This is a Standard Form 30 (Amendment of Solicitation/Modification of Contract) issued by the General Services Administration (GSA) PBS Office of Acquisition Management. Amendment Number 0002, effective February 5, 2026, pertains to Solicitation 47PC5226R0009 for Project RME05602 (Calais IA LPOE located at 180 International Ave, Calais, ME 04619). The amendment includes additional RFI (Request for Information) questions answered and an Electrical Drawing. The hour and date specified for receipt of offers is not extended. Offerors must acknowledge receipt of this amendment prior to the specified deadline by completing items 8 and 15 and returning copies, acknowledging receipt on each copy of the offer submitted, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers. The contracting officer is Joseph Spado, and the contractor is not required to sign and return copies of this document.
The RFI responses address technical questions regarding the roofing project scope, including confirmation that a roof core sample has been taken with all material to be removed per specifications. Detailed specifications for the new roof system are referenced on page 6 of the scope of work, existing roof conditions are detailed on page 1 and related prints, and re-sloping of the substrate is required per page 2, section 10. The contractor must provide a detailed project plan with labeled sections and removal sequence timelines. Acceptable materials include acrylic-based construction seam tape (or aluminum foil type), 20 PSI polyiso insulation board, and 24-gauge prefinished metal cap and flashing with field cuts painted/treated. The membrane shall create a protective envelope adhering to plywood and concrete per manufacturer specifications to maintain TPO warranties and withstand 100+ MPH wind speeds. Manufacturer-approved adhesives are acceptable pending submittal approval. The amendment includes architectural sections (AE 820, AE 821, AE 822) detailing wall sections, parapets, and roof details, as well as complete electrical sections addressing grounding and canopy lighting requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment 47PC5226R0009_0005.pdf | ||
| Solicitation Amendment 47PC5226R0009_0004.pdf | ||
| Solicitation Amendment 47PC5226R0009_0003.pdf | ||
| Solicitation Amendment 47PC5226R0009_0001.pdf | ||
| 47PC5226R0009 - North Calais IA - LPOE Roof Replacement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
1/14/2025
Joseph Spado, Contracting Officer
RME05602EQ1PS-26-00070002
PBS Office of Acquisition Management/Acquisition Project Delivery Contracting Division East/Contracting Branch B 1800 F Street NW Washington , DC 20405 USA
47PC5226R0009
PQBB
PBS Office of Acquisition Management/Acquisition Project Delivery Contracting Division East/Contracting Branch B 1800 F Street NW Washington , DC 20405 USA
PQBB
2/5/2026
This amendment includes additional RFI questions answered and an Electrical Drawing.
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
pg. 1
General Service Administration
R1.PBS.1PSK
MC Smith FBCH 202 Harlow Street Bangor, Maine 04401
RFI Responses: from Solicitation and site walk.
Project Number: R M E 0 5 6 0 2
Project: Calais IA LPOE 180 International Ave Calais, ME 04619
Date: 21 Jan 2026
Has a roof core sample taken of the existing roof system? This would help confirm the existing insulation type and substrate conditions.
Yes, a core sample has been taken, we want all material removed per page 1 section 5. Core samples have no bearing of scope. Material can also be found on the blueprint.
Will a full specification be provided for the new roof system, including base layer requirements, insulation type and thickness, and the roofing materials to be used?
Page 6 of the scope of work.
What is the existing roof system, including exact materials currently in place? Is the intent for the new roof to match the existing materials and architectural style?
Page 1 of the scope of work, and on multiple pages of print provided. Intent is to maintain architectural style, and similar material.
Will any re-sloping of the substrate be required to address existing ponding or drainage issues?
Yes, per page 2 section 10 of the Scope of work.
The removal of the roof will be done in small sections and new product installed prior to additional removal. This will require multiple inspections. I know we need to give 48hours notice as well. Can we assume that decisions will be made quickly upon inspection in order to keep the project moving as well as keep everything watertight?
Decisions will be made on site at time of inspection. A detailed project plan will need to be provided with sections labeled and a order of sequence in which they will be removed. (provide a timeline for each section)
pg. 2
What brand and type of mastic or adhesive is specified for substrate preparation if cracks in the concrete deck require filling, and is there a required cure time for this material prior to installation of the vapor barrier?
