This amendment to a solicitation provides responses to additional questions received regarding a request for proposals from the General Services Administration for construction services. The project involves building out a new U.S. District Courtroom and holding cell at the Sam M. Gibbons U.S. Courthouse in Tampa, Florida. The amendment provides responses to questions on submittal requirements, the scope of cold formed metal framing and joint sealant work, HVAC controls integration, lighting control specifications, signage specifications, concrete mix specifications, and requests for information on existing building systems. Proposal due dates and all other terms remain unchanged.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Solicitation 47PE0723R0011 - Gibbons Courtroom 7B and Holding Cell - Additional RFI Responses 06/28/2023 AnswerQuestion

1 The photos are the best we are able to provide at this time.

Cold-formed metal framing systems that are detailed completely and explicitly on the drawings or completely specified, including depth, flange width, gage, and spacing of members, as well as connections to the supporting structure, do not need to be engineered. All other items will need to be designed and sealed per the specifications.

3 Yes, provide per the specifications.

Since this is an existing building with an established BAS, they would need to install controls to communicate with that existing system. That continues to be the protocol for existing buildings. In fact, the regional BAS specifications strictly forbids mixing systems in buildings that will not communicate with the existing front end computer.

The lighting control system design consists of general performance requirements and is intended to be biddable by multiple manufacturers.

6 Provide signage to match existing building signage.

The specifications are written to explicitly allow either ready-mixed or site mixed concrete.

The existing manufacturer / model is unknown. Provide the best match to the existing finishes.

9 AFA Protective Systems, Inc./Top Notch Fire & Safety

10 JCI

11 Siemens

AFA Protective Systems, Inc./Top Notch Fire & Safety (We have an agreement with AFA, and they sub out to Top Notch.)

We are looking for information or a POC with the vendor who installed the Notifier Alarm/Security System which is located on the seventh floor. Can you please furnish us with this information ?

The USMS uses TYCO for the building security system. Initial installer is unknown.

The pictures provided were blurry. It is hard to read the proprietary companies on panels and devices like t-stats.

054000 – Cold Formed Metal Framing requires Shop Drawings stamped by a Structural Engineer which is not industry standard and will be an additional unnecessary expense to the GSA and its customer.

079200 – Joint Sealants requires Preconstruction and Field Testing by the GC and GSA. It is questionable why this is required and if the GSA wants to spend monies on testing like this.

The is no DDC HVAC Controls specifications. I know Region 4 has an extensive HVAC Specification per P-100. If the existing system is Metasys(JCI), we would need to know how to handle the P-100 open protocol requirement.

260923 – Lighting Control Devices. There is no basis of design.

There is no specification section for Signage.

033000 – Concrete specification is written as if it were a project outside with easy access for concrete trucks. The concrete will need to be mixed on the 7th floor or windows will have to be removed and concrete pumped from the street with is cost prohibitive for such a small amount of concrete.

Finish Schedule requires the GC to match Access Floor. Carpets and Wallpaper without giving the manufacturer and model/spec to match.

Who currently maintains and tests the Fire Sprinkler Suppression System for the building.

Who maintains the HVAC DDC Control System?

What is the manufacturer for the Fire Alarm System?

What company maintains the Fire Alarm System?

Is LEED Certification required? No

topmostSubform[0]:
Page1[0]:
Code[0]: 4P1QB
Copies[0]: 1
CheckBox9[0]: 1
Code[2]:
NameandTitleOfficer[0]: Rania Sanders, Contracting Officer
Is[0]: Off
CheckBox10[0]: Off
NameandAddress[0]:
DateSigned[1]:
Pages[0]: 2
AmendmentNo[0]: 0003
Dated10B[0]:
ModificationNo[0]:
AdministeredBy[0]:
FacilityCode[0]:
CheckBox13B[0]: Off
CheckBox13D[0]: Off
ReqNumber[0]: EQ4P1PB-23-0002
Dated9B[0]: 5/19/2023
C13[0]:
Description[0]: The purpose of this amendment is to provide responses to additional RFI's received in response to the solicitation. The proposal due date and all other terms and conditions remain unchanged.
NotExtended[0]: 1
Code[1]:
AmendmentNo[1]: 47PE0723R0011
ContractIDCode[0]:
DateSigned[0]:
CheckBox11[0]: 1
Page[0]: 1
AccountingData[0]:
CopiesReturned[0]:
CheckBox13A[0]: Off
IsNot[0]: Off
EffectiveDate[0]: 6/28/2023
A13[0]:
ProjectNo[0]: N242531
CheckBox13C[0]: Off
Extended[0]: Off
D13[0]:
IssuedBy[0]: Gulf Coast Branch

Gulf Coast Branch 501 E POLK ST Room: 805

TAMPA, FL 33602-3949

NameandTitleSigner[0]:

File details come from the government source that posted it. Updated .