This solicitation is for the demolition of the Hoosac Stores building at the Charlestown Navy Yard. Key details include demolishing the existing six-story brick building and related site work; removing pavement, fencing, utilities, and landscaping; and replacing the building footprint and parking area with gravel. Bidders must provide alternate pricing to pave the entire site with either new bituminous asphalt or porous asphalt. The solicitation number is 47PB0024R0009 and was issued by the General Services Administration Public Buildings Service Region 1. The response due date is not specified.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
The Purpose of this amendment is to:
1. Provide the drawing package dated 7/20/2023.
2. Provide an updated wage determination for MA20230001 Mod 24 dated 12/08/2023.
3. Extend the due date for questions from 12/15/2023 to 12/21/2023 by 2:00pm EST.
4. The proposal due date remains 1/12/2024 by 2:00pm EST.
All other terms and conditions remain unchanged.
HQ.
V.C.
MONUMENT
BUNKER HILL
CHARLESTOWN
HOOSAC
STORES
NAVY YARD
MAIN ST.
GATE 1
PIER
HOOSAC
GATE 4
FIR
ST
A
VE
MUSEUM
USS CONSTITUTION
B O
ST
O N
IN
N
ER
H
AR
B O R
HALL
OLD SOUTH
MEETING
HOUSE
OLD STATE
HOUSE
V.C.
FANEUIL
HEIGHTS
DORCHESTER
D
EV
O N
SH
IR
E
ST
MILK STREET
WAS
HIN
GTO
N
WATER ST.
TO
CO
UR
T
SQ
UA
RE
ST
RE
ET
C
OURT STREET
C O N G R E S S
S
TR
E E T
STATE STREET
TO PAUL REVERE'S HOUSE
AND OLD NORTH CHURCH
DORCHESTER
HEIGHTS
TELEGRAPH ST
O
LD
H A R B O R
DO
RC
HE
ST
ER
S
TR
EE
T
THO
MAS
PA
RK
S
TR
E E T
W.BROADWAY ST.
TO
CENTER
MEETING
OLD SOUTH
HOUSE
GOVERNMENT
AREA
CHURCH
OLD NORTH
PAUL REVERE
HOUSE
TILESTON ST.
N. BENNET STREET
PARMENTER
H
AN
O
VE
R
ST
RE
ET
CENTER
FANEUIL
TO
ST.
PRINCE STREET
S A
LE
M
S T.
MUSEUM
S
AL
E M
S T.
SEXTON'S
HOUSE
SQUARE
NORTH
HALL
GOVERNMENT
AREA
C H
AR
LE
S
CAMBRIDGE
STREET
STATE
S
TR
E E T
ST
RE
ET
W
AS
H
IN
GT
ON
ESSEX
STREET
BEA
CON
ST
REE
T
HILL
BEACON
STREET 93
TU
NN
EL
S
R U
TH
E R
FO
R D
MAINSTREET
NORTH
END
AVENUE
CHARLESTOWN
BOSTON
EAST
PARK
HISTORICAL
NATIONAL
BOSTON
HEIGHTS
TO
DORCHESTER
HOUSE
OLD
STATE
OLD SOUTH
HOUSE
MEETING
BUNKER
HILL
FANEUIL
HALL
CHURCH
OLD
NORTH
HOUSE
PAUL REVERE
NAVY
CHARLESTOWN
YARD
:2 :5
A M
NAME OF PARK
REGION COUNTY STATE
LOCATION WITHIN PARK
TITLE OF DRAWING
BOSTON NATIONAL HISTORICAL PARK
UNITED STATES
DEPARTMENT OF INTERIOR
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
NORTHEAST SUFFOLK MASSACHUSETTS
HOOSAC STORES 1 & 2
TITLE SHEET
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
DEMOLITION DRAWINGS
BOSTON NATIONAL HISTORICAL PARK
SCALE OF METERS
SCALE OF FEET
500 0 500
150 0 150
SCALE OF METERS
SCALE OF FEET
500 0 500
150 0 150
MASSACHUSETTS
SCALE OF FEET
01,000 1,000
LEGEND
V.C.
HQ.
HISTORICAL PARK BOUNDARY
VISITOR CENTER
PARK HEADQUARTERS
QUALITY DESIGN CERTIFICATION
Prepared in accordance with Design Development (Title I)
Variance from Design Development (Title I) Approved by Superintendent on
Construction Drawing Not Preceded by Design Development (Title I)
OR
OR
Project Manager Date
Drawing No.
Date
Mark Sheet Revision Date Initial
A U
TO
C A D u sc m b fi l0 fa c p ro j\ C N Y G A
TE
W A Y
C A D D A rc h it e c tu re S h e e ts O ri g in a l S e t O f D w g s
TI
TL
E
S H E E T.
d w g
318750
179511
A/E Firm
CIVIL:
CITY, STATE
STRUCTURAL:
NAME
CITY, STATE
PRIME/ARCH:
MARBLE, FAIRBANKS
NEW YORK, NY
MEP:
NAME
CITY, STATE
HOOSAC BUILDING DEMOLITION
PMIS 318750
INDEX OF DRAWINGS
SUB-SHEET
NO.
TITLE
1 TITLE SHEET
D-1 GENERAL NOTES - SHEET 1 OF 2
D-2 GENERAL NOTES - SHEET 2 OF 2
D-3 EXISTING SITE PLAN
D-4 DEMOLITION SITE PLAN
D-5 FINAL SITE PLAN
D-6 DETAILS - SHEET 1 OF 3
D-7 DETAILS - SHEET 2 OF 3
D-8 DETAILS - SHEET 3 OF 3
D-9 EXISTING FIRST FLOOR PLAN
D-10 EXISTING SECOND FLOOR PLAN
D-11 EXISTING THIRD FLOOR PLAN
D-12 EXISTING FOURTH FLOOR PLAN
D-13 EXISTING FIFTH FLOOR PLAN
D-14 EXISTING SIXTH FLOOR PLAN
D-15 EXISTING NORTH AND EAST ELEVATION
D-16 EXISTING SOUTH ELEVATION
D-17 EXISTING WEST ELEVATION
D-18 EXISTING SECTION
T-1 TRAFFIC MANAGEMENT PLAN - DEMOLITION
T-2 HOOSAC BUILDING DEMOLITION PEDESTRIAN DETOUR PLAN
GENERAL NOTES:
1. THE STATE OF MASSACHUSETTS STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, AMENDED AUGUST 2013 WITH ALL REVISIONS AND ADDENDA, AND THE MASSACHUSETTS STANDARD DETAILS ARE MADE A PART HEREOF AS FULLY AND COMPLETELY AS IF ATTACHED HERETO. ALL WORK SHALL MEET OR EXCEED THE MASSACHUSETTS STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, WITH LATEST REVISIONS. THE LATEST REVISION OF THE STANDARD SPECIFICATIONS
MAY BE OBTAINED AT THE MASSACHUSETTS DEPARTMENT OF TRANSPORTATION.
2. THE CONTRACTOR SHALL MAKE ALL NECESSARY CONSTRUCTION NOTIFICATIONS AND APPLY FOR AND OBTAIN ALL NECESSARY CONSTRUCTION PERMITS, PAY ALL FEES AND POST ALL BOND ASSOCIATED
WITH THE SAME, AND COORDINATE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE AS
REQUIRED.
3. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR JOB SITE SAFETY. THE CONTRACTOR SHALL
PROVIDE TEMPORARY FENCING AND/OR BARRIERS AROUND ALL OPEN EXCAVATED AREAS IN
ACCORDANCE WITH OSHA FEDERAL, STATE, AND LOCAL REQUIREMENTS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT THE PROPOSED WORK SHOWN ON THE PLANS DO NOT CONFLICT WITH ANY KNOWN EXISTING OR OTHER PROPOSED IMPROVEMENTS. IF ANY CONFLICTS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE OWNER AND THE ENGINEER PRIOR TO INSTALLATION OF ANY PORTION OF THE SITE WORK WHICH WOULD BE AFFECTED. NO FIELD ADJUSTMENTS IN THE LOCATION OF SITE ELEMENTS SHALL BE MADE WITHOUT THE ENGINEER'S
APPROVAL.
5. IF ANY DEVIATION OR ALTERATION OF THE WORK PROPOSED ON THESE DRAWINGS IS REQUIRED, THE
CONTRACTOR SHALL IMMEDIATELY CONTACT AND COORDINATE ANY DEVIATIONS WITH THE
CONTRACTING OFFICER.
6. ANY AREA OUTSIDE OF THE LIMIT OF WORK THAT IS DISTURBED SHALL BE RESTORED TO ITS
ORIGINAL CONDITION AT NO ADDITIONAL COST TO THE GOVERNMENT.
7. ALL SITE WORK SHALL MEET OR EXCEED THE SITE WORK SPECIFICATIONS PREPARED FOR THIS
PROJECT.
8. ALL UTILITIES (LOCATION AND ELEVATION) DEPICTED SHALL BE CONSIDERED APPROXIMATE ONLY, BEFORE COMMENCING SITE WORK IN ANY AREA, CONTACT “DIG SAFE” AT 1-888-DIG-SAFE
(1-888-344-7233) TO ACCURATELY LOCATE UNDERGROUND UTILITIES. ALL DAMAGE TO EXISTING UTILITIES OR STRUCTURES, AND THE COST TO REPAIR THE DAMAGES TO INITIAL CONDITIONS, AS
SHOWN ON THE PLANS SHALL BE THE CONTRACTOR'S RESPONSIBILITY.
9. NO EXCAVATION SHALL BE DONE UNTIL COMPANIES ARE PROPERLY NOTIFIED IN ADVANCE. NOTE THAT ALL EXISTING UNDERGROUND UTILITIES ARE SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT ALL RESPECTIVE UTILITY COMPANIES TO VERIFY AND LOCATE EXISTING UTILITIES.
DEMOLITION NOTES:
1. ALL NOTED UTILITIES TO BE REMOVED AND DISPOSED OF, RELOCATED OR CAPPED REPRESENT ALL
KNOWN SITE CONDITIONS TO BE DEMOLISHED. THE CONTRACTOR SHALL COORDINATE ALL
UNFORESEEN CONDITIONS WITH THE PROJECT ENGINEER, OWNER AND/OR RESPECTIVE UTILITY
COMPANIES PRIOR TO PROCEEDING WITH WORK
GRADING AND UTILITY NOTES:
1. ALL WORK PERFORMED AND ALL MATERIALS FURNISHED SHALL CONFORM WITH THE LINES AND
GRADES ON THE PLANS AND SITE WORK SPECIFICATIONS.
2. AT ALL LOCATIONS WHERE EXISTING CURBING OR PAVEMENT ABUT NEW CONSTRUCTION, THE EDGE OF THE EXISTING CURB OR PAVEMENT SHALL BE SAWCUT TO A CLEAN, SMOOTH EDGE. BLEND NEW
PAVEMENT AND CURBS SMOOTHLY INTO EXISTING BY MATCHING LINES, GRADES AND JOINTS.
3. ALL UTILITY COVERS, GRATES, ETC. SHALL BE ADJUSTED TO BE FLUSH WITH THE SURROUNDING
SURFACE OR PAVEMENT FINISH GRADE. RIM ELEVATIONS OF STRUCTURES AND MANHOLES ARE
APPROXIMATE. FINAL ELEVATIONS ARE TO BE SET FLUSH AND CONSISTENT WITH THE GRADING PLANS.
4. THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS FOR THE ALTERATIONS OF PRIVATE UTILITIES BY
THE UTILITY COMPANIES, AS REQUIRED.
5. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, THE LOCATION, ELEVATION AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED WITHOUT DELAY BY THE CONTRACTOR AND THE INFORMATION SHALL BE PROVIDED ON A SKETCH TO SCALE OF THE EXISTING UTILITY WITH TIES TO KNOWN POINTS, PHOTOS AND FURNISHED TO THE ENGINEER FOR RESOLUTION.
6. THE CONTRACTOR SHALL PROTECT ALL UNDERGROUND DRAINAGE, SEWER AND UTILITY FACILITIES FROM EXCESSIVE VEHICULAR LOADS DURING CONSTRUCTION. ANY DAMAGE TO THESE FACILITIES
RESULTING FROM CONSTRICTION LOADS SHALL BE RESTORED TO ORIGINAL CONDITION.
7. GAS, ELECTRIC, AND COMMUNICATIONS ROUTING ARE SUBJECT TO REVIEW AND APPROVAL BY
APPROPRIATE UTILITY COMPANIES.
8. DURING CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL PROTECT EXISTING UTILITIES BY PROVIDING TEMPORARY SUPPORTS OR SHEETING AS REQUIRED AT NO ADDITIONAL COST TO THE
OWNER.
9. ALL GRAVITY SANITARY PIPING SHALL BE SDR-35 PVC. ALL SEWER CONSTRUCTION SHALL CONFORM
TO BOSTON WATER AND SEWER COMMISSION (BWSC) SPECIFICATIONS.
10. EXCAVATION REQUIRED IN THE PROXIMITY OF EXISTING UTILITY LINES SHALL BE DONE BY HAND.
CONTRACTOR SHALL REPAIR ANY DAMAGE TO EXISTING UTILITY LINES OR STRUCTURES INCURRED
DURING CONSTRUCTION OPERATIONS AT NO COST TO THE OWNER.
EROSION AND SEDIMENTATION CONTROL NOTES:
1. THE CONTRACTOR AND RELEVANT SUBCONTRACTORS SHALL READ AND UNDERSTAND THE NPDES
GENERAL PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY
(GENERAL PERMIT) AND THE SITE-SPECIFIC SOIL EROSION AND SEDIMENT CONTROL PLAN (SESC)
PREPARED FOR THE PROJECT. ALL EROSION CONTROL SHALL BE IN ACCORDANCE WITH THE
MASSACHUSETTS SOIL EROSION AND SEDIMENT CONTROL HANDBOOK, LATEST REVISION.
2. THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE CONDITIONS ISSUED FOR THE PROJECT BY
THE MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION (MASSDEP) AND BE
RESPONSIBLE FOR CONFORMANCE WITH ALL PERMIT REQUIREMENTS AND CONSTRUCTION
DOCUMENTS.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ALL TEMPORARY SEDIMENT AND EROSION CONTROLS AS SHOWN ON THESE PLANS AND SHALL MAINTAIN ALL EROSION CONTROL MEASURES AS
NECESSARY DURING THE ENTIRE CONSTRUCTION PERIOD.
4. ANTI-TRACKING PADS SHALL BE PROVIDED AT ALL POINTS OF EGRESS OR INGRESS AND SHALL BE
MAINTAINED TO LIMIT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC ROADS.
5. EROSION CONTROL BARRIERS SHALL BE INSTALLED AS SHOWN ON THE DEMOLITION SITE PLAN PRIOR
TO COMMENCEMENT OF CONSTRUCTION OPERATIONS.
6. SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTED AND MAINTAINED ON
A WEEKLY BASIS AND AFTER EACH STORM EVENT OR 0.25 INCH OR GREATER DURING
CONSTRUCTION TO INSURE THAT CHANNELS AND PIPES ARE CLEAR OF DEBRIS AND THAT THE
EROSION CONTROL BARRIERS ARE INTACT. IDENTIFIED DEFICIENCIES SHALL BE CORRECTED
IMMEDIATELY.
7. DUST SHALL BE CONTROLLED BY WATERING OR OTHER APPROVED METHODS AS NECESSARY, OR AS
DIRECTED BY THE OWNER OR OWNER'S REPRESENTATIVE.
8. THE CONTRACTOR SHALL CLEAN AND MAINTAIN EROSION CONTROL BARRIER WHEN SEDIMENT
ACCUMULATES TO ONE HALF THE HEIGHT OF THE BARRIER. MATERIAL COLLECTED FROM THE
SEDIMENTATION BARRIERS SHALL BE REMOVED AS NECESSARY AND DISPOSED IN AN UPLAND AREA.
9. INSTALLATION OF THE EROSION CONTROL BARRIERS AS ILLUSTRATED IS INTENDED TO REPRESENT
THE MINIMUM SEDIMENTATION CONTROL FACILITIES NECESSARY TO MEET ANTICIPATED SITE
CONDITIONS. ADDITIONAL EROSION CONTROL MEASURES SHALL BE IMPLEMENTED AS CONDITIONS
WARRANT OR AS DIRECTED BY THE OWNER OR OWNER'S REPRESENTATIVE.
10. THE CONTRACTOR SHALL MAINTAIN A SUFFICIENT RESERVE OF VARIOUS EROSION CONTROL
MATERIALS ON SITE AT ALL TIMES FOR EMERGENCY PURPOSES OR ROUTINE MAINTENANCE.
11. CATCH BASINS AND STORM DRAIN INLETS SHALL BE PROTECTED WITH APPROPRIATE TEMPORARY
INLET PROTECTION IN ACCORDANCE WITH THE MASSACHUSETTS SOIL EROSION AND SEDIMENT
CONTROL HANDBOOK.
12. DEWATERING WASTE WATER PUMPED FROM EXCAVATIONS SHALL BE CONVEYED BY HOSE TO AN UPLAND AREA AND DISCHARGED INTO STRAW BALE CORRALS OR SEDIMENTATION BAGS. NOTHING
SHALL BE DISCHARGED INTO THE HARBOR.
13. THE CONTRACTOR SHALL NOT REMOVE ANY TEMPORARY SEDIMENT CONTROL BARRIERS UNTIL THE
CONTRIBUTING DRAINAGE AREA HAS BEEN PERMANENTLY STABILIZED.
14. CONSTRUCTION SITE WASTE MATERIALS SHALL BE PROPERLY CONTAINED ONSITE AND DISPOSED OFF
SITE AT A LOCATION IN ACCORDANCE WITH THE LOCAL AND STATE REGULATIONS.
15. ALL DISTURBED AREAS SHALL BE STABILIZED WITHIN 14 DAYS UPON COMPLETION OF WORK IN THAT
AREA.
16. ALL DRAINAGE STRUCTURES SHALL BE CLEARED OF ACCUMULATED SEDIMENT PRIOR TO ACCEPTANCE
OF FINAL PROJECT.
17. EROSION AND SEDIMENTATION CONTROLS SHALL BE UTILIZED AS SHOWN ON THE PLANS. POTENTIAL EROSION AND SEDIMENTATION PROBLEMS ASSOCIATED WITH THE CONSTRUCTION OF THE PROJECT SHALL BE AVOIDED THROUGH THE PROJECT SCHEDULING AND THE USE OF APPROPRIATE STANDARD
CONTROLS (MASSACHUSETTS SOIL EROSION AND SEDIMENTATION CONTROL HANDBOOK) AS
ILLUSTRATED ON THE PROJECT PLANS.
18. WHERE EROSION CONTROLS ARE NEEDED ON IMPERVIOUS SURFACES, THE CONTRACTOR SHALL
PROVIDE SAND BAG EROSION CONTROL BARRIER.
