Hypothetical Project B - Waste Diversion Plan 2024 04 09.xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- 47PH0823R0003
About this file
This document is a Waste Diversion Plan for a federal contract opportunity called "Hypothetical Project B". The plan outlines the anticipated and actual waste diversion rates for various construction materials, including asphalt, brick, concrete, drywall, metals, and wood. It provides target diversion rates of 50% and a table for converting volume to weight measurements. The plan is to be submitted pre-construction and during project close-out.
The related federal contract opportunity is a Request for Proposal (RFP) for a multiple award Indefinite-Delivery Indefinite-Quantity (IDIQ) task order contract for construction, repair, and alteration services, with design-build and incidental abatement, in GSA/PBS Region 7 (Arkansas, Louisiana, New Mexico, Oklahoma, and Texas). The contract will be awarded to 5-7 small business concerns per geographic zone, with a maximum order limit of $2M for small projects and $6M for large projects. The contracts will be firm-fixed price, evaluated on technical merit (past performance and hypothetical projects) and price.
View the file
Other files
Show 40 more
Latest 50 of 164 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Waste Diversion Plan
| Project Waste Management Plan | Submittal Type: | Waste Diversion Plan (Anticipated): | X | Waste Diversion Report (Final) : | ||
| The general info in these gray cells replicates onto the Report tabs. | ||||||
| Project Name: | Hypothetical B | ECC (estimated construction cost): | Project Manager: | Brad Garbers | ePM/ePMX Project # : | Hyp A |
| Project Short Description: | PM email or phone: | 214-787-6254 | gBUILD Project # : | |||
| Building Number: | Service Center / Field Office: | Budget Activity: | RWA # : | N/A |
Anticipated Waste Diversion Plan To be filled out and submitted Pre-Construction, with final Construction Documents (PM or contractor populates this pink section) Actual Waste Diversion Report To be submitted during Project Close-Out (Reports tab figures auto-populate this green section)
| Material* | |||||
| (see weight conversion factors below) | Diversion Method | Target Diversion Rate for each material, by weight | |||
| (Change to actual target(s) as needed) | Diverted (lbs) | Landfilled (lbs) | Total C&D material weight (Diverted + Landfilled) (lbs) | Diversion |
Rate
| Reuse* | Recycle or Compost | Donation | ||||||
| Asphalt | 50% | 0 | 0 | 0 | n/a | |||
| Brick, Masonry, and Tile | 50% | 0 | 0 | 0 | n/a | |||
| Cardboard | 50% | 0 | 0 | 0 | n/a | |||
| Carpet, including Padding | 50% | 0 | 0 | 0 | n/a | |||
| Ceiling tile | 50% | 0 | 0 | 0 | n/a | |||
| Concrete | 50% | 0 | 0 | 0 | n/a | |||
| Drywall/ sheetrock (unpainted) | 50% | 0 | 0 | 0 | n/a | |||
| Metals | 50% | 0 | 0 | 0 | n/a | |||
| Painted wood, drywall, or plywood | 50% | 0 | 0 | 0 | n/a | |||
| Reusable items | 50% | 0 | 0 | 0 | n/a | |||
| Roofing | 50% | 0 | 0 | 0 | n/a | |||
| Soil, Rock, Land Clearing Debris | 4000 | 50% | 0 | 0 | n/a | |||
| Wood (unpainted) | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Total**: | 0 | 0 | 0 | n/a |
| Reuse is encouraged. Please list any items such as cabinets, doors, shelves, bricks, framing lumber, siding, fill material, misc. millwork, etc. planned for reuse. | |||
| Item | Reuse Onsite | Reuse Offsite | Off-Site Recipient or Salvage/ Deconstruction Company |
| Volume-to-Weight Conversion Factor Reference Table |
| If a hauler reports materials by volume, this table enables conversion to weight, for reporting actual diversion and disposal. |
| Asphalt paving: 1 cubic yard = 773 lbs | Dirt or sand: 1 cubic yard = 929 lbs |
| Asphalt or composite roof shingles: 1 cubic yard = 731 lbs | Fiberglass insulation, loose: 1 cubic yard = 17 lbs |
| Brick, laid flat: 1 flat square foot = 20 lbs | Mixed (composite) C&D material: 1 cubic yard = 417 lbs |
| Brick, loose: 1 cubic yard = 3,200 lbs. (1 cubic foot = 120 lbs) | Sheetrock (drywall), loose: 1 cubic yard = 393.5 lbs |
| Ceramic tile, scrap, loose: 1 cubic yard = 1,214 lbs | Rock, crushed: 1 cubic yard = 2,570 lbs |
| Concrete: 1 cubic yard = 860 lbs | Wood: 1 cubic yard = 169 lbs |
| *Only non-hazardous materials need to be included in this document. C&D mandates governing GSA exclude hazardous materials such as asbestos or lead-containing paint. |
| **At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics. |
ESRI_MAPINFO_SHEET
DO NOT EDIT
For Esri use only
File details come from the government source that posted it. Updated .