This is a bidding and contract document issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design and Construction Division for water storage tank painting and minor repairs at seven Department of Corrections facilities. The project encompasses work at Jackson, Lakeland, Macomb, Marquette Branch Prison, Newberry, Oaks, and Woodland Correctional Facilities. Services include abrasive blast cleaning, repainting, foundation repair, valve vault piping restoration, cathodic protection installation, roof hatch gasket replacement, fall prevention system installation, and dechlorinating diffuser furnishing at various locations across Michigan. A mandatory pre-bid conference is scheduled for May 6, 2026, via Microsoft Teams at 9:00 a.m. Eastern Time, with tours to be scheduled thereafter. Electronic bids are due May 20, 2026, at 2:00 p.m. Eastern Time through the SIGMA VSS website. The contract term extends from July 1, 2026, to October 30, 2027, with specific completion requirements for Marquette and Newberry facilities between May 1 and September 30. Work at the remaining five facilities must be completed over the full contract duration.
Bidders must submit a five percent bid guarantee and, if awarded a contract exceeding $50,000, provide both performance and payment bonds. Each facility includes a $3,000 contingency allowance within the base bid. The State will apply a ten percent preference for Qualified Disabled Veteran-owned businesses meeting all solicitation requirements. Prevailing wage rates apply to all construction mechanics, with detailed wage schedules provided for multiple classifications and skill levels across the project counties. Contractors must comply with all Department of Corrections security protocols, including LEIN (Law Enforcement Information Network) requests for all employee representatives, mandatory orientation, body searches, vehicle inspections, tool control procedures, and restrictions on fraternization with inmates. The State reserves the right to reject any or all bids, waive irregularities, and award to the responsive and responsible best value bidder. Liquidated damages of $250 per calendar day apply for delays beyond the contract completion date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Service Disabled Veteran Owned Business Info Sheet 2025.pdf | ||
| 472-25212.SDW Advertisement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bidding and Contract Document (R 11/25) Multiple DOC Facilities, Tank Painting & Minor Repairs File No. 472/25212.SDW
State of Michigan Department of Technology, Management and Budget
State Facilities Administration Design and Construction Division
DCSPEC
Bidding and Contract Document Minor Projects
File No. 472/25212.SDW Department of Corrections
Multiple DOC Facilities
Tank Painting & Minor Repairs
Jackson Correctional Facility Lakeland Correctional Facility Macomb Correctional Facility
Marquette Branch Prison Newberry Correctional Facility
Oaks Correctional Facility Woodland Correctional Facility
April 23, 2026
Bidding and Contract Document (R 11/25) Multiple DOC Facilities, Tank Painting & Minor Repairs File No. 472/25212.SDW
BID SUMMARY
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
3111 W. St. Joseph Street Lansing, Michigan 48917
Bids must be submitted electronically at: https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
FILE NUMBER
472/25212.SDW
DEPARTMENT/AGENCY
472-Corrections
CONTRACT TIME(S)
July 1, 2026 to October 30, 2027.
Marquette and Newberry to be completed between May 1 and September 30. Remaining 5 tanks to be completed over full duration.
PROJECT NAME
Multiple DOC Facilities Tank Painting & Minor Repairs
LOCATION
Various Correctional Facilities
BID OPENING DATE
Wednesday, May 20, 2026, at 2:00 pm ET
FOR AN EXAMINATION OF THE SITE CONTACT:
To be determined during mandatory pre-bid meeting.
SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.
BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS IN
CONSIDERATION OF THE BID PRICE (S) STATED BELOW.
FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS
□ Qualified Disabled Veteran
SIGMA VENDOR NUMBER
(protected information required for processing payments)
BIDDER'S SIGNATURE AND TITLE DATE
WITNESS' SIGNATURE DATE
By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.
BASE BID FROM BID SCHEDULE (Include specified Allowances):
____________________________________________________________________________Dollars $____________________ (use words) (in figures)
A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE ACCOMPANIED BY A FIVE (5) PERCENT BID GUARANTEE. BUILDERS RISK INSURANCE IS REQUIRED TO BE PROVIDED BY THE
CONTRACTOR UNLESS OTHERWISE INDICATED IN THE BID DOCUMENTS.
BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.
Project Scope of Work:
Multiple DOC Facilities, Tank Painting & Minor Repairs
The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.
Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: ________, No. ___ dated: ________ No. ___ dated:
Bidding and Contract Document (R 11/25) Multiple DOC Facilities, Tank Painting & Minor Repairs File No. 472/25212.SDW
BID SCHEDULE
Base Bid Schedule - The Bidder will complete the Work and accept as full payment, for the Work items listed, the following Unit Prices and/or Item Bid Prices, as applicable:
Base Bid Item No.
