About this file

Amendment 7 - 47PC0319R0008 (SF30)

View the file

Other files

File Type Posted
Amendment_8_-_47PC0319R0008.pdf PDF
Amendment_6_-_47PC0319R0008.pdf PDF
Amendment_5_-_47PC0319R0008.pdf PDF
Amendment_4_-_47PC0319R0008.pdf PDF
Amendment_3_-_47PC0319R0008.pdf PDF
Contract_Pricing_Form_47PC0319R0008_2019_08_23.pdf PDF
Amendment_2_-_47PC0319R0008.pdf PDF
Amendment_1_-_47PC0319R0008.pdf PDF
St._Croix_USVI_Hurricane_Recovery_Pre-proposal_Site_Visit_Sign-In_Sheet_-_47PC0319R0008.pdf PDF
St._Croix_Hurricane_Recovery_Preproposal_Conference_Presentation_-_47PC0319R0008.pdf PDF
Model_Subcontracting_Plan_Updated_May_2019_-_For_Informational_Purposes_Only.docx DOCX document
Attachment_A2_-_Project_Fact_Sheet.pdf PDF
Attachment_A5_-_Subcontracting_Methodology_Form.pdf PDF
SF24_-_Bid_Bond.pdf PDF
Additional_Information__-_RFP_47PC0319R0008.pdf PDF
Draft_GC_Agreement_-_St._Croix_USVI_Hurricane_Recovery.pdf PDF
SF1442_-_47PC0319R0008.pdf PDF
Solicitation_47PC0319R0008_-_St._Croix_USVI_Hurricane_Recovery.pdf PDF
GSA_Form_527.pdf PDF
Attachment_A1_-_Experience_Summary_Table_47PC0319R0008.pdf PDF
Attachment_A4_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_A3_-_Sample_Key_Personnel_Resume_Format.pdf PDF
Offerors_Representations_and_Certifications_47PC0319R0008.pdf PDF
Proposal_Preparation_Instructions_-_47PC0319R0008.pdf PDF
Partnering_-_St_Croix_USVI_Hurricane_Recovery.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2PQC

Winnie Eng, Senior Contracting Officer

Please see attached.

General Services Administration Public Buildings Service One World Trade Center, 55th Floor New York, NY 10007

General Services Administration Public Buildings Service One World Trade Center, 55th Floor New York, NY 10007

47PC0319R0008

1 4

09/11/2019

08/01/2019

U.S. VIRGIN ISLANDS HURRICANE RECOVERY PROJECT

ST. CROIX GSA-PBS, REGION 2

SOLICITATION NO. 47PC0319R0008

AMENDMENT NO. 7

Amendment No. 7 is hereby issued to respond to the following RFI’s:

87. Specification Section notes the Equipment Supplier is responsible for the nature of the incoming water and notes additional equipment is required for seasonal variations will be provided at no charge. As there has been no water analysis provided and there is no way to speculate regarding seasonal changes.

Please provide the necessary water analysis of the existing incoming water to be treated. Also please provide a written description of the extent of “additional equipment” to be provided at no charge.

Response: This specification section does not apply to our project and can be ignored.

88. The majority of windows (167 out of 169) are fixed windows. Only mark W10b (qty. 2) & W14 (qty. 2) have casements. As per the below, we cannot find on any of the drawings for the NX- 3800 Series fixed windows that have the glass specified of “3/8” FT(OUTER)”. Please clarify.

Response: Offerors may propose any window system that meets the project specifications.

89. The only NX-3800 fixed windows we found with FBC HVHZ approval with the below search query for Kawneer was for Kawneer’s Traco TR-3800, which may only be installed up to 30 ft above grade. The 4th floor and maybe 3rd floor may exceed that. Glass make up below. Please clarify.

Response: The contractor shall provide window systems that conform to all project performance specifications. Window systems listed in the specifications as basis of design are recommendations only. Regarding the window height limitation of the NX3800, the contractor may consider using the Kawneer 1600 system with applied muntins or an alternate manufacturer, provided that the selected window system meets all required performance criteria.

The date and time for receipt of proposals remains unchanged.

END OF AMENDMENT NO. 7

File details come from the government source that posted it.