This is a table of contents and summary section for construction specification documents for the 1st Floor Build-Out of the Binghamton Federal Building & Courthouse located at 15 Henry Street, Binghamton, NY 13901 (GSA Project #47PC0521F0080).

The base bid work requires the contractor to furnish all materials, equipment, labor, and supervision for a comprehensive renovation project incorporating selective demolition of interior architectural, mechanical, and electrical systems; reconfiguration of interior doors and walls; modifications to mechanical, plumbing, and electrical systems including VAV work in select zones, unit replacements/upgrades, and BMS sequencing with testing and balancing; and replacement of floor, wall, and ceiling finishes with specialty finishes including acoustically-rated systems. The contract documents reference work across multiple construction divisions including thermal and moisture protection, openings, finishes, specialties, furnishings, fire suppression, plumbing, HVAC, and electrical systems. The contractor must interface with the GSA Authority Having Jurisdiction (AHJ) for all major life safety submittal reviews and approvals. The project was designed by N.K. Bhandari, Architecture & Engineering, P.C., with C&S Companies retained as architect's consultant. The document status is marked for construction dated 07/16/2025.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

1ST Floor Build-Out FOR CONSTRUCTION Binghamton Federal Building & Courthouse 06/06/2024 15 Henry St., Binghamton, NY 13901

TABLE OF CONTENTS 000100 - 2

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice - properly destroy or return documents when no longer needed

DIVISION 7 – THERMAL AND MOISTURE PROTECTION

078413 PENETRATION FIRESTOPPING

079200 JOINT SEALANTS

DIVISION 8 – OPENINGS

081113 HOLLOW METAL DOORS AND FRAMES

081213 HOLLOW METAL FRAMES

081416 FLUSH WOOD DOORS

087100 DOOR HARDWARE

DIVISION 9 – FINISHES

092216 NON-STRUCTURAL METAL FRAMING

092900 GYPSUM BOARD

095113 ACOUSTICAL PANEL CEILINGS

096513 RESILIENT BASE AND ACCESSORIES

096519 RESILIENT TILE FLOORING

096536 STATIC-CONTROL RESILIENT FLOORING

096813 TILE CARPETING

099123 INTERIOR PAINTING

DIVISION 10 – SPECIALTIES

101423.16 ROOM IDENTIFICATION PANEL SIGNAGE

102600 WALL AND DOOR PROTECTION

104413 FIRE PROTECTION CABINETS

104416 FIRE EXTINGUISHERS

DIVISION 12 - FURNISHINGS

123661.16 SOLID SURFACING COUNTERTOPS

DIVISION 21 – FIRE SUPPRESSION

211313 WET PIPE SPRINKLER

FOR CONSTRUCTION

07/16/2025

1 04/24/26 Table of Contents

MARK DATE DESCRIPTION

Binghamton Federal Building & Courthouse 06/06/2024 15 Henry St., Binghamton, NY 13901

TABLE OF CONTENTS 000100 - 3

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice - properly destroy or return documents when no longer needed

DIVISION 22 – PLUMBING

220517 220518 220523 220529 220553

SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

ESCUTCHEONS FOR PLUMBING PIPING

GENERAL-DUTY VALVES FOR PLUMBING PIPING

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

220719 221116 221119 221316 221319 221320 224216

PLUMBING PIPING INSULATION

DOMESTIC WATER PIPING

DOMESTIC WATER PIPING SPECIALTIES

SANITARY WASTE AND VENT PIPING

SANITARY WASTE PIPING SPECIALTIES

SANITARY DRAINS

COMMERCIAL SINKS

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING

230513 230514 230529 230553 230593 230713 230719 230900 232113 233113 233300 233600 233713 237200 238113 238239

COMMON MOTOR REQUIREMENTS FOR HVAC

ELECTRIC WIRING FOR HVAC EQUIPMENT

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

TESTING, ADJUSTING AND BALANCING FOR HVAC

DUCT INSULATION

HVAC PIPING INSULATION

INSTRUMENTATION AND CONTROL FOR HVAC

HYDRONIC PIPING

METAL DUCTS

AIR DUCT ACCESSORIES

AIR TERMINAL UNITS

DIFFUSERS, REGISTERS AND GRILLES

ROOF ACCESSORIES

VARIABLE REFRIGERANT FLOW SYSTEM

UNIT HEATERS

DIVISION 26 – ELECTRICAL

260501 260502 260519 260526 260529 260533 260553 260943 262213 262416 262726 263323 265119

COMMON WORK RESULTS FOR ELECTRICAL

SELECTIVE ELECTRICAL DEMOLITION

LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

IDENTIFICATION FOR ELECTRICAL SYSTEMS

DISTRIBUTED DIGITAL LIGHTING CONTROL SYSTEM

LOW-VOLTAGE DISTRIBUTION TRANSFORMERS

PANELBOARDS

WIRING DEVICES

CENTRAL BATTERY EQUIPMENT FOR EMERGENCY LIGHTING

LED INTERIOR LIGHTING

FOR CONSTRUCTION

07/16/2025

Binghamton Federal Building & Courthouse 06/06/2024 15 Henry St., Binghamton, NY 13901

SUMMARY 011000 - 1

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

SECTION 011000 – SUMMARY

PART 1 - GENERAL

1.1 PROJECT INFORMATION

A. Project Name and Location:

1. 1st Floor GSA Tenant Build-Out

BINGHAMTON FEDERAL OFFICE BUILDING & COURTHOUSE

15 Henry St.

Binghamton, NY 13901

GSA Project #: 47PC0521F0080

B. Project Summary Description:

1. Base Bid Work: Furnish all materials, equipment, labor, and supervision to perform all work described by the contract Documents for the Binghamton Federal Building & Courthouse 1st Floor Build-Out.

a. The contract work incorporates demolition, general construction, electrical, mechanical, plumbing, hard-wall partitions, security and telecommunication work to meet United States Government requirements as follows:

Selective demolition of interior Architectural, Mechanical and Electrical systems, structures and finishes to support the renovation work.

Reconfiguration of interior doors and walls as indicated in the contract documents

(both drawings and specifications).

Modifications of mechanical, plumbing, and electrical systems to serve the new uses of the renovated spaces, including but not limited to:

o VAV work in select zones o Unit replacement/upgrades o BMS sequencing, testing, and balancing

Replacement of floor, wall, and ceiling finishes.

Installation of specialty finishes as necessary, including acoustically-rated systems.

2. The contractor shall expect to interface with the GSA Authority Having Jurisdiction (AHJ) for all major Life Safety contract submittal reviews & approvals. Typically, all submittals, once completed, will be grouped and transmitted to the AHJ for review and final approval.

3. Failure to coordinate the work successfully does not grant the contractor any special adjustments or considerations to their contract for additional time or fee.

C. Architect: The term Architect refers to the project designer. The Architect's status relative to the construction will be stated in writing by the Contracting Officer prior to the pre-construction conference. The project was designed by:

1. N.K. BHANDARI, Architecture & Engineering, P.C.

1020 7th North Street, Suite 130 Liverpool, NY 13088

D. Architect's Consultants: Architect has retained the following design professionals, who have prepared designated portions of the Contract Documents:

1. C&S Companies

FOR CONSTRUCTION