Attachment #3 - 100% For Construction Specifications VOL 2.pdf

PDF 6 MB Posted

Attached to
Construction Services, Building 185 Renovation, Brooklyn, New York
Solicitation number
47PA0320R0024
Issued by

About this file

This federal solicitation calls for construction services to renovate Building 185 in Brooklyn, New York for use by the United States Secret Service. Renovations will include select demolition work, insulating existing exterior metal panels, constructing three free-standing structures for storage, resealing the existing asphalt floor, restriping parking lanes and areas, adding three ceiling fans, replacing all interior lights, and other miscellaneous architectural and mechanical interventions. Interested vendors must comply with access instructions in the Google Docs attachment to view construction drawings for the project. The General Services Administration will manage the project on behalf of the Department of Homeland Security and United States Secret Service.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USSS BUILDING 185

REPAIR & RENOVATION

GS-02-P-15-DT-D-7001

188 KING STREET, BROOKLYN, NY 11231

DattnerArchitects

Cosentini Associates - A Tetra Tech Company MEP Engineers

Silman Structural Engineers

Toscano Clements Taylor Cost Consultants Cost Estimating

May 29th, 2019 100% For Construction Design

VOLUME 2 OF 2

THIS IS THE PROPERTY OF THE UNITED STATES GOVERNMENT. COPYING,

DISSEMINATION OR DISTRIBUTION OF PROJECT DRAWINGS, PLANS, OR SPEC-

IFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED.

Do not remove this notice. Properly dispose of documents when no longer needed.

Brinkerhoff Environmental Services, Inc.

Hazmats

Jensen Hughes Engineering P.C.

FP Engineers

USSS Building 185 Repair & Renovation Contract # GS-02-P-15-DT-D-7001 Brooklyn, New York

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

DO NOT REMOVE THIS NOTICE – PROPERLY DESTROY DOCUMENT WHEN NO LONGER NEEDED

100% For Construction Design May 29, 2019 Technical Specifications Index

TECHNICAL SPECIFICATIONS INDEX

100% FOR CONSTRUCTION DESIGN

VOLUME 2 OF 2

DIVISION 21 - FIRE PROTECTION

211316 DRY-PIPE SPRINKLER SYSTEM

DIVISION 22 - PLUMBING

220500 COMMON WORK RESULTS FOR PLUMBING

220508 TESTING, ADJUSTING, AND BALANCING

220516 EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING

220517 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

220518 ESCUTCHEONS FOR PLUMBING PIPING

220523 VALVES FOR PLUMBING PIPING

220529 HANGERS, SUPPORTS AND MISCELLANEOUS FOR PLUMBING PIPING EQUIPMENT

220533 HEAT TRACING FOR PLUMBING PIPING

220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

220719 PLUMBING PIPING INSULATION

221116 DOMESTIC WATER PIPING

221316 WASTE AND VENT PIPING

221319 WASTE DRAINAGE PIPING SPECIALTIES

224100 PLUMBING FIXTURES

DIVISION 23 - HVAC

230500 COMMON WORK RESULTS FOR HVAC

230512 VARIABLE-FREQUENCY MOTOR CONTROLLERS

230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

230517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING

230529 HANGERS, SUPPORTS AND ACCESSORIES FOR HVAC PIPING AND EQUIPMENT

230547 VIBRATION CONTROLS FOR MECHANICAL/ELECTRICAL SYSTEMS (NON-SEISMIC)

230553 IDENTIFICATION FOR HVAC PIPING, DUCTWORK AND EQUIPMENT

230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

230800 COMMISSIONING OF HVAC

232300 REFRIGERANT PIPING

233113 METAL DUCTS

233423 HVAC POWER VENTILATORS

233713 DIFFUSERS, REGISTERS, AND GRILLES

238126 SPLIT-SYSTEM AIR-CONDITIONERS

DIVISION 26 - ELECTRICAL

260500 COMMON WORK RESULTS FOR ELECTRICAL

260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

260523 CONTROL-VOLTAGE ELECTRICAL POWER CABLES

260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

100% For Construction Design May 29, 2019 Technical Specifications Index

260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

260531 HEAT TRACING FOR PIPING

260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

260544 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

260573 OVERCURRENT PROTECTIVE DEVICE COORDINATION AND ARC FLASH HAZARD

ASSESSMENT

260923 LIGHTING CONTROL DEVICES

260943.23 RELAY-BASED LIGHTING CONTROLS

262001 FEEDERS AND BRANCH CIRCUITRY

262416 PANELBOARDS

262726 WIRING DEVICES

262804 SELECTION OF OVERCURRENT DEVICES (CB-RAD)

262813 FUSES

262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

262913 ENCLOSED CONTROLLERS (INSTALLATION OF)

262923 VARIABLE-FREQUENCY MOTOR CONTROLLERS (INSTALLATION OF)

265100 LIGHTING

265619 LED EXTERIOR LIGHTING

283111 DIGITAL ADDRESSABLE FIRE ALARM

DIVISION 32 - EXTERIOR IMPROVEMENTS

321216 ASPHALT PAVING

321723 PAVEMENT MARKINGS

100% For Construction Design May 29, 2019

Dry-Pipe Sprinkler System 211316 - 1

SECTION 211316 - DRY-PIPE SPRINKLER SYSTEMS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Pipes, fittings, and specialties.

2. Fire-protection valves.

3. Sprinklers.

4. Alarm devices.

5. Pressure gages.

B. Related Sections:

1. Section 283111 "Digital, Addressable Fire-Alarm System" for alarm devices not specified in this Section.

1.2 SYSTEM DESCRIPTIONS

A. Dry-Pipe Sprinkler System: Automatic sprinklers are attached to piping containing compressed air. Opening of sprinklers releases compressed air and permits water pressure to open dry-pipe valve. Water then flows into piping and discharges from sprinklers that are open.