Bid Quantity
Description
Unit Price
Item Bid Price
Jackson Correctional Facility 1 1 Foundation repair 2 1 Replace vertical inlet pipe 3 1 Replace bolts on valve vault piping 4 1 Furnish and install balcony walkthrough 5 1 Modify overflow pipe 6 2 Furnish and install roof handholds 7 1 Replace vent screen 8 1 Furnish and install roof hatch gasket 9 1 Abrasive blast clean and repaint valve vault piping 10 1 Furnish and install cathodic protection 11 1 Furnish dechlorinating diffuser and tablets 12 1 Allowance $3,000 $3,000 Total for Jackson Correctional Facility
Lakeland Correctional Facility 13 1 Furnish and install fill pipe grate 14 1 Replace exterior fall protection system 15 5 Adjust sway rods 16 2 Furnish and install roof handholds 17 1 Furnish and install roof hatch gasket 18 1 Furnish and install new post, relocate aviation light and sidewall roof conduit
19 1 Abrasive blast clean and repaint valve vault piping 20 1 Power wash, spot tool clean and repaint exterior 21 1 Furnish dechlorinating diffuser and tablets 22 1 Allowance $3,000 $3,000 Total for Lakeland Correctional Facility
Macomb Correctional Facility 23 1 Furnish and install fill pipe grate 24 1 Repair patch plate and support at upper platform 25 1 Furnish and install overflow flap gate 26 1 Furnish and install frost free vent 27 2 Furnish and install roof handholds 28 1 Furnish and install fall prevention to all ladders 29 1 Furnish and install roof hatch gasket 30 1 Furnish and install access tube gasket 31 1 Spot tool clean and repaint basebell piping
Bidding and Contract Document (R 11/25) Multiple DOC Facilities, Tank Painting & Minor Repairs File No. 472/25212.SDW
32 1 Furnish and install lighting for dry interior 33 1 Furnish and install cathodic protection anode 34 1 Furnish dechlorinating diffuser and tablets 35 1 Allowance $3,000 $3,000 Total for Macomb Correctional Facility
Marquette Branch Prison 36 1 Foundation repair 37 1 Repair sidewall stiffener 38 1 Furnish and install wet interior ladder 39 1 Furnish and install frost free vent 40 1 Furnish and install fall prevention to dry and wet interior ladders
41 1 Furnish and install overflow flap gate 42 1 Furnish and install roof hatch gasket 43 1 Remove cathodic protection anode and reference cell 44 1 Abrasive blast clean and repaint wet interior 45 1 Furnish and install internal mixer 46 1 Furnish dechlorinating diffuser and tablets 47 1 Allowance $3,000 $3,000 Total for Marquette Branch Prison
Newberry Correctional Facility 48 1 Foundation repair 49 1 Furnish and install frost free vent 50 1 Furnish and install balcony walkthrough 51 1 Furnish and install roof hatch 52 2 Furnish and install roof handholds 53 1 Furnish and install fill pipe grate 54 1 Replace overflow pipe screen 55 1 Replace fall prevention cable guides 56 1 Power wash, spot tool clean and repaint exterior 57 1 Abrasive blast clean and repaint wet interior 58 1 Furnish dechlorinating diffuser and tablets 59 1 Allowance $3,000 $3,000 Total for Newberry Correctional Facility
Oaks Correctional Facility 60 1 Replace mud valve 61 1 Furnish and install frost free vent 62 1 Furnish and install overflow flap gate 63 2 Furnish and install roof handholds 64 1 Furnish and install fill pipe grate
Bidding and Contract Document (R 11/25) Multiple DOC Facilities, Tank Painting & Minor Repairs File No. 472/25212.SDW
65 1 Furnish and install access tube gasket 66 1 Furnish and install roof hatch gasket 67 1 Replace all light bulbs 68 1 Furnish dechlorinating diffuser and tablets 69 1 Allowance $3,000 $3,000 Total for Oaks Correctional Facility
Woodland Correctional Facility 70 1 Repair vent collar 71 1 Furnish and install overflow flap gate 72 1 Replace vent screen 73 1 Furnish and install fill pipe grate 74 1 Power wash, spot tool clean and repaint exterior 75 1 Portable tank rental 76 1 Furnish dechlorinating diffuser and tablets 77 1 Allowance $3,000 $3,000 Total for Woodland Correctional Facility
TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $
General Conditions/Remainder of Project
Base Bid (Sum of Item Bid Prices for all Base Bid Items):
__________________________________________________________________ Dollars $__________________________ (use words) (in figures)
Bidding and Contract Document (R 11/25) Multiple DOC Facilities, Tank Painting & Minor Repairs File No. 472/25212.SDW
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration
Design & Construction Division
Qualified Disabled Veteran (QDV) Business Representation
‘Qualified Disabled Veