This document is a Program of Requirements (POR) for the design and construction of a new Engineering and Mission Operations (EMO) Facility N278 at the NASA Ames Research Center in Moffett Field, CA. The POR outlines the technical and performance requirements for the project site, building, systems, and services. Key details include:
The new 30,292 GSF facility will co-locate several key program functions including offices, meeting space, technical labs, support space, and collaborative/conference space. It will support NASA's goals to reduce facility footprint and operations/maintenance costs while providing a healthy, safe, efficient, modern, flexible, and sustainable work environment. The project requires demolition of two existing buildings (Motor Pool and Machine Shop) and two underground fuel tanks. The new facility must achieve LEED Gold and SITES Silver certification. The Government will use a two-phase design-build procurement process, with Phase 1 evaluating technical qualifications and Phase 2 evaluating design concepts, key personnel, management plan, and small business utilization. The estimated total design/build cost is between $33-43 million.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New Construction of Engineering & Mission Operations Facility - N278 NASA Ames Research Center – Moffett Field, CA
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
VOLUME III
Program of Requirements for Design-Build (DB) Contract
FINAL BID SUBMISSION
03 May 2024
PROJECT IDENTIFICATION
Project Name: New Construction of Engineering & Mission Operations Facility N278
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 2
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
VOLUME III – TABLE OF CONTENTS
I. ACRONYMS
II. PROGRAM OF REQUIREMENTS
A. SUMMARY
B. CODES, REGULATIONS, AND STANDARDS
C. SITE, LANDSCAPE, AND URBAN DESIGN
D. ARCHITECTURE / INTERIORS
E. STRUCTURAL
F. HEATING, VENTILATION, AIR CONDITIONING (HVAC)
G. BUILDING AUTOMATION AND CONTROLS
H. PLUMBING
I. FIRE PROTECTION AND LIFE SAFETY
J. ELECTRICAL AND LIGHTING SYSTEM
K. TELECOMMUNICATIONS AND ELECTRONIC SECURITY
III. APPENDIX A: PROGRAM, TEST FIT DIAGRAMS, AND ROOM DATA SHEETS
IV. APPENDIX B: COMMISSIONING PLAN
V. APPENDIX C: EXISTING UTILITIES & TOPOGRAPHIC DRAWINGS
VI. APPENDIX D: EXISTING WIND TUNNEL FOUNDATION DRAWINGS
VII. APPENDIX E: GEOTECHNICAL REPORT (REFERENCE ONLY)
VIII. APPENDIX F: AREA NOISE STUDY
IX. APPENDIX G: SAIC/NICS CABLE PLANT STANDARDS AND APPROVED PRODUCTS LIST
X. APPENDIX H: SAMPLE LEED SCORECARD
XI. APPENDIX I: SAMPLE SITES SCORECARD
XII. APPENDIX J: CONCEPTUAL SITE DEVELOPMENT PACKET
XIII. APPENDIX K: ENVIRONMENTAL REPORT
XIV. APPENDIX L: TECHNICAL SPECIFICATIONS GUIDE
XV. APPENDIX M: ARC TCE PLUME MAP
XVI. APPENDIX N: ELECTRICAL STANDARDS AND DETAILS
XVII. APPENDIX O: CLIMATE PROFILE
XVIII. APPENDIX P: NHPA SECTION 106 DOCUMENTATION
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 3
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
I. ACRONYMS
The following list represents the acronyms used in this Program of Requirements (POR):
A Ampere or Amp AABC Associated Air Balance Council ABAAS Architectural Barriers Act Accessibility Standards ACGIH American Conference of Government Industrial Hygienists AED Automatic External Defibrillator AHJ Authority Having Jurisdiction ANSI American National Standards Institute APR Ames Procedural Requirements ARC Ames Research Center ARC IT Ames Research Center Information Technology ARMD Aeronautics Research Mission Directorate ASE Annual Sunlight Exposure
ASHRAE
American Society of Heating, Refrigerating, and Air-Conditioning Engineers
ASI Architect's Supplemental Instruction ASTM American Society for Testing and Materials ATS Automatic Transfer Switch AWI Architectural Woodworking Institute
BACnet Building Automation Controls Network BAS Building Automation System BEP BIM Execution Plan BIM Building Information Model(ing) BISCI Building Industry Consulting Service International BMS Building Management System BOMA Building Owners and Managers Association BPOR Building Program of Requirements BUG Backlight, Uplight, and Glare
CBC California Building Code CCT Correlated Color Temperature CEC California Electrical Code CESM Cost Effective Spaceflight Missions CFD Computational Fluid Dynamics CFR Code of Federal Regulations CIP Cast In Place
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 4
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
CMC California Mechanical Code CML Concept Maturity Level CMP Center Master Plan COR Contracting Officer's Representative CP Communications Program CPC California Plumbing Code CRI Color Rendering Index CSI Construction Specifications Institute CT Current Transformer CxP Commissioning Provider
DB Design Build(er) DDC Direct Digital Control DID Design Intent Drawings
ECONPACK Economic Analysis Package EMO Engineering and Mission Operations Facility EMT Electrical Metallic Tubing EO Executive Order EPA Environmental Protection Agency ETL Electrical Testing Laboratories
FCC Federal Communications Commission FDC Fire Department Connection FM Factory Mutual FOUO For Official Use Only FPE Fire Protection Engineer FSL Facilities Security Level FT or ft Feet
GPM Gallons per Minute GSA General Services Administration GSF Gross Square Feet
HEOMD Human Exploration and Operations Mission Directorate HH Hand Hole(s) HP Horsepower HVAC Heating, Ventilation, and Air-Conditioning
ICEA Insulated Cable Engineers Association
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 5
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
