This is a table of contents and summary section for construction specification documents for the 1st Floor Build-Out of the Binghamton Federal Building & Courthouse located at 15 Henry Street, Binghamton, NY 13901 (GSA Project #47PC0521F0080).
The base bid work requires the contractor to furnish all materials, equipment, labor, and supervision for a comprehensive renovation project incorporating selective demolition of interior architectural, mechanical, and electrical systems; reconfiguration of interior doors and walls; modifications to mechanical, plumbing, and electrical systems including VAV work in select zones, unit replacements/upgrades, and BMS sequencing with testing and balancing; and replacement of floor, wall, and ceiling finishes with specialty finishes including acoustically-rated systems. The contract documents reference work across multiple construction divisions including thermal and moisture protection, openings, finishes, specialties, furnishings, fire suppression, plumbing, HVAC, and electrical systems. The contractor must interface with the GSA Authority Having Jurisdiction (AHJ) for all major life safety submittal reviews and approvals. The project was designed by N.K. Bhandari, Architecture & Engineering, P.C., with C&S Companies retained as architect's consultant. The document status is marked for construction dated 07/16/2025.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
1ST Floor Build-Out FOR CONSTRUCTION Binghamton Federal Building & Courthouse 06/06/2024 15 Henry St., Binghamton, NY 13901
TABLE OF CONTENTS 000100 - 2
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice - properly destroy or return documents when no longer needed
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
078413 PENETRATION FIRESTOPPING
079200 JOINT SEALANTS
DIVISION 8 – OPENINGS
081113 HOLLOW METAL DOORS AND FRAMES
081213 HOLLOW METAL FRAMES
081416 FLUSH WOOD DOORS
087100 DOOR HARDWARE
DIVISION 9 – FINISHES
092216 NON-STRUCTURAL METAL FRAMING
092900 GYPSUM BOARD
095113 ACOUSTICAL PANEL CEILINGS
096513 RESILIENT BASE AND ACCESSORIES
096519 RESILIENT TILE FLOORING
096536 STATIC-CONTROL RESILIENT FLOORING
096813 TILE CARPETING
099123 INTERIOR PAINTING
DIVISION 10 – SPECIALTIES
101423.16 ROOM IDENTIFICATION PANEL SIGNAGE
102600 WALL AND DOOR PROTECTION
104413 FIRE PROTECTION CABINETS
104416 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
123661.16 SOLID SURFACING COUNTERTOPS
DIVISION 21 – FIRE SUPPRESSION
211313 WET PIPE SPRINKLER
FOR CONSTRUCTION
07/16/2025
1 04/24/26 Table of Contents
MARK DATE DESCRIPTION
Binghamton Federal Building & Courthouse 06/06/2024 15 Henry St., Binghamton, NY 13901
TABLE OF CONTENTS 000100 - 3
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice - properly destroy or return documents when no longer needed
DIVISION 22 – PLUMBING
220517 220518 220523 220529 220553
SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
ESCUTCHEONS FOR PLUMBING PIPING
GENERAL-DUTY VALVES FOR PLUMBING PIPING
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
220719 221116 221119 221316 221319 221320 224216
PLUMBING PIPING INSULATION
DOMESTIC WATER PIPING
DOMESTIC WATER PIPING SPECIALTIES
SANITARY WASTE AND VENT PIPING
SANITARY WASTE PIPING SPECIALTIES
SANITARY DRAINS
COMMERCIAL SINKS
DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING
230513 230514 230529 230553 230593 230713 230719 230900 232113 233113 233300 233600 233713 237200 238113 238239
COMMON MOTOR REQUIREMENTS FOR HVAC
ELECTRIC WIRING FOR HVAC EQUIPMENT
HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
TESTING, ADJUSTING AND BALANCING FOR HVAC
DUCT INSULATION
HVAC PIPING INSULATION
INSTRUMENTATION AND CONTROL FOR HVAC
HYDRONIC PIPING
METAL DUCTS
AIR DUCT ACCESSORIES
AIR TERMINAL UNITS
DIFFUSERS, REGISTERS AND GRILLES
ROOF ACCESSORIES
VARIABLE REFRIGERANT FLOW SYSTEM
UNIT HEATERS
DIVISION 26 – ELECTRICAL
260501 260502 260519 260526 260529 260533 260553 260943 262213 262416 262726 263323 265119
COMMON WORK RESULTS FOR ELECTRICAL
SELECTIVE ELECTRICAL DEMOLITION
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
IDENTIFICATION FOR ELECTRICAL SYSTEMS
DISTRIBUTED DIGITAL LIGHTING CONTROL SYSTEM
LOW-VOLTAGE DISTRIBUTION TRANSFORMERS
PANELBOARDS
WIRING DEVICES
CENTRAL BATTERY EQUIPMENT FOR EMERGENCY LIGHTING
LED INTERIOR LIGHTING
FOR CONSTRUCTION
07/16/2025
Binghamton Federal Building & Courthouse 06/06/2024 15 Henry St., Binghamton, NY 13901
SUMMARY 011000 - 1
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice properly destroy or return documents when no longer needed
SECTION 011000 – SUMMARY
PART 1 - GENERAL
1.1 PROJECT INFORMATION
A. Project Name and Location:
1. 1st Floor GSA Tenant Build-Out
BINGHAMTON FEDERAL OFFICE BUILDING & COURTHOUSE
15 Henry St.
Binghamton, NY 13901
GSA Project #: 47PC0521F0080
B. Project Summary Description:
1. Base Bid Work: Furnish all materials, equipment, labor, and supervision to perform all work described by the contract Documents for the Binghamton Federal Building & Courthouse 1st Floor Build-Out.
a. The contract work incorporates demolition, general construction, electrical, mechanical, plumbing, hard-wall partitions, security and telecommunication work to meet United States Government requirements as follows:
Selective demolition of interior Architectural, Mechanical and Electrical systems, structures and finishes to support the renovation work.
Reconfiguration of interior doors and walls as indicated in the contract documents
(both drawings and specifications).
Modifications of mechanical, plumbing, and electrical systems to serve the new uses of the renovated spaces, including but not limited to:
o VAV work in select zones o Unit replacement/upgrades o BMS sequencing, testing, and balancing
Replacement of floor, wall, and ceiling finishes.
Installation of specialty finishes as necessary, including acoustically-rated systems.
2. The contractor shall expect to interface with the GSA Authority Having Jurisdiction (AHJ) for all major Life Safety contract submittal reviews & approvals. Typically, all submittals, once completed, will be grouped and transmitted to the AHJ for review and final approval.
3. Failure to coordinate the work successfully does not grant the contractor any special adjustments or considerations to their contract for additional time or fee.
C. Architect: The term Architect refers to the project designer. The Architect's status relative to the construction will be stated in writing by the Contracting Officer prior to the pre-construction conference. The project was designed by:
1. N.K. BHANDARI, Architecture & Engineering, P.C.
1020 7th North Street, Suite 130 Liverpool, NY 13088
D. Architect's Consultants: Architect has retained the following design professionals, who have prepared designated portions of the Contract Documents:
1. C&S Companies