This is Amendment 1 to solicitation 47PH0825R0004 for a Design-Build contract to improve and construct roadways at the Santa Teresa Land Port of Entry in New Mexico. The amendment provides pre-proposal meeting minutes from January 22, 2025, sign-in sheets, and revisions to the Statement of Work dated January 23, 2025.

Key updates include revised square footage for several areas: POVSRD2 reduced to 5,885 SF from 30,604 SF, CIDOCKPK1 reduced to 23,978 SF from 24,558 SF, and questions and answers addressing technical requirements for Low Embodied Carbon materials, security clearances, and project execution. The amendment clarifies that e-signatures are acceptable, the Superintendent and QC Manager must be separate individuals (though SSHO duties can be performed by either), and each past performance reference must be $5M or greater (cannot be combined). Proposals are due March 4, 2025 at 12:00 PM Fort Worth time, with final questions due February 14, 2025. The project involves approximately 190,000 SF of concrete pavement repair/replacement using Low Embodied Carbon materials over 300 calendar days.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

7PQA

Santa Teresa Land Port of Entry (LPOE) Border Roadway Improvement and Construction (BRIC) Project, Santa Teresa, NM Solicitation Number 47PH0825R0004

Amendment 0001 See following pages.

7PQA

GSA/PBS/AMD/Region 7 819 Taylor Street, Room 11A09 Fort Worth, TX 76102

See Box 6.

01/24/2025

01/25/2025

Solicitation 47PH0825R0004 Amendment 1 Santa Teresa Land port of Entry, Border Roadway Improvement and Construction (BRIC) Project, Santa Teresa, NM

Amendment No. 1

Santa Teresa Land port of Entry, Border Roadway Improvement and Construction (BRIC) Project

This amendment is issued to provide the following:

Pre-Proposal meeting minutes from January 22, 2025 Sign-in sheet from Pre-Proposal Meeting Sign-in sheet for site visit conducted January 23, 2025 Attachment # 9 of the RFP. GSA was informed an error message occurred when opening. The file has been provided in PDF form.

Areal map of Santa Teresa with sections identified.

Revised Scope of Work dated January 23, 2025. Please note all updates are in RED.

RFI questions and answers.

REMINDER: Proposal Due date remains the same, March 4, 2025, at 12:00 P.M. Fort Worth, TX Local Time. Only electronic submissions are allowed, and all submissions are to be emailed to Jeffrey Kang at : Jeffrey.kang@gsa.gov and Jason Gerloff at: Jason.gerloff@gsa.gov.

mailto:Jeffrey.kang@gsa.gov mailto:Jason.gerloff@gsa.gov

GSA Public Buildings Service Greater Southwest Region

PRE-PROPOSAL CONFERENCE MINUTES

Santa Teresa Land Port of Entry (LPOE) Border Roadway Improvement and Construction (BRIC) PROJECT, Santa Teresa, NM

SOLICITATION NUMBER: 47PH0825R0004

DATE AND TIME: January 22, 2025, at 10:00 a.m. CST LOCATION: Virtual/Google Meet

I. PROJECT NAME AND LOCATION

Design-Build construction services for the Santa Teresa Land Port of Entry (LPOE) Border Roadway Improvements and Construction (BRIC) project, located at 170 Pete Domenici Highway, Santa Teresa, NM 88008-9801.

II. INTRODUCTIONS

• GSA Contracting Officer: Jason Gerloff

• GSA Contract Specialist: Jeff Kang

• GSA Project Manager & Contracting Officer’s Representative: Adena Alarcon

III. MEETING PURPOSE

This meeting is to brief prospective offerors on the nature of the work, to clarify the solicitation, to identify any ambiguities in the solicitation, and to answer any questions.

During this meeting, all technical questions will be directed to the GSA Project Manager.

All administrative and contracting questions will be directed to the Contracting Officer.

"No oral statement made by a government representative during this pre-proposal conference, nor any written record of such oral statements as may be made and subsequently furnished to the offeror, will be deemed to have the effect of adding to, modifying, or otherwise varying from the written provisions of the solicitation (including, but not limited to specifications, drawings, and written amendments to the solicitation). In the event the discussion or questions raised during the pre-proposal conference and site walk indicate a need to modify the solicitation, an amendment to the solicitation shall be issued in writing; and such amendment to the solicitation shall be acknowledged in the same manner and under the same conditions as all other written amendments to a solicitation."

IV. PROJECT OVERVIEW (PM)

A. Background

The Santa Teresa LPOE is the facility that provides controlled entry into or departure from the United States for persons and cargo arriving as commercial, non-commercial, or pedestrian traffic. The LPOE houses the U.S. Customs and Border Protection (CBP) and other federal inspection services (FIS) agencies responsible for the enforcement of federal laws pertaining to immigration, drugs, agriculture, wildlife, smuggling, and commerce.

B. Description of Project

This design-build project involves roadway repair and replacement of approximately 190,000 square feet (SF) of concrete pavement, using Low Embodied Carbon (LEC) materials, to include LEC asphalt, concrete, and steel. The repairs consist of complete reconstruction, surface reconstruction, mill and 2” asphalt overlay, joint sealing, patching, and the select replacement of 8” – 13” thick reinforced concrete. Construction phasing will be required to allow for continued LPOE traffic flow and operation during construction. The project consists of seventeen (9) sites (areas) within the LPOE.

C. Inflation Reduction Act (IRA)

The Inflation Reduction Act (IRA) of 2022, Pub. L. No. 117-169, enacted in August 2022, provided GSA with significant funding for (a) measures necessary to convert facilities to high-performance green buildings, (b) acquisition and installation of construction materials and products with substantially lower levels of embodied greenhouse gas emissions, and (c) emerging and sustainable technologies. The Contract resulting from this Solicitation will be funded in part by IRA appropriations, and it contains numerous IRA-specific requirements. Requirements include, but are not limited to, requirements regarding pricing, invoicing, submittals, materials, and construction. In addition, please note that this Solicitation contains an evaluation factor favoring certain construction materials with the lowest possible levels of embodied carbon. Offerors shall carefully review this Solicitation, the Agreement, the Statement of Work, the Specifications, and the Drawings. Offerors are responsible for accurately pricing and, if successful, fully performing all Contract requirements.

D. Other information (i.e. site hours of operation, emergency building contacts, etc)

1. Building Management Specialist:

Port Hours of Operations: 6am -10:00pm

V. PROCUREMENT INFORMATION (CO)

A. General Information

1. This requirement is set-aside for small business concerns, in accordance with FAR 19.

2. The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

NOTE: Issuance of the Solicitation does not warrant that funds are presently available for award of a Contract. Award of the contract shall be subject to the availability of appropriated funds, and the Government shall incur no obligation under this Solicitation in advance of such time as funds are made available to the Contracting Officer for the purpose of contract award.

3. The selected contractor must agree to hold the pricing for 120 days.

4. The contract will include a base award for design services, and eleven

(11) construction options (for each site) as described in the Statement of Work (SOW) dated October 25, 2024.

a. The total period of performance (POP) for this project is 300 calendar days from issuance of the Design Notice to Proceed

(NTP).

5. Davis-Bacon Wage Rates will be applicable to the project and the selected contractor must adhere to the current wage rates. NM20250035 dated 01-03-2025.

6. A bid guarantee is required and shall be submitted electronically with proposals.

7. Payment and Performance bonds will be required within ten days after notice of acceptance of proposal, and shall be sent via email to the Contract Specialist Jeff Kang at Jeffrey.kang@gsa.gov and Contracting Officer, Jason Gerloff at Jason.gerloff@gsa.gov.

8. The selected contractor (and all its employees) must go through a security clearance and all employees are required to have an ID badge.

9. An Offeror is required to be registered in System for Award Management (SAM) when submitting an offer or quotation and at time of award.

10. Four Factors:

(1) Past Performance, Experience, and Qualifications of Key Personnel 40%

(2) Past Experience and Performance of the Company 25%

(3) Management Plan 20%

(4) Sustainability - LEC Materials 15% *Offerors shall complete the “IRA Sustainability Factor Table” attached to this solicitation (attachment 4) by filling out the applicable IRA Limit they commit to meet for each IRA-Eligible Material (concrete, asphalt, cement and steel). Based upon the offeror’s selection in the “IRA Limit Commitment” column, the associated Raw Score, the Weighted Score, and the Total Weighted Score will be automatically calculated.

In addition, for each IRA-Eligible Material identified in the IRA Sustainability Factor Table, offerors shall submit Environmental Product Declaration (EPDs) listing that material’s Global warming Potential (GWP). Such EPDs must meet the standards reflected in GSA’s IRA Low Embodied Carbon asphalt, concrete, cement, and steel requirements (see Compliance Documentation criteria listed for each IRA-Eligible Material).

B. Requests for Information (RFIs)/Questions

1. RFIs/Questions due date:

• All questions shall be submitted in writing and sent via email to the Contract Specialist Jeff Kang at Jeffrey.kang@gsa.gov and Contracting Officer, Jason Gerloff at Jason.gerloff@gsa.gov. no later than February 14, 2025. Answers to all questions received will be included in an amendment to the solicitation.

C. Site Visit

1. A site visit has been scheduled for 10:00 a.m. CST on January 23, 2025 at the Santa Teresa LPOE. All interested parties who have registered should have received an email with the latest information.

2. No walk-ins without an invitation will be permitted to attend the site visit. The maximum number of attendees for a company was three (3).

3. Map – meeting location, attached to meeting minutes.

D. Proposal Requirements

1. Proposal due date: March 4, 2025

11. Offers conforming to the requirements of the Solicitation must be submitted via email to the Contract Specialist Jeff Kang at Jeffrey.kang@gsa.gov and Contracting Officer, Jason Gerloff at Jason.gerloff@gsa.gov, no later than 12:00 p.m. CST March 4, 2025 (See Solicitation Section I.H Receipt of Offers for additional details).