IECC International Energy Conservation Code IEEE Institute of Electrical and Electronics Engineers IES Illuminating Engineering Society IESNA Illuminating Engineering Society of North America IGBT Insulated-gate Bipolar Transistor IP Internet Protocol ISC Interagency Security Committee ISO International Standards Organization IT Information Technology kA Kiloampere KIAC Kennedy Infrastructure Application and Communications kV Kilovolt kW Kilowatt
LCCA Life Cycle Cost Analysis LED Light-emitting Diode LEED Leadership in Energy and Environmental Design LonWorks Local Operating Network LPD Lighting Power Densities
MAQ Maximum Acceptable Quantity MDC Mission Design Center MH Maintenance Hole(s) MIL-STD Military Standard MTS Manual Transfer Switch
N/A Not Applicable NAC Notification Appliance Circuit NASA National Aeronautics and Space Administration NCRA National Roofing Contractors Association NEBB National Environmental Balancing Bureau NEC National Electrical Code NEMA National Electrical Manufacturers Association NETA International Electrical Testing Association NFPA National Fire Protection Association NICS NASA Integrated Communications Services NPD NASA Policy Directive NPR NASA Procedural Requirements NSF Net Square Feet
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 6
FOR OFFICIAL USE ONLY
OSHA Occupational Safety and Health Administration
PBS Public Buildings Service PBS P-120 Project Estimating Requirements for the Public Buildings Service PBS-P100 GSA Facilities Standards for the Public Buildings Service ph Phase PIV Post Indicator Valve POR Program of Requirements PPE Personal Protective Equipment psi or PSI Pound-force per Square Inch PT Potential Transformer PVC Polyvinyl Chloride PWM Pulse-width Modulation
RDS Room Data Sheet RH Relative Humidity
SDA Spatial Daylight Autonomy SDC Seismic Design Category SEFA Scientific Equipment and Furniture Association sf or SF Square Feet SITES The Sustainable SITES Initiative SLC Signaling Line Circuit SMACNA Sheet Metal and Air-Conditioning Contractor's National Association SMD Science Mission Directorate SPO Spaceflight Projects Office STC Sound Transmission Class STD Standard STMD Space Technology Mission Directorate SWMP Stormwater Management Plan SWRCB State Water Quality Control Board
TBB Telecommunications Bonding Backbar TCE Trichloroethylene TCP Transmission Control Protocol TGB Telecommunications Grounding Busbar THD Total Harmonic Distortion TIA Telecommunications Industries Association TMGB Telecommunications Main Grounding Bus Bar
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 7
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
TPO Thermoplastic Polyolefin TR Telecommunications Room
UFC Unified Facilities Guide UL Underwriters Laboratories UPS Uninterruptible Power Supply USBGC The U.S. Green Building Council USF Usable Square Feet UTP Unshielded Twisted Pair
V Volt VAV Variable Air Volume VCB Vacuum Circuit Breaker VoIP Voice over Internet Protocol
W Watt
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 8
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
II. PROGRAM OF REQUIREMENTS
A. SUMMARY
1. This Volume, Volume III, is the Program of Requirements (POR) and its main function is to communicate the technical and performance requirements associated with the project site, building, systems, and services. These requirements are provided in both performance and prescriptive forms and are intended to be used in conjunction with all other provisions in the Program of Requirements (POR) volumes, Solicitation, and Agreement below:
GSA’s Solicitation and Agreement for the Design-Build Contract
Volume I: Design-Build Statement of Work
Volume II: Division 1 Specifications
2. Collectively, the volumes of this POR, GSA’s P100, NASA’s referenced Standards, and other referenced codes and standards represent the Government’s requirements of the Design Builder and may be referred to as “governing documents,” “the POR,” or the “Contract Documents.” Stated requirements and references are intended as complementary and shall be considered together to arrive at the complete solution for the project.
3. This volume outlines the Government’s basic design requirements for the new facility to the extent such requirements can be documented in the absence of a design to graphically illustrate the requirements. It captures the information that is of foremost importance to the Government for the design of a fully functional, modern Engineering and Mission Operations (EMO) Facility – Building N278. Each section describes both general requirements of the Government as well as those requirements specific to Building N278. The Government believes these documents are as complete as can reasonably be expected for use as the basis design for the project.
4. The Government recognizes that design requirements alone, no matter how well prepared, cannot and need not convey all the information that shall reasonably be understood by an experienced Design Builder. Further, they cannot anticipate or regulate every variable of a design approach that is developed during the procurement process. Therefore, the Government expects the Design Builder, having the knowledge and expertise of these types of facilities, to interpret the intent of the design requirements correctly and supplement the project with the required expertise to achieve a complete, high quality, and fully functional design. The project design and its ultimate implementation shall be complete in every way and shall provide the durability, serviceability, and full functionality anticipated by the requirements within the POR, notwithstanding that the technical requirements or arrangement of any component of the facility may not be completely described.
