Bid Schedule Template 2024 04 09.xlsx
XLSX spreadsheet 48 KB Posted
- Solicitation number
- 47PH0823R0003
About this file
This document is a bid proposal template for a federal contract opportunity. It provides a detailed bid schedule format with fields for labor, material, and equipment costs across various construction divisions such as general requirements, concrete, masonry, metals, finishes, and mechanical/electrical systems. The template includes instructions for calculating overhead, profit, bonds, and taxes.
The related federal contract opportunity is a solicitation for a multiple award indefinite-delivery, indefinite-quantity (IDIQ) task order contract for construction, repair, alteration, design-build, and incidental abatement services in GSA/PBS Region 7 covering several states. The contract will be awarded to 5-7 small business concerns per geographic zone, with a maximum order limit of $2-6 million per zone depending on the project pool. Proposals will be evaluated based on technical factors like past performance and sample projects, which are more important than price.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Proposal Template
| GC IDIQ CONTRACTOR NAME | ||||
| PREPARED BY: | Ima Estimator | DATE: | 4/16/23 | |
| PROPOSAL SUMMARY | *In columns "C-G", a breakdown is only required for any "Substantial" labor, material or equipment. "Substantial" means above 2K or more than 10% of the entire project. All other pricing is considered "ancillary". |
| Project Number and Name: | Hypothetical: XX | |
| Building Number and Name: | ** Total of all costs for entire CSI division to include (substantial and ancillary pricing) | |
| RFP Number: |
| Divison 1 General Requirements | ||||||||
| SOW Task No. | DESCRIPTION | Unit Type* | QTY* | MATERIAL* | LABOR* | EQUIPMENT* | Line Item Total | DIVISION TOTAL** |
| General Requirements | ||||||||
| 1.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| General Conditions | ||||||||
| 1.2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 2 Existing Conditions | ||||||||
| 2.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 3 Concrete (footing) | ||||||||
| 3.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 4 Masonry (concrete block / brick) | ||||||||
| 4.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 5 Metals (beams) | ||||||||
| 5.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 6 Wood, Plastics and Composites (framing) | ||||||||
| 6.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 7 Thermal and Moisture Protection (insulation water barrier) | ||||||||
| 7.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 8 Openings (door ways / windows) | ||||||||
| 8.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 9 Finishes | ||||||||
| 9.1 | Carpet Tile 24"x24" | SY | 100 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 9.2 | Paint, 1 coat prime, 2 coats paint, no voc | SF | 4000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 10 Specialties | ||||||||
| 10.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 11 Equipment | ||||||||
| 11.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 12 Furnishings | ||||||||
| 12.1 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 13 Special Construction | ||||||||
| 13.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 14 Conveying Equipment | ||||||||
| 14.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 21 Fire Suppression | ||||||||
| 21.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 22 Plumbing | ||||||||
| 22.1 | 3/4" Type L Copper pipe, fittings, insulation, supports | LF | 120 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 23 Heating, Ventilation and Air Conditioning | ||||||||
| 23.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 25 Integrated Automation | ||||||||
| 25.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 26 Electrical | ||||||||
| 26.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 27 Communications | ||||||||
| 27.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 28 Electronic Safety and Security | ||||||||
| 28.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 31 Earthwork | ||||||||
| 31.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 32 Exterior Improvements | ||||||||
| 32.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Divison 33 Utilities | ||||||||
| 33.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Subtotal | $ - 0 | ||
| Overhead | 1.00% | $ - 0 | |
| Subtotal | $ - 0 | ||
| Profit | 1.00% | $ - 0 | |
| Subtotal | $ - 0 | ||
| Bonds | 1.00% | $ - 0 | |
| Subtotal | $ - 0 | ||
| Gross Receipts Tax | 1.00% | $ - 0 |
TOTAL $ - 0
Overhead Rate The offeror’s Rates must be ALL INCLUSIVE and shall included all indirect costs to include, but not limited to:
| 1. Subcontractor mark-ups |
| 2. General / Prime Contractor Overhead |
| 3. Social security contributions |
| 4. General insurances & Workmen's compensations insurance |
| 5. State & Federal unemployment insurance |
| 6. Mobilization and demobilization costs |
| 7. Quality control |
| 8. Adjustment factors to account for small jobs |
| 9. Incidental tools and equipment |
| 10. Submittals |
| 11. Task Order preparation costs |
| 12. GSA Project Management Information System engagement |
NOTE:
• Travel and travel-related costs will be paid only for travel outside the identified radius in roadway miles from the place of performance of the metropolitan area identified in the base contract. This includes subcontractors and suppliers.
• Profit is not included in this cost.
• Direct Project costs for: Project Manager, Superintendant and Bonds are not included in this cost.
File details come from the government source that posted it. Updated .