2. Proposal Contents:

Proposals shall consist of the following documents, completed and executed in accordance with the Solicitation:

a. Price Proposal

b. Technical Proposal

c. Representations and Certifications

d. Standard Form 24, Bid Bond

e. GSA Form 527 – Contractor’s Qualification and Financial Information (See Solicitation Section I.H Receipt of Offers for additional details).

E. Basis for Award

1. The approach to Proposal Evaluation for this procurement will be pursuant to the best value tradeoff concept. After evaluation of Final Proposal Revisions are completed, the Government will make an award to the responsible offeror whose offer conforms to the Solicitation and provides the best value to the Government, cost or price and technical factors as listed in the Solicitation.

2. For this Solicitation, technical quality is significantly more important than cost or price. As proposals become more equal in their technical merit, the cost or price becomes more important.

VI. QUESTIONS – PLEASE SUBMIT ALL QUESTIONS VIA EMAIL TO Contract Specialist Jeff Kang at Jeffrey.kang@gsa.gov and Contracting Officer, Jason Gerloff at Jason.gerloff@gsa.gov. BY FEBRUARY 14, 2025.

Other items addressed

1) Attachment 9 of the RFP will be sent in Amendment 1. Some individuals had issues opening the file. The file will be loaded as a PDF.

2) EPD, websites were posted in the sam.gov posting and will be included in amendment

3) Last day of questions February 14, 2025

4) As a reminder, the due date for proposals is March 4, 2025, at 12:00 P.M, Local

Fort Worth, TX time.