19. TEMPORARY DIVERSION (TD) MAY CONSIST OF A DITCH OR SWALE, OR MAY BE ACHIEVED USING
WOOD CHIPS, COIR LOGS, OR SIMILAR MATERIALS.
20. TEMPORARY SEDIMENT TRAPS (TST) AND TEMPORARY SWALES (TSW) SHALL BE SIZED BY THE
CONTRACTOR USING THE PARAMETERS CONTAINED IN THE MASSACHUSETTS SOIL EROSION AND
SEDIMENT CONTROL HANDBOOK.
STORMWATER MANAGEMENT SYSTEM INSPECTION AND MAINTENANCE NOTES:
DURING CONSTRUCTION (CONTRACTOR'S RESPONSIBILITY)
1. THE CONTRACTOR SHALL REMOVE SEDIMENT AND DEBRIS FROM ALL CATCH BASINS, MANHOLES, AND THE DRAINAGE SYSTEM ON A ROUTINE BASIS, IMMEDIATELY FOLLOWING SITE STABILIZATION, AND
PRIOR TO PROJECT COMPLETION AND ACCEPTANCE.
2. THE CLOSED DRAINAGE SYSTEM AND ASSOCIATED STRUCTURES SHALL BE CLEANED AND FLUSHED
BY THE CONTRACTOR AT THE COMPLETION OF CONSTRUCTION, AND THE CONTRACTOR SHALL BE
RESPONSIBLE FOR INSPECTION AND MAINTENANCE OF THE DRAINAGE SYSTEM UNTIL ACCEPTANCE OF
THE SYSTEM BY THE ENGINEER AND THE CITY OF BOSTON. FOLLOWING ACCEPTANCE OF THE
PROPOSED DRAINAGE SYSTEM PROPOSED FOR THIS SITE, THE OWNER OF THE SITE SHALL BE
RESPONSIBLE FOR THE LONG-TERM INSPECTION AND MAINTENANCE OF THE DRAINAGE SYSTEM.
3. ANY ACCUMULATION OF PONDING WATER IN AREAS WITHIN THE LIMITS OF DISTURBANCE, OTHER
THAN DESIGNATED AREAS, SHALL BE REMOVED ACCORDINGLY AND PREVENTED IN THE FUTURE.
POST CONSTRUCTION (OWNER'S RESPONSIBILITY - NPS)
1. TRASH, LITTER, SEDIMENT AND OTHER DEBRIS SHALL BE REMOVED FROM ANY STORMWATER
MANAGEMENT SYSTEM FACILITY (INCLUDING BUT NOT LIMITED TO CATCH BASINS, MANHOLES, INLET, OUTLET AND DIVERSION STRUCTURES AND STORMWATER BEST MANAGEMENT PRACTICES (BMPS) A MINIMUM OF TWO TIMES PER YEAR, PREFERABLY IN THE SPRING AND FALL, AT THE COST OF THE
OWNER.
2. THE LOT SHALL BE SWEPT BY THE OWNER AS EARLY AS POSSIBLE EVERY SPRING AND ONCE IN
THE FALL TO REMOVE SEDIMENTS.
3. ALL CLEANING AND MAINTENANCE OF STORMWATER MANAGEMENT SYSTEMS SHALL BE THE
RESPONSIBILITY OF THE OWNER.
D. D. CHOI
C. W. BAISLY
D-1
GENERAL NOTES
SHEET 1 OF 2
179511
318750
:2
A M
TITLE OF SHEET
BOSTON NATIONAL HISTORICAL PARK
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
A U
TO
C A D u s c m b fi l0 fa c p ro j\ C N Y G A
TE
W A Y
C A D D A rc h it e c tu re S h e e ts O ri g in a l S e t O f D w g s\ D
G E N 'L
N O
TE
S S Y M B O
LS
A B B R E V .d w g
SUB SHEET NO.
DESIGNED:
TECH. REVIEW:
DATE: 7/20/2023
11:26:34 AM
A/E Firm
PRIME/ARCH:
MARBLE, FAIRBANKS
NEW YORK, NY
SUBCONTRACTOR:
JACOBS
BOSTON, MA
CADD
STORMWATER MANAGEMENT SYSTEM INSPECTION AND MAINTENANCE AND
CATCH BASINS AND AREA DRAINS WITH SUMPS INSPECTION, MAINTENANCE, AND REPAIR NOTES:
1. THE INLET GRATE SHALL NOT BE WELDED TO THE FRAME OR PAVED OVER SO THAT THE SUMP
CAN BE EASILY INSPECTED AND MAINTAINED.
2. CARE SHALL BE TAKEN TO AVOID DAMAGING AND DISPLACING HOODS PLACED ON HOODED OUTLETS
DURING CLEANING.
GENERAL CONSTRUCTION NOTES:
1. ALL CONSTRUCTION DEBRIS SHALL BE DISPOSED OF LEGALLY OFF SITE.
2. CONTRACTOR IS RESPONSIBLE FOR DUST CONTROL. DUST CONTROL SHALL INCLUDE THE WATERING
OF UNPAVED ROAD SURFACES AND STREET SWEEPING OF PAVED SURFACES. STREET SWEEPING
SHALL OCCUR ON THE PAVED SURFACES WITHIN THE SITE AND OFF THE SITE WHERE VEHICLE
TRACKING OF SEDIMENTS HAS OCCURRED.
3. ALL SITE WORK SHALL BE SECURED AT THE END OF THE WORK DAY TO REDUCE EROSION AND SEDIMENT PROBLEMS. THIS INCLUDES AS APPLICABLE, COVERING STOCKPILES OF SOIL, INSTALLING TEMPORARY VEGETATION OR BY USING GEOTEXTILES TO COVER DISTURBED AREAS WITH STEEPER
SLOPES.
4. CONSTRUCTION FENCING SHALL BE SET TO PREVENT UNCONTROLLED ACCESS TO THE SITE AT ALL
TIMES AND ADJUSTED AS NECESSARY THROUGHOUT CONSTRUCTION AT NO ADDITIONAL COST TO
THE GOVERNMENT DEPENDING ON PHASING.
5. ALL AREAS DISTURBED WITHIN THE LIMIT OF WORK SHALL BE RESTORED TO EXISTING CONDITIONS
OR BETTER.
UTILITY NOTES:
1. ALL UTILITY COMPANIES, PUBLIC AND PRIVATE, MUST BE NOTIFIED, INCLUDING THOSE IN CONTROL OF UTILITIES NOT SHOWN ON THIS PLAN, (SEE CHAPTER 370, ACTS OF 1963, MASSACHUSETTS) PRIOR TO DESIGNING, EXCAVATING, BLASTING, INSTALLING, BACKFILLING, GRADING, PAVEMENT
RESTORING OR REPAVING.
2. UTILITY WORK WITHIN THE ZONE 10 FT OUTSIDE OF FOUNDATION WALL OF THE BUILDING SHALL CONFORM TO EFFECTIVE BUILDING CODE REQUIREMENTS, AND THE MECHANICAL, ELECTRICAL AND PLUMBING SPECIFICATIONS. UTILITIES, WITHIN THIS AREA (10 FT FROM THE FOUNDATION WALL).
3. CONTRACTOR TO ADJUST UTILITY ELEMENT MEANT TO BE FLUSH WITH GRADE (CLEAN-OUTS, UTILITY
MANHOLES, CATCH BASINS, INLETS, ETC.) THAT ARE AFFECTED BY SITE WORK OR GRADE
CHANGES, WHETHER SPECIFICALLY NOTED ON THE PLANS OR NOT.
4. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE TAKEN FROM RECORD INFORMATION
SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE
GOVERNMENT OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND BE FULLY RESPONSIBLE FOR ANY
AND ALL DAMAGES WHICH MAY BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY
LOCATE AND PRESERVE ALL UNDERGROUND UTILITIES.
5. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, THE LOCATION, ELEVATION, AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED WITHOUT DELAY BY THE
CONTRACTOR, AND THE INFORMATION FURNISHED TO THE ENGINEER FOR RESOLUTION OF THE
CONFLICT.
6. THE LOCATION, SIZE, DEPTH, AND SPECIFICATIONS FOR CONSTRUCTION OF PRIVATE UTILITY SERVICES SHALL BE INSTALLED ACCORDING TO THE REQUIREMENTS PROVIDED BY, AND APPROVED BY, THE RESPECTIVE UTILITY COMPANY (GAS, TELEPHONE, ELECTRICAL). FINAL DESIGN AND LOCATIONS AT THE BUILDING WILL BE PROVIDED BY THE ARCHITECT. THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF THE UTILITY CONNECTION WITH THE RESPECTIVE COMPANIES
PRIOR TO ANY UTILITY CONSTRUCTION.
7. ALL WORK MUST COMPLY WITH STATE AND LOCAL PERMITS, AS WELL AS THE CITY OF BOSTON
REQUIREMENTS.
BUILDING DEMOLITION GENERAL NOTES:
1. REFER TO SPECIFICATION DIVISION 02 "DEMOLITION" FOR ADDITIONAL DEMOLITION REQUIREMENTS.
COORDINATE PROPOSED METHODS AND OPERATIONS OF DEMOLITION WITH CONTRACTING OFFICER PRIOR TO START OF DEMOLITION WORK. INCLUDE IN SCHEDULE COORDINATION FOR SHUT-OFF, CAPPING AND CONTINUATION OF UTILITY SERVICES AS REQUIRED.
