This document provides details for a federal design-build contract opportunity. The General Services Administration seeks proposals for the elevator modernization project at the Birch Bayh Federal Building and U.S. Courthouse in Indianapolis, Indiana. The scope of work includes designing and constructing upgrades to six passenger and one freight elevator. Key upgrades are solid state drive replacements, destination-based electronic controllers, door operators and safety systems, machine room upgrades, and hazardous material abatement. The contract will be awarded in two phases, with phase one evaluating qualifications and selecting up to three offerors for phase two. Phase two will require technical and price proposals, with the contract awarded to a single offeror. The total small business set-aside contract value is unknown. Interested parties must register to attend the February 8th pre-proposal conference. Proposals are due March 5, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

5P2QEB

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 03 – RFP 47PF0024R0014 Design Build Contract for the Birch Bayh Federal Building and U.S. Courthouse Elevator Modernization, Indianapolis, IN

Amendment 03 is hereby issued to incorporate additional RFI's and a revised PBS Past Performance Questionnaire (see attached).

You must acknowledge this and all amendments.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

R5 AMD Capital & Customer Projects Contracting Branch Capital Construction Team 230 S. Dearborn St Chicago IL 60604 USA

47PF0024R0014

02/21/2024

01/31/2024

Responses to RFI’s - Amendment 03

RFQ 47PF0024R0014

Design Build Elevator Modernization

Birch Bayh Federal Building and U.S. Courthouse 46 E. Ohio Street, Indianapolis, IN 46204

1) Question:

We have a follow up RFI to the Amendment #1 RFI responses:

Factor 1 Submittal Requirements – the solicitation states that the submitted projects will be considered similar if the contract value at award is in excess of $4,000,000. Due to the number of elevators within most facilities, it is rare that elevator specific modernization projects are awarded at excess of $4,000,000.

Please consider lowering the contract value threshold requirement to $2,800,000 as design-build elevator modernizations over $2,800,000 are less frequent.

Response:

The threshold specified in Factor 1 (reference The Solicitation, VI.G.) is lowered from $4,000,000 to $3,500,000.

2) Question:

I wanted to bring to your attention that the “Instructions for Questionnaire” document contradicts the instructions within the PPQ itself. The PPQ states that “The offeror will submit the completed questionnaire to PBS within their proposal”. Are we to have the client sent you the PPQ but also send us a copy so we can include in our proposal?

Response:

The Client completing the PPQ should follow the directions on the handout “Instructions for Questionnaire” and submit an electronic copy of the questionnaire directly to the Contracting Officer at lisa.gonzalez@gsa.gov. The “PBS Past Performance Questionnaire” has been revised to avoid confusion.

mailto:lisa.gonzalez@gsa.gov

PBS Past Performance Questionnaire July 2014

PBS PAST PERFORMANCE QUESTIONNAIRE

CONTRACT INFORMATION (Contractor/Offeror to complete Blocks 1-4)

1. CONTRACTOR/OFFEROR INFORMATION

Firm Name:

Address:

Phone Number: UEI Number:

Contact Name:

Email Address: Contact Phone Number:

2. GENERAL WORK INFORMATION

Work performed as: ☐ Prime Contractor ☐ Sub Contractor ☐ Joint Venture ☐ Other (Please explain):

Percent (%) of project work performed:

If a subcontractor, who was the prime (Name/Phone #):

3. CONTRACT INFORMATION

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: ☐ Firm Fixed Price ☐ Cost Reimbursement ☐ Other (Please explain)

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. PROJECT DESCRIPTION

Complexity of Work: ☐ High ☐ Med ☐ Routine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

Use the following adjective ratings and definitions in your evaluation of the Contractor’s performance.

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

CLIENT INFORMATION

Client Point of Contact Information

Name:

Title:

Phone Number:

Email Address:

Project Information

Contract Type:

Contract Title:

Contract Location:

Describe your role in the project:

Date Questionnaire was completed (mm/dd/yy):

Client’s Signature:

Instructions: Please select the adjective rating that best reflects your evaluation of the contractor’s performance.

1. QUALITY: E VG S M U N

(a) Quality of technical data/report preparation efforts. ☐ ☐ ☐ ☐ ☐ ☐

(b) Ability to meet quality standards specified for technical performance. ☐ ☐ ☐ ☐ ☐ ☐

(c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance. ☐ ☐ ☐ ☐ ☐ ☐

(d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance).

2. SCHEDULE/TIMELINESS OF PERFORMANCE: E VG S M U N

(a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below.)

(b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract. ☐ ☐ ☐ ☐ ☐ ☐

3. CUSTOMER SATISFACTION: E VG S M U N

(a) To what extent were the end users satisfied with the project? ☐ ☐ ☐ ☐ ☐ ☐

(b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication).

(c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? ☐ ☐ ☐ ☐ ☐ ☐

(d) Overall customer satisfaction. ☐ ☐ ☐ ☐ ☐ ☐

4. MANAGEMENT/ PERSONNEL/LABOR E VG S M U N

(a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? ☐ ☐ ☐ ☐ ☐ ☐

(b) Ability to hire, apply, and retain a qualified workforce to this effort. ☐ ☐ ☐ ☐ ☐ ☐

4. MANAGEMENT/ PERSONNEL/LABOR - Continued E VG S M U N

(c) Government Property Control. ☐ ☐ ☐ ☐ ☐ ☐

(d) Knowledge/expertise demonstrated by contractor personnel. ☐ ☐ ☐ ☐ ☐ ☐

(e) Utilization of Small Business concerns. ☐ ☐ ☐ ☐ ☐ ☐

(f) Ability to simultaneously manage multiple projects with multiple disciplines. ☐ ☐ ☐ ☐ ☐ ☐

(g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes.

(h) Effectiveness of overall management (including ability to effectively lead, manage and control the program). ☐ ☐ ☐ ☐ ☐ ☐

5. COST/FINANCIAL MANAGEMENT E VG S M U N

(a) Ability to meet the terms and conditions within the contractually agreed price(s)? ☐ ☐ ☐ ☐ ☐ ☐

(b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client.

(c) If this is/was a Government cost type contract, or a CMc/CMc at Risk Contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns).

(d) Is the Contractor’s accounting system adequate for management and tracking of costs? (If no, please explain in comment section below.) ☐ Yes ☐ No

(e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? (Indicate if show cause or cure notices were issued, or any default action in comment section below.)

☐ Yes ☐ No

(f) Have there been any indications that the contractor has had any financial problems? (If yes, please explain in the comment section below.) ☐ Yes ☐ No

6. SAFETY/SECURITY E VG S M U N

(a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.).

(b) Contractor complied with all security requirements for the project and personnel security requirements. ☐ ☐ ☐ ☐ ☐ ☐

7. GENERAL E VG S M U N

(a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

(b) Compliance with contractual terms/provisions (If there were specific issues, please explain in the comments sections below ☐ ☐ ☐ ☐ ☐ ☐

(c) In summary, provide an overall rating for the work performed by this contractor. ☐ ☐ ☐ ☐ ☐ ☐

8. SUSTAINABILITY

Did this project include sustainable methods, materials, processes or certifications? (See Whole Building Design Guide for acceptable requirements. Link to guide WBDG Green Building Standards and Certification Systems.) (If yes, please explain in the comments section below.)

☐ Yes ☐ No

9. SUMMARY

Would you hire or work with this firm again? (If no, please explain in the comments section below.) ☐ Yes ☐ No

COMMENTS SECTION

Please provide additional information below, and attach additional pages if necessary.

Please provide responses to the above questions (if applicable) and/or additional remarks. Also please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

File details come from the government source that posted it. Updated .