mailto:Jeffrey.kang@gsa.gov mailto:Jason.gerloff@gsa.gov

VIRTUAL

# First Name Last Name Company Email Phone Number Signature/Virtual

1 AARON MOORE MCKENZIE CONSTRUCTION & SITE DEVELOPMENT, LLC AARON@MCKENZIECONST.COM 336-803-1204 Present

2 ALEX CADET Wilson & Company, Inc. Engineers & Architects ALEXANDER.CADET@WILSONCO.COM 915-298-8512

3 ALFONSO ANDRES GARCIA ULTIMATE CONCRETE, LLC AAGARCIA.UC@GMAIL.COM 915-408-1871 Present

4 ASHLEY HARDY MCKENZIE CONSTRUCTION & SITE DEVELOPMENT, LLC ASHLEY@MCKENZIECONST.COM 919-437-9109 Present

5 BRIAN L CLOUSE MORROW ENTERPRISES, INC. BRIAN@MORROWNM.COM 575-640-0760 Present

6 BRIGITTE FULLER Wilson & Company, Inc. Engineers & Architects BRIGITTE.FULLER@WILSONCO.COM 505-948-5121

7 Bryan Long Hawk Construction hawkpm@hamktx.com 915-260-7420 Present

8 CASEY WIDENER SEDONA CONTRACTING, INC CASEY@SEDONACONTRACTINGINC.COM 575-937-3092 Present

9 Cecilia Lara Classic Industries office@classicindincnm.com 575-523-2053

10 CHARLES EASTERLING E-QUAL CONSTRUCTION C.EASTERLING@E-QUALCONSTRUCTION.COM 505-401-4662

11 CHARLIE GERTKIN MOORE INDUSTRIES CGERKIN@MOREUSA.COM 225-751-4120 Present

12 Chris Tharp Patriot Construction Management chris.tharp@patriotccm.com 850-313-1787 Present

13 CHRIS HOLECHEK AR6+WHITE JOINT VENTURE CHRISH@WHITECONST.COM 512-751-0498 Present

14 Christopher Miramontes Classic Industries office@classicindincnm.com 575-523-2053

15 David Concha CEA Group dconcha@ceagroup.net 915-544-5232 Present

16 Dwight Belyue DCR Services & Construction, Inc. dwight@dcr-services.com 313-779-2612 Present

17 Eddie Gallardo Classic Industries office@classicindincnm.com 575-523-2053

18 ERIC RYPPLE AR6+WHITE JOINT VENTURE esrypple@ar6ce.com 210-314-9710

19 Erik Tijerina Volter Electrical Construction Group tijerinae@volterelp.com 915-422-2289 Present

20 ERIKA FLORES E-QUAL CONSTRUCTION ERIKA@E-QUALCONSTRUCTION.COM 505-659-8521 Present

21 GLORIA PAIZ TIGUA INC GLORIA.PAIZ@TIGUAINC.ORG 915-538-7172 Present

22 HENRY HERRERA SMR CONSTRUCTION HENRY@SMRCONSTRUCTIONINC.COM 972-533-6788

23 HENRY HERRERA SMR CONSTRUCTION HENRY@SMRCONSTRUCTIONINC.COM 972-533-6788

24 ILIYAN KRASTEV TERRA TECH SOLUTIONS, LLC ILIYAN@TERRATECHSOLUTIONS.NET 704-675-3400 Present

25 Isaiah Allen CEA Group iallen@ceagroup.net 915-544-5232

26 ISRAEL BROWN NISOU ENTERPRISES, INC ISRAEL.BROWN@NISOUENTERPRISES.COM 575-640-9062

27 JACOB HASSARD ADVANCIA REMEDIATION SERVICES JACOB.HASSARD@ADVANCIA-RS.COM 208-602-9563 Present

28 James Smith Cambro Construction james@cambroco.com 915-727-2846 Present

29 JASON SAMA TIGUA INC JASON.SAMA@TIGUAINC.ORG 915-549-9054 Present

30 JESUS MAGDALENO ALLEN CONCRETE, LLC JESUS@ALLENCONCRETEINC.COM 915-921-0678 Present

31 Jesus Mesta Access Commuicatiions Group jmesta@straightedgeco.com 915-491-8789 Present

Santa Teresa LPOE Pre-Proposal January 22, 2025 10:00 A.M. CST

32 JESUS E. VALTIER HDR ENGINEERING EDDIE.VALTIER@HDRINC.COM 915-330-7536

33 JOHN BEAN BENHAM, LLC JOHN.BEAN@BENHAM.COM 918-440-4412

34 John Mimbela MIMBELA CONSTRUCTIONS, INC johnm@mimbela.com 915-491-6576

35 John Jr Mimbela MIMBELA CONSTRUCTIONS, INC johnjr@mimbela.com 915-252-0582

36 JORGE FERNANDEZ MIRANDA WILLIAM CHARLES CONSTRUCTION JORGE.FERNANDEZ@WILLIAMCHARLES.COM 773-951-6654 Present

37 JUAN CARLOS SALCIDO ULTIMATE CONCRETE, LLC JCSALCIDOUC@GMAIL.COM 915-238-9890 Present

38 KARLA DANIELA HOLGUIN FULCRUM CONTRACTING GROUP, LLC K.HOLGUIN@FULCRUMCONTRACTING.NET 915-777-9967 Present

39 KYLE IBARRA Wilson & Company, Inc. Engineers & Architects KYLE.IBARRA@WILSONCO.COM 915-298-8504

40 LENSA CONSTRUCTION CURRENTPATH CONSULTING MICKCOV@LESNAINC.COM 915-727-8225

41 LEONARD MORROW MORROW ENTERPRISES, INC. LEONARD@MORROWNM.COM 575-649-0618

42 LOREN JALBERT ADVANCIA REMEDIATION SERVICES LOREN.JALBERT@ADVANCIA-RS.COM 208-559-0336 Present

43 LUIS CANO BURGOS GROUP LCANO@BURGOSGROUP.COM 856-316-4064

44 MANUEL GUARDIOLA SEDONA CONTRACTING, INC MANNY@SEDONACONTRACTINGINC.COM 575-937-3015

45 Manuel Maldonado Platinum Paving Inc manny.maldonado@platinumpaveusa.com 210-784-0406 Present

46 Manuel Palma CEA Group mpalma@ceagroup.net 915-544-5232

47 MARIAH GARCIA A BROTHERS MILLING, LLC MARIAHG@ABROTHERSMILLING.COM 915-328-7613

48 MARIE BIESECKER BURGOS GROUP MBIESECKER@BURGOSGROUP.COM 609-351-6814 Present

49 MARIO HIDALGO A BROTHERS MILLING, LLC MHIDALGO@ABROTHERSMILLING.COM 915-252-2718 Present

50 MICHAEL ACKERMANN MOORE INDUSTRIES MACKERMANN@MOOREUSA.COM 225-614-0908 Present

51 Michael Sambrano Gracen Engineering & Construction, Inc. m.sambrano@gracenconstruction.com 915-920-9515 Present

52 MICHAEL GUERIN Wilson & Company, Inc. Engineers & Architects MICHAEL.GUERIN@WILSONCO.COM 505-348-4049

53 Miguel Garcia MIMBELA CONSTRUCTIONS, INC mikem@mimbela.com 915-491-8671 Present

54 MIGUEL ALLEN ALLEN CONCRETE, LLC ACI@ALLENCONCRETEINC.COM 915-490-8789 Present

55 MIGUEL ANGEL LEZAMA JAG CONSTRUCTION JAGCONSTRUCTION@ELPASOJAG.COM 915-533-8607

56 MOISES GARCIA MIMBELA CONSTRUCTIONS, INC MOISESG@MIMBELA.COM 915-219-0996

57 Moises Garcia MIMBELA CONSTRUCTIONS, INC moisesg@mimbela.com 915-219-0996

58 MOSES PINEDO ULTIMATE CONCRETE, LLC MOSES@ULTIMATECONCRETELLC.COM 915-449-7464

59 OJEDA JORGE HAWK CONSTRUCTION JOJEDA@HAWKCONCRETE.COM 915-996-7615

60 Omar Elias Elias Concrete Construction LLC eliasccllc@gmail.com 915-487-7998

61 Raul Paredes Jobe Co raul@jobeco.com 915-472-2246

62 REYNALDO ZAMBRANO ALLEN CONCRETE, LLC REY@ALLENCONCRETEINC.COM 915-921-0678 Present

63 Roberto Duran Volter Electrical Construction Group roberto.d@volterelp.com 915-873-9918 Present

64 RONNIE PITKIN MOORE INDUSTRIES RPITKIN@MOOREUSA.COM 225-751-4120 Present

65 RONNIE G. AUTREY BARLOVENTO, LLC RAUTREY@BARLOVENTOLLC.COM 575-791-2065 Present

66 SAM GARRELL AUI INC/GROUNDHOG SAMG@AUIINC.NET 505-975-6630 Present

67 SAMAR BASHIR SMR CONSTRUCTION SAMAR@SMRCONSTRUCTIONINC.COM 972-533-6788 Present

68 SARAH BIGGER Wilson & Company, Inc. Engineers & Architects SARAH.BIGGER@WILSONCO.COM 505-348-4064 Present

69 SERGIO MARTINEZ TIGUA INC SERGIO.MARTINEZ@TIGUAINC.ORG 915-474-4209 Present

70 STEPHEN LEE DURDEN BARLOVENTO, LLC SDURDEN@BARLOVENTOLLC.COM 334-983-9979

71 TIMOTHY ROBERT NOE ULTIMATE CONCRETE, LLC TIMRNOE@GMAIL.COM 619-454-1497

72 Tina Hesley DCR Services & Construction, Inc. tina@dcr-services.com 313-949-4884 Present

73 TROY WEISS WILLIAM CHARLES CONSTRUCTION TROYWEISS@WILLIAMCHARLES.COM 815-509-7082 Present

74 Vanessa Gomez Elias Concrete Construction LLC eliasccllc@gmail.com 915-234-6819

75 Victor Salcido Jobe Co victor@jobeco.com 915-478-7489 Present

76 VICTORIA SMITH MCKENZIE CONSTRUCTION & SITE DEVELOPMENT, LLC VICTORIA@MCKENZIECONST.COM 703-505-8346 Present

77 VICTORIA PRUETT SEDONA CONTRACTING, INC TORI@SEDONACONTRACTINGINC.COM 575-386-3313 Present

78 VINCENT REO MARTINEZ VITAL CONSULTING GROUP, LLC VINCENT.MARTINEZ@VITALGRP.NET 505-369-0623 Present

79 WARREN A MORROW MORROW ENTERPRISES, INC. WARREN@MORROWNM.COM 575-993-1358 Present

80 William Vail Granite william.vail@gcinc.com 520-603-4103 Present

81 ZAHEER RANGWALA CURRENTPATH CONSULTING CONTRACTS@CURRENTPATHLLC.COM 475-366-5355 Present

** Paticipants not on our list

1 ADAM LOCK Present

2 ALI MAHDI TIGUA INC. ALI.MAHDI@TIGUAINC.ORG Present

3 ANGEL RAMOS Present

4 ASHTON BASTEDO MOORE INDUSTRIES ABAESTEDO@MOOREUSA.COM Present

5 BRIAN COSBEY BOHANNAN HOUSTON BCOSBEY@BHINC.COM Present

6 CHRIS THARP PATRIOT CONSTRUCTION MANAGEMENT CHRIS.THARP@PATRIOTCCM.COM Present

7 FELICIA GONZALEZ CLASSIC INDUSTRIES, INC FGONZALEZ@CLASSICINDINCNM.COM Present

8 GINA NUTT Present

9 JORGE JARAMILLO FULCRUM CONTRACTING PRJECTMANAGER@FULCRUMCONTRACTING.NET Present

10 KAY AYE Present

11 MIKE MIMBELA MIMBELA MIKEM@MIMBELA.COM Present

12 RODOLFO RICO JORDAN FOSTER CONSTRUCTION RRICO@JORDANFOSTERCONSTRUCTION.COM Present

13 TEAM X Present

14 TORI PRUETT SEDONA CONTRACTING, INC TORI@SEDONACONTRACTINGINC.COM Present

15 VICTOR MEDRANO FULCRUM CONTRACTING V.MEDRANO@FULCRUMCONTRACTING.NET Present

First Last Check-In Check-Out

1 MIGUEL ALLEN X X

2 Isaiah Allen X X

3 ERIN ARMENTA X X

4 RONNIE G. AUTREY X X

5 Victor Adrian Medrano Balderas

6 SAMAR BASHIR

7 JOHN BEAN

8 Erin Suzanne Becker X X

9 ISRAEL BROWN

10 Austin Buescher 11 Joseph A. Cadet X X

12 LUIS CANO X X

13 BRIAN L CLOUSE

14 Roberto Duran X X

15 STEPHEN LEE DURDEN

16 CHARLES EASTERLING X X

17 Omar Elias

18 JORGE FERNANDEZ MIRANDA X X

19 ERIKA FLORES X X

20 Eddie Gallardo

21 ALFONSO ANDRES GARCIA X X

22 Moises Garcia X X

23 SAM GARRELL X X

24 Gabriel Gil X X 25 Vanessa Gomez

26 MANUEL GUARDIOLA X X

27 HENRY HERRERA X X

28 MARIO HIDALGO

29 CHRIS HOLECHEK

30 KARLA DANIELA HOLGUIN X X

31 Nathan Hunter

32 KYLE IBARRA X X

33 Arath Jauregui

34 OJEDA JORGE X X

35 Cecilia Lara

36 MIGUEL ANGEL LEZAMA

37 Bryan Long 38 Reynaldo Loya Jr. X X

39 JESUS MAGDALENO X X

40 Manuel Maldonado X X

41 VINCENT REO MARTINEZ X X

42 Jesus Mesta X X 43 Miguel Mimbela X X 44 Christopher Miramontes

Site-Walk

Site walk held on January 23, 2025.

45 AARON MOORE X X

46 WARREN A MORROW

47 LEONARD MORROW

48 Gunner Mounts X X 49 Manuel Palma X X

50 MOSES PINEDO X X

51 Nathanael PRICE X X

52 VICTORIA PRUETT X X

53 ERIC RYPPLE

54 JUAN CARLOS SALCIDO X X

55 Michael Sambrano 56 Steven Sambrano 57 Erik Tijerina X X 58 William Vail X X

59 JESUS E. VALTIER

60 TROY WEISS

61 CASEY WIDENER

62 REYNALDO ZAMBRANO X X

63 *VICTOR MEDRANO X X

* Individual was not on the list, but had a confirming email

Region Contractor Name Project Manager Name

Project Number (in Kahua) Contractor Email Address

Project Manager Email Address

Project Type (non-ESPC or

ESPC?)

Project Manager Approval Date

Enter Work Item Information Below: Design-Build or Construction Team: Enter E&ST / HPGB Installation Information and Outcomes

Enter your email address Milestone Status Building

Number [1] Building Name Project # (Kahua)

Accounting String ID

(ASID) [2]

Work Item (WI) # [3]

Budget Activity Code [4]

IRA Program

(E&ST, HPGB)

Select the guiding principle for the material or technology Deep Energy

Retrofit All Electric

Building Net Zero Energy

Sustainable Building

Design-Build or Construction Team: Enter E&ST / HPGB Installation Information and Outcomes Energy

Conservation Measure /Water Conservation

Measure

(ECM/WCM)

Identifier [5] ECM/WCM Category [6] ECM/WCM Technology [7]

Quantity Installed

TO Schedule Technology [8]

Emerging & Sustainable Technology

[9]

ECM/WCM

Default

Design Life [10]

Alternative ECM Design Life [11]

Primary Building

Cooling Fuel

Primary Building

Heating Fuel

Refrigerant Involved in

ECM?

Refrigerant

Type

Refrigerant Capacity

(lbs)

Initial ECM/WCM implementation cost ($)

Estimated initial savings associated with

ECM/WCM installation ($) [12]

Annual O&M Cost ($/year) [13]

Electric Savings (kWh/year) [14]

Natural Gas Savings

(scf/year) [15]

Fuel Oil Savings

(gal/year) [16]

Steam Savings

(mmBtu/year) [17]

Chilled Water Savings

(mmBtu/year) [18]

Propane Fuel Savings (mmBtu/year)

[19]

Water Savings

(gal/year) [20]

Construction Manager as Advisor (CMa) or Commissioning Provider (CxP): Validate technology Installation

Additional notes about ECM/WCM

Certify technology is installed and working properly Email of Certifier

[1] Location Code (from REXUS)

[2] 8-digit alphanumeric string

[3] 4 digit numeric string as reported in IRIS

[4] PG Code for HPGB Projects: PG21 PG Code for E&ST Projects: PG27

[5] Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO Schedule

[6] AoA Dropdown

[7] AoA Dropdown

[8] Auto populates based on ECM Category and Technology Selected

[9] Auto populates based on ECM Category and Technology Selected

[10] In years

[11] In years. If different than default. Max of 30 year design life

[12] ESPC estimated year one savings e.g. If you install a new high efficiency chiller instead of spending $10,000 to repair the old one, enter $10,000 here.

