Solicitation Amendment 47PC0220R0008_0004.pdf

PDF 569 KB Posted

Attached to
PIRNIE UPPER ENVELOPE PROJECT – ALEXANDER PIRNIE FEDERAL BUILDING
Solicitation number
47PC0220R0008
Issued by

About this file

This document contains a solicitation amendment and related federal contract opportunity. The solicitation amendment provides responses to questions received regarding specifications for tube sizing and spacing for post and rails at a roof accessory project. It requires acknowledgement and signature upon return with any offer.

The related federal contract opportunity is for replacing approximately 28,500 square feet of existing roofing systems at the Alexander Pirnie Federal Building in Utica, New York. The project involves replacing wood planking, slate roofing, flashing, skylights, and roof membranes. It also includes installing guardrails, snow rails, tie-off systems, and secondary roof drains. HVAC work includes installing attic ventilation and relocating rooftop equipment. There are three options involving steam coils, replacing direct expansion refrigeration systems, or replacing additional direct expansion refrigeration systems. The requirement will be solicited as a 100% Total Small Business set-aside. The General Services Administration Public Buildings Service Region 2 is the agency.

View the file

Other files

File Type Posted
Solicitation Amendment 47PC0220R0008_0003.pdf PDF
Amendment 0003 - Q-A.pdf PDF
Attendance Sheet - Site Visit.pdf PDF
Amendment 0002 - Pirnie Upper Envelope Project - SOW, 11-1-19.pdf PDF
Amendment 0002 - Q-A.pdf PDF
Amendment 0002 - Pirnie Upper Envelope Project - Key Personnel Qualifications Resume Form, Attachment C.pdf PDF
Amendment 0002 - Pirnie Upper Envelope Project - Past Performance Questionnaire, Attachment B.pdf PDF
Solicitation Amendment 47PC0220R0008_0002 (1).pdf PDF
Solicitation Amendment 47PC0220R0008_0001 (2).pdf PDF
Amendment 0001 - Pirnie Upper Envelope Project - Key Personnel Qualifications Resume Form, Attachment C.xlsx XLSX spreadsheet
Amendment 0001 - Pirnie Upper Envelope Project - Past Performance Questionnaire, Attachment B.docx DOCX document
Amendment No. 1 Q-A.pdf PDF
Amendment 0001 - Pirnie Upper Envelope Project - SOW, 11-1-19.pdf PDF
GC Reps andCerts dec19 508.pdf PDF
Final_SBSA GC Agreement aug19 r1 508.pdf PDF
Pirnie Upper Envelope Project - Key Personnel Qualifications Resume Form, Attachment C.xlsx XLSX spreadsheet
Standard Form 24 - Bid Bond.pdf PDF
GSA 527 - Contractor's Qualifications and Financial Information.pdf PDF
Building Drawings Final 12-20-2019.pdf PDF
Wage Determination NY20190013.pdf PDF
Specifications Final 12-20-2019.pdf PDF
47PC0220R0008 Form 1442.pdf PDF
Pirnie Upper Envelope Project - SOW, 11-1-19.pdf PDF
Pirnie Upper Envelope Project - Experience on Similar Projects Offeror Form - Attachment A.xlsx XLSX spreadsheet
Final_SBSA GC Solicitation aug19 r1 508.pdf PDF
Pirnie Upper Envelope Project - Past Performance Questionnaire, Attachment B.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

Description of Modification Continuation Page

... specifications for tube sizing and spacing for post and rails.

GSA Response: Specification Section 077200 - Roof Accessories, para. 2.3 provides the information bidders can use for the railings in question and acceptable manufacturers are listed.

This amendment must be signed and returned with your offer.

47PC0220R0008/0004

topmostSubform[0]:
Page2[0]:
TextField1[5]:
TextField1[2]:
TextField1[1]:
TextField1[4]:
TextField1[3]:
TextField1[0]:
Page1[0]:
Code[0]: 2PQB
Copies[0]: 1
CheckBox9[0]: 1
Code[2]: 2PQB
NameandTitleOfficer[0]: Jayshree Tank, Contract Specialist
Is[0]: Off
CheckBox10[0]: Off
NameandAddress[0]:
DateSigned[1]:
Pages[0]: 3
AmendmentNo[0]: 0004
Dated10B[0]:
ModificationNo[0]:
AdministeredBy[0]: OPERATIONS BRANCH B

1 WORLD TRADE CENTER

NEW YORK, NY 10007

FacilityCode[0]:
CheckBox13B[0]: Off
CheckBox13D[0]: Off
ReqNumber[0]: EQ2PSEU-20-0008
Dated9B[0]: 1/24/2020
C13[0]:
Description[0]: This Amendment No. 0004 is being issued to provide GSA response to RFIs received below:

Question: Is it the intent of the perimeter roof railing at the Pirnie Upper Envelope Project to be a prefabricated aluminum railing system with weighted bases, if so is there a specification for a manufacturer or supplier that we should be using. If it’s to be shop fabricated is there...

[See Description of Modification Continuation Page]

NotExtended[0]: 1
Code[1]:
AmendmentNo[1]: 47PC0220R0008
ContractIDCode[0]:
DateSigned[0]:
CheckBox11[0]: 1
Page[0]: 1
AccountingData[0]:
CopiesReturned[0]:
CheckBox13A[0]: Off
IsNot[0]: Off
EffectiveDate[0]: 3/5/2020
A13[0]:
ProjectNo[0]: RNY12834
CheckBox13C[0]: Off
Extended[0]: Off
D13[0]:
IssuedBy[0]: OPERATIONS BRANCH B

1 WORLD TRADE CENTER

NEW YORK, NY 10007

NameandTitleSigner[0]:

File details come from the government source that posted it. Updated .