There are multiple brands of foam filler available in the market, provide a material that is suitable for bonding to a concrete roof deck system and submit the data sheet during the submittal process.
Can taping of insulation seams be omitted? We do not typically see that on flat roof structures and it will cause inconsistent adhesion of the dens deck between the tape material and insulation.
It is my knowledge that taping seams should 100 percent be done and actually it allows better adhesion for the dens deck, minimizes moisture seepage and drastically reduces the risk of delamination, while also increases your thermal retention.
If taping is required, can you please provide the specified tape (type, width, adhesion method)?
An acrylic-based construction seam tape , there is also a aluminum foil type tape.
Is substitution of 5/8" DensDeck Prime with a high-density polyiso cover board acceptable? The existing concrete deck will act as the fire barrier, and the high-density polyiso is manufactured by the same manufacturer as the remainder of the roofing system, whereas DensDeck is a third-party product. The high-density polyiso also provides a durable walking surface while reducing dead load by more than 1 lb per square foot.
Provide a Data sheet on the equal material and it will be reviewed during the submission process.
Will standard 24ga prefinished metal cap and flashing be acceptable?
Under the scope of work, general tasks #11, is the roof manufacture walk to be done prior to the TPO install? If so, we assume only for the first section that is being completed.
Yes, 24 Gauge prefinished cap and flashing is acceptable, paint/treat any field cuts.
With the multiple section removal install approach I would like for the manufacture (Prior to the TPO roof being installed) but fully prepared and ready for the roofing membrane to be installed, site walk the section of roof where there is the higher parapet is located. Then a second walkthrough once the
pg. 3 roof is completed.
Can you provide Plan pages AE 820 and AE 821 detailing coping cap condition?
See attached print
Unless clarified on the above referenced plan pages, can you please define how the factory fabricated coping clip ties into the existing metal wall panels on top of the parapet wall? Would the installer provide a continuous cleat only to secure the membrane and shop fabricate a coping cover to match existing profile and color? If so, access would needed to secure the cleat on all three side of the system. Cross section of Permatite Coping shown below.
See attached print , and a cleat will be needed.
Should we assume any manufacturer approved membrane adhesive would be acceptable for use? Any odor restrictions/concerns?
Yes, a manufactured approved membrane adhesive will be acceptable, provide submittal during submittal process of project.
Is 20 PSI Polyisocyanurate acceptable for flat and tapered insulation?
Yes a 20 PSI polyiso insulation board is acceptable, as long as meeting the thickness spec’d
Where will the AVB stop at the parapet wall conditions? At the top of the insulation or extended up the vertical face and onto the horizontal top?
Membrane shall create a protective pan / envelope, membrane shall stick to Plywood and concrete and meet manufacture specs for TPO to properly adhere to and maintain all manufacture warranties and wind speeds of 100 MPH or greater.
Could you provide electrical drawings of the building? We need additional information of the grounding as well as canopy lighting.
See attached complete Electrical sections.
Kevin R Dessureault Construction Project Manager
MBA, PMP, FAC-PPM II, COR II
GSA – R1.PBS.1PSK
1"
4" M
IN
LC
1'-2 3/4"1'-0"
1'-2 3/4"1'-0"
LC
1"
T.O. SILL
6" M
IN
6" M
IN
T.O. WDW
OPENING
18 GA MTL STUDS
@16" OC
STRUCT COL BEYOND
3"
1"
STAFF ENTRY
T.O.S.
1"
A
LI
G N
2' -0
1/ 2"
1/
2" 8"
4" M
IN
2 LAYERS PTD PLYWD
T.O. STL
1"
5"
7" 4"
4"10
/2
1"
1"
3/
8"
1"
1' -4
T.O. CONC
1' -4
1' -1
0" T
.O . P
LY
W
D
1' -0
1' -1
/4
PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
ROBERT SIEGEL ARCHITECTS
OVE ARUP & PARTNERS CONSULTING ENGINEERS PC
SASAKI ASSOCIATES INC.