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 9
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
5. Building systems shall be designed for ease of operation and cost-effective maintenance and repair. System accessibility is a critical consideration in the building’s design. Anticipate the means and methods expected for the inspection, adjustment, cleaning, maintenance, repair, and replacement of building components.
6. All building components that require routine inspection, adjustment, cleaning, maintenance, repair, and replacement shall be so located, oriented, or otherwise designed to allow for optimal, safe, and unencumbered access by building maintenance personnel. Access shall include both the route to the component and the required clearances. Access to components shall be addressed for each maintenance task and shall conform with NASA requirements.
7. Components shall be located and oriented to allow the removal and replacement of such components or parts thereof, without the need for special rigging, removal of non-related components or equipment, or requiring special safety precautions.
8. Worker access and component removal/replacement shall be demonstrated in the Building Information Model (BIM). Animation is not required, and verification may be provided through static clash modeling. All components that require routine inspection, adjustment, cleaning, maintenance, repair, and replacement shall be modeled. GSA or NASA may exclude components where adequate access and removal/replacement is obvious without modeling. Volume I introduces the BIM standards applicable to the project.
9. Material and finish selections shall emphasize durability, extended life, replaceability, and visual appearance based on facility use and anticipated level of wear. Material and finish selections shall also meet all performance and sustainability requirements as noted throughout the POR at a minimum. Finishes selected shall present a cohesive palette. The Design Builder shall ensure that the design supports quality-based performance for reduced operation and maintenance. Material types, quality and finishes, commensurate with residential design and construction are unacceptable for use on this project. The Design Builder shall provide interior construction and fixtures that shall not be damaged by ordinary cleaning and maintenance operations. The Design Builder shall consider cost, ease of maintenance, and sustainability requirements while ensuring the best value for the Government.
10. A Responsibility Matrix is included in Volume I, Appendix A. This Matrix outlines aspects of the design and construction of the facility and identifies a responsible party for each.
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 10
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
B. CODES, REGULATIONS, AND STANDARDS
1. Overview
Unless otherwise indicated in this document, the project shall comply with the current adopted code at the time of permit submission of the following laws, regulations, standards, codes, and criteria documents (some of which are listed within NASA- Standard-10002, PBS-P100, and APR 8829.1, but are listed herein for additional emphasis or clarification).
Conflicts between codes or standards and NASA/GSA requirements: To ensure flexibility, NASA/GSA’s policy is to make maximum use of equivalency clauses in all codes and standards. If a conflict exists between NASA/GSA requirements and the NASA/GSA-adopted codes or standards, the most stringent requirement shall take precedence. All such conflicts must be brought to the attention of the NASA and GSA projects managers. Modifications to minimum Code requirements shall be approved by NASA's Chief Building Official (CBO) by means of submitting an Alternative Materials, Design and Methods of Construction and Equipment request to the CBO, through the GSA Project Manager, for review and approval. Reference Section 012500 – Substitution Procedures for submittal requirements.
All applicable laws, regulations, standards, codes, and criteria documents referenced below and in the GSA PBS-P100 are hereby incorporated into this contract by this reference. NASA has also adopted the requirements of Cal Health and Safety Code, Section 18938.5 which specifies that the project shall be designed to the current adopted code at the time of permit submission, and the code edition shall be locked in for construction. The Design Builder will be responsible for anticipating and incorporating code updates between the contract award and the permit submission.
2. GSA Facilities Standards PBS-P100
The PBS-P100, "Facilities Standards for the Public Buildings Service," is GSA's mandatory facilities standard. It applies to the design and construction of new federal facilities. The P100 informs and regulates decisions made throughout a project's life.
All references to the P100 are tied to the July 2018 version, which was the most current version at the time of award of this POR development. The latest version of the GSA PBS-P100 at time of contract award shall be used in the design and construction of this project. Refer to all guidance documents available at:
https://www.gsa.gov/real-estate/design-construction/engineering-and-architecture/facilities-standards-p100-overview
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 11
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
P100 contains both performance-based and prescriptive requirements. It specifies levels, or tiers of performance or standards, allowing the Design Builder to identify and implement the best strategies to meet the project goals. The specific requirements defined therein are mandatory minimums and not voluntary. As a general matter, the Solicitation and Agreement, P100, the volumes of the POR, and standards incorporated by reference represent the overarching documents that govern the Design Builders performance in executing the Work.
Building N278 shall meet the P100 BASELINE Tier performance criteria unless noted otherwise within this POR.
3. NASA Requirements and Standards
NASA Design standards shall be complied with for the Building N278 project unless in conflict with GSA PBS-P100, where the more stringent shall govern. The NASA Fire Marshal, as the Authority Having Jurisdiction (AHJ), has primary responsibility to ensure compliance with NASA-STD 8719.11 and NASA-specific criteria for ARC. Any conflicts between the GSA and NASA standards shall be brought to the attention of the NASA and GSA project managers. Other NASA roles and responsibilities during construction such as the Construction Permit Office, Chief Building Official, Permit Reviewers, etc. are defined in APR 8829.1 as well as NASA Occupational Safety, Health and Medical Service Division, and Construction Safety Management as defined in APR 8715.1 Chapter 27. The NASA design standards not publicly available will be provided by GSA as part of the solicitation via a large file transfer or a flash drive. The list of attachments is provided in Appendix B of Volume I.