2. DEMOLITION WORK SHALL BE PHASED. REFER TO SPECIFICATION DIVISION 01.
3. INTERRUPTIONS IN DAILY OPERATIONS MUST BE COORDINATED IN ADVANCE WITH CONTRACTING
OFFICER. THIS SHALL INCLUDE SERVICE INTERRUPTIONS AND CONNECTIONS, REMOVAL OF
EQUIPMENT, SHIFTS IN LOCATION OF WORK, MECHANICAL AND ELECTRICAL DISRUPTION, ETC. ANY OF THE ABOVE INTERRUPTIONS REQUIRE A MINIMUM OF THREE FULL WORKING DAYS' NOTICE TO THE CONTRACTING OFFICER. FRIDAY P.M. NOTICE FOR MONDAY A.M. INTERRUPTIONS WILL NOT BE
ACCEPTABLE.
4. CONDUCT DEMOLITION AND DEBRIS REMOVAL IN A SAFE MANNER TO MINIMIZE INTERFERENCE WITH
OTHER ADJACENT FACILITIES AND TO AVOID DAMAGE TO SAME. DO NOT CLOSE OR OBSTRUCT
VEHICULAR, CYCLIST OR PEDESTRIAN TRAFFIC WAYS WITHOUT PERMISSION OF THE CONTRACTING
OFFICER.
5. ERECT TEMPORARY ENCLOSURE(S) AROUND ALL EXTERIOR OPENINGS CREATED IN THE BUILDING.
6. ALL SALVAGEABLE MATERIAL AND EQUIPMENT SHOWN OR SCHEDULED TO REMAIN AS THE PROPERTY
OF THE GOVERNMENT OR NOT DISCLAIMED BY THE GOVERNMENT PRIOR TO THE BEGINNING OF
DEMOLITION WORK SHALL BE CAREFULLY REMOVED AND STORED WHERE DIRECTED BY THE OWNER.
THE CONTRACTOR SHALL VERIFY WITH THE CONTRACTING OFFICER ALL ITEMS TO BE SALVAGED.
7. ALL SALVAGEABLE MATERIAL AND EQUIPMENT SCHEDULED TO BE REMOVED AND NOT REUSED AND DISCLAIMED BY THE GOVERNMENT SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE TRANSPORTED FROM THE SITE AS THEY ARE REMOVED. STORAGE OR SALE OF REMOVED ITEMS
ON SITE WILL NOT BE PERMITTED.
8. VERIFY SAVING AND RE-USE OF ALL MISCELLANEOUS ITEMS AND EQUIPMENT NOT SPECIFICALLY LISTED ON THE DRAWINGS OR IN THE SPECIFICATIONS WITH THE CONTRACTING OFFICER PRIOR TO
DEMOLITION.
9. FOR ITEMS TO BE SALVAGED, REFER TO SPECIFICATIONS SECTION 02 05 50: SELECTIVE SALVAGE
AND STORAGE.
:2
A M
TITLE OF SHEET
BOSTON NATIONAL HISTORICAL PARK
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
A U
TO
C A D u sc m b fi l0 fa c p ro j\ C N Y G A
TE
W A Y
C A D D A rc h it e c tu re S h e e ts O ri g in a l S e t O f D w g s\ D
G E N 'L
N O
TE
S S Y M B O
LS
A B B R E V .d w g
SUB SHEET NO.
DESIGNED:
TECH. REVIEW:
DATE: 7/20/2023
11:27:23 AM
A/E Firm
PRIME/ARCH:
MARBLE, FAIRBANKS
NEW YORK, NY
SUBCONTRACTOR:
JACOBS
BOSTON, MA
CADD
D. D. CHOI
C. W. BAISLY
D-2
GENERAL NOTES
SHEET 2 OF 2
179511
318750
:2
A M
TITLE OF SHEET
BOSTON NATIONAL HISTORICAL PARK
DRAWING NO.
PMIS/PKG. NO.
SHEET
OF
A U
TO
C A D u sc m b fi l0 fa c p ro j\ C N Y G A
TE
W A Y
C A D D A rc h it e c tu re S h e e ts O ri g in a l S e t O f D w g s\ D
E X
IS
TI
N G
S
IT
E
P
LA
N .d w g
SUB SHEET NO.
DESIGNED:
TECH. REVIEW:
DATE: 7/20/2023
11:29:52 AM
A/E Firm
PRIME/ARCH:
MARBLE, FAIRBANKS
NEW YORK, NY
SUBCONTRACTOR:
JACOBS
BOSTON, MA
CADD
D. D. CHOI
C. W. BAISLY
D-3 EXISTING SITE PLAN
179511
318750
0' 10' 20' 40' 80'
0m 5m 10m 20m
GRAPHIC SCALE
AutoCAD SHX Text
CCB
AutoCAD SHX Text
CCB
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
BIT. CONC.
AutoCAD SHX Text
BIT. CONC.
AutoCAD SHX Text
BIT. CONC.
AutoCAD SHX Text
BIT. CONC.
AutoCAD SHX Text
BIT. CONC.
AutoCAD SHX Text
BRICK APRON
AutoCAD SHX Text
STEPS
AutoCAD SHX Text
COBBLE
AutoCAD SHX Text
CC
AutoCAD SHX Text
6' CLF
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
FSW
AutoCAD SHX Text
GRN
AutoCAD SHX Text
GRN
AutoCAD SHX Text
GRN
AutoCAD SHX Text
GRN APRON
AutoCAD SHX Text
GRN
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
ANCHOR
AutoCAD SHX Text
TR
AutoCAD SHX Text
MISC.
AutoCAD SHX Text
WIF
AutoCAD SHX Text
WIF
AutoCAD SHX Text
MTL
AutoCAD SHX Text
MTL
AutoCAD SHX Text
CANOPY
AutoCAD SHX Text
FGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
FGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text 15.09
AutoCAD SHX Text 15.19
AutoCAD SHX Text 15.27
AutoCAD SHX Text 15.28
AutoCAD SHX Text 15.26
AutoCAD SHX Text 15.23
AutoCAD SHX Text 15.08
AutoCAD SHX Text 14.63
AutoCAD SHX Text 15.71
AutoCAD SHX Text 15.68
AutoCAD SHX Text 15.43
AutoCAD SHX Text 15.43
AutoCAD SHX Text 15.52
AutoCAD SHX Text 15.66
AutoCAD SHX Text 15.25
AutoCAD SHX Text 14.90
AutoCAD SHX Text 14.83
AutoCAD SHX Text 14.89
AutoCAD SHX Text 14.83
AutoCAD SHX Text 14.80
AutoCAD SHX Text 14.94
AutoCAD SHX Text 15.16
AutoCAD SHX Text 15.18
AutoCAD SHX Text 15.16
AutoCAD SHX Text 15.04
AutoCAD SHX Text 15.60
AutoCAD SHX Text 15.53
AutoCAD SHX Text 15.42
AutoCAD SHX Text 15.44
AutoCAD SHX Text 15.51
AutoCAD SHX Text 15.48
AutoCAD SHX Text 15.39
AutoCAD SHX Text 14.95
AutoCAD SHX Text 15.20
AutoCAD SHX Text 15.35
AutoCAD SHX Text 15.25
AutoCAD SHX Text 15.16
AutoCAD SHX Text 15.31
AutoCAD SHX Text 14.93
AutoCAD SHX Text 15.03
AutoCAD SHX Text 15.09
AutoCAD SHX Text 15.11
AutoCAD SHX Text 15.08
AutoCAD SHX Text 15.10
AutoCAD SHX Text 14.75
AutoCAD SHX Text 15.18
AutoCAD SHX Text 14.72
AutoCAD SHX Text 14.68
AutoCAD SHX Text 14.64
AutoCAD SHX Text 15.11
AutoCAD SHX Text 15.09
AutoCAD SHX Text 15.96
AutoCAD SHX Text 16.38
AutoCAD SHX Text 16.35
AutoCAD SHX Text 15.90
AutoCAD SHX Text 16.01
AutoCAD SHX Text 14.66
AutoCAD SHX Text 14.67
AutoCAD SHX Text 14.62
AutoCAD SHX Text 14.54
AutoCAD SHX Text 14.49
AutoCAD SHX Text 14.81
AutoCAD SHX Text 14.86
AutoCAD SHX Text 15.02
AutoCAD SHX Text 15.08
AutoCAD SHX Text 15.08
AutoCAD SHX Text 15.10
AutoCAD SHX Text 15.56
AutoCAD SHX Text 15.90
AutoCAD SHX Text 16.19
AutoCAD SHX Text 16.54
AutoCAD SHX Text 16.38
AutoCAD SHX Text 16.40
AutoCAD SHX Text 16.36
AutoCAD SHX Text 16.04
AutoCAD SHX Text 17.98
AutoCAD SHX Text 17.32
AutoCAD SHX Text 17.07
AutoCAD SHX Text 16.95
AutoCAD SHX Text 17.96
AutoCAD SHX Text 17.29
AutoCAD SHX Text 17.01
AutoCAD SHX Text 16.95
AutoCAD SHX Text 16.89
AutoCAD SHX Text 15.90
AutoCAD SHX Text 16.34
AutoCAD SHX Text 14.12
AutoCAD SHX Text 17.20
AutoCAD SHX Text 13.34
AutoCAD SHX Text 14.74
AutoCAD SHX Text 14.70
AutoCAD SHX Text 14.70
AutoCAD SHX Text 14.47
AutoCAD SHX Text 14.50
AutoCAD SHX Text 14.91
AutoCAD SHX Text 14.96
AutoCAD SHX Text 15.05
AutoCAD SHX Text 15.13
AutoCAD SHX Text 15.12
AutoCAD SHX Text 15.17
AutoCAD SHX Text 14.93
AutoCAD SHX Text 14.67
AutoCAD SHX Text 14.21
AutoCAD SHX Text 14.35
AutoCAD SHX Text 13.49
AutoCAD SHX Text 13.32
AutoCAD SHX Text 13.18
AutoCAD SHX Text 13.24
AutoCAD SHX Text 13.23
AutoCAD SHX Text 13.29
AutoCAD SHX Text 13.53
AutoCAD SHX Text 13.90
AutoCAD SHX Text 14.03
AutoCAD SHX Text 13.98
AutoCAD SHX Text 14.93
AutoCAD SHX Text 15.89
AutoCAD SHX Text 16.37
AutoCAD SHX Text 16.74
AutoCAD SHX Text 17.22
AutoCAD SHX Text 16.49
AutoCAD SHX Text 16.49
AutoCAD SHX Text 16.12
AutoCAD SHX Text 13.97
AutoCAD SHX Text 13.89
AutoCAD SHX Text 14.16
AutoCAD SHX Text 16.12
AutoCAD SHX Text
16.46BW
AutoCAD SHX Text
16.47BW
AutoCAD SHX Text
16.54BW
AutoCAD SHX Text 15.8
AutoCAD SHX Text
16.08BC
AutoCAD SHX Text
15.95BC
AutoCAD SHX Text 14.15
AutoCAD SHX Text 14.18
AutoCAD SHX Text 14.26
AutoCAD SHX Text 15.5
AutoCAD SHX Text 15.2
AutoCAD SHX Text 15.3
AutoCAD SHX Text 15.67
AutoCAD SHX Text 15.66
AutoCAD SHX Text 15.70
AutoCAD SHX Text 15.67
AutoCAD SHX Text 15.48
AutoCAD SHX Text 14.76
AutoCAD SHX Text 14.23
AutoCAD SHX Text 14.43
AutoCAD SHX Text 14.22
AutoCAD SHX Text 14.14
AutoCAD SHX Text 14.38
AutoCAD SHX Text 15.04
AutoCAD SHX Text 14.96
AutoCAD SHX Text 13.45
AutoCAD SHX Text 13.12
AutoCAD SHX Text 17.20
AutoCAD SHX Text 2"
AutoCAD SHX Text 3"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text 15.5
AutoCAD SHX Text 15.3
AutoCAD SHX Text 14.62
AutoCAD SHX Text 14.60
AutoCAD SHX Text 14.58
AutoCAD SHX Text 14.38
AutoCAD SHX Text 14.42
AutoCAD SHX Text 14.76
AutoCAD SHX Text 14.80
AutoCAD SHX Text 14.79
AutoCAD SHX Text 14.87
AutoCAD SHX Text 14.94
AutoCAD SHX Text 15.02
AutoCAD SHX Text 14.97
AutoCAD SHX Text 15.46
AutoCAD SHX Text 15.74
AutoCAD SHX Text 16.13
AutoCAD SHX Text 16.45
AutoCAD SHX Text 17.37
AutoCAD SHX Text 17.51
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text G
AutoCAD SHX Text
GM
AutoCAD SHX Text 16.42
AutoCAD SHX Text 16.38
AutoCAD SHX Text 16.18
AutoCAD SHX Text 16.61
AutoCAD SHX Text 16.83
AutoCAD SHX Text 16.89
AutoCAD SHX Text 16.44
AutoCAD SHX Text 16.36
AutoCAD SHX Text 15.95
AutoCAD SHX Text 16.08
AutoCAD SHX Text 16.21
AutoCAD SHX Text 16.28
AutoCAD SHX Text 16.13
AutoCAD SHX Text 16.12
AutoCAD SHX Text
15.90BC
AutoCAD SHX Text 15.88
AutoCAD SHX Text 15.29
AutoCAD SHX Text 15.88
AutoCAD SHX Text 15.36
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
MH
AutoCAD SHX Text 14.51
AutoCAD SHX Text 14.49
AutoCAD SHX Text 14.35
AutoCAD SHX Text 14.43
AutoCAD SHX Text 14.66
AutoCAD SHX Text 14.46
AutoCAD SHX Text 15.15
AutoCAD SHX Text 14.87
AutoCAD SHX Text 14.75
AutoCAD SHX Text 14.61
AutoCAD SHX Text 14.46
AutoCAD SHX Text 13.93
AutoCAD SHX Text 13.98
AutoCAD SHX Text 14.11
AutoCAD SHX Text 14.55
AutoCAD SHX Text 14.42
AutoCAD SHX Text 14.75
AutoCAD SHX Text 14.97
AutoCAD SHX Text 14.94
AutoCAD SHX Text 15.03
AutoCAD SHX Text 15.29
AutoCAD SHX Text 16.41
AutoCAD SHX Text 12.85
AutoCAD SHX Text 13.14
AutoCAD SHX Text 13.01
AutoCAD SHX Text 13.52
AutoCAD SHX Text 13.98
AutoCAD SHX Text 14.66
AutoCAD SHX Text 15.17
AutoCAD SHX Text 15.80
AutoCAD SHX Text 14.15
AutoCAD SHX Text 13.80
AutoCAD SHX Text 13.71
AutoCAD SHX Text 13.89
AutoCAD SHX Text 14.37
AutoCAD SHX Text 16.39
AutoCAD SHX Text 18.73
AutoCAD SHX Text 18.20
AutoCAD SHX Text 16.93
AutoCAD SHX Text 16.43
AutoCAD SHX Text 15.88
AutoCAD SHX Text 15.97
AutoCAD SHX Text 14.14
AutoCAD SHX Text 14.05
AutoCAD SHX Text 13.90
AutoCAD SHX Text 14.27
AutoCAD SHX Text 16.02
AutoCAD SHX Text 16.14
AutoCAD SHX Text 16.13
AutoCAD SHX Text 14.19
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text 15.28
AutoCAD SHX Text 15.44
AutoCAD SHX Text 15.49
AutoCAD SHX Text 15.46
AutoCAD SHX Text 15.49
AutoCAD SHX Text 15.47
AutoCAD SHX Text
14.45TC
AutoCAD SHX Text
14.46TC
AutoCAD SHX Text 14.27
AutoCAD SHX Text 14.26
AutoCAD SHX Text
14.63TC
AutoCAD SHX Text 14.68
AutoCAD SHX Text 14.27
AutoCAD SHX Text
14.33TC
AutoCAD SHX Text
14.81TC
AutoCAD SHX Text 15.66
AutoCAD SHX Text 15.83
AutoCAD SHX Text 15.97
AutoCAD SHX Text 16.05
AutoCAD SHX Text 15.48
AutoCAD SHX Text 15.73
AutoCAD SHX Text 16.11
AutoCAD SHX Text 16.65
AutoCAD SHX Text 16.66
AutoCAD SHX Text 16.36
AutoCAD SHX Text 16.89
AutoCAD SHX Text 17.78
AutoCAD SHX Text 18.12
AutoCAD SHX Text 16.18
AutoCAD SHX Text 16.22
AutoCAD SHX Text 16.31
AutoCAD SHX Text
16.41TC
AutoCAD SHX Text
16.38TC
AutoCAD SHX Text 14.65
AutoCAD SHX Text 14.32
AutoCAD SHX Text 14.32
AutoCAD SHX Text 13.81
AutoCAD SHX Text 14.00
AutoCAD SHX Text 14.01
AutoCAD SHX Text 13.95
AutoCAD SHX Text 13.83
AutoCAD SHX Text 13.64
AutoCAD SHX Text 13.67
AutoCAD SHX Text 13.38
AutoCAD SHX Text 13.32
AutoCAD SHX Text 13.27
AutoCAD SHX Text 13.21
AutoCAD SHX Text 13.24
AutoCAD SHX Text 14.19
AutoCAD SHX Text 14.76
AutoCAD SHX Text 15.48
AutoCAD SHX Text 16.72
AutoCAD SHX Text 16.91
AutoCAD SHX Text 18.14
AutoCAD SHX Text 17.18
AutoCAD SHX Text 16.43
AutoCAD SHX Text 15.45
AutoCAD SHX Text 14.75
AutoCAD SHX Text 14.30
AutoCAD SHX Text 14.06
AutoCAD SHX Text 14.20
AutoCAD SHX Text 14.27
AutoCAD SHX Text 14.45
AutoCAD SHX Text 14.45
AutoCAD SHX Text 14.47
AutoCAD SHX Text 14.81
AutoCAD SHX Text 15.44
AutoCAD SHX Text 16.05
AutoCAD SHX Text 16.80
AutoCAD SHX Text 17.55
AutoCAD SHX Text 18.16
AutoCAD SHX Text 18.48
AutoCAD SHX Text 19.54
AutoCAD SHX Text 18.95
AutoCAD SHX Text 17.76
AutoCAD SHX Text 17.15
AutoCAD SHX Text 16.71
AutoCAD SHX Text 16.47
AutoCAD SHX Text 16.52
AutoCAD SHX Text 16.92
AutoCAD SHX Text 18.05
AutoCAD SHX Text 18.78
AutoCAD SHX Text 14.73
AutoCAD SHX Text 14.13
AutoCAD SHX Text 14.26
AutoCAD SHX Text 13.48
AutoCAD SHX Text T
AutoCAD SHX Text
TR
AutoCAD SHX Text
TR
AutoCAD SHX Text
30.50TW
AutoCAD SHX Text
30.64TW
AutoCAD SHX Text
14.17BC
AutoCAD SHX Text
14.29BC
AutoCAD SHX Text 14.26
AutoCAD SHX Text 14.36
AutoCAD SHX Text 15.15
AutoCAD SHX Text 15.40
AutoCAD SHX Text 15.50
AutoCAD SHX Text 15.56
AutoCAD SHX Text 15.55
AutoCAD SHX Text 15.48
AutoCAD SHX Text 15.66
AutoCAD SHX Text 16.15
AutoCAD SHX Text 16.31
AutoCAD SHX Text 16.81
AutoCAD SHX Text 17.36
AutoCAD SHX Text 17.69
AutoCAD SHX Text 15.69
AutoCAD SHX Text 15.82
AutoCAD SHX Text 14.14
AutoCAD SHX Text 13.91
AutoCAD SHX Text 13.86
AutoCAD SHX Text 13.68
AutoCAD SHX Text 13.58
AutoCAD SHX Text 14.08
AutoCAD SHX Text 13.89
AutoCAD SHX Text 13.39
AutoCAD SHX Text 13.27
AutoCAD SHX Text 13.61
AutoCAD SHX Text 13.33
AutoCAD SHX Text 12.91
AutoCAD SHX Text 12.78
AutoCAD SHX Text 12.68
AutoCAD SHX Text 12.81
AutoCAD SHX Text 13.71
AutoCAD SHX Text 14.34
AutoCAD SHX Text 15.03
AutoCAD SHX Text 13.70
AutoCAD SHX Text 13.90
AutoCAD SHX Text 19.09
AutoCAD SHX Text 18.53
AutoCAD SHX Text 17.28
AutoCAD SHX Text 16.56
AutoCAD SHX Text 16.26
AutoCAD SHX Text 16.16
AutoCAD SHX Text 16.49
AutoCAD SHX Text 17.60
AutoCAD SHX Text 18.26
AutoCAD SHX Text 14.41
AutoCAD SHX Text 14.05
AutoCAD SHX Text 13.88
AutoCAD SHX Text O
AutoCAD SHX Text W
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text W
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text W
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text W
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text W
AutoCAD SHX Text S
AutoCAD SHX Text
BIT. CONC.
AutoCAD SHX Text 15.39
AutoCAD SHX Text 15.32
AutoCAD SHX Text 15.32
AutoCAD SHX Text 15.33
AutoCAD SHX Text 15.20
AutoCAD SHX Text
BIT. CONC.
AutoCAD SHX Text 15.29
AutoCAD SHX Text
BIT. CONC.
AutoCAD SHX Text 16.09
AutoCAD SHX Text
BIT. CONC.
AutoCAD SHX Text 16.07
AutoCAD SHX Text
CONC.
AutoCAD SHX Text 14.87
AutoCAD SHX Text
CONC.
AutoCAD SHX Text 14.77
AutoCAD SHX Text
15.13TW
AutoCAD SHX Text
CONC.
AutoCAD SHX Text 13.34
AutoCAD SHX Text
CONC.
AutoCAD SHX Text 13.94
AutoCAD SHX Text
CONC.
AutoCAD SHX Text 17.50
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text 15.69
AutoCAD SHX Text 14.89
AutoCAD SHX Text
CONC.
AutoCAD SHX Text 14.41
AutoCAD SHX Text
COBBLE
AutoCAD SHX Text 16.4
AutoCAD SHX Text 15.9
AutoCAD SHX Text
COBBLE
AutoCAD SHX Text 19.13
AutoCAD SHX Text 18.72
AutoCAD SHX Text
COBBLE
AutoCAD SHX Text 15.5
AutoCAD SHX Text 16.11
AutoCAD SHX Text 16.45
AutoCAD SHX Text
COBBLE
AutoCAD SHX Text
COBBLE
AutoCAD SHX Text 17.49
AutoCAD SHX Text 17.99
AutoCAD SHX Text
COBBLE
AutoCAD SHX Text
COBBLE
AutoCAD SHX Text
GRAN.
AutoCAD SHX Text 16.36
AutoCAD SHX Text 17.60
AutoCAD SHX Text 17.50
AutoCAD SHX Text 17.03
AutoCAD SHX Text 17.10
AutoCAD SHX Text 16.64
AutoCAD SHX Text
(2) BENCHES ON CONC.
AutoCAD SHX Text
BIT. CONC.
AutoCAD SHX Text
BIT. CONC.
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text 24"x24"S
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
REC.
AutoCAD SHX Text 24"x30"S(MWRA) UNDER
AutoCAD SHX Text 8"W
AutoCAD SHX Text 4"W
AutoCAD SHX Text S
AutoCAD SHX Text
REC.
AutoCAD SHX Text 24"x30"S (BRICK)
AutoCAD SHX Text 24"x30"S(BOX)
AutoCAD SHX Text
12"D (RCP)
AutoCAD SHX Text
CCB
AutoCAD SHX Text
CCB
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
BIT. CONC.
AutoCAD SHX Text
BIT. CONC.
AutoCAD SHX Text
COBB
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC. RAMP
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
WIF
AutoCAD SHX Text
WIP
AutoCAD SHX Text
WIF
AutoCAD SHX Text
WIP
AutoCAD SHX Text
WIF
AutoCAD SHX Text
FGC
AutoCAD SHX Text
GRN
AutoCAD SHX Text
GRN
AutoCAD SHX Text
GRN
AutoCAD SHX Text
ANCHOR
AutoCAD SHX Text
ANCHOR
AutoCAD SHX Text
HR
AutoCAD SHX Text
MTL
AutoCAD SHX Text
RAILROAD TRACK
AutoCAD SHX Text
MTL
AutoCAD SHX Text
MTL
AutoCAD SHX Text
WIF
AutoCAD SHX Text
RAILROAD TRACKS
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text
15.00BC
AutoCAD SHX Text 15.26
AutoCAD SHX Text 15.53
AutoCAD SHX Text 15.71
AutoCAD SHX Text 16.05
AutoCAD SHX Text 16.29
AutoCAD SHX Text 16.43
AutoCAD SHX Text
16.21BC
AutoCAD SHX Text 15.36
AutoCAD SHX Text 15.65
AutoCAD SHX Text 15.58
AutoCAD SHX Text 15.58
AutoCAD SHX Text 15.15
AutoCAD SHX Text 15.09
AutoCAD SHX Text 14.90
AutoCAD SHX Text 14.92
AutoCAD SHX Text 14.84
AutoCAD SHX Text 14.59
AutoCAD SHX Text 14.70
AutoCAD SHX Text 14.69
AutoCAD SHX Text 14.84
AutoCAD SHX Text 15.0
AutoCAD SHX Text 16.55
AutoCAD SHX Text 15.4
AutoCAD SHX Text 15.61
AutoCAD SHX Text 15.49
AutoCAD SHX Text 15.27
AutoCAD SHX Text 15.14
AutoCAD SHX Text 15.02
AutoCAD SHX Text
15.00BW
AutoCAD SHX Text
15.74BW
AutoCAD SHX Text
15.28BW
AutoCAD SHX Text
14.98BW
AutoCAD SHX Text
14.84BW
AutoCAD SHX Text
14.95BW
AutoCAD SHX Text
14.90BW
AutoCAD SHX Text
14.46BW
AutoCAD SHX Text
14.74BW
AutoCAD SHX Text
14.57BW
AutoCAD SHX Text
15.59BW
AutoCAD SHX Text
16.29BW
AutoCAD SHX Text
16.51BW
AutoCAD SHX Text 14.74
AutoCAD SHX Text
14.81BW
AutoCAD SHX Text
15.30BW
AutoCAD SHX Text
15.35BW
AutoCAD SHX Text
15.31BW
AutoCAD SHX Text
14.63BW
AutoCAD SHX Text
14.58BW
AutoCAD SHX Text
14.64BW
AutoCAD SHX Text
14.69BW
AutoCAD SHX Text
14.58BW
AutoCAD SHX Text
15.12BW
AutoCAD SHX Text
15.05BW
AutoCAD SHX Text
15.10BW
AutoCAD SHX Text
14.94BW
AutoCAD SHX Text 14.98
AutoCAD SHX Text
14.64BW
AutoCAD SHX Text
14.89BW
AutoCAD SHX Text
15.19BW
AutoCAD SHX Text 15.20
AutoCAD SHX Text 15.29
AutoCAD SHX Text 15.28
AutoCAD SHX Text
14.64BW
AutoCAD SHX Text
14.61BW
AutoCAD SHX Text
14.68BW
AutoCAD SHX Text
14.75BW
AutoCAD SHX Text
14.60TW
AutoCAD SHX Text 14.71
AutoCAD SHX Text 14.78
AutoCAD SHX Text 14.94
AutoCAD SHX Text 15.07
AutoCAD SHX Text 15.13
AutoCAD SHX Text 15.26
AutoCAD SHX Text 15.37
AutoCAD SHX Text
15.41BC
AutoCAD SHX Text
15.47BC
AutoCAD SHX Text
15.18BC
AutoCAD SHX Text 15.16
AutoCAD SHX Text 15.00
AutoCAD SHX Text 15.53
AutoCAD SHX Text 15.5
AutoCAD SHX Text 15.5
AutoCAD SHX Text 18.55
AutoCAD SHX Text 15.02
AutoCAD SHX Text
14.96BC
AutoCAD SHX Text 16.62
AutoCAD SHX Text 16.17
AutoCAD SHX Text 16.35
AutoCAD SHX Text 16.23
AutoCAD SHX Text 15.93
AutoCAD SHX Text 16.02
AutoCAD SHX Text 14.91
AutoCAD SHX Text 14.87
AutoCAD SHX Text 14.80
AutoCAD SHX Text 15.34
AutoCAD SHX Text 8"
AutoCAD SHX Text 14"
AutoCAD SHX Text 8"
AutoCAD SHX Text 20"
AutoCAD SHX Text 24"
AutoCAD SHX Text 4"
AutoCAD SHX Text 20"
AutoCAD SHX Text 20"
AutoCAD SHX Text 20"
AutoCAD SHX Text
(2) 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text D
AutoCAD SHX Text
HH
AutoCAD SHX Text
HH
AutoCAD SHX Text
ENT.
AutoCAD SHX Text
ENT.
AutoCAD SHX Text
TH=16.07
AutoCAD SHX Text 14.70
AutoCAD SHX Text 15.4
AutoCAD SHX Text 15.3
AutoCAD SHX Text
GM
AutoCAD SHX Text 14.65
AutoCAD SHX Text 14.59
AutoCAD SHX Text 15.05
AutoCAD SHX Text 15.00
AutoCAD SHX Text 14.28
AutoCAD SHX Text 14.37
AutoCAD SHX Text 14.50
AutoCAD SHX Text 14.62
AutoCAD SHX Text 15.31
AutoCAD SHX Text 15.32
AutoCAD SHX Text 15.34
AutoCAD SHX Text 15.29
AutoCAD SHX Text 15.30
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text 15.59
AutoCAD SHX Text 15.42
AutoCAD SHX Text 15.34
AutoCAD SHX Text 15.28
AutoCAD SHX Text 15.19
AutoCAD SHX Text 15.36
AutoCAD SHX Text 15.27
AutoCAD SHX Text 15.19
AutoCAD SHX Text 15.39
AutoCAD SHX Text
14.81BC
AutoCAD SHX Text 14.83
AutoCAD SHX Text 14.66
AutoCAD SHX Text 14.62
AutoCAD SHX Text 15.86
AutoCAD SHX Text 16.08
AutoCAD SHX Text 15.48
AutoCAD SHX Text 15.16
AutoCAD SHX Text 15.63
AutoCAD SHX Text 15.49
AutoCAD SHX Text 14.85
AutoCAD SHX Text 14.23
AutoCAD SHX Text 14.33
AutoCAD SHX Text 14.34
AutoCAD SHX Text 14.33
AutoCAD SHX Text 14.17
AutoCAD SHX Text
14.32BW
AutoCAD SHX Text 14.09
AutoCAD SHX Text 15.91
AutoCAD SHX Text 15.73
AutoCAD SHX Text 16.06
AutoCAD SHX Text 16.08
AutoCAD SHX Text 14.51
AutoCAD SHX Text 14.45
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text 16.17
AutoCAD SHX Text
15.12BW
AutoCAD SHX Text
16.02BW
AutoCAD SHX Text
14.73BW
AutoCAD SHX Text
15.09BW
AutoCAD SHX Text
15.23BW
AutoCAD SHX Text
15.07BW
AutoCAD SHX Text 14.59
AutoCAD SHX Text 14.60
AutoCAD SHX Text 14.56
AutoCAD SHX Text
15.43BW
AutoCAD SHX Text
15.75BW
AutoCAD SHX Text
15.12BW
AutoCAD SHX Text
14.97BW
AutoCAD SHX Text
15.07BW
AutoCAD SHX Text
16.50BW
AutoCAD SHX Text
16.32BW
AutoCAD SHX Text
16.28BW
AutoCAD SHX Text 16.13
AutoCAD SHX Text
16.05BW
AutoCAD SHX Text
16.20BW
AutoCAD SHX Text
15.34TC
AutoCAD SHX Text 15.46
AutoCAD SHX Text 15.84
AutoCAD SHX Text 16.01
AutoCAD SHX Text 16.34
AutoCAD SHX Text 16.59
AutoCAD SHX Text
16.48TC
AutoCAD SHX Text 15.41
AutoCAD SHX Text 15.42
AutoCAD SHX Text 15.56
AutoCAD SHX Text 15.64
AutoCAD SHX Text
15.69TC
AutoCAD SHX Text
15.86TC
AutoCAD SHX Text
15.44TC
AutoCAD SHX Text 15.46
AutoCAD SHX Text 15.49
AutoCAD SHX Text 15.34
AutoCAD SHX Text 15.95
AutoCAD SHX Text 15.82
AutoCAD SHX Text 15.46
AutoCAD SHX Text
TR
AutoCAD SHX Text
TR
AutoCAD SHX Text 18.0
AutoCAD SHX Text 17.9
AutoCAD SHX Text 18.2
AutoCAD SHX Text 17.5
AutoCAD SHX Text 17.2
AutoCAD SHX Text 19.1
AutoCAD SHX Text 18.1
AutoCAD SHX Text 17.3
AutoCAD SHX Text 19.0
AutoCAD SHX Text 18.6
AutoCAD SHX Text
16.49TW
AutoCAD SHX Text
16.68TW
AutoCAD SHX Text
15.63TW
AutoCAD SHX Text
15.62TW
AutoCAD SHX Text
16.92TW
AutoCAD SHX Text
16.92TW
AutoCAD SHX Text
16.89TW
AutoCAD SHX Text
16.91TW
AutoCAD SHX Text
16.86TW
AutoCAD SHX Text
16.88TW
AutoCAD SHX Text
16.83TW
AutoCAD SHX Text
16.88TW
AutoCAD SHX Text
16.89TW
AutoCAD SHX Text
16.87TW
AutoCAD SHX Text
16.89TW
AutoCAD SHX Text
19.43TW
AutoCAD SHX Text
19.33TW
AutoCAD SHX Text
19.69TW
AutoCAD SHX Text
19.85TW
AutoCAD SHX Text
19.90TW
AutoCAD SHX Text
17.39TW
AutoCAD SHX Text
15.24TW
AutoCAD SHX Text
15.74TW
AutoCAD SHX Text
16.65TW
AutoCAD SHX Text
17.15TW
AutoCAD SHX Text
17.42TW
AutoCAD SHX Text
15.07TW
AutoCAD SHX Text
15.10TW
AutoCAD SHX Text
15.23TW
AutoCAD SHX Text
15.29TW
AutoCAD SHX Text
14.60TW
AutoCAD SHX Text
14.62TW
AutoCAD SHX Text
17.44TW
AutoCAD SHX Text
17.30TW
AutoCAD SHX Text
17.20TW
AutoCAD SHX Text
17.18TW
AutoCAD SHX Text
17.21TW
AutoCAD SHX Text 15.83
AutoCAD SHX Text 15.47
AutoCAD SHX Text 15.02
AutoCAD SHX Text
14.81TC
AutoCAD SHX Text O
AutoCAD SHX Text W
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text W
AutoCAD SHX Text S
AutoCAD SHX Text 15.22
AutoCAD SHX Text 15.09
AutoCAD SHX Text 14.44
AutoCAD SHX Text
BIT. CONC.
AutoCAD SHX Text
BIT. CONC.
AutoCAD SHX Text 15.12
AutoCAD SHX Text 14.39
AutoCAD SHX Text 15.00
AutoCAD SHX Text
BIT. CONC.
AutoCAD SHX Text 14.79
AutoCAD SHX Text 15.71
AutoCAD SHX Text
CONC.
AutoCAD SHX Text 17.08
AutoCAD SHX Text 19.76
AutoCAD SHX Text
CONC.
AutoCAD SHX Text 19.81
AutoCAD SHX Text
CONC.
AutoCAD SHX Text 18.90
AutoCAD SHX Text
CONC.
AutoCAD SHX Text 15.58
AutoCAD SHX Text
CONC.
AutoCAD SHX Text 15.25
AutoCAD SHX Text 14.66
AutoCAD SHX Text
16.16TW
AutoCAD SHX Text
16.14TW
AutoCAD SHX Text
GRAN.
AutoCAD SHX Text
16.15TW
AutoCAD SHX Text
16.15TW
AutoCAD SHX Text
GRAN.
AutoCAD SHX Text
16.10TW
AutoCAD SHX Text
GRAN.
AutoCAD SHX Text
16.15TW
AutoCAD SHX Text
GRAN.
AutoCAD SHX Text 15.39
AutoCAD SHX Text 15.1
AutoCAD SHX Text 15.0
AutoCAD SHX Text 15.1
AutoCAD SHX Text 15.4
AutoCAD SHX Text 15.3
AutoCAD SHX Text 15.5
AutoCAD SHX Text 16.9
AutoCAD SHX Text 16.8
AutoCAD SHX Text 16.6
AutoCAD SHX Text 17.7
AutoCAD SHX Text 18.5
AutoCAD SHX Text 18.4
AutoCAD SHX Text 14.8
AutoCAD SHX Text 14.8
AutoCAD SHX Text 15.1
AutoCAD SHX Text 17.1
AutoCAD SHX Text 19.8
AutoCAD SHX Text 15.6
AutoCAD SHX Text 15.1
AutoCAD SHX Text 15.1
AutoCAD SHX Text 15.4
AutoCAD SHX Text S
AutoCAD SHX Text 3"G
AutoCAD SHX Text
(ABAND.)
AutoCAD SHX Text 14.06
AutoCAD SHX Text 16.91
AutoCAD SHX Text 16.34
AutoCAD SHX Text
VGC
AutoCAD SHX Text 16.77
AutoCAD SHX Text 17.20
AutoCAD SHX Text 17.56
AutoCAD SHX Text
VGC
AutoCAD SHX Text 15.96
AutoCAD SHX Text 16.52
AutoCAD SHX Text
VGC
AutoCAD SHX Text 15.72
AutoCAD SHX Text
VGC
AutoCAD SHX Text 14.97
AutoCAD SHX Text
VGC
AutoCAD SHX Text 15.04
AutoCAD SHX Text 14.21
AutoCAD SHX Text 14.45
AutoCAD SHX Text
VGC
AutoCAD SHX Text
VGC
AutoCAD SHX Text 14.07
AutoCAD SHX Text 13.78
AutoCAD SHX Text 13.98
AutoCAD SHX Text
VGC
AutoCAD SHX Text 13.71
AutoCAD SHX Text 15.25
AutoCAD SHX Text 14.99
AutoCAD SHX Text 14.86
AutoCAD SHX Text 14.91
AutoCAD SHX Text
GRN APRON
AutoCAD SHX Text 15.91
AutoCAD SHX Text
GRN WALL
AutoCAD SHX Text
16.79TW
AutoCAD SHX Text
14.67BW
AutoCAD SHX Text
BENCHES ON CONC PAD
AutoCAD SHX Text
15.47TC
AutoCAD SHX Text 15.35
AutoCAD SHX Text 14.59
AutoCAD SHX Text
RAILROAD TRACKS
AutoCAD SHX Text
GRN WALL
AutoCAD SHX Text
GRN WALL
AutoCAD SHX Text
COBB
AutoCAD SHX Text
COBB
AutoCAD SHX Text
GRAN. PAVERS
AutoCAD SHX Text
GRAN. PAVERS
AutoCAD SHX Text
GRANITE MONUMENT
AutoCAD SHX Text
GRANITE BENCH
AutoCAD SHX Text
WIF
AutoCAD SHX Text
WIF
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GRASS
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text
RAILROAD TRACKS
AutoCAD SHX Text
RAIL STOP
AutoCAD SHX Text
MTL STEPS
AutoCAD SHX Text
TH=19.18
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
TH=18.79
AutoCAD SHX Text
ENT.
AutoCAD SHX Text
TH=18.39
AutoCAD SHX Text
ENT.
AutoCAD SHX Text
TH=18.82
AutoCAD SHX Text
ENT.
AutoCAD SHX Text
TH=18.77
AutoCAD SHX Text
TR
AutoCAD SHX Text
TR
AutoCAD SHX Text
GRANITE PAVERS
AutoCAD SHX Text
GRANITE PAVERS
AutoCAD SHX Text
GRANITE PAVERS
AutoCAD SHX Text
15.94BW
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
VGC
AutoCAD SHX Text 17.64
AutoCAD SHX Text 18.11
AutoCAD SHX Text 17.82
AutoCAD SHX Text
10"D (DI)
AutoCAD SHX Text I=0.0
AutoCAD SHX Text
8"S (BRICK)
AutoCAD SHX Text
15"D (DI)
AutoCAD SHX Text 2"D
AutoCAD SHX Text 2"D
AutoCAD SHX Text 3"D
AutoCAD SHX Text 6"D
AutoCAD SHX Text "A"
AutoCAD SHX Text "B"
AutoCAD SHX Text "C"
AutoCAD SHX Text 15.17
AutoCAD SHX Text 14.72
AutoCAD SHX Text D
AutoCAD SHX Text
SHEET PILES W/CONC. CAP
AutoCAD SHX Text
SHEET PILES W/CONC. CAP
AutoCAD SHX Text
SHEET PILES
AutoCAD SHX Text
24"D (RCP)
AutoCAD SHX Text 15"D
AutoCAD SHX Text
12"D (RCP)
AutoCAD SHX Text
MH
AutoCAD SHX Text
12"D (RCP)
AutoCAD SHX Text
15"D (RCP)
AutoCAD SHX Text
15"D (RCP)
AutoCAD SHX Text
12"D (RCP)
AutoCAD SHX Text
12"D (RCP)
AutoCAD SHX Text
12"D (RCP)
AutoCAD SHX Text 12"S
AutoCAD SHX Text 12"S
AutoCAD SHX Text
12"S (BRICK)
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text D
AutoCAD SHX Text 24"x30"S (BRICK) MWRA
AutoCAD SHX Text 24"x30"S (BRICK) MWRA
AutoCAD SHX Text 24"x30"S (BRICK) MWRA
AutoCAD SHX Text
CROSSWALK
AutoCAD SHX Text
15" DRAIN OVER
AutoCAD SHX Text 24"x30"S (BRICK)
AutoCAD SHX Text 14.42
AutoCAD SHX Text
VGC
AutoCAD SHX Text
D REC
AutoCAD SHX Text
10"D (DI)
AutoCAD SHX Text
ABAND.
AutoCAD SHX Text
14.32BC
AutoCAD SHX Text
14.38BC
AutoCAD SHX Text 24"x30"S(BOX)
AutoCAD SHX Text
ENT.
AutoCAD SHX Text
TH=18.88
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
15"D (RCP)
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
CHAIN FENCE
AutoCAD SHX Text
CHAIN FENCE
AutoCAD SHX Text
CHAIN FENCE
AutoCAD SHX Text
CHAIN FENCE
AutoCAD SHX Text
CHAIN FENCE
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
ENT.
AutoCAD SHX Text
ENT.
AutoCAD SHX Text
TH=16.46
AutoCAD SHX Text Now or Formerly UNITED STATES OF AMERICA BOSTON NATIONAL HISTORICAL TRACT P-1 CIVIL ACTION NUMBER 77-1848-Z NO RECORDED LEGAL REFERENCE FOUND PARCEL ID 203595000
AutoCAD SHX Text
LOT AREA = 26,616 SQ. FT.
AutoCAD SHX Text Now or Formerly MASSACHUSETTS PORT AUTHORITY NO LEGAL REFERENCE FOUND PARCEL ID 203594300
AutoCAD SHX Text Now or Formerly MASSACHUSETTS PORT AUTHORITY NO LEGAL REFERENCE FOUND PARCEL ID 203594300
AutoCAD SHX Text Now or Formerly CONSTITUTION PLAZA ASSOCIATES DEED BOOK 12160, PAGE 52 PARCEL ID 2035940000
AutoCAD SHX Text
ENT.
AutoCAD SHX Text
TH=18.62
AutoCAD SHX Text
ENT.
AutoCAD SHX Text
TH=18.61
AutoCAD SHX Text Now or Formerly UNITED STATES OF AMERICA NO LEGAL REFERENCE FOUND PARCEL ID 203595000
AutoCAD SHX Text
ZONE X(UNSHADED)
AutoCAD SHX Text
ZONE AE
AutoCAD SHX Text
#115 6 STORY BRICK BUILDING
AutoCAD SHX Text (S.H.L.O. 3818)
AutoCAD SHX Text
CONSTITUTION ROAD
AutoCAD SHX Text
(PUBLIC - VARIABLE WIDTH)
AutoCAD SHX Text I=13.3 "A" I=13.2 "B" I=11.7 "C"
AutoCAD SHX Text
OHW
AutoCAD SHX Text 16.71
AutoCAD SHX Text 17.05
AutoCAD SHX Text 16.65
AutoCAD SHX Text 16.94
AutoCAD SHX Text 3"G
AutoCAD SHX Text 3"G
AutoCAD SHX Text 3"G
AutoCAD SHX Text 3"G
AutoCAD SHX Text 3"G
AutoCAD SHX Text 3"G
AutoCAD SHX Text I=9.5
AutoCAD SHX Text I=9.2
AutoCAD SHX Text
TT=9.0
AutoCAD SHX Text I=8.0
AutoCAD SHX Text I=6.6
AutoCAD SHX Text I=10.6
AutoCAD SHX Text
TT=7.8
AutoCAD SHX Text I=3.7
AutoCAD SHX Text
TT=11.7
AutoCAD SHX Text I=(-0.4)
AutoCAD SHX Text I=(-0.4)
AutoCAD SHX Text I=11.1
AutoCAD SHX Text I=11.1
AutoCAD SHX Text I=9.9
AutoCAD SHX Text I=9.4
AutoCAD SHX Text I=9.1
AutoCAD SHX Text I=8.7
AutoCAD SHX Text I=8.6
AutoCAD SHX Text I=8.9
AutoCAD SHX Text I=9.2
AutoCAD SHX Text I=8.7
AutoCAD SHX Text
TT=11.4
AutoCAD SHX Text I=8.7
AutoCAD SHX Text I=9.1
AutoCAD SHX Text I=8.2
AutoCAD SHX Text I=6.0
AutoCAD SHX Text I=5.7
AutoCAD SHX Text I=8.3
AutoCAD SHX Text I=9.1
AutoCAD SHX Text I=11.6
AutoCAD SHX Text I=11.6
AutoCAD SHX Text I=12.0
AutoCAD SHX Text I=13.1
AutoCAD SHX Text I=11.7
AutoCAD SHX Text I=11.7
AutoCAD SHX Text I=5.5
AutoCAD SHX Text I=5.7
AutoCAD SHX Text I=5.9
AutoCAD SHX Text I=5.2
AutoCAD SHX Text I=4.7
AutoCAD SHX Text I=2.0
AutoCAD SHX Text I=1.4
AutoCAD SHX Text I=0.6
AutoCAD SHX Text
INACC.
AutoCAD SHX Text
INACC.
AutoCAD SHX Text I=12.7
AutoCAD SHX Text I=10.3
AutoCAD SHX Text I=10.5
AutoCAD SHX Text I=10.2
AutoCAD SHX Text
TOW=11.7
AutoCAD SHX Text
TOW=11.9
AutoCAD SHX Text 3"G
AutoCAD SHX Text 16.90
AutoCAD SHX Text 17.06
AutoCAD SHX Text 17.52
AutoCAD SHX Text 18.37
AutoCAD SHX Text 17.93
AutoCAD SHX Text 3"G
AutoCAD SHX…