[13] (Enter cost if O&M contracts will change due to ECM Implementation)

Enter negative value if there will be confirmed O&M savings

[14] Enter negative value if there will be an increase in energy use

[15] Enter negative value if there will be an increase in energy use

1 mmBtu = 974.66 scf

[16] Enter negative value if there will be an increase in energy use

1 mmBtu = 7.246376812 gal

[17] Enter negative value if there will be an increase in energy use

[18] Enter negative value if there will be an increase in energy use

[19] Enter negative value if there will be an increase in energy use

[20] Enter negative value if there will be an increase in energy use

������������������� ������� � !� ����� � �����"��#�$ ��%&'� ���� �'� ��(��) ����% �����*����������+�,�� ��&�-��./0123�/4567�89932::;672:1<02�=151>: ?<0@/=AB�:>C461157:D

/=AB�:>C461157:D

E>67960F�?>4C23�GH3<4I/JK=LDE>67960F�0542A3<M2N1�O�GP5Q>5L8NN<>0160F�=1360F�RS�G8=RSLT<3U�R124�GTRL�OE>9F21�8N16V61W�B<92 ?<0@RI8�X>0960F:�GH<3�F7>2�H>0960F�:61>516<0:L RI8�A3<F354�G/Y=Z[�\A]EL=272N1�1Q2�F>6960F�̂360N6̂72H<3�1Q2�45123657�<312NQ0<7<FW

_̀ab cdefdg�̀ebhi _j̀�̀kdlg�dmmh̀nn�dnnopldb̀m�qlbj�bj̀�fǹh�̀eb̀hler�shot̀pb�mdbdu cfnb�v̀�wdglm�̀kdlg�dmmh̀nnxùu�̀adksg̀yrndurow_̀ab zhosmoqe {̀ sh̀ǹebn�|̀i�dpjl̀ẁk̀ ebn�bjhofrjofb�bj̀�shot̀pb}n�m̀nlre�demlksg̀k̀ ebdbloe�dem�lbn�dmwdep̀k̀ eb�bjhofrj�|̀i�nbdr̀n�nfpj�dn~h̀glkledhi��nǹnnk̀ eb������z̀ nlre�������z̀ nlre��dem�koh̀u���nfvklbbdgn�dh̀�deblplsdb̀m��oh�eoe���~��shot̀pbnu���nfvklbbdgn�dh̀às̀pb̀m��oh���~��shot̀pbnu �fvklbbdg������ledg�~̀h�ohkdep̀��fvklbbdg���clg̀nboè��u�������fvnbdebldg��oksg̀bloe�fvklbbdg������dem�o���_fheoẁh���clg̀nboè��u�������fvnbdebldg��oksg̀bloe�fvklbbdg����������z���clg̀nboè��u������z̀ nlre��oksg̀b̀�fvklbbdg���������zz�{̀ wl̀q�������z���clg̀nboè��u������z̀ nlre��bdhb����_~�fvklbbdg���������zz���clg̀nboè��u������z̀ nlre��bdhb����_~�fvklbbdg������okklnnloèh}n��oep̀sb�z̀ nlre��sshowdg���clg̀nboè��u������okklnnloèh}n��oep̀sb�z̀ nlre��sshowdg�fvklbbdg�����~hot̀pb��rh̀ k̀̀ eb���clg̀nboè��u������xelbldg��ledepldg��rh̀ k̀̀ eb�q�fnbok̀ h�fvklbbdg������ledg�~̀h�ohkdep̀��fvklbbdg���clg̀nboè���u�������fgg�~hot̀pb�pp̀sbdep̀�xnnf̀m�fvklbbdg������dem�o���_fheoẁh���clg̀nboè���u�������gg���cn����zdi�~hoo��o�~̀h�ohkdep̀��oksg̀b̀�fvklbbdg����������z���clg̀nboè���u������xeẁnbk̀ eb��hdm̀��fmlb��x�����oksg̀b̀�fvklbbdg���������zz�{̀ wl̀q�������z���clg̀nboè���u������xeẁnbk̀ eb��hdm̀��fmlb�x�����oksg̀b̀�fvklbbdg���������zz���clg̀nboè���u�������oblp̀�o��xeb̀eb�bo��qdhm����x_���xnnf̀m�fvklbbdg�����~hot̀pb��rh̀ k̀̀ eb���clg̀nboè���u������~h̀glkledhi��nǹnnk̀ eb��~���bdhb�bj̀h�klg̀nboèn�dglreler�qlbj��djfd�dh̀�dgno�sh̀ǹeb��vfb�nfvklbbdgn�dh̀�oegih̀�flh̀m�mfhler�bj̀�klg̀nboèn�lm̀ebl�l̀m�dvoẁu�z̀ �̀hh̀m���l��sfhnflb�o��qoh|�lb̀k�ln�m̀�̀hh̀m�sdfǹm��dep̀gg̀m���l��qoh|�lb̀k�ln�eo�goer̀h�v̀ler�poenlm̀h̀m��o���fvklbbdg���l��qoh|�lb̀k�ln�fem̀h�poenlm̀hdbloe�qlbj�de�dedginln�o��dgb̀hedblẁn�gsjdefk̀ hlp�ǹg̀pb��hokmhosmoqe� zhosmoqe ��pom̀�h̀sh̀ǹebler�bj̀�vflgmler�gopdbloe�dn�h̀sohb̀m�le�bj̀�{����ninb̀ku��̀hẁn�dn�de�lm̀ebl�l̀hu �lnb�o��oqèm��dpblẁ��h̀rloe�ns̀pl�lp�vflgmlern�le�bj̀�����sohb�oglo_̀ab �fbo�r̀èhdb̀m _j̀�edk̀ �o��bj̀�vflgmler�dnnopldb̀m�qlbj�bj̀�shot̀pbu�fk̀ hlp zhosmoqe ~hot̀pb�efkv̀h�dnnlrèm�le�bj̀��djfd�ninb̀ku��̀hẁn�dn�de�lm̀ebl�l̀hu�gsjdefk̀ hlp zhosmoqe �x{x��r̀èhdb̀m�pomler�bj̀�h̀sh̀ǹebn�bj̀��femler�bis̀��oh�qoh|�lb̀knqlbjle�d�shot̀pbu��̀hẁn�dn�de�lm̀ebl�l̀hu cfnb�̀eb̀h�de���mlrlb�dgsjdefk̀ hlp�nbhler�dnh̀sohb̀m�le�x{x�u�fk̀ hlp zhosmoqe ��om̀�r̀èhdb̀m�le�x{x��h̀sh̀ǹebler�d�ns̀pl�lp�qoh|�lb̀ku��̀hẁn�dn�delm̀ebl�l̀hu cfnb�̀eb̀h�d���mlrlb�efkv̀h�qlbjofb�dei�nsdp̀noh�ns̀pldg�pjdhdpb̀hnu�gsjdefk̀ hlp zhosmoqe �femler�nbh̀dk�dnnopldb̀m�qlbj�bj̀�qoh|�lb̀ku ~�������lrj�~̀h�ohkdep̀��h̀ è��flgmlern~�������k̀ hrler����fnbdledvg̀�_̀pjeogorl̀n~���~���~���~���~���~���~���~���~���~�����~�����_̀ab �fbo�r̀èhdb̀m xemlpdb̀n�bj̀�x{��shorhdk�vdǹm�oe�~��pom̀�ǹg̀pb̀m��qj̀bj̀h����_��k̀ hrler�dem��fnbdledvg̀�_̀pjeogori��oh��~�����lrj�~̀h�ohkdep̀�h̀ è��flgmler�u_̀ab zhosmoqe �s̀pl�l̀n�bj̀�rflmler�shleplsg̀�dpjl̀ẁm�vdǹm�oe�bj̀�lenbdggdbloe�o��bj̀b̀pjeogori��l��dssglpdvg̀u �ksgoi�xeb̀rhdb̀m�z̀ nlre�~hleplsg̀n�sblkl ̀��èhri�~̀h�ohkdep̀~hob̀pb�dem��oeǹhẁ�¡db̀h�ejdep̀�bj̀�xemooh��ewlhoek̀ eb{̀ mfp̀�bj̀��ewlhoek̀ ebdg�xksdpb�o��cdb̀hldgn�nǹnn�dem��oenlm̀h��flgmler�{̀ nlgl̀ep̀

������������������� ������� � !� ����� � �����"��#�$ ��%&'� ���� �'� ��(��) ����% �����*����������+�,�� ��&�-��./001�230456�70849:;8 <0=0>8�8?;@�9A8>9B0�CDEF==�2=0>84;>�GA;=H;35 <0=0>8�8?;@�9A8>9B0�CDI08�J049�230456 <0=0>8�8?;@�9A8>9B0�CD<A@8K;3KL=0�GA;=H;35 <0=0>8�8?;@�9A8>9B0�CDE230456�M93@04NK8;93O0K@A40�P�QK804M93@04NK8;93�O0K@A40R2MOPQMOS�CH038;:;042MOPQMO�MK805946