The Design-Builder shall comply with all requirements listed in these specifications.
Exceptions to GSA PBS-P100 where the NASA Standards take precedence are listed below, but are not all inclusive, and shall be the responsibility of the Design Builder to identify all such exceptions.
Green roofs are not permitted.
All underground abandoned lines shall be removed and terminated back to the nearest junction/connection unless they are under an existing building to remain.
If there are abandoned electrical wiring present, they will need to be removed back to the source in coordination with NASA.
Aluminum windings are not permitted for Harmonic Transformers, only copper windings are approved.
Aluminum cables or conductors are not permitted, only copper cables and conductors are approved.
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 12
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
Aluminum bus duct is not permitted, only copper bus duct is approved.
Intermediate metallic conduit is not permitted for direct buried conduit, only PVC coated, galvanized rigid steel conduit or schedule 80 PVC conduit are approved.
Schedule 40 PVC conduit is permitted for concrete-encased ductbanks; however, rigid steel long radius bends must be used for all duct bank direction changes.
The minimum required cover shall be governed by the NEC. Concrete-encased ductbanks shall be red concrete with supporting rebar and detectable foil warning tape.
Below grade PVC is not permitted for water, sanitary sewer, and storm drainage systems due to plume issues.
Plastic receptacle device plates are not permitted, only stainless steel plates are approved.
Purple, not orange, conductors shall be used for 480/277-V Phase B.
Grounding rods shall be 3/4-inch in diameter with a length of 10 feet, minimum.
Electric Vehicle (EV) Charging Stations shall be limited to Federal Vehicles only and are not to be used for employee use. Cal Green requires the installation of EV charging stations; however, Federal Fiscal Law prohibits providing this for employee use. Federal use will require a key system. Design Builder to provide conduit and pathway to the parking lot for future installation by NASA.
The collection, storage, treatment, and use of reclaimed water is not permitted due to maintenance and cost concerns.
NASA standards shall be used for all work on the ARC campus using the above-listed guidance for items, including the following:
Utility Outage Requests and Utility Connection Requests
Application for Connecting to Government Electrical Utilities
Access to Site
Excavation Plans and Permits
Site Specific Safety Plans
Traffic Control Plans
Confined Space Permit
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 13
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
Crane Permit
Security Requirements and Regulation Observance
Design Builder Personnel Requirements
Work restrictions
Scheduling of Work
Coordination with occupants
Project Signage
Hot Work Permits
NASA Ames Fire Prevention Standards and Working Hours
Project Notification Requirements
Other Agency Permits Include: Air Quality (BAAQMD), Underground Tanks, Water Discharge, Excavation, and Santa Clara County Hazardous Materials Division permits. Design Builder will be responsible for any associated fees with these permits outside of NASA.
4. Codes and Standards
The Design Builder shall comply with the latest edition of all applicable federal, state, and Santa Clara County codes and building ordinances, and laws and obtain all permits and approvals required by the Authority Having Jurisdiction (AHJ).
The facility and site will be NASA-owned. All products, materials, and equipment specified shall be installed in accordance with the manufacturer’s recommendations and written specifications. The Public Buildings Amendments of 1988, 40 United States Code 3312, require that each building constructed or altered by GSA or any other federal agency shall, to the maximum extent feasible, comply with all listed applicable codes and their referenced codes.
In addition to building-specific codes, the project shall comply with the latest adopted edition or update of federal, state, and local environmental laws, regulations, and Executive Orders (EOs). Project teams are advised to collaborate with the NASA/GSA regional environmental coordinator, NASA Ames Chief Building Official, and the Office of the Chief Architect for assistance during the design process.