CONSTRUCTION DOCUMENTS
CONFORMED SET
2/08/2008
AE 8 20
WALL SECTION DETAILS
SCALE: 1 1/2"=1'-0"1 SECTION NC LOBBY
SCALE: 1 1/2"=1'-0"6 SECTION NC LOBBY WDW HEAD
SCALE: 1 1/2"=1'-0"11 SECTION @ REINFORCED PARAPET
SCALE: 1 1/2"=1'-0"16 SECTION @ STAFF LOBBY
SCALE: 1 1/2"=1'-0"4 SECTION @ FIREARMS RANGE
SCALE: 1 1/2"=1'-0"9 SECTION @ NC LOBBY LIGHT SHELF
SCALE: 1 1/2"=1'-0"14 SECTION @ NC LOBBY LIGHT COVE
SCALE: 1 1/2"=1'-0"3 SECTION @ HARD ZONE
SCALE: 1 1/2"=1'-0"8 SECTION @ HARDZONE
SCALE: 1 1/2"=1'-0"13 SECTION @ NC LOBBY RETURN AIR
SCALE: 1 1/2"=1'-0"5 SECTION @ NC ENCLOSED INSPECTION
SCALE: 1 1/2"=1'-0"10 SECTION @ NC ENCLOSED INSPECTION
SCALE: 1 1/2"=1'-0"15 SECTION @ BFR IN HARD ZONE
SCALE: 1 1/2"=1'-0"20 SECTION @ BFR IN HARD ZONE
SCALE: 1 1/2"=1'-0"22 SECTION @ INSPECTION BAY
SCALE: 1 1/2"=1'-0"23 TYPICAL PARAPET
SCALE: 1 1/2"=1'-0"24 SECTION @ BFR IN HARD ZONE
SCALE: 1 1/2"=1'-0"21 SECTION @ COL 11 EXP/MVNT JNT
SCALE: 1 1/2"=1'-0"2 SECTION @ NC OFFICE
SCALE: 1 1/2"=1'-0"7 SECTION @ NC OFFICE WDW HEAD
SCALE: 1 1/2"=1'-0"12 SECTION @ CONF RM SILL
SCALE: 1 1/2"=1'-0"18 SECTION @ STAFF LOBBY
SCALE: 1 1/2"=1'-0"19 SECTION @ STAFF LOBBY
SCALE: 1 1/2"=1'-0"17 SECTION @ CONF RM WDW HEAD
1 AMENDMENT NO. 107.25.07
LC
LCLC
CORR MTL PANELS
SEALANT
LC 2' WIDE ICE &
WATER SHIELD
OVERLAPS GUTTER CONT
CLCOL
5/ 8"
9" 1'-0" 7" 7"
8"
8 5/8" 4 1/8" 6"
4"
3/ 4"
6" 3/
4"
1"
CONC WALK
SEE CIVIL DWGS
MTL SILL FLASH
11" LC FTR
F.O. SLAB
1"
EXT. UPLIGHTS
8"
1/ 2"
NIITOF T.O.S.
3 1/2"
8" 2"
8" M
IN
VIF
T.O.
STRUCT
WELD
4" x 6" CONT
STL ANG
MC CHANNEL
SEE STRUCT
DWGS
CORR MTL FAS
T.O.
STRUCT
CORR MTL PNL-
CONT FROM
FIN FLR TO
ROOF SOFFIT
EXT SHEATH
4" RIGID INSUL
WP MEMB
STUCCO SOFFIT
SEE AE 822
4 3/4"
1/
8"
EXT. SHEATH
STL COL BEYOND
4"x4" STL ANG
STL SHELF ANG
SEE STRUCT DWGS
CEMENT PARGE TO 1'-0"
BELOW FIN GRADE
6" 18 GA MTL STUDS
@24" O.C.
STUCCO STARTER TRACK
W/ WEEPS - SEE AE 822
1"
8"
1/2" CEMENT BD
W.P. MEMBRANE
GRAVEL TRENCH DRAIN
SEE CIVIL DWGS
WP MEMB
4" M
IN 1"
1"
CONT MTL FLASH- UP
VERT WALL 8" MIN
SPRAY APPLIED W.P.