TUVWXYZ[ TUVWXYZ[ \]̂_ẀaVb�cUVaUVd�aUV�cZdX�_aVe�WZ]ad_YfaVb�aZc̀ d̂b�aU_b�bfbà_]̀Y_g_ahZfaWZeVijV]Zk̀a_Z]b�̀dV�è V̂�aZ�̀]�V[_ba_]l�Yf_ĝ_]l�c_aU�aUV�md_è dh�lZ̀g�Znb_l]_n_Ẁ]agh�_emdZk_]l�_ab�V]Vdlh�Vnn_W_V]Whi��ò dXV̂�Yh�pqrYf_ĝ_]lsgVkVg�tu\�dV̂fWa_Z]�̀l̀_]ba�̀�vqwx�ỲbVg_]Vi�yb�̀�̂_dVWa�dVbfga�Zn�aUV�\jy�mdZzVWa{�aUV�Yf_ĝ_]lc_gg�̀WU_VkV�̀�|̂VVm�V]Vdlh�dVadZn_ai| }jut~�y��t��WUVWX�YZ[� TUVWXYZ[ TUVWXYZ[ \]̂_ẀaVb�cUVaUVd�aUV�cZdX�_aVe�WZ]ad_YfaVb�aZc̀ d̂b�aU_b�bfbà_]̀Y_g_ahZfaWZeVi�adfWafdV�aÙa�dVg_Vb�bZgVgh�Z]�VgVWad_W_ah�nZd�_ab�V]Vdlh�]VV̂b{�_]Wgf̂_]lUV̀a_]l{�WZZg_]l{�̀]̂�ZaUVd�bhbaVeb�ad̀ _̂a_Z]̀ggh�mZcVdV̂�Yh�nZbb_g�nfVgbi��yb�̀�̂_dVWa�dVbfga�Zn�aUV�\jy�mdZzVWa{�aUV�Yf_ĝ_]lc_gg�YV�̀]�|̀gg�VgVWad_W�Yf_ĝ_]li| }jut~�y��t��WUVWX�YZ[�TUVWXYZ[ TUVWXYZ[ \]̂_ẀaVb�cUVaUVd�aUV�cZdX�_aVe�WZ]ad_YfaVb�aZc̀ d̂b�aU_b�bfbà_]̀Y_g_ahZfaWZeViy�Yf_ĝ_]l�Ỳg̀]WVb�_ab�V]Vdlh�]VV̂b�c_aU�V]Vdlh�mdẐfWV̂�ndZedV]Vc̀ YgV{��VdZsVe_bb_Z]�bZfdWVbi�TZ]bfe_]l�]Z�eZdV�V]Vdlh�aÙ]�_bmdẐfWV̂�ndZe�dV]Vc̀ YgV�bZfdWVbi��yb�̀�̂_dVWa�dVbfga�Zn�aUV�\jy�mdZzVWa{�aUV�Yf_ĝ_]lc_gg�YV�̀�|]Va��VdZ�V]Vdlh�Yf_ĝ_]li| }jut~�y��t��WUVWX�YZ[� TUVWXYZ[ TUVWXYZ[ \]̂_ẀaVb�cUVaUVd�aUV�cZdX�_aVe�WZ]ad_YfaVb�aZc̀ d̂b�aU_b�bfbà_]̀Y_g_ahZfaWZeVi�_l]_n_Vb�WZemg_̀]WV�c_aU�aUV��f_̂_]l��d_]W_mgVb�nZd��fbà_]̀YgV��V̂Vd̀g�f_ĝ_]lbi�}U_b�eV̀]b�aUV�cZdX�_aVe�WZ]ad_YfaVb�aZc̀ d̂b�WVda_nh_]l�̀Yf_ĝ_]l�̀b�WZemg_̀]a�c_aU_]�aUV��f_̂_]l��d_]W_mgVb�nZd��fbà_]̀YgV�V̂Vd̀g��f_ĝ_]lb����b�i��ZaU�WfddV]agh����WZemg_̀]a�̀]̂�]Z]s��WZemg_̀]a��Vg_l_YgV��Yf_ĝ_]lb�Ẁ]�̀WU_VkV�aU_b�bad̀aVl_W�ZfaWZeVi�yb�̀�̂_dVWa�dVbfga�Zn�aUV�\jy�mdZzVWa{�aU_b�Yf_ĝ_]l_b�mg̀]]V̂�nZd����WVda_n_Ẁa_Z]��Zd�ÙkV�dVWVda_n_Ẁa_Z]�è _]à_]V̂��c_aU_]�̀hV̀d�̀naVd�WZemgVa_Z]�Zn�aUV�\jy�mdZzVWai��Zd����dV̀bbVbbeV]ab{�aUVZYzVWa_kV�bUZfĝ�Z]gh�YV�WUVWXV̂�_n�aUV�Yf_ĝ_]l�cZfĝ�]Za�YV�dVWVda_n_V̂c_aUZfa�aUV�\jy�mdZzVWa��_iVi�aUV�\jy�mdZzVWa�̂_dVWagh�bfmmZdaV̂���dV̀bbVbbeV]ai�

}jut~�y��t��WUVWX�YZ[� ygmÙ]feVd_W ò ]f̀g�V]adh }U_b�n_Vĝ�_b�mdZk_̂V̂�aZ�̂_nnVdV]a_̀aV�YVacVV]�g_]V�_aVeb�aÙa�bÙdV�aUVb̀eV��ZdX�\aVe��feYVdi�ygg�g_]V�_aVeb�bUZfĝ�ÙkV�̀�f]_�fV�_̂V]a_n_Vd�_iVi�tTo�w{�tTo�v{�tTo��iii�}V[a �dZm̂Zc] �_ba�Zn�t]Vdlh�̀]̂�� àVd�TZ]bVdk̀a_Z]�eV̀bfdV�ẀaVlZd_Vb�tTob~�Tob�i�}U_b�g_ba�̀g_l]b�c_aU�aUV��Vm̀daeV]a�Zn�t]Vdlh�b����t�TZemg_̀]WV�}d̀WX_]l��hbaVe��T}�� �Z_gVd��g̀]a�\emdZkVeV]abTU_ggVd��g̀]a�\emdZkVeV]ab�f_ĝ_]l�yfaZè a_Z]��hbaVeb~toT��V̀a_]l{��V]a_g̀a_]l{�̀]̂�y_d�TZ]̂_a_Z]_]l�_lUa_]l�\emdZkVeV]ab�f_ĝ_]l�t]kVgZmV�oẐ_n_Ẁa_Z]bTU_ggV̂�� àVd{��Za�� àVd{�̀]̂��aV̀e��_bad_Yfa_Z]��hbaVebtgVWad_W�oZaZdb�̀]̂��d_kVbjVnd_lVd̀a_Z]�_bad_YfaV̂��V]Vd̀a_Z]jV]Vc̀ YgV�t]Vdlh��hbaVebt]Vdlh~ua_g_ah��_bad_Yfa_Z]��hbaVeb� àVd�̀]̂��VcVd�TZ]bVdk̀a_Z]��hbaVebtgVWad_Ẁg��V̀X��Ùk_]l~�Z̀ �̂�U_na_]lj̀ aV�ŷzfbaeV]abt]Vdlh�jVg̀aV̂��dZWVbb�\emdZkVeV]abŷ k̀]WV̂�oVaVd_]l��hbaVebymmg_̀]WV~�gflsgZ̀ �̂jV̂fWa_Z]b�Vdk_WV��Za�� àVd��������hbaVebTZ]kVh̀]WV��hbaVeb�̀ à�TV]aVd�t]Vdlh�TZ]bVdk̀a_Z]�\emdZkVeV]ab

������������������� ������� � !� ����� � �����"��#�$ ��%&'� ���� �'� ��(��) ����% �����*����������+�,�� ��&�-��./012301�456789:9;<=>?8@A@<�B8C@?::5D4E�F675D>:5�456789:9;</G5H;A8;�I�F>C@?A8?J:5456789:9;</01�K5L?>:@�K5CA;8�MAL5N:@5H8?@AO5�/01�K5CA;8�MAL5PHAG?H<�Q>A:DA8;�099:A8;R>5:PHAG?H<�Q>A:DA8;�S5?@A8;R>5:T5LHA;5H?8@�B8O9:O5D�A8�/01UT5LHA;5H?8@�4<V5T5LHA;5H?8@�0?V?6A@<�W:JCXB8A@A?:�/01�AGV:5G58@?@A9869C@�WYX/C@AG?@5D�A8A@A?:�C?OA8;C?CC96A?@5D�ZA@7�/01A8C@?::?@A98�W/FP0�5C@AG?@5D<5?H�985�C?OA8;CX�WYXN88>?:�EI1�09C@�WY2<5?HX BL�@75H5�ZA::�J5�?�D56H5?C5�A8�EI169C@C[�58@5H�?�85;?@AO5�8>GJ5H�75H5/:56@HA6�F?OA8;C�W\372<5?HX BL�@75H5�ZA::�J5?8�A86H5?C5�A8�L>5:�698C>GV@A98[�58@5H�?�85;?@AO5�8>GJ5H�75H5]?@>H?:�̂?C�F?OA8;CWC6L2<5?HX BL�@75H5�ZA::�J5�?8�A86H5?C5�A8�L>5:�698C>GV@A98[�58@5H�?�85;?@AO58>GJ5H�75H5R>5:�EA:�F?OA8;CW;?::98C2<5?HX BL�@75H5�ZA::�J5?8�A86H5?C5�A8�L>5:�698C>GV@A98[�58@5H�?�85;?@AO5�8>GJ5H�75H5F@5?G�F?OA8;C�WGGQ@>2<5?HX �BL�@75H5�ZA::�J5?8�A86H5?C5�A8�L>5:�698C>GV@A98[�58@5H�?�85;?@AO5�8>GJ5H�75H507A::5D�3?@5H�F?OA8;CWGGQ@>2<5?HX BL�@75H5ZA::�J5�?8�A86H5?C5�A8�L>5:�698C>GV@A98[�58@5H�?�85;?@AO5�8>GJ5H75H5PH9V?85�R>5:�F?OA8;CWGGQ@>2<5?HX �BL�@75H5ZA::�J5�?8�A86H5?C5�A8�L>5:�698C>GV@A98[�58@5H�?�85;?@AO5�8>GJ5H75H5

_̀ab cdefgehi cjiklmn�ompb�eq�rìdsj�kig�tkb̀d�ueip̀dvkbmei�l̀ kpwd̀�b̀nxieoesm̀py_x̀�gdefgehi�efbmeip�kd̀�gjiklmn�zkp̀g�ei�bx̀�ru{|tu{�nkb̀sedjp̀ònb̀g�mi�bx̀�fdmed�neowliy�_xmp�ompb�komsip�hmbx�bx̀�c̀ fkdbl̀ ib�eqrìdsj}p�~c�r��uelfomkiǹ�_dkn�mis��jpb̀l�~u_�� _x̀�gdefgehi�efbmeip�kd̀�gjiklmn�zkp̀g�ei�bx̀�ru{|tu{�nkb̀sedj�p̀ònb̀g�mi�bx̀fdmed�neowliy�wl̀ dmn {kiwko�̀ibdj �wkibmbj�eq�̀ìdsj|hkb̀d�neip̀dvkbmei�l̀ kpwd̀�mipbkoòg�mi�bx̀�zwmogmisyỳsy�mq���zemòdp�hmbx�bx̀�pkl̀ �pf̀nmqmnkbmeip�h̀ d̀�mipbkoòg��ompb��y��òkp̀ìpwd̀�bxkb�bx̀�qeooehmis�neowlip�d̀okb̀g�be�nepb�kig�pkvmisp�d̀qònb�bxkbeq�����mb̀lp�mipbkoòg�ei�bxmp�omì�mb̀l����_�nepb|pkvmisp�f̀d�mb̀l �ifwb�lwpb�z̀�k�vkoẁ�sd̀kb̀d�bxki��y_̀ab �wbe�s̀ìdkb̀g �omsip�̀ìdsj|hkb̀d�neip̀dvkbmei�l̀ kpwd̀�nkb̀sedj�kig�b̀nxieoesjp̀ònb̀g�hmbx�bx̀�_kp���dg̀d��nx̀gwòy_̀ab �wbe�s̀ìdkb̀g �omsip�̀ìdsj|hkb̀d�neip̀dvkbmei�l̀ kpwd̀�nkb̀sedj�kig�b̀nxieoesj�hmbxbx̀�rl̀ dsmis����wpbkmikzò�_̀nxieoesj�ompb�wl̀ dmn �wbe�s̀ìdkb̀g c̀ qkwob�g̀pmsi�omq̀�eq�bx̀�rìdsj�ueip̀dvkbmei�{̀ kpwd̀�~ru{���mi�j̀kdpy�wl̀ dmn {kiwko�̀ibdj �q�bx̀�fdegwnb�mipbkoòg�xkp�k�gmqq̀d̀ib�kibmnmfkb̀g�omq̀pfki�bxki�bx̀g̀qkwob��̀ib̀d�mb�x̀d̀ �ifwb�lwpb�z̀�k�hxeò�iwlz̀d�z̀bh̀ ì���kig��y_̀ab cdefgehi �igmnkb̀p�bx̀�fdmlkdj�qẁo�pewdǹ�qed�zwmogmis�neeomisy rònbdmnmbjuxmoòg�tkb̀d�b̀kl�|�_̀ab cdefgehi �igmnkb̀p�bx̀�fdmlkdj�qẁo�pewdǹ�qed�zwmogmis�x̀kbmisy rònbdmnmbj�kbwdko��kp�ẁo��mo�b̀kl�bx̀d�|�_̀ab cdefgehi �f̀nmqm̀p�hx̀bx̀d�bx̀�ru{�miveov̀p�bx̀�wp̀�eq�d̀qdms̀dkiby �̀p�e�ofxkiwl̀ dmn {kiwko�̀ibdj c̀ pndmz̀p�bx̀�bjf̀�eq�d̀qdms̀dkib�wp̀g�mi�bx̀�ru{y�wl̀ dmn {kiwko�̀ibdj �f̀nmqm̀p�bx̀�nkfknmbj�eq�bx̀�d̀qdms̀dkib�wp̀g�mi�fewigpy �ifwb�lwpb�z̀�k�iwl̀ dmnko�vkoẁ�mi�ozp��mỳy�����uwdd̀inj {kiwko�̀ibdj �̀ fd̀p̀ibp�bx̀�mimbmko�nepb�kppenmkb̀g�hmbx�mlfòl̀ ibmis�bx̀�rìdsjueip̀dvkbmei�{̀ kpwd̀y��q�g̀pmsi�nepbp�h̀ ib�mibe�bx̀�mlfòl̀ ibkbmei�eqbxmp�ru{��fòkp̀�minowg̀�bxep̀ �ifwb�lwpb�z̀�k�iwl̀ dmnko�vkoẁyuwdd̀inj {kiwko�̀ibdj rpbmlkb̀�eq�bx̀�mimbmko�pkvmisp�kppenmkb̀g�hmbx�bx̀�ru{�mipbkookbmei�iedlkooj�mi�bx̀�qmdpb�j̀kdy��ed�̀aklfò��mq�jewd�b̀kl�mp�d̀foknmis�k�zemòdmipb̀kg�eq�pf̀igmis���������be�d̀fkmd�ki�̀ampbmis�zemòd��̀ib̀d������x̀d̀y�_xmp�kooehp�qed�knnwdkb̀�omq̀�njnò�nepb�nkonwokbmeip �ifwb�lwpb�z̀�k�iwl̀ dmnko�vkoẁyuwdd̀inj {kiwko�̀ibdj �f̀nmqj�bx̀�kiiwko��f̀dkbmeip�kig�{kmib̀ikiǹ�~��{��nepb�mq�mb�hmoonxkis̀�gẁ�be�ru{�mlfòl̀ ibkbmeiy� �ifwb�lwpb�z̀�k�iwl̀ dmnko�vkoẁy�wl̀ dmn {kiwko�̀ibdj �igmnkb̀p�bx̀�kiiwko�̀ònbdmn�pkvmisp�mi��txy��òkp̀�̀ipwd̀�bx̀�vkoẁìb̀d̀g�lkbnx̀p�bx̀�qẁo�pf̀nmqmn�wimbp�pxehi�mi�bx̀�ǹooy� �ifwb�lwpb�z̀�k�iwl̀ dmnko�vkoẁy�wl̀ dmn {kiwko�̀ibdj �igmnkb̀p�bx̀�kiiwko�ikbwdko�skp�pkvmisp�mi�pbkigkdg�nwzmn�q̀̀ by��òkp̀ìpwd̀�bx̀�vkoẁ�̀ib̀d̀g�lkbnx̀p�bx̀�qẁo�pf̀nmqmn�wimbp�pxehi�mi�bx̀ǹooy� �ifwb�lwpb�z̀�k�iwl̀ dmnko�vkoẁy�wl̀ dmn {kiwko�̀ibdj �igmnkb̀p�bx̀�kiiwko�qẁo�emo�pkvmisp�mi�skooeipy��òkp̀�̀ipwd̀�bx̀�vkoẁìb̀d̀g�lkbnx̀p�bx̀�qẁo�pf̀nmqmn�wimbp�pxehi�mi�bx̀�ǹooy� �ifwb�lwpb�z̀�k�iwl̀ dmnko�vkoẁy�wl̀ dmn {kiwko�̀ibdj �igmnkb̀p�bx̀�kiiwko�pb̀kl�pkvmisp�mi�ll�bwy��òkp̀�̀ipwd̀�bx̀�vkoẁìb̀d̀g�lkbnx̀p�bx̀�qẁo�pf̀nmqmn�wimbp�pxehi�mi�bx̀�ǹooy �ifwb�lwpb�z̀�k�iwl̀ dmnko�vkoẁy�wl̀ dmn {kiwko�̀ibdj �igmnkb̀p�bx̀�kiiwko�nxmoòg�hkb̀d�pkvmisp�mi�ll�bwy��òkp̀�̀ipwd̀�bx̀vkoẁ�̀ib̀d̀g�lkbnx̀p�bx̀�qẁo�pf̀nmqmn�wimbp�pxehi�mi�bx̀�ǹooy� �ifwb�lwpb�z̀�k�iwl̀ dmnko�vkoẁy�wl̀ dmn {kiwko�̀ibdj �igmnkb̀p�bx̀�kiiwko�fdefkì�qẁo�pkvmisp�mi�ll�bwy��òkp̀�̀ipwd̀�bx̀vkoẁ�̀ib̀d̀g�lkbnx̀p�bx̀�qẁo�pf̀nmqmn�wimbp�pxehi�mi�bx̀�ǹooy �ifwb�lwpb�z̀�k�iwl̀ dmnko�vkoẁy

������������������� ������� � !� ����� � �����"��#�$ ��%&'� ���� �'� ��(��) ����% �����*����������+�,�� ��&�-��./0123�4056789�:80;;<79=>203? �@A�1B232�C6;;�D207�67E32092�67�C0123�E<79FGH16<7I�27123�0�72801652�7FGD23�B232JKK616<70;�7<129�0D<F1LMN=/MNM2316A>�12EB7<;<8>�6967910;;2K�07K�C<3O678H3<H23;>�:MPQ=MN0�R20GS7;>?LG06;�<A�M2316A623�:MPQ=MN0R20G�S7;>?

TUVWXYZ [\]U\̂�W]_X̀ a]bYZ\_Wc�_dW�\]]U\̂�e\_WX�c\fY]gc�Y]�g\̂̂h]ci�ĵW\cW�W]cUXW�_dW�f\̂UWW]_WXWb�V\_ZdWc�_dW�kUŴ�clWZYkYZ�U]Y_c�cdhe]�Y]�_dW�ZŴ̂i a]lU_�VUc_�mW�\�]UVWXYZ\̂�f\̂UWinWo_ [\]U\̂�W]_X̀ p]̀�\bbY_Yh]\̂�]h_Wc�hX�ZhVVW]_c�\mhU_�_dW�q]WXg̀�rh]cWXf\_Yh][W\cUXW�sqr[t�̀hU�ehÛb�̂YuW�_h�Y]ẐUbWi q]_WX�\bbY_Yh]\̂�]h_Wcv_Wo_�\mhU_�qr[inWo_ wXhlbhe] rWX_Yk̀�Yk�_dW�_WZd]ĥhg̀�\cchZY\_Wb�eY_d�_dW�q]WXg̀�rh]cWXf\_Yh][W\cUXW�Yc�Y]c_\̂̂Wb�\]b�kU]Z_Yh]Y]g�lXhlWX̂̀�sqoẐUcYfW�_h�rojvr[\_W\Vti�ndYc�cdhÛb�mW�̂Wk_�m̂\]u�U]_Ŷ�lXhxWZ_�Yc�ZhVl̂W_Wb yWcThnWo_ [\]U\̂�W]_X̀ qV\Ŷ�\bbXWcc�hk�_dW�ZWX_YkYWX�kXhV�_dW�rojvr[\�_W\Vi�ndYc�cdhÛb�mW�̂Wk_m̂\]u�U]_Ŷ�lXhxWZ_�Yc�ZhVl̂W_Wb [Uc_�mW�f\̂Yb�WV\Ŷ�\bbXWccaiWi�Wo\Vl̂Wzgc\ighf

Contractor Name Project Manager Name

Project Number (in Kahua) Contractor Email Address

Project Manager Email Address

Project Type (non-ESPC or

ESPC?)