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 14
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
Applicable Building Codes and Standards:
NASA-Standard-10002, including NASA NPR 8820.2H and APR 8829.1
GSA PBS-P100, Facilities Standards for the Public Buildings Service, most current edition, including all applicable standards, criteria and guides listed therein. Design submissions shall comply with PBS-P100 Appendix A unless otherwise indicated in this Statement of Work, plus addenda
California Building Code (CBC) family of building codes and Industry Standards shall be incorporated as required by the PBS-P100 and APR 8829.1 requirements
California Code of Regulations, Title 24, Part 1-12 (California Building Standards Code (CBSC) including County of Santa Clara Codes and Ordinances
California Building Code, Chapter 11B Accessibility to Public Buildings
California Mechanical Code (CMC)
California Plumbing Code (CPC)
California Electrical Code (CEC)
California Energy Code (CEnC)
California Green Code (CalGreen)
GSA PBS Order Number 3490.3 (2021) Security for Sensitive Building Information Related to Federal Buildings, Grounds, or Property
GSA PBS P-120, Project Estimating Requirements for the Public Buildings Service
Architectural Barriers Act Accessibility Standard (ABAAS)
GSA PBS Building Commissioning Guide (latest version)
GSA PBS Pricing Desk Guide (latest version)
The Construction Specifications Institute (CSI) MasterFormat, latest edition
Code of Federal Regulations 29 CFR Parts 1910 and 1926 including Occupational Safety and Health Administration (OSHA) Regulations
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 15
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
Sheet Metal & Air Conditioning Contractors National Association, Inc. – (SMACNA) Seismic Restraint Manual “Guidelines for Mechanical Systems”
NASA Specific / Local Requirements and Guidelines:
(a) NASA NPR 8820.2H Facility Project Requirements
(b) NASA APR 8829.1 ARC Construction Permit Process
(c) NASA Reliability-Centered Building and Equipment Acceptance Guide
(d) NASA Reliability-Centered Maintenance Guide for Facilities and Collateral Equipment
(e) NASA APD 8830.1 Reliability Centered Maintenance Program for Institutional Equipment
(f) NASA APR 8500.1 ARC Environmental Procedural Requirements
(g) NASA APR 8715.1 Chapter 27 Construction Safety Management
(h) NASA APR 8715.2B NASA Emergency Management Program Procedural Requirements
(i) NASA STD-8719.7 Facility System Safety Guidebook
(j) NASA STD 8719.11B Safety Standard for Fire Protection
(k) NPD 1600.2E NASA Security Policy
(l) NPD 8710.5 Policy for Pressure Vessels and Pressurized Systems
(m) NPD 8820.2E Design and Construction of Facilities
(n) NPD 8831.2E Facilities Maintenance and Operations Management
(o) NPR 1600.1 NASA Security Program Procedural Requirements
(p) NPR 7150.2 NASA Software Engineering Requirements
(q) NPR 8510.1 NASA Cultural Resources Management; and Historic and Architectural Survey and Evaluation of Facilities, Nov. 6, 2017
(r) NPR 8553.1B NASA Environmental Management System
(s) NPR 8570.1A Energy Efficiency and Water Conservation
(t) NPR 8590.1A NASA Environmental Compliance and Restoration Program
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 16
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
(u) NPR 8715.3D - NASA General Safety Program Requirements
(v) Santa Clara Unidocs
(w) CCR Title 19 Public Safety Division 1 (State Fire Marshal)
(x) CCR Title 19 Public Safety Division 2 (Office of Emergency Services)
(y) CA Health and Safety Code, Division 20, Chapter 6.95 Hazardous Materials Release Response Plans and Inventories
(z) Santa Clara County Hazardous Materials Storage Ordinance, Division B11, Chapter 13
(aa) CCR Title 8 Subchapter 6 (California Elevator Safety Orders, Both New and Existing)
(bb) ASME A17.1 American Society of Mechanical Engineers (ASME) Safety Code for New Elevators and Escalators
(cc) County of Santa Clara Sustainable Landscape Ordinance, > 500 sf., establishing new water-efficient landscaping regulations, Ordinance No. NS–
1200.328 and NS-1200-361
(dd) NFPA 70E (Workplace Electrical Safety)
(ee) CCR Title 17 Public Health, Division 3 Air Resources Chapter 1 Air Resources Board
(ff) CCR Title 17 and 22 (Potable and Non-Potable Water)
(gg) CCR Title 17 Protection of Water Systems (Cross Connections, Backflow Protection)
(hh) Bay Area Air Quality Management District (BAAQMD) Rules and Regulations
(ii) City of Mountain View/Palo Alto Sewer Use Ordinances and Specifications (PA Sewer Use Ordinance chapter 16.09) to include connection permits and metering requirements
(jj) California State Water Resources Control Board General Permit for Discharges of Storm Water Runoff Associated with Construction and Land Disturbance Activities (Storm Water General Permit)
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 17
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
(kk) California Water Board, Small MS4 General Permit WQ order 2013-0001-
DWQ
(ll) Project-specific Stormwater Pollution Prevention Plan (as required by the Storm Water General Permit), which includes NASA ARC Storm Water Best Management Practices for construction activities (from APR 8500.1 Chapter 14 “Storm Water Management”, as appropriate
(mm) NFPA 54 - National Gas Fuel Code (System lines over 5psi)
(nn) National Electric Safety Code (NESC)
(oo) International Electrical Testing Association Acceptance Testing Standard
(ANSI/NETA ATS)
(pp) Pressure systems has adopted both ASME B31.1 – Power Piping, ASME B31.9 – Building Services Piping, and ASME B31.8 – Gas Transportation & Distribution Piping Systems, which are above CPC/CMC requirements.
SEFA Recommended Laboratory Practices
The latest edition of these codes and standards in effect at the time of design contract award shall be used throughout design and construction of the project.
The Design Builder shall also be responsible for anticipating and incorporating code updates between contract award and the permit submission, as required by the NASA Permit Review Board.
Additional references to codes, standards and regulations are included in Volume II – Division 1 Specifications.
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 18
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
C. SITE, LANDSCAPE, AND URBAN DESIGN
1. General Requirements
The design shall meet P100 BASELINE Tier performance criteria for Urban Planning per Section 2.2 with highlights as follows:
2.2.1(a) Sustainable Locations: Site uses existing local infrastructure resources and preserves natural resources.
2.2.1(b) Sustainable Locations: Site supports neighborhood connectivity, walkability, and transportation access with exception noted below:
(a) The site may or may not meet this baseline criteria but shall be verified and coordinated with NASA.
