigation // LightingLighting

NiagaraAX Navigation NiagaraAX Navigation // LightingLighting

Single Zone, Face & Bypass AHUSingle Zone, Face & Bypass AHU

Hotlink to Seq Of Op pdf file

Multizone AHU GraphicMultizone AHU Graphic

Single Zone AHU Single Zone AHU –– Draw Through, PreheatDraw Through, Preheat

Single Zone AHUSingle Zone AHU

VAV OverviewVAV Overview

VAV GraphicVAV Graphic

Fan Powered Box OverviewFan Powered Box Overview

Fan Powered Box GraphicFan Powered Box Graphic

Basic Chilled Water PlantBasic Chilled Water Plant

Heating Plant PointsHeating Plant Points

Chilled Water and Heating plants are to have the same type of Hot Link boxes to logged and trended data for all points pertinent to the system displayed. Graphics is to display all available points on the plant Include the ability to modify the Hot Water set point reset schedule from the Boiler graphic page

Configuration of R8 Configuration of R8

Siemens AMS to Central Siemens AMS to Central

Office EEMOffice EEMOffice EEMOffice EEM

Language from [230900] Language from [230900]

SpecificationSpecification

�� Integration Integration of each JACE onto the GSA Region 8 BAS of each JACE onto the GSA Region 8 BAS

NiagaraAX Web Supervisor NiagaraAX Web Supervisor and GSA Region 8 AMS and GSA Region 8 AMS

Siemens server that has points normalized to GSA Siemens server that has points normalized to GSA

Central Office EEM national server shall occur. 100% Central Office EEM national server shall occur. 100% integration, communication, mapping, set up, integration, communication, mapping, set up, integration, communication, mapping, set up, integration, communication, mapping, set up, configuration, and sharing of points between the GSA configuration, and sharing of points between the GSA

Region 8 BAS Region 8 BAS NiagaraAX Supervisor Server NiagaraAX Supervisor Server and the and the

AMS (Advanced Metering System) Siemens Energy AMS (Advanced Metering System) Siemens Energy

Suite Application Supervisor Servers are required. AMS Suite Application Supervisor Servers are required. AMS point histories and configuration shall be set up and point histories and configuration shall be set up and operational on the AMS at the server level for trending, operational on the AMS at the server level for trending, monthmonth//toto//year archiving, and analysis.year archiving, and analysis.

SPECIAL COURTESY NOTE

� It is encouraged that the integrator finish all JACE station programming and changes prior to integrating to the GSA Region 8 NiagaraAX Supervisor Server.

� Prior to any integrator restarting the server with changes, the courtesy of checking with other integrators who may be on/line by using the text message function on the NiagaraAX server application shall be used to ensure that no one dumps another integrators work.

File details come from the government source that posted it.