1"
A
LIG
N
3/ 4"
5 1/2" 5 1/2"
6" M
IN 3/
4"
SEALANT
CORR MTL PANELS
LIGHTNING PROTECTION
LC
1 1/2" 1"
1"
1"
1"
1" 1'-0 1/2"
1/
2"
GALV"Z"
FLUSH SEAM
METAL PNL
1 1/2"
PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
ROBERT SIEGEL ARCHITECTS
OVE ARUP & PARTNERS CONSULTING ENGINEERS PC
SASAKI ASSOCIATES INC.
CONSTRUCTION DOCUMENTS
CONFORMED SET
2/08/2008
AE 8 21
WALL SECTION PLAN DETAILS
SCALE: 1 1/2"=1'-0"1SECTION CORR N102C THRESHOLD
SCALE: 1 1/2"=1'-0"2SECTION @ NC ENTRY SILL
SCALE: 1 1/2"=1'-0"3SECTION @ FIREARMS ENTRY
SCALE: 1 1/2"=1'-0"5SECTION @ STAFF LOBBY
SCALE: 1 1/2"=1'-0"6SECTION CORR N102C WDW HD
SCALE: 1 1/2"=1'-0"7SECTION @ NC ENTRY WDW HD
SCALE: 1 1/2"=1'-0"11SECTION CO LOBBY WDW HD
SCALE: 1 1/2"=1'-0"8SECTION @ NIITOF
SCALE: 1 1/2"=1'-0"13SECTION @ NIITOF
SCALE: 1 1/2"=1'-0"10SECTION @ FIREARMS CANOPY
SCALE: 1 1/2"=1'-0"12SECTION @ NC ENTRY SOFFIT
SCALE: 1 1/2"=1'-0"4SECTION @ USFDA / SILL
SCALE: 1 1/2"=1'-0"14SECTION @ NIITOF
SCALE: 1 1/2"=1'-0"19SECTION @ NIITOF
SCALE: 1 1/2"=1'-0"20 SECTION @ NIITOF GUTTER
SCALE: 1 1/2"=1'-0"22 SECTION @ CO DOCK PARAPET
SCALE: 1 1/2"=1'-0"17SECTION @ CO DOCK PARAPET
SCALE: 1 1/2"=1'-0"16SECTION @ CORR N102J
SCALE: 1 1/2"=1'-0"21SECTION @ CORR N102J WDW HD
SCALE: 1 1/2"=1'-0"27 SECTION @ FITNESS RM
SCALE: 1 1/2"=1'-0"33 SECTION @ FTNS RM WDW HD
SCALE: 1 1/2"=1'-0"23 SECTION @ COMM EXAM BAY CURB
SCALE: 1 1/2"=1'-0"24 SECTION @ COMM EXAM BAY CURB
SCALE: 1 1/2"=1'-0"15SECTION @ STAFF LOBBY WDW HD & COVE
SCALE: 1 1/2"=1'-0"30 SECTION @ STF LOBBY SILL
SCALE: 1 1/2"=1'-0"29SECTION @ STF LBY DR
SCALE: 1 1/2"=1'-0"26SECTION @ STF LBY / RETAINING WALL
SCALE: 1 1/2"=1'-0"28 SECTION @ LINK CANOPY
SCALE: 1 1/2"=1'-0"31SECTION @ LINK CANOPY
SCALE: 1 1/2"=1'-0"32 SECTION @ BRK RM
SCALE: 1 1/2"=1'-0"25 SECTION @ LINK & STAIRS
1 AMENDMENT NO. 107.25.07
SCALE: 3"=1'-0"18 SECTION @ CO DOCK CANOPY
SCALE: 3"=1'-0"17a
17a
AE821
2 RFP 25
4 1/2"
1/2" CLEARANCE ALL AROUND
3'-7" OVERALL
3'-0" FRAME OPENING LENGTH
3' -0
" F R
A M
E O
P E
N
IN
G W
ID
TH
3' -7
" O V
E R
A
LL
2 1/4" 3 1/2"
3/
8"
1' -0
Á
2' -3
1 1 /2"
CL
3/ 4"
8" 3/
4" 1"
8" 3/
4"
1/ 4"
W.P. MEMB
4" RIGID INSUL FASTENED
TO SHEATH W/ 2-FUR C
EXT SHEATH
BLKG AS REQ'D -
MUST BE LEVEL
TRACK FASTENER
SQ EDGE STARTER TRACK
W/ WEEPS
CLOSED CELL BACKER
ROD AND ELAST SEALANT
CONT SEALANT
CONT SEALANT
REINF STUCCO
8"
OVERLAP MTL LATH 2-1/2"
MIN
SLOPE CONE 1/8"/FT
3/ 4"
1" 3/
4"
SHEATH JNT REINF
W.P. MEMB
MTL CRNR REINF.
REINF.STUCCO
CASING BD
LAYOUT WORK POINT
ALUM WDW-
SEE AE 705-707
F.O. STUCCO BEYOND
WDW FLASH-
1 12" PROJECTION TYP
T.O.
OPNG
3/ 4"
3/4"
PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
ROBERT SIEGEL ARCHITECTS
OVE ARUP & PARTNERS CONSULTING ENGINEERS PC
SASAKI ASSOCIATES INC.
CONSTRUCTION DOCUMENTS
CONFORMED SET
2/08/2008
AE 8 22
STUCCO AND ROOF DETAILS
SCALE: 3"=1'-0"10 STUCCO @ LINK CANOPY
SCALE: 3"=1'-0"12 STUCCO @ BRK RM
SCALE: 3"=1'-0"7 STUCCO @ TYP. WDW HEAD
SCALE: 3"=1'-0"3 STUCCO @ STARTER TRACK
SCALE: 3"=1'-0"4 STUCCO @ STARTER TRACK
SCALE: 3"=1'-0"6 STUCCO @ COMM EXAM BAY CURB
SCALE: 3"=1'-0"11 STUCCO @ LINK CANOPY
SCALE: 3"=1'-0"5 STUCCO @ COMM EXAM BAY CURB
SCALE: 3"=1'-0"2 STUCCO @ TYP. WDW SILL
SCALE: 3"=1'-0"17 STUCCO @ COMM. LOBBY WDW HD
SCALE: 3"=1'-0"1 STUCCO @ COMM. LOBBY WDW HD
SCALE: 3"=1'-0"18 STUCCO @ TYP VERTICAL JNT
SCALE: 3"=1'-0"16 STUCCO @ OUTSIDE CORNER
SCALE: 3"=1'-0"14 STUCCO @ TYP PARAPET
SCALE: 3"=1'-0"9 STUCCO @ BOTT INSUL
SCALE: 3"=1'-0"13 STUCCO @ TYP. WDW HEAD
SCALE: 3"=1'-0"8 STUCCO @ TYP. DOOR JAMB
SCALE: 3"=1'-0"19 STUCCO @ TYP HORIZONTAL JNT
SCALE: 3"=1'-0"15 STUCCO @ INSIDE CORNER
SCALE: 3"=1'-0"21 STUCCO @ INSIDE CORNER
SCALE: 3"=1'-0"20 STUCCO @ FIXTURE ATTACHMENT
SCALE: 1 1/2"=1'-0"26 DUCT PENETRATION THROUGH ROOF
SCALE: 1 1/2"=1'-0"22 PIPE PENETRATION THROUGH ROOF
SCALE: 1 1/2"=1'-0"23 VENT FLASHING DETAIL
SCALE: 1 1/2"=1'-0"27 ROOF DRAIN DETAIL
SCALE: 1 1/2"=1'-0"24 ROOF HATCH PLAN DETAIL
SCALE: 1 1/2"=1'-0"25 ROOF HATCH SECTION DETAIL
SCALE: 1 1/2"=1'-0"28 ROOF HATCH DETAIL
| Calais IA top cap RFI design response.pdf |
| AE-820-NME00245-42 x 30 |
| AE-821-NME00245-42 x 30 |
| AE-822-NME00245-42 x 30 |
File details come from the government source that posted it. Updated .