2.2.2 Collaborative Design Process: Design considers input of local officials with supplemental criteria noted below:
(a) All coordination with local authorities shall be done through and in tandem with NASA.
2.2.3 Design for Public Use: Interior and exterior spaces with exception noted below:
(a) Assembly areas may or may not be designed to allow manageable public access after-hours.
The design shall meet P100 BASELINE Tier prescriptive requirements for Urban Planning/Design and Site per Section 2.3 with supplemental criteria as follows:
All coordination with local authorities shall be done through and in tandem with
NASA.
The design shall meet P100 BASELINE Tier performance/prescriptive requirements for Landscape Design per Section 2.4/2.5 and County of Santa Clara standards. All landscape and irrigation designs are to be reviewed and coordinated with NASA Facility Engineering & Real Property Management Division – Plant Engineering Branch in order to incorporate ARC maintainable solutions and best practices.
The project sites contain existing utilities. A description of known utilities and underground structures is included in this POR, but it shall be the Design Builder’s responsibility to validate those findings, locate all existing utilities horizontally and vertically, and to coordinate any existing utility relocations.
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 19
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
Durations of utility shutdowns affecting the existing systems shall be kept to a minimum.
In the event a utility shutdown is required, all preparation work shall be conducted prior to shutdown. Obtain approval from NASA Project Manager/Construction Manager, through the GSA Project Manager, of the affected building(s) prior to shutdown. Facility Engineering Code JCM shall be notified prior to shutdown and place administrative LOTO lock to the shutdown utilities. LOTO procedures in APR 8715.1 Chapter 31 apply to any high energy utilities such as electrical, natural gas, or high-pressure air and shall be strictly adhered to. 8715The utility shutdown shall be coordinated directly with NASA and adhere to the following schedule:
Water/Fire – no shutdown time is allowed between 6 AM and 6 PM Monday through Friday.
Sanitary Sewer – no shutdown time is allowed between 6 AM and 6 PM Monday through Friday.
Storm Sewer – no shutdown time is allowed during rain events or if rain is forecast during the duration of the shutdown. Otherwise, no restrictions.
The design shall provide building utility connections to the facility as follows:
Water / Fire: Domestic water and fire services lines shall be provided to the proposed building. The domestic water service will continue directly to the building to an interior reduced pressure backflow preventer and domestic water service meter located just inside the mechanical room. The fire line shall enter the building just after a reduced pressure backflow preventer for fire water, followed by a post-indicator shut-off valve that shall be installed adjacent fire department connection. Based on the specific site design criteria, the fire service line may need to loop around the building and to provide flow to on-site fire hydrants.
(a) Verify flow and pressure of existing domestic water system such that connection shall successfully serve the proposed building without affecting the existing domestic water system.
(b) Provide a full domestic water system to service the proposed building to meet flow and pressure requirements as determined by the CBC and the NASA Fire Marshal.
Sanitary Sewer: Sanitary building sewers shall be routed from the building via gravity flow to the nearby sanitary sewer main. Sanitary manholes shall be placed at all changes in direction or slope. A sanitary cleanout and monitoring port shall be provided at each connection point to the building. The monitoring ports shall be located downstream of all main laterals from the building. No
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 20
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed lateral connections are to be made downstream of the monitoring ports. If necessary, a sanitary lift station shall be installed just outside the building if there is insufficient fall from the building to the municipal sewer to flow via gravity.
(a) The point of connection to the existing sanitary sewer system shall retain at least 50% spare capacity in the overall system. Design Builder shall perform flow tests to confirm capacity prior to design.
(b) All sewer lines shall be designed for a minimum flow velocity of two (2) feet per second at peak daily flow.
(c) All sewer lines shall be designed for maximum capacity of no more than one half (1/2) full flow.
(d) Vertical curves and bend fittings in gravity sewer are not allowed.
(e) All sewers must have a minimum clearance of five (5) feet from the proposed building.
(f) Horizontal and vertical separation from domestic water lines shall conform to the State of California, Department of Health Services, “Criteria for the Separation of Water and Sanitary Sewer.”
Storm Drain: Storm drains shall collect all on-site impervious areas such as pavements, walkways, building roof drains, etc. The storm drains shall route the flows into on-site storm water detention and water quality treatment areas to meet water quantity such that there is no increase in peak flow rate or total volume of discharge from the project site, and to meet quality requirements.
(a) Overland conveyance may be used to convey larger storm events. At least six (6”) inches of freeboard shall be maintained between the finished floor of the building and the highest anticipated water surface elevation.
(b) To the extent possible, natural open channels shall be utilized to convey stormwater.
(c) Evaluate the appropriate use of Low Impact Development (LID) methods as may be best suited to their individual topography, soils, and site elements and quality requirements.
Electricity: Electrical service shall be provided and derived from the existing campus medium voltage system. Medium voltage and low voltage feeders shall be underground. Overhead lines are not permitted. Refer to the Electrical section within this document for additional information.
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 21
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
Gas: A natural gas connection from the existing nearby gas lines shall be routed to the building through a natural gas meter and pressure regulator located on an exterior building wall and then into the mechanical room.