Project Manager Approval Date

Enter Work Item Information Below: Design-Build or Construction Team: Enter LEC Installation Information & Outcomes

Enter your email address Milestone Status Building

Number [1] Building Name Project # (Kahua)

Accounting String ID (ASID) [2] Work Item (WI) # [3]

Budget Activity Code [4] LEC Identifier [5] LEC Material Category LEC Material Subcategory

Declared Unit

Design-Build or Construction Team: Enter LEC Installation Information & Outcomes

GWP Limit Specified in the Contract [6]

New GWP Limit Specified in the Contract (if Different than

Previous Column) Reported Threshold Target Calculated Threshold

Achieved Provide link for Material EPD Description of Material Installed

[7] Quantity Quantity Reporting Unit

Design-Build or Construction Team: Enter LEC Installation Information & Outcomes Construction Manager as Advisor (CMa) or Commissioning Provider (CxP) Certify information below:

Product Category Rule (PCR) Product Specific GWP

Embodied Carbon Reduction (Calculated)

Upstream Scope 3

Upstream Plant's ENERGY STAR Energy Performance

Score [8] Year of plant's ENERGY STAR

Energy Performance Score Certify information for this row is accurate Certify the embodied carbon calculations

[9]

Construction Manager as Advisor (CMa) or Commissioning Provider (CxP) Certify information below:

Email of Certifier

[1] Location Code (from REXUS)

[2] (8-digit alphanumeric string)

[3] 4 digit numeric string

[4] PG Code for LEC projects: PG24

[5] Unique identifier for project teams to use during data entry process, if necessary. Example, ECM number in TO Schedule

[6] Top 20% of Contract Limits by Material Subcategory

[7] Brief description of what material was used for on the project, supplier, mix type etc.

[8] For glass, upstream cement plant, and steel from integrated mills, ask manufacturer to generate and report their ENERGY STAR Energy Performance Score per: http://www.energystar.gov/epis

Any cement, glass, or integrated steel plant based in the U.S. can use the free ENERGY STAR Energy Performance Indicator tool to generate a score, even if the plant is not ENERGY STAR certified.

[9] Certify that the quantity is accurate, and reported product-specific GWP matches the identified EPD

�)*+,-.�*/012�344.-55612-5,7+-�8,0,95 :*;�89</1,,025�5=7924�<-�9>40,-4�?90.,-.2@A�,=7.9B=�>.7C-D,D7/>2-,17+A�EF�G=-+�0+@�/0C7.�D=0+B-5�1+�,=-�>.7C-D,�H1I->.7D9.-/-+,�7J�:*;�/0,-.102K�7DD9.5 L7+M*8N;�59</1,,025O *8N;�59</1,,025O

P91241+B�L9/<-.�HJ.7/F*QR8KOP91241+B�+0/-N.7C-D,�S�HT0=90K3DD79+,1+B�8,.1+B�UV�H38UVKHWM41B1,�02>=0+9/-.1D�5,.1+BKX7.Y�U,-/�HXUK�SHZ�41B1,�+9/-.1D�5,.1+BKP94B-,�3D,1[1,@�;74-:*;�U4-+,1J1-.:*;�60,-.102�;0,-B7.@

\]̂_ àbcad�]b_ef \g]�]haid�ajje]kk�akklmia_]j�ni_g�_g]�ck]e�]b_]eibo�pelq]m_�ja_ar c̀k_�s]�tadij�]haid�ajje]kkur]r�]̂ahpd]vokarolt\]̂_ welpjlnb x]pe]k]b_k�y]f�amgi]t]h]b_k�_gelcoglc_�_g]�pelq]m_zk�j]kiob�abjihpd]h]b_a_ilb�abj�i_k�ajtabm]h]b_�_gelcog�y]f�k_ao]k�kcmg�ak{e]dihibaef�|kk]kkh]b_}�~���w]kiob}������w]kiob}�abj�hle]r �cshi__ad������ibad�{]e�lehabm]��cshi__ad���̀id]k_lb]��r�������csk_ab_iad�lhpd]_ilb�cshi__ad������abj�l���\ceblt]e���̀id]k_lb]��r�������csk_ab_iad��lhpd]_ilb�cshi__ad�~��������w���̀id]k_lb]��r������w]kiob��lhpd]_]�cshi__ad������~��ww�x]ti]n��~����w���̀id]k_lb]��r�~����w]kiob��_ae_���\{�cshi__ad������~��ww���̀id]k_lb]��r�~����w]kiob��_ae_����\{�cshi__ad������lhhikkilb]ezk��lbm]p_�w]kiob�|ppeltad���̀id]k_lb]��r������lhhikkilb]ezk��lbm]p_�w]kiob�|ppeltad�cshi__ad�����{elq]m_�|oe]]h]b_���̀id]k_lb]��r������ubi_iad��ibabmiad|oe]]h]b_�n��ck_lh]e�cshi__ad������ibad�{]e�lehabm]��cshi__ad���̀id]k_lb]���r�������cdd�{elq]m_|mm]p_abm]�ukkc]j�cshi__ad�~����abj�l���\ceblt]e���̀id]k_lb]���r������|dd���̀ k����waf�{ell�l��{]e�lehabm]��lhpd]_]�cshi__ad����������w���̀id]k_lb]���r������ubt]k_h]b_��eaj]�|cji_��u�|��lhpd]_]�cshi__ad������~��ww�x]ti]n��~����w���̀id]k_lb]���r������ubt]k_h]b_�eaj]�|cji_��u�|���lhpd]_]�cshi__ad������~��ww���̀id]k_lb]���r�������l_im]�l��ub_]b_�_l�|naej����u\|�ukkc]j�cshi__ad�����{elq]m_�|oe]]h]b_���̀id]k_lb]���r������{e]dihibaef|kk]kkh]b_��{|���_ae_�_g]e�hid]k_lb]k�adiobibo�ni_g��agca�ae]�adkl�pe]k]b_}�sc_�kcshi__adk�ae]lbdf�e]�cie]j�jceibo�_g]�hid]k_lb]k�ij]b_i�i]j�aslt]r�w]�]ee]j���i��pcekci_�l��nley�i_]h�ik�j]�]ee]j�pack]j��abm]dd]j���i��nley�i_]h�ik�bl�dlbo]e�s]ibo�mlbkij]e]j�|l|��cshi__ad���i��nley�i_]h�ik�cbj]e�mlbkij]ea_ilb�ni_g�ab�abadfkik�l�ad_]eba_it]k|dpgabch]eim�k]d]m_��elhjelpjlnb� welpjlnb |�mlj]�e]pe]k]b_ibo�_g]�scidjibo�dlma_ilb�ak�e]ple_]j�ib�_g]�x����kfk_]hr��]et]k�ak�ab�ij]b_i�i]er\]̂_ |c_l�o]b]ea_]j \g]�bah]�l��_g]�scidjibo�akklmia_]j�ni_g�_g]�pelq]m_r�ch]eim welpjlnb {elq]m_�bchs]e�akkiob]j�ib�_g]��agca�kfk_]hr��]et]k�ak�abij]b_i�i]er|dpgabch]eim welpjlnb �uxu��o]b]ea_]j�mljibo�_g]�e]pe]k]b_k�_g]��cbjibo�_fp]��le�nley�i_]hkni_gib�a�pelq]m_r��]et]k�ak�ab�ij]b_i�i]er�ch]eim welpjlnb ��lj]�o]b]ea_]j�ib�uxu��e]pe]k]b_ibo�a�kp]mi�im�nley�i_]hr��]et]k�akab�ij]b_i�i]er|dpgabch]eim welpjlnb �cbjibo�k_e]ah�akklmia_]j�ni_g�_g]�nley�i_]hr {�������ln��aeslb�̀a_]eiadk|dpgabch]eim àbcad�]b_ef \gik��i]dj�ik�peltij]j�_l�ji��]e]b_ia_]�s]_n]]b�dib]�i_]hk�_ga_�kgae]�_g]kah]��ley�u_]h��chs]er�|dd�dib]�i_]hk�kglcdj�gat]�a�cbi�c]ij]b_i�i]e��ir]r������}������}������rrr�\]̂_ welpjlnb �ln��hslji]j��aeslb�������̀a_]eiad�ma_]olef�mdakki�ima_ilb}��addkcbj]e���peihaef�ma_]olei]kr �lbme]_]��abj�m]h]b_�le��̀ �k�|kpgad_�_]]d�dakk �� �������� ��¡�¢£¤£�� ¥¦§ �����£̈ ��£�¤� ���¦©���¢�£��ª«ª¬�� �������� �®̄¢£¤£�����°���±£�§©�� �²� ¦ ̈� �©�� ¦�̈£ ¥�̈§ � ̈���

�)*+,�-./012.3�4567./0891:

;073.10<�=>2/?@A�*2B2/�4C072D20<�2>�/E0,9>/1.7/F0G�?@A�*2B2/�4C072D20<�2>/E0�,9>/1.7/�2D�;2DD010>/�/E.>?@A�*2B2/�*2H/0<�2>A10I295H�,935B>J0C91/0<�KE10HE93<�K.180/,.3753./0<�KE10HE93<L7E20I0<A19I2<0�32>M�D91�-./012.3+A;;0H712C/29>�-./012.3N>H/.330<O5.>/2/:O5.>/2/:�J0C91/2>8�=>2/ KE2H�2H�.�<0D.53/�I.3506.H0<�9>�/E0�B./012.3�H0307/0<P