1.3 PERFORMANCE REQUIREMENTS

A. Standard-Pressure Piping System Component: Listed for 175-psig (1200-kPa) minimum working pressure.

B. Delegated Design: Design sprinkler system(s), including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.

1. Available fire-hydrant flow test records indicate the following conditions:

a. See Drawing FX100 for Port Authority Facility Pump Test Report.

C. Sprinkler system design shall be approved by authorities having jurisdiction.

1. Margin of Safety for Available Water Flow and Pressure: 10percent, including losses through water-service piping, valves, and backflow preventers.

2. Sprinkler Occupancy Hazard Classifications:

a. Storage Areas: Ordinary Hazard, Group 1

3. Minimum Density for Automatic-Sprinkler Piping Design:

a. Ordinary-Hazard, Group 1 Occupancy: 0.15 gpm over 1500-sq. ft. (6.1 mm/min.

over 139-sq. m)

100% For Construction Design May 29, 2019

Dry-Pipe Sprinkler System 211316 - 2

4. Maximum Protection Area per Sprinkler: Per UL listing.

5. Maximum Protection Area per Sprinkler:

a. Storage Areas: 130 sq. ft. (12.1 sq. m).

b. Other Areas: According to NFPA 13 recommendations unless otherwise indicated.

6. Total Combined Hose-Stream Demand Requirement: According to NFPA 13 unless otherwise indicated:

a. Ordinary-Hazard Occupancies: 250 gpm (15.75 L/s) for 60 minutes

D. Seismic Performance: Sprinkler piping shall withstand the effects of earthquake motions determined according to NFPA 13 and ASCE/SEI 7

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

B. Shop Drawings: For dry-pipe sprinkler systems. Include plans, elevations, sections, details, and attachments to other work.

1. Wiring Diagrams: For power, signal, and control wiring.

C. Delegated-Design Submittal: For sprinkler systems indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For qualified Installer and professional engineer.

B. Approved Sprinkler Piping Drawings: Working plans, prepared according to NFPA 13, that have been approved by authorities having jurisdiction, including hydraulic calculations if applicable.

C. Field Test Reports and Certificates: Indicate and interpret test results for compliance with performance requirements and as described in NFPA 13. Include "Contractor's Material and Test Certificate for Aboveground Piping."

D. Field quality-control reports.

1.6 CLOSEOUT SUBMITTALS

A. Operation and maintenance data.

1.7 QUALITY ASSURANCE

A. Installer Qualifications:

1. Installer's responsibilities include designing, fabricating, and installing sprinkler systems and providing professional engineering services needed to assume engineering responsibility. Base calculations on results of fire-hydrant flow test.

100% For Construction Design May 29, 2019

Dry-Pipe Sprinkler System 211316 - 3

a. Engineering Responsibility: Preparation of working plans, calculations, and field test reports by a qualified professional engineer.

B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

C. NFPA Standards: Sprinkler system equipment, specialties, accessories, installation, and testing shall comply with the following:

1. NFPA 13, "Installation of Sprinkler Systems." 2016 Edition.

PART 2 - PRODUCTS

2.1 PIPING MATERIALS

A. Comply with requirements in "Piping Schedule" Article for applications of pipe, tube, and fitting materials, and joining methods for specific services, service locations, and pipe sizes.

2.2 STEEL PIPE AND FITTINGS

A. Standard Weight, Galvanized-Steel Pipe: ASTM A 53/A 53M, Type E Grade B. Pipe ends may be factory or field formed to match joining method.

B. Galvanized-Steel Pipe Nipples: ASTM A 733, made of ASTM A 53/A 53M, standard-weight, seamless steel pipe with threaded ends.

C. Galvanized, Steel Couplings: ASTM A 865, threaded.

D. Galvanized, Gray-Iron Threaded Fittings: ASME B16.4, Class 125, standard pattern.

E. Malleable- or Ductile-Iron Unions: UL 860.

F. Cast-Iron Flanges: ASME B16.1, Class 125.

G. Grooved-Joint, Steel-Pipe Appurtenances:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Anvil International, Inc.

b. Corcoran Piping System Co.

c. National Fittings, Inc.

d. Shurjoint Piping Products.

e. Tyco Fire & Building Products LP.

f. Victaulic Company.

2. Pressure Rating: 175 psig (1200 kPa) minimum.

3. Galvanized, Grooved-End Fittings for Steel Piping: ASTM A 47/A 47M, malleable-iron casting or ASTM A 536, ductile-iron casting; with dimensions matching steel pipe.

4. Grooved-End-Pipe Couplings for Steel Piping: AWWA C606 and UL 213, rigid pattern, unless otherwise indicated, for steel-pipe dimensions. Include ferrous housing sections, EPDM-rubber gasket, and bolts and nuts.

100% For Construction Design May 29, 2019

Dry-Pipe Sprinkler System 211316 - 4

2.3 LISTED FIRE-PROTECTION VALVES

A. General Requirements:

1. Valves shall be UL listed or FM approved.

2. Minimum Pressure Rating: 175 psig (1200 kPa).

B. Check Valves:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. AFAC Inc.

b. American Cast Iron Pipe Company; Waterous Company Subsidiary.

c. Anvil International, Inc.

d. Globe Fire Sprinkler Corporation.

e. Groeniger & Company.

f. Kennedy Valve; a division of McWane, Inc.

g. Milwaukee Valve Company.

h. Mueller Co.; Water Products Division.

i. NIBCO INC.

j. Potter Roemer.

k. Reliable Automatic Sprinkler Co., Inc.

l. Tyco Fire & Building Products LP.

m. United Brass Works, Inc.

n. Venus Fire Protection Ltd.

o. Victaulic Company.

p. Viking Corporation.

q. Watts Water Technologies, Inc.

2. Standard: UL 312

3. Pressure Rating: 250 psig (1725 kPa) minimum.

4. Type: Swing check.

5. Body Material: Cast iron.

6. End Connections: Flanged or grooved.

C. Bronze OS&Y Gate Valves:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following

a. Crane Co.; Crane Valve Group; Crane Valves.

b. Crane Co.; Crane Valve Group; Stockham Division.

c. Milwaukee Valve Company.

d. NIBCO INC.

e. United Brass Works, Inc.

2. Standard: UL 262.

3. Pressure Rating: 175 psig (1200 kPa).

4. Body Material: Bronze.

5. End Connections: Threaded.

D. Iron OS&Y Gate Valves:

100% For Construction Design May 29, 2019

Dry-Pipe Sprinkler System 211316 - 5

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following

a. American Cast Iron Pipe Company; Waterous Company Subsidiary.

b. American Valve, Inc.

c. Clow Valve Company; a division of McWane, Inc.

d. Crane Co.; Crane Valve Group; Crane Valves.

e. Crane Co.; Crane Valve Group; Jenkins Valves.

f. Crane Co.; Crane Valve Group; Stockham Division.

g. Hammond Valve.

h. Milwaukee Valve Company.

i. Mueller Co.; Water Products Division.

j. NIBCO INC.

k. Shurjoint Piping Products.

l. Tyco Fire & Building Products LP.

m. United Brass Works, Inc.

n. Watts Water Technologies, Inc.

2. Standard: UL 262.

3. Pressure Rating: 250 psig (1725 kPa) minimum

4. Body Material: Cast or ductile iron.

5. End Connections: Flanged or grooved.

2.4 TRIM AND DRAIN VALVES

A. General Requirements:

1. Standard: UL's "Fire Protection Equipment Directory" listing or "Approval Guide," published by FM Global, listing.

2. Minimum Pressure Rating: 175 psig (1200 kPa).

B. Ball Valves:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following

a. Affiliated Distributors.

b. Anvil International, Inc.

c. Jomar International, Ltd.

d. Kennedy Valve; a division of McWane, Inc.

e. Milwaukee Valve Company.

f. NIBCO INC.

g. Potter Roemer.

h. Tyco Fire & Building Products LP.

i. Victaulic Company.

j. Watts Water Technologies, Inc.

2.5 SPECIALTY VALVES

A. General Requirements:

1. Standard: UL's "Fire Protection Equipment Directory" listing or "Approval Guide," published by FM Global, listing.

100% For Construction Design May 29, 2019

Dry-Pipe Sprinkler System 211316 - 6

2. Minimum Pressure Rating: 175 psig (1200 kPa).

3. Body Material: Cast or ductile iron.

4. Size: Same as connected piping.

5. End Connections: Flanged or grooved.

B. Dry-Pipe Valves:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following

a. AFAC Inc.

b. Globe Fire Sprinkler Corporation.

c. Reliable Automatic Sprinkler Co., Inc.

d. Tyco Fire & Building Products LP.

e. Venus Fire Protection Ltd.

f. Victaulic Company.

g. Viking Corporation.

2. Standard: UL 260

3. Design: Differential-pressure type.

4. Include UL 1486, quick-opening devices, trim sets for air supply, drain, priming level, alarm connections, ball drip valves, pressure gages, priming chamber attachment, and fill-line attachment.

2.6 SPRINKLER SPECIALTY PIPE FITTINGS

A. General Requirements for Dry-Pipe-System Fittings: UL listed for dry-pipe service.

B. Branch Outlet Fittings:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Anvil International, Inc.

b. National Fittings, Inc.

c. Shurjoint Piping Products.

d. Tyco Fire & Building Products LP.

e. Victaulic Company.

2. Standard: UL 213.

3. Pressure Rating: 175 psig (1200 kPa) minimum.

4. Body Material: Ductile-iron housing with EPDM seals and bolts and nuts.

5. Type: Mechanical-T and -cross fittings.

6. Configurations: Snap-on and strapless, ductile-iron housing with branch outlets.

7. Size: Of dimension to fit onto sprinkler main and with outlet connections as required to match connected branch piping.

8. Branch Outlets: Grooved, plain-end pipe, or threaded.

C. Flow Detection and Test Assemblies:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following

a. AGF Manufacturing Inc.

100% For Construction Design May 29, 2019

Dry-Pipe Sprinkler System 211316 - 7

b. Reliable Automatic Sprinkler Co., Inc.

c. Tyco Fire & Building Products LP.

d. Victaulic Company.

2. Standard: UL's "Fire Protection Equipment Directory" listing or "Approval Guide," published by FM Global, listing.

3. Pressure Rating: 175 psig (1200 kPa) minimum.

4. Body Material: Cast- or ductile-iron housing with orifice, sight glass, and integral test valve.

5. Size: Same as connected piping.

6. Inlet and Outlet: Threaded.

2.7 SPRINKLERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following

1. AFAC Inc.

2. Globe Fire Sprinkler Corporation.

3. Reliable Automatic Sprinkler Co., Inc.

4. Tyco Fire & Building Products LP.

5. Venus Fire Protection Ltd.

6. Victaulic Company.

7. Viking Corporation.

B. General Requirements:

1. Standard: UL's "Fire Protection Equipment Directory" listing or "Approval Guide," published by FM Global, listing.

2. Pressure Rating for Automatic Sprinklers: 175 psig (1200 kPa) minimum.

C. Automatic Sprinklers with Heat-Responsive Element:

1. Nonresidential Applications: UL 199

2. Characteristics: Nominal 1/2-inch (12.7-mm) orifice with discharge coefficient K of 5.6, and for "Ordinary" temperature classification rating unless otherwise indicated or required by application.

D. Sprinkler Finishes:

1. Chrome plated.

2. Bronze.

3. Painted.

E. Special Coatings:

1. Wax.

2. Lead.

3. Corrosion-resistant paint.

F. Sprinkler Guards:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following

100% For Construction Design May 29, 2019

Dry-Pipe Sprinkler System 211316 - 8

a. Reliable Automatic Sprinkler Co., Inc.

b. Tyco Fire & Building Products LP.

c. Victaulic Company.

d. Viking Corporation.

2. Standard: UL 199.

3. Type: Wire cage with fastening device for attaching to sprinkler.

2.8 ALARM DEVICES

A. Alarm-device types shall match piping and equipment connections.

B. Water-Motor-Operated Alarm:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following

a. Globe Fire Sprinkler Corporation.

b. Tyco Fire & Building Products LP.

c. Victaulic Company.

d. Viking Corporation.

2. Standard: UL 753.

3. Type: Mechanically operated, with Pelton wheel.

4. Alarm Gong: Cast aluminum with red-enamel factory finish.

5. Size: 10-inch (250-mm) diameter.

6. Components: Shaft length, bearings, and sleeve to suit wall construction.

7. Inlet: NPS 3/4 (DN 20).

8. Outlet: NPS 1 (DN 25) drain connection.

C. Valve Supervisory Switches:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following

a. Fire-Lite Alarms; a Honeywell company.

b. Kennedy Valve; a division of McWane, Inc.

c. Potter Electric Signal Company.

d. System Sensor; a Honeywell company.

2. Standard: UL 346.

3. Type: Electrically supervised.

4. Components: Single-pole, double-throw switch with normally closed contacts.

5. Design: Signals that controlled valve is in other than fully open position.

2.9 PRESSURE GAGES

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following

1. AMETEK, Inc.; U.S. Gauge Division.

2. Ashcroft, Inc.

3. Brecco Corporation.

100% For Construction Design May 29, 2019

Dry-Pipe Sprinkler System 211316 - 9

4. WIKA Instrument Corporation.

B. Standard: UL 393.

C. Dial Size: 3-1/2- to 4-1/2-inch (90- to 115-mm) diameter.

D. Pressure Gage Range: 0 to 250 psig (0 to 1725 kPa) minimum

E. Water System Piping Gage: Include "WATER" or "AIR/WATER" label on dial face.

F. Air System Piping Gage: Include retard feature and "AIR" or "AIR/WATER" label on dial face.

PART 3 - EXECUTION

3.1 SERVICE-ENTRANCE PIPING

A. Connect sprinkler piping to water-service piping for service entrance to building.

B. Install shutoff valve, check valve, pressure gage, and drain at connection to water service.

3.2 WATER-SUPPLY CONNECTIONS

A. Connect sprinkler piping to building's interior water-distribution piping.

B. Install shutoff valve, check valve, pressure gage, and drain at connection to water supply.

3.3 PIPING INSTALLATION

A. Locations and Arrangements: Drawing plans, schematics, and diagrams indicate general location and arrangement of piping. Install piping as indicated, as far as practical.

1. Deviations from approved working plans for piping require written approval from authorities having jurisdiction. File written approval with Architect before deviating from approved working plans.

B. Piping Standard: Comply with requirements in NFPA 13 for installation of sprinkler piping.

C. Install seismic restraints on piping. Comply with requirements in NFPA 13 for seismic-restraint device materials and installation.

D. Use listed fittings to make changes in direction, branch takeoffs from mains, and reductions in pipe sizes.

E. Install unions adjacent to each valve in pipes NPS 2 (DN 50) and smaller.

F. Install flanges, flange adapters, or couplings for grooved-end piping on valves, apparatus, and equipment having NPS 2-1/2 (DN 65) and larger end connections.

G. Install "Inspector's Test Connections" in sprinkler system piping, complete with shutoff valve, and sized and located according to NFPA 13.

100% For Construction Design May 29, 2019

Dry-Pipe Sprinkler System 211316 - 10

H. Install sprinkler piping with drains for complete system drainage.

I. Install sprinkler control valves, test assemblies, and drain risers adjacent to standpipes when sprinkler piping is connected to standpipes.

J. Install automatic (ball drip) drain valves to drain piping between fire-department connections and check valves. Drain to floor drain or to outside building.

K. Install alarm devices in piping systems.

L. Install hangers and supports for sprinkler system piping according to NFPA 13. Comply with requirements in NFPA 13 for hanger materials.

M. Install pressure gages on riser or feed main, at each sprinkler test connection, and at top of each standpipe. Include pressure gages with connection not less than NPS 1/4 (DN 8) and with soft metal seated globe valve, arranged for draining pipe between gage and valve. Install gages to permit removal, and install where they will not be subject to freezing.

N. Drain dry-pipe sprinkler piping.

O. Pressurize and check dry-pipe sprinkler system piping and air-pressure maintenance devices

P. Install sleeves for piping penetrations of walls, ceilings, and floors.

Q. Install sleeve seals for piping penetrations of concrete walls and slabs.

R. Install escutcheons for piping penetrations of walls, ceilings, and floors.

3.4 JOINT CONSTRUCTION

A. Install couplings, flanges, flanged fittings, unions, nipples, and transition and special fittings that have finish and pressure ratings same as or higher than system's pressure rating for aboveground applications unless otherwise indicated.

B. Install unions adjacent to each valve in pipes NPS 2 (DN 50) and smaller.

C. Install flanges, flange adapters, or couplings for grooved-end piping on valves, apparatus, and equipment having NPS 2-1/2 (DN 65) and larger end connections.

D. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.

E. Remove scale, slag, dirt, and debris from inside and outside of pipes, tubes, and fittings before assembly.

F. Flanged Joints: Select appropriate gasket material in size, type, and thickness suitable for water service. Join flanges with gasket and bolts according to ASME B31.9.

G. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:

1. Apply appropriate tape or thread compound to external pipe threads.

2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged.

100% For Construction Design May 29, 2019

Dry-Pipe Sprinkler System 211316 - 11

3.5 VALVE AND SPECIALTIES INSTALLATION

A. Install listed fire-protection valves, trim and drain valves, specialty valves and trim, controls, and specialties according to NFPA 13 and authorities having jurisdiction.

B. Install listed fire-protection shutoff valves supervised open, located to control sources of water supply except from fire-department connections. Install permanent identification signs indicating portion of system controlled by each valve.

C. Install check valve in each water-supply connection. Install backflow preventers instead of check valves in potable-water-supply sources.

D. Specialty Valves:

1. General Requirements: Install in vertical position for proper direction of flow, in main supply to system.

2. Dry-Pipe Valves: Install trim sets for air supply, drain, priming level, alarm connections, ball drip valves, pressure gages, priming chamber attachment, and fill-line attachment.

a. Existing air compressor shall be reused.

3.6 SPRINKLER INSTALLATION

A. Install dry-type sprinklers with water supply from heated space. Do not install pendent or sidewall, wet-type sprinklers in areas subject to freezing.

B. Install sprinklers into flexible, sprinkler hose fittings and install hose into bracket on ceiling grid.

3.7 IDENTIFICATION

A. Install labeling and pipe markers on equipment and piping according to requirements in

NFPA 13.

B. Identify system components, wiring, cabling, and terminals.

3.8 FIELD QUALITY CONTROL

A. Perform tests and inspections.

B. Tests and Inspections:

1. Leak Test: After installation, charge systems and test for leaks. Repair leaks and retest until no leaks exist.

2. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

3. Flush, test, and inspect sprinkler systems according to NFPA 13, "Systems Acceptance" Chapter.

4. Energize circuits to electrical equipment and devices.

5. Start and run air compressors.

6. Coordinate with fire-alarm tests. Operate as required.

C. Sprinkler piping system will be considered defective if it does not pass tests and inspections.

100% For Construction Design May 29, 2019

Dry-Pipe Sprinkler System 211316 - 12

D. Prepare test and inspection reports.

3.9 CLEANING

A. Clean dirt and debris from sprinklers.

B. Remove and replace sprinklers with paint other than factory finish.

3.10 PIPING SCHEDULE

A. Sprinkler specialty fittings may be used, downstream of control valves, instead of specified fittings.

B. Dry-pipe sprinkler system, Standard-weight Schedule 40, galvanized-steel pipe with threaded ends; galvanized, gray-iron threaded fittings; and threaded joints.

3.11 SPRINKLER SCHEDULE

A. Use sprinkler types in subparagraphs below for the following applications:

1. Rooms without Ceilings: Upright sprinklers

2. Rooms with Suspended Ceilings: Dry pendent sprinklers

3. Wall Mounting: Dry sidewall sprinklers.

B. Provide sprinkler types in subparagraphs below with finishes indicated.

1. Concealed Sprinklers: Rough brass, with factory-painted white cover plate.

2. Flush Sprinklers: Bright chrome, with painted white escutcheon.

3. Recessed Sprinklers: Bright chrome, with bright chrome escutcheon.

4. Upright, Pendent, and Sidewall Sprinklers: Chrome plated in finished spaces exposed to view; rough bronze in unfinished spaces not exposed to view; wax coated where exposed to acids, chemicals, or other corrosive fumes.

END OF SECTION 211316

100% For Construction Design Common Work Results for Plumbing

May 29, 2019 220500 - 1

SECTION 220500 - COMMON WORK RESULTS FOR PLUMBING

PART 1 - GENERAL

1.1 SUMMARY

A. Work Included:

1. The system shall include but not limited to the following: All plumbing fixtures, roughing and accessories, piping insulation, fittings, valves, strainers, pumps, water distribution, water heaters, sanitary vents, interceptors, gauges, thermometers, equipment and piping identification.

B. This Section includes general administrative and procedural requirements for the plumbing installations. The administrative and procedural requirements included in this section expand the requirements specified in Division 01.

1.2 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this and the other sections of Division 22.

B. Related Sections: The following Sections contain requirements that relate to this Section:

1. Sustainable design Requirements – Division 01

2. Cast-in Place Concrete - Division 03-“Concrete”

3. Metal Fabrications - Division 05-“Metals”

4. Firestopping-Division 07 -“Thermal and Moisture Protection”

5. Sealants and Caulking - Division 07 - “Thermal and Moisture Protection”

6. Painting – Division 09 – “Finishes”

7. Division 21 – Fire Protection

8. Division 22 - Plumbing

9. Division 23 – Heating, Ventilation, and Air Conditioning

10. Division 26 – Electrical

1.3 CODES, PERMITS AND INSPECTIONS

A. All work shall meet or exceed the latest requirements of all national, state, county, municipal and other authorities exercising jurisdiction over construction work at the project.

B. All required permits, approval and inspection certificates shall be obtained, paid for, and made available at the completion of the work, by the Plumbing Contractor.

May 29, 2019 220500 - 2

C. Installation procedures, methods, and conditions shall comply with the latest requirements of The Federal Occupational Safety and Health Act (OSHA).

D. Prepare and submit to the building department a set of “as-built” record drawings for approval, in a form acceptable to the building department.

E. The Contractor shall be responsible for the installation and filing until the installation has been approved by the authorities having such jurisdiction.

F. All products and equipment shall be tested and/or listed and labeled by approved agency, such as Underwriters Laboratories (UL), according to prescribed standard or by approved agency according to New York city Office of Technical Certification and Research (OTCR) approved criteria. It is the responsibility of this trade to demonstrate or obtain and pay for all costs and fees of such approval and, when applicable, to prepare and submit an alternative product application to OTCR for review and approval.

G. The Contractor shall be responsible for the installation and filing until the installation has been approved by the authorities having such jurisdiction.

1.4 GUARANTEES AND CERTIFICATIONS

A. All work shall be guaranteed to be free from leaks and defects. Any defective materials or workmanship, as well as damage to the work of all trades resulting from same, shall be replaced or repaired as directed for the duration of stipulated guaranteed periods.

B. The duration of guarantee periods following the date of beneficial use of the system shall be one year. Beneficial use is defined as operation of the system to obtain its intended use.

C. The date of acceptance shall be the date of the final payment for the work or the date of a formal notice of acceptance, whichever is earlier.

D. Non-durable replaceable items, such as water filter media, do not require replacement after the date of acceptance. If received in writing, requests to have earlier acceptance dates established for these items will be honored.

E. Certification shall be submitted attesting to the fact that specified performance criteria are met by all items of plumbing equipment.

1.5 DEFINITIONS

A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct shafts, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.

B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.

C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.

D. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above ceilings and in duct shafts.

May 29, 2019 220500 - 3

E. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants but subject to outdoor ambient temperatures.

Examples include installations within unheated shelters.

F. Piping: Pipe, fittings, flanges, valves, controls, hangers, drains, insulation, and items customarily required in connection with the transfer of fluids.

G. By Other Trades: By persons or parties responsible for work at the project other than the party or parties who have been duly awarded the contract for the work of this Trade. In the event that this document is used to acquire work as part of a general construction contract the words “by other trades” shall mean by persons or parties who are not anticipated to be the sub-contractor for this trade working together with the general contractor. In this context the words “by other trades” shall not be intercepted to mean not included in the overall contract.

H. The following are industry abbreviations for plastic materials:

1. ABS: Acrylonitrile-butadiene-styrene plastic.

2. CPVC: Chlorinated polyvinyl chloride plastic.

3. PE: Polyethylene plastic.

4. PVC: Polyvinyl chloride plastic.

I. The following are industry abbreviations for rubber materials:

1. EPDM: Ethylene-propylene-diene terpolymer rubber.

2. NBR: Acrylonitrile-butadiene rubber.

1.6 SUBMITTALS

A. In accordance with Division 01, SUBMITTAL PROCEDURES, furnish the following:

B. Prior to purchasing any equipment or materials, a list of their manufacturers shall be submitted for approval.

C. Prior to assembling or installing the work, the following shall be submitted for approval:

1. Scale drawings indicating insert and sleeve locations if required by Architect or Structural Engineer.

2. Scale drawings showing all piping runs with sizes, elevations and appropriate indication of coordination with other trades. This submission shall consist of one (1) electronic file and two (2) paper prints.

3. Catalog/internet information, factory assembly drawings and field installation drawings as required for a complete explanation and description of all items of equipment.

4. Coordination drawings for access panels and door locations

May 29, 2019 220500 - 4

5. Welder Certificates signed by the Contractor certifying that welders comply with requirements specified under “Quality Assurance” in this section.

D. Documents for equipment will not be accepted for review unless:

1. They include complete information pertaining to appurtenances and accessories.

2. They are submitted as a package where they pertain to related items.

3. They are properly marked with service or function, project name, where they consist of catalog sheets displaying other items which are not applicable.

4. They indicate the project name and address along with the Contractor's name, address and phone number.

5. They are properly marked with external connection identification as related to the project where they consist of standard factory assembly or field installation drawings.

E. Shop Drawing Review

1. The purpose of the review of shop drawings is to maintain integrity of the design. Unless the contractor clearly points out changes, substitutions, deletions or any other differences between the submission and the Contract Documents in writing on the Contractor's letterhead, approval by the Engineer or Architect does not constitute acceptance. It is not to be assumed that the engineer has read the text nor reviewed the technical data of a manufactured item and its components except where the Vendor has pointed out differences between his product and the specified model.

2. It is the responsibility of the contractor to confirm all dimensions, quantities, and the coordination of materials and products supplied by him with other trades. Approval of shop drawings containing omissions improper coordination does not relieve the contractor from making corrections at his expense.

3. Substitutions of equipment, systems, materials, must be coordinated by the Contractor with his own or other trades which may be involved with the item, such as, but not limited to, equipment substitutions which change electrical requirements, or hanging or support weights or dimensions.

4. Any extra charges or credits which may be generated by other trades due to substitutions will not be accepted unless the Contractor has an agreement in writing with the Owner.

5. Substitutions of equipment, systems, etc. requiring approval of local authorities must comply with such regulations and be filed at the expense of the Contractor (should filing be necessary). Substitutions are subject to approval or disapproval by the Engineer. The Contractor in offering substitutions shall hold the Owner and Engineer harmless if the substituted item is an infringement of patent held by the specified item.

6. Shop drawings shall show all data required by NFPA.

May 29, 2019 220500 - 5

F. Explanation of Shop Drawing Stamp

1. Reviewed - No Exception Taken: indicates that we have not found any reason why this item should not be acceptable within the intent of the contract documents.

2. Exception Taken As Noted: indicates that we have found questionable components which if corrected or otherwise explained make the product acceptable.

3. Revised and Resubmit: indicates that this item should be resubmitted for review before further processing.

4. Resubmit Specified Item: indicates that the item will not meet the intent of the Contract.

5. Incomplete - Resubmit: Indicates that the submission is not complete and ready for review by the Architect or Engineer.

6. Verified for Electrical Services: Indicates that the electrical requirements has been confirmed with the electrical contract documents.

7. Architects Approval Required: Indicates that the submission will required the Architects review.

8. Structural Approval Required: Indicates that the submission will require the Structural Engineer’s review.

9. Acoustical Consultant Review Required: Indicates that the submission will required the Acoustical Consultant’s review

10. No shop drawing stamp or note shall constitute an order to fabricate or ship. Such notification can only be performed by the Project Manager for Construction, the Contractor scheduling his own work, or the Owner.

11. The Contractor is responsible for having "Reviewed" copies of shop drawings bearing the Reviewed - No Exception Taken stamp of the Architect/Engineer or Owner's Consultant are kept on the job site and work is implemented in the field in accordance with these documents.

12. Where information from one Contractor is required by another contractor, it is the responsibility of the contractors to exchange information and coordinate their work.

1.7 MAINTENANCE DATA AND OPERATING INSTRUCTIONS

A. Maintenance and operating manuals in accordance with Division 01, for systems and equipment.

B. After all final tests and adjustments have been completed, fully instruct the proper Owner's Representative in all details of operation for equipment installed. Supply qualified personnel to operate equipment for sufficient length of time to assure that Owner's Representative is properly qualified to take over operation and maintenance procedures. Supply qualified personnel to operate equipment for sufficient length of time as required to meet all governing authorities in operation and performance tests.

May 29, 2019 220500 - 6

C. Furnish required number of manuals, in bound form containing data covering capacities, maintenance of operation of all equipment and apparatus. Operating instruction shall cover all phases of control and include the following:

1. Performance Curves: For pumps compressors, and similar equipment at the operating conditions.

2. Lubrication Schedule: Indicating type and frequency of lubrication required.

3. List of Spares: Recommended for normal service requirements.

4. Parts List: Identifying the various parts of the equipment for repair and replacement purposes.

5. Instruction Books may be standard booklets but shall be clearly marked to indicate applicable equipment.

6. Wiring Diagrams: Generalized diagrams are not acceptable, submittal shall be specifically prepared for this Project.

7. Automatic Controls: Diagrams and functional descriptions.

D. Where applicable, one set of operating and maintenance instructions shall be neatly framed behind glass and securely hung adjacent to the equipment concerned.

E. Welding certificates. Submit welding certificates as specified herein.

1.8 DELIVERY, STORAGE, HANDLING AND PROTECTION

A. Deliver products to the project properly identified with names, model numbers, types, grades, compliance labels, and other information needed for identification.

B. Unit shall be stored and handled in accordance with manufacturer's instructions.

C. Unit shall be shipped with all listed items and control wiring factory installed unless noted on the submittals and approved prior to shipment.

D. Unit shall be shipped complete as specified. Parts for field installation shall not be shipped and stored on site without prior approval.

E. Rigging: Units shall be fully assembled. Units requiring disassembly for rigging shall be factory assembled and tested. Disassembly, reassembly and testing shall be supervised by the manufacturer's representative.

F. Unit shall be shipped with firmly attached labels that indicate name of manufacturer, model number, serial number, date of manufacturer, capacity information and plan tagging.

G. Deliver, store and handle all materials to keep clean and protected from damage.

H. Deliver pipes and tubes with factory-applied end-caps. Maintain end-caps through shipping, storage, and handling to prevent pipe-end damage and prevent entrance of dirt, debris, and moisture.

May 29, 2019 220500 - 7

I. Protect flanges, fittings, and piping specialties from moisture and dirt.

J. Protect stored plastic pipes and materials from direct sunlight and excessive heat. Support to prevent sagging and bending.

K. Protect equipment and other materials from damage after installed from construction debris and other damage.

L. This trade shall be responsible for its work and equipment until finally inspected, tested and accepted. Carefully store materials and equipment which are not immediately installed after delivery to site. Close open ends of work with temporary covers or plugs during construction to prevent entry of obstructing material.

M. This trade shall protect work and material of other trades from damage that might be caused by its work or workmen and make good damage thus caused.

1.9 PRECONSTRUCTION CONFERENCE PRIOR TO START OF WORK

A. Prior to commencing any Work, the Construction Manager, together with designated major Contractors, shall confer with the Architect and Engineer concerning the Work under the Construction Contract.

B. The pre-construction conference will be conducted under the leadership of the CM and will occur soon after the CM notifies the Subcontractors of contract award. The pre-construction conference will focus on items such as the expedited submittal review procedure, interface and coordination between Contractor work scope, the CM's project site rules and requirements, temporary utility requirements, CM's construction schedule, etc.

1.10 SEQUENCING AND SCHEDULING

A. Coordinate plumbing equipment installation with other building components.

B. Arrange for chases, slots, and openings in building structure during progress of construction to allow for plumbing installations.

C. Coordinate the installation of required supporting devices and set sleeves in poured in place concrete and other structural components as they are constructed.

D. Sequence, coordinate, and integrate installations of plumbing materials and equipment for efficient flow of the Work. Coordinate installation of large equipment requiring positioning prior to closing in the building.

E. Coordinate connection of electrical services prior to purchasing equipment.

F. Coordinate connection of plumbing systems with existing and new exterior underground and overhead utilities and services. Comply with requirements of governing regulations, franchised service companies, and controlling agencies.

G. Coordinate requirements for access panels and doors where plumbing items requiring access are concealed behind finished surfaces. See paragraph titled “Separation of Work Between Trades” to determine whether access panels and doors the responsibility of the Contractor for Division 08 or the Contractor responsible for Division 22.

May 29, 2019 220500 - 8

H. Coordinate installation of identifying devices after completing covering and painting where devices are applied to surfaces. Install identifying devices prior to installing acoustical ceilings and similar concealment.

1.11 COORDINATION

A. Arrange for pipe spaces, chases, slots, and openings in building structure during progress of construction, to allow for mechanical installations.

B. Coordinate installation of required supporting devices and set sleeves in poured-in-place concrete and other structural components as they are constructed.

C. Coordinate requirements for access panels and doors for plumbing items requiring access that are concealed behind finished surfaces.

D. Provide all designating signs for shutoff valves, control valves, alarms, and the like, as required by the agencies having jurisdiction.

1.12 COORDINATION DRAWINGS

A. Prepare coordination drawings in accordance with Division 01 Section titled "PROJECT COORDINATION," to a scale of 3/32"=1'-0" or larger; detailing major elements, components, and systems of plumbing equipment and materials in relationship with other systems, installations, and building components. Indicate locations where space is limited for installation and access and where sequencing and coordination of installations are of importance to the efficient flow of the Work:

1. The coordination drawings shall be produced using AutoCad 2011 or later software. The design drawings will be made available on disks in AutoCad format for use as a basis for the "Coordination" drawings. These documents remain the property of Cosentini Associates and shall be used for no other purpose without expressed, written consent.

The contractor shall assume all liabilities resulting from unauthorized use or modifications to the drawings.

2. Indicate the proposed locations of piping, equipment, and materials. Include the following:

a. Planned piping layout, including valve and specialty locations and valve stem movement.

b. Clearances for servicing and maintaining equipment, including space for equipment disassembly required for periodic maintenance.

c. Equipment connections and support details.

d. Exterior wall and foundation penetrations.

e. Fire-rated wall and floor penetrations.

f. Sizes and location of required concrete pads and bases.

g. Clearances as required by Electric Code.

May 29, 2019 220500 - 9

3. Indicate piping loads and support points for all piping 4" and larger, racked piping, and submit to the Structural Engineer for review and approval. Indicate the elevation, location, support points, and loads imposed on the structure at support, anchor points, and size of all lines. Indicate all beam penetrations and slab penetrations sized and coordinated.

Indicate all work routed underground or embedded in concrete by dimension to column and building lines.

4. Indicate scheduling, sequencing, movement, and positioning of large equipment into the building during construction.

5. Prepare floor plans, elevations and details to indicate penetrations in floors, walls and ceilings and their relationship to other penetrations and installation.

6. Prepare reflected ceiling plans to coordinate and integrate sprinkler installations, air outlets and inlets, light fixtures, communication systems components and other ceiling-mounted items.

B. Plumbing Coordination Drawings

1. This trade shall add to Coordination Drawings prepared by the HVAC Contractor showing all of the plumbing work (equipment, piping, etc.) to be installed as part of the work of this section of the specifications.

2. The Coordination Drawings shall be prepared on electronic media (CADD) at not less than 3/32": 1'-0" scale.

3. This Trade after showing all of the plumbing work shall forward the reproducible Coordination Drawings to the Electrical or Fire Protection Contractor.

4. The sequence of coordination drawings shall be HVAC-PLBG-FP-ELEC-CM/GC.

5. The Plumbing Contractor shall attend a series of meetings arranged by the General Contractor/Construction Manage to resolve any real or apparent interferences or conflicts with the work of the other Contractors.

6. The Plumbing Contractor shall then make adjustments to his work on the Coordination Drawings to resolve any real or apparent interferences or conflicts.

7. After any real or apparent interferences and conflicts have been incorporated into the Coordination Drawings, the Plumbing Contractor shall "sign-off" the final Coordination Drawings.

8. The Plumbing Contractor shall not install any of his work prior to "sign-off" of final Coordination Drawings. If the plumbing work proceeds prior to sign-off of Coordination Drawings, any change to the fire protection work to correct the interferences and conflicts which result will be made by the Fire Protection Contractor at no additional cost to the project.

9. Coordination Drawings are for the Contractor's and Architects use during construction and shall not be construed as replacing any shop "as-built", or Record Drawings required elsewhere in these Contract Documents.

May 29, 2019 220500 - 10

10. Architect's review of Coordination Drawings shall not relieve Contractor from his overall responsibility for coordination of all work performed pursuant to the Contract or from any other requirements of the Contract.

1.13 RECORD DRAWINGS

A. Prepare record documents in accordance with the requirements in Division 1. In addition to the requirements specified in Division 1, comply with the following.

1. A complete set of "as-built" or record drawings shall be made up and delivered to the Architect.

B. The drawings shall show:-

1. All work installed exactly in accordance with the original design.

2. All installed as a modification or addition to the original design.

3. The dimensional information necessary to delineate the exact location of all piping runs which are so concealed as to be untraceable by inspection through the regular means of access established for inspection and maintenance.

C. This trade shall submit the "as-built" set for approval by the building department, when required by the jurisdiction.

D. The drawings shall be produced using AutoCad 2011 or later software. The design drawings will be made available on disks in AutoCad format for use as a basis for the "as-built" drawings.

These documents remain the property of Cosentini Associates and shall be used for no other purpose without expressed, written consent. The contractor shall assume all liabilities resulting from unauthorized use or modifications to the drawings. Prior to developing any "as-built" drawings, the contractor shall coordinate with the Owner and the Architect and Engineer the drawing layers, colors, etc., of the CAD drawings. "As-built" information shall be submitted as follows:

1. CAD drawing files on disks in AutoCad 2011 format.

2. Two (2) sets of printed drawings.

E. Where shop drawings have been prepared and approved, the "as-built" drawings shall be cross referenced to the respective shop drawing.

F. As-built record drawings shall include the updating of all equipment schedule sheets

G. The record drawings shall be of legible reproducible and durable type.

H. The quantity of design drawings which are made available shall in no way be interpreted as setting a limit to the number of drawings necessary to show the required "as-built" information.

I. Progress prints of record drawings shall be submitted monthly during the construction period for Architect's approval.

May 29, 2019 220500 - 11

J. This trade shall submit the "as-built" set for approval by the Engineer in a form acceptable to the Engineer.

K. Final acceptance of the fire protection systems by the authority having jurisdiction will not be implemented until "as-built" drawings are on site.

L.