Stormwater Management:
Stormwater discharges for either small or large construction activities shall follow the requirements of the California State Water Quality Control Board (SWRCB) Order No. 2009-0009-DWQ, National Pollutant Discharge Elimination System (NPDES) General Permit No. CAS000002 for Discharges of Stormwater Runoff Associated with Construction and Land Disturbance Activities, referred to herein as the Construction General Permit (CGP) and shall meet the requirements in the San Francisco Bay Region Municipal Regional Stormwater NPDES Permit (Order No. r2-2015-0049, Permit No. CAS612008).
The design shall provide permanent post-project stormwater management measures to meet the site-specific design criteria per Sections 2 and 3 as follows (measures may include but are not limited to):
(a) Pervious Pavements: Pervious pavements may be included for areas such as parking and drive aisles. Porous asphalt, and/or interlocking unit pavers aid in storm water management by allowing ground infiltration, thus reducing site storm water runoff and water quality treatment. The advantage of pervious pavements is that they take no additional space to the already dedicated parking and drive areas. Approval of pervious pavements to be coordinated directly with NASA.
(b) Stormwater Bio-Retention Areas: Stormwater Bioretention areas typically located adjacent to pavement, and parking and drive aisles provide water quality treatment and a reduction in storm water quantity to be detained in larger ponds. These planted areas capture runoff from the initial “first flush” of pavement areas to pick up deposited salts, metals, and other chemical contaminates and filter through soil infiltration before the storm water enters downstream ponds and outlet areas.
(c) Stormwater Ponds: Stormwater ponds may be used to detain excess storm water flows created from increased run-off associated with impervious areas such as pavements, walks and building roofs. These ponds can either be continually wet or designed to become dry during periods of limited rainfall.
The ponds shall have extended detention pools where low flows shall drain over a longer period of time to allow settling of contaminates to reduce their discharge into downstream sewers, open ditches and streams.
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 22
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
The design shall provide exterior site accessibility per ABAAS standards.
Screening Enclosures
Trash and Recycling
(a) Provide a screened enclosure to accommodate two dumpsters. Dumpster capacity and collection type to be confirmed by NASA during the design process.
(b) Screening shall prevent viewing of dumpsters from outdoor areas and walkways through the use of a screen wall that is aesthetically compatible with the building palette.
Generator
(a) Provide a screened enclosure to accommodate the emergency generator.
Coordinate access, locking, etc.
(b) Screening shall prevent viewing of generator from outdoor areas and walkways through the use of a screen wall that is aesthetically compatible with the building palette.
The design shall achieve LEED Gold and SITES Silver per P100.
A sample LEED scorecard was prepared and is included in Appendix H. It is not intended to dictate which credits the design team is to pursue, but rather provide a possible path to Gold.
A sample SITES scorecard is included for reference in Appendix I.
The Design Builder is responsible to register the project and pay all fees with USGBC, as well as the procurement and installation of a bronze plaque for the building.
Fire Protection and Life Safety
The NASA Fire Marshal is the Authority Having Jurisdiction for fire protection and life safety on the campus. NASA ARC has its own dispatch and fire department.
The site shall be designed for fire access based on local standards.
(a) Fire access through pedestrian areas adjacent to the building is to be designed in consultation with the ARC Fire Department.
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 23
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
(b) Design/Build team shall provide 25’ clear fire access for the building and facilitate a review with the ARC Fire Department prior to finalizing plans.
Landscape Design
All landscape and irrigation design shall follow County of Santa Clara standards and Gal Green. All landscape and irrigation design is to be reviewed and coordinated with NASA Plant Engineering Branch in order to incorporate ARC maintainable solutions and best practices.
Landscaping shall include native, drought resistant, and adapted non-invasive plant materials in accordance with LEED and SITES requirements and NASA ARC maintenance best practices. Landscape shall not include fruiting trees.
Provide irrigation per ARC maintenance best practices. Turf shall be limited to areas where turf will be used for active or passive recreational activities or to continue existing turf from adjacent sites.
(a) Irrigation shall use purple piping.
(b) Grey water capture and reuse for irrigation or appropriate building uses (such as toilet flushing) shall not be permitted on this project due to system cost and maintenance.
(c) Due to maintenance concerns, ARC prohibits planting on exterior sheathing materials constituting the building envelope.
2. Building N278 Site Location & Requirements
Location: The site is bounded by Warner Road to the north, existing surface parking and Mark Avenue to the east, building N216A and the 7’x10’ wind tunnel and building N215 to the south, and C-Lane (a service alley) to the west.
Historic Preservation: The N278 site sits within the NASA Ames Wind Tunnel Historic District. This district was listed in the National Register of Historic Places in 2017 and includes five buildings (N215, N220, N221/B, N226, and N227) for their associations with aeronautical and aerospace research, the development of aircraft and spacecraft, and the evolution of wind tunnel technology in the United States. The historic designation is just for these five (5) buildings and does not impact the architecture and development of the N278 site. NASA has received approval from SHPO. The approval and Section 106 information has been provided in Appendix P.