QRST UVWXYWZ[ \WZ�]̂ _WỲRY�abV_W[�c\]ad�ebTRV̀bf�gh_�ibTRjWVk�ifbll̀m̀ibT̀W[noVWp̀YRl�YRTb̀f�TW�TqR�̂bTRV̀bf�ibTRjWVk�lRfRiTRYn rstuu�ogvwxxx�ogvtxxx�ogvyxxx�ogvzxxx�ogv{|sxx�ogv}]garstuu�ogv}]gawxxx�ogv}]gatxxx�ogv}]gayxxx�ogv}]gazxxx�ogv}]ga{|sxx�ogvaR̂ R[TaW[iVRTR�eblW[Vk�~[̀Tl�lXqbfT�R_bV�cmb_V̀ibTRYd�R_bV�ch[mb_V̀ibTRYd}WffWZ�gTVhiThVbf�gRiT̀W[l�cmb_V̀ibTRYd}WffWZ�gTVhiThVbf�gRiT̀W[l�mVŴ �]fRiTV̀i��Vi��hV[biRl�ch[mb_V̀ibTRYd}WT��WffRY�gRiT̀W[l�cmb_V̀ibTRYd}WT��WffRY�gRiT̀W[l�ch[mb_V̀ibTRYdaWfY��WV̂RY�b[Y��bfpb[̀�RY�clThY��TVbi���mVb̂ [̀j��RTindgTVhiThVbf�gTRRf�ofbTR�mVŴ �]fRiTV̀i��Vi��hV[biRl�ch[mb_V̀ibTRYd�fbT��fbllQRST �hTW�jR[RVbTRY �hb[T̀Tk�Wm�̂RblhVR�mWV�TqR�̂bTRV̀bf�bl�f̀lTRY�̀[�TqR�]oUn�ĥ RV̀i �hTW�jR[RVbTRY QqR��fW_bf��bV̂ [̀j�oWTR[T̀bf�c��od�f̀̂ T̀�lXRìm̀RY�̀[�TqR�iW[TVbiTnQqR�pbfhR�TqbT�bhTW�XWXhfbTRl�VRXVRlR[Tl�TqR�TWX�sx��Wm�iW[TVbiTf̀̂ T̀l�_k�̂bTRV̀bf�b[Y�lh_ibTRjWVk�b[Y�lRVpRl�bl�b�YRmbhfT�pbfhR�ĥ RV̀i eb[hbf�R[TVk ][TRV�b�[RZ��fW_bf��bV̂ [̀j�oWTR[T̀bf�c��od�f̀̂ T̀�̀m�TqR�pbfhR�f̀lTRY[̀�TqR�iW[TVbiT�ỲmmRVl�mVŴ �TqR�XVRp̀Whl�iWfĥ [nQRST UVWXYWZ[ oVRỲiTRY��RTTRV�Qqb[��pRVbjR��tx���WV�sx��TqVRlqWfY�bT�lTbVT�Wm�TqRXVW�RiTn QWX�sx�QWX�tx��RTTRV�Qqb[��pRVbjRQRST �hTW�jR[RVbTRY �RXWVTl��RTTRV�Qqb[��pRVbjR��tx���WV�sx��TqVRlqWfY�biThbffkbiq̀RpRY�_k�XVW�RiT�_blRY�W[�XVWYhiT�lXRìm̀i���o�R[TRVRYnQRST eb[hbf�R[TVk \̀[��TW�TqR�][p̀VW[̂ R[Tbf�oVWYhiT�URifbVbT̀W[�c]oUd�mWV�TqR�̂bTRV̀bfnvYRbffk��b�f̀[��TW�b�jWWjfR�YV̀pR�oU��m̀fRQRST eb[hbf�R[TVk �V̀Rm�YRliV̀XT̀W[�Wm�qWZ�TqR�̂bTRV̀bf�Zbl�hT̀f̀�RY�̀[�TqR�XVW�RiTn�ĥ RV̀i eb[hbf�R[TVk �iThbf��hb[T̀Tk�Wm�̂bTRV̀bfl�XhViqblRY�h[YRV�Tq̀l�ZWV��̀TR̂ n�ofRblRR[lhVR�TqR�h[̀Tl�̂bTiq�TqR��hb[T̀Tk�VRXWVT̀[j�h[̀Tl�XVRXWXhfbTRY�̀[TqR�mWffWZ̀[j�iWfĥ [nQRST �hTW�jR[RVbTRY �RXWVT̀[j�h[̀Tl�Wm�̂bTRV̀bfl�XhViqblRYn�

�������������������������������
������������������������������������¡¡�¢�������£���¤�������������£��£¥�����������������¥£��������£¦��������������������������������������������������§̈©ª«©�©¬«®©�̄ª̈©�©¬°©®©±�ª̈²³¬«²́°µ�¶ª¬°²°·�®©̧¹®°²¬³�¬²°«

�)*+,-./0�12034,+5�6.738*169 *+,-./0�:;3/<=</�>?*@AB,-<3-�12+B,C63-./0<,C�8127/.7203-9D;E0+32A�:/,;3�FD;E0+32A�*72C0GE�@H@6>I:JK6�@C3+45�*3+=,+A2C/3:/,+3I32+�,=�;72C0GE�@H@6>I:JK6�@C3+45�*3+=,+A2C/3:/,+313+0<=5�<C=,+A20<,C�=,+�0L<E+,M�<E�2//.+203�81N*O1P2J32A�QC75913+0<=5�0L3�3AB,-<3-�/2+B,C/27/.720<,CE�81N*O1P2�J32AQC759@A2<7�,=�13+0<=<3+�81N*O1P2J32A�QC759

RSTU VWXYWZ�SXU[\ ]�̂_̀ �ab�W�cde\[afgUSh�hdcYiSXU�UgWU�ab�eW[U�dj�UgS�k̂ l�WXh��abbeScajac�Ud�UgS�iWUS[aWZ�e[dhYcU�cWUSfd[\m�RgS�̂_̀ �e[dnahSb�UgSaXbU[YcUadXb�jd[�gdo�UgS�ZajSpc\cZS�WbbSbbiSXU�qr_]s�bgdYZh�tScdXhYcUShm _dXc[SUS�p�uvw�xXUS[XWUadXWZyb�̂[dhYcU�_WUSfd[\�̀YZS�jd[�_dXc[SUS�qnS[badXzm{�d[�ZWUS[s_SiSXU�p�uvw�xXUS[XWUadXWZyb�̂[dhYcU�_WUSfd[\�̀YZS�jd[�̂d[UZWXh|�}ZSXhSh|VWbdX[\|�Vd[UW[|�WXh�̂ZWbUac�qvUYccds�_SiSXU�qnS[badX�~m��d[�ZWUS[s_dXc[SUS�VWbdX[\��XaUb�p�]vRV�xXUS[XWUadXWZyb�̂_̀ �jd[�̂[ScWbU�_dXc[SUSqnS[badX�~m��d[�ZWUS[s_dXc[SUS�VWbdX[\��XaUb�p�ryb�̂W[U�}��_dXc[SUS�VWbdX[\�WX�vSfiSXUWZ_dXc[SUS�̂WnaXf�̂[dhYcU�k̂ l�̀S�Ya[SiSXUb�qnS[badX�{m{�d[�ZWUS[s]begWZU�p�uWUadXWZ�]begWZU�̂WnaXf�]bbdcaWUadXyb�̂[dhYcU�_WUSfd[\�̀YZS�jd[]begWZU�VaTUY[Sb�qnS[badX�zm��d[�ZWUS[svUSSZ�p��ryb�̂_̀ ��YahWXcS�jd[�}YaZhaXf�p�̀SZWUSh�̂[dhYcUb�WXh�vS[nacSb|Ŵ[U�}��lSbafXWUSh�vUSSZ�_dXbU[YcUadX�̂[dhYcU�k̂ l�̀S�Ya[SiSXUb�qnS[badXzm��d[�ZWUS[svUSSZ�p�v_v��ZdtWZ�vS[nacSby�̂_̀ �jd[�lSbafXWUS�vUSSZ�_dXbU[YcUadX�̂[dhYcUbqnS[badX�{m��d[�ZWUS[s�ZWbb�p�uvw�xXUS[XWUadXWZ���uWUadXWZ��ZWbb�]bbdcaWUadX�wZWU��ZWbb�̂_̀qnS[badX�{m��d[�ZWUS[s�UgS[�qeZSWbS�beScaj\�aX�lSbc[aeUadX�dj�VWUS[aWZ�xXbUWZZSh�cdZYiXsuYiS[ac VWXYWZ�SXU[\ ]cUYWZ�fZdtWZ�oW[iaXf�edUSXUaWZ�jd[�UgS�beScajac�e[dhYcU|�Wb�ZabUSh�aXUgS�k̂ lm�̂ZSWbS�SXbY[S�UgWU�UgS��� �̂YXaUb�q�f_�zS�hScZW[Sh�YXaUsiWUcg�UgS�hScZW[Sh�YXaU�ZabUShuYiS[ac ]YUd�fSXS[WUSh Rgab�cWZcYZWUSb�UgS�SitdhaSh�cW[tdX�WndahSh�t\�YUaZa�aXf�UgS�rk_iWUS[aWZ�bSZScUSh�aXbUSWh�dj�W��tSUUS[�UgWX�WnS[WfS��XdXprk_bYtbUaUYUSmuYiS[ac VWXYWZ�SXU[\ kuk̀ ���vR]̀ �kXS[f\�̂S[jd[iWXcS�vcd[S�dj�UgS�eZWXUm�RgS[S�ab�XdiaXaiYi�bcd[S�[S�Ya[SiSXUmwd[�fZWbb|�YebU[SWi�cSiSXU�eZWXU|�WXh�bUSSZ�j[di�aXUSf[WUSh�iaZZb|Wb��iWXYjWcUY[S[�Ud�fSXS[WUS�WXh�[Sed[U�UgSa[�kuk̀ ���vR]̀kXS[f\�̂S[jd[iWXcS�vcd[S�eS[��gUUe���ooomSXS[f\bUW[mfdn�Seab]X\�cSiSXU|�fZWbb|�d[�aXUSf[WUSh�bUSSZ�eZWXU�tWbSh�aX�UgS��mvm�cWXYbS�UgS�j[SS�kuk̀ ���vR]̀ �kXS[f\�̂S[jd[iWXcS�xXhacWUd[�UddZ�UdfSXS[WUS�W�bcd[S|�SnSX�aj�UgS�eZWXU�ab�XdU�kuk̀ ���vR]̀ �cS[UajaShuYiS[ac VWXYWZ�SXU[\ �SW[�aX�ogacg�UgS�SXS[f\�bUW[�bcd[S�jd[�UgS�YebU[SWi�eZWXU�oWbcWZcYZWUShm_gSc��tdT VWXYWZ�SXU[\ _dXja[iWUadX�UgWU�UgS�aXjd[iWUadX�ZabUSh�[SjZScUb�UgS�iWUS[aWZ�WbaXbUWZZShm�Rgab�bgdYZh�tS�ZSjU�tZWX��YXUaZ�e[d�ScU�ab�cdieZSUSh_gSc��tdT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .