About this file

This addendum provides revisions to drawings and specifications for the Capital Security Project at the Clemente Ruiz Nazario U.S. Courthouse and Federico Degetau Federal Building. Addendum 2 revises the plumbing drawings and schedules to specify accessible and non-accessible combination toilet and lavatory fixtures for holding cells. It also revises instrumentation and control for HVAC and lighting control device specifications to require graphic interface floor plan diagrams and integration with existing building management and lighting control systems.

The solicitation notice seeks a general contractor to provide construction services for the Capital Security Project. Bidders should attend the pre-proposal conference on July 26, 2021 for more information. The General Services Administration Public Buildings Service Region 2 is the contracting agency.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The list of revised or new drawings and specifications constituting Addendum 2 of the Capital

Security Project is as follows:

REVISED DRAWINGS (ALL REVISIONS CLOUDED AND TAGGED):

P-001.00 PLUMBING COVER SHEET

• Revised plumbing fixture schedule to list prescriptive requirements for combination toilet and lavatory fixtures. Differentiated tags for ABAAS-compliant (Accessible) and non-ABAAS-compliant combination fixtures. Removed nonapplicable fixture types from schedule.

P-102.04 OPTION 4 SECURE CORRIDOR HOLDING CELL ADDITION

• Included plumbing fixture tags to differentiate between ABAAS-compliant (Accessible) and non-ABAAS-compliant combination fixtures in the holding cell.

P-100.05 OPTION 5 RUIZ NAZARIO U.S. COURTHOUSE BASEMENT HOLDING CELLS

PLUMBING PLAN

• Included plumbing fixture tags to differentiate between ABAAS-compliant (Accessible) and non-ABAAS-compliant combination fixtures in the holding cells.

REVISED SPECIFICATIONS (ALL DELETIONS AND ADDITIONS FORMATTED):

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

• Added Paragraph 1.7 C. d. - BMS Control System Graphic Interface Floor Plan Diagram

Submittal

• Added Paragraph 3.7.B - PROJECT INTERGRATION WITH BMS SYSTEM AND GRAPHIC INTERFACE

26 09 23 LIGHTING CONTROL DEVICES

• Added Paragraph 1.3.C – Lighting Control System Graphic Interface Floor Plan Diagram

Submittal

• Added Paragraph 3.7 – PROJECT INTEGRATION WITH EXISTING LIGHTING CONTROL SYSTEM

GRAPHIC INTERFACE

• Added Paragraph 3.8 – EXPANSION OF LIGHTING CONTROL SYSTEM CAPACITY

[End of list of inclusions in Addendum 2]

File details come from the government source that posted it. Updated .