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 24
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
National Environmental Policy Act (NEPA): NASA is leading the NEPA process. The NEPA review is not yet complete and the environmental requirements that the project will need to incorporate are not yet identified. The project (demo, construction and operation) will be analyzed, and requirements identified based on the potential for environmental impacts. The final NEPA documentation will contain all those requirements and the project will need to comply with them. This may include constraints on construction such as construction vehicle engine classifications, frequency of watering to control dust, dewatering management, pre-construction surveys for biological resources, etc. Design Builder to coordinate with NASA to ensure that the design and construction of the new facility is coordinated with the NEPA requirements identified in the Final NEPA documentation for the project.
Figure C.1 – Site Context
ARC Center Master Plan (CMP)
Building N278 is being knit into the existing campus fabric. Its location and program are part of an effort to consolidate core competencies – in this case within the Project Engineering, Integration, and Management District. The site sits adjacent to the Unitary Complex to the north, the Operations Logistics/Security District to the east, the Amenities District to the south, and the Discovery Sciences District (Space and Earth, Astrobiology, and Life Sciences)
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 25
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed to the southwest. See Figure C.5 for the Future Campus Integration Plan for N278.
In the future, there is a plan for C-Lane to become a greenspace/pedestrian promenade. Though that project is not yet funded, the design for N278 must take the future greenspace/connector into account. The creation of outdoor gathering, meeting, and spill-out spaces for N278 that engage with the greenway is crucial to its success as an integrated part of the campus.
South of the building site, at the termination of C-Lane, there is a triangle of land formed by Durand and King Roads. This site is planned as the future Amenities District (cafeteria, fitness center, conferencing spaces) and large outdoor gathering space. The future C-Lane greenway will terminate at this amenities hub.
The site planning is to take future laboratory expansion into account and identify a location for that future expansion; however no systems are to be upsized. See also the requirements in the P100 regarding this issue.
The ARC Center Master Plan identified the following overarching principles and goals:
(a) Physical Planning
(i) Desirable campus. A well-designed campus which eliminates physical barriers and encourages interactions.
(ii) Collaboration and creation of a community of diverse expertise driven by excellence.
(iii) Pedestrian-oriented campus. Clearly defined, safe, pedestrian pathways that form connections between public and open spaces that are appropriately segregated from vehicles are integral to the creation of a healthy campus-like environment.
(iv) Public spaces. Creation of significant public spaces that support and enhance the new image of the campus as a collaborative learning environment and provide venues for interaction and collaboration as well as large ceremonial gatherings.
(v) Safety, security and efficiency. Address physical security and provide for clarification of access and circulation as well as overall site security, and safety and security of personnel. Provide for efficient facilities management and operations.
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 26
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
(vi) Clearly defined circulation and parking. Address the safe movement of vehicles, pedestrians and bicycles and provide clear and efficient means of wayfinding throughout the campus. Consider pedestrian-friendly core spaces with convenient, consolidated parking and balanced access.
(b) Facilities
(i) Replacement of obsolete and degraded facilities.
(ii) Footprint reduction of existing facilities on campus per NASA and ARC policies.
(iii) Flexible facilities and mission-suitability.
(iv) Support services.
(v) Increase affordability.
(vi) Enhanced work environment. Provide conducive, comfortable, state-of-the-art workspaces to attract the next generation of NASA researchers and support their continued intellectual growth and productivity in an increasingly competitive environment.
(vii) Prioritize durability and ease of maintenance in design of building and site.
(c) Environmental
(i) Sustaining the natural environment and improving landscaping.
Emphasize the importance of conserving the site’s natural resources and protecting and enhancing the regional, recreational and open space assets of the campus.
(ii) Enhance the quality of the environment and conserve energy resources.
Incorporate sustainable design and green building concepts to enhance the quality of the campus-like workplace and the natural environment, as well as improve site and building efficiency and promote the conservation of energy.
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 27
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
General Site & Site Utility Information: The graphics that follow illustrate the designated building site with known utilities and hazards. The wind tunnel shown was previously demolished, but the Design Builder shall remove the remaining existing wind tunnel foundations and any existing abandoned utilities prior to constructing the new N278. In addition to the wind tunnel foundations and general utility work, the Design Builder shall demolish Building N216 (Machine Shop) and Building N251 (Motor Pool Building).
Work at N251 shall also involve the removal of two existing below grade fuel tanks, above grade fuel pumps, a building grease trap, and an oil pit, coordinating the work with NASA Ames Environmental Management Division. The removal of the underground fuel tanks will require approved Closure Permits from the County of Santa Clara per the requirements at https://hazmat.sccgov.org/programs-and-services/underground-storage-tanks. Additional utility demolition and/or relocation is as indicated in Figure C.2 below. Recent survey files from 2014 and site utility information are provided in Appendix C. The Design Builder shall minimize utility lines running underneath the building footprint to maximize maintenance as much as practicable. Wind Tunnel demolition drawings and photographs along with N216 and N251 existing building and site drawings will be provided as part of the solicitation.
Figure C.2 – Site and Existing Utilities
VOLUME III: BUILDING PROGRAM OF REQUIREMENTS – FINAL BID SUBMISSION 28
FOR OFFICIAL USE ONLY
Do not remove this notice
Properly destroy or return documents when no longer needed
Floodplains, Sea Level Rise, and Inundation: Though the site is adjacent to wetlands and the San Francisco Bay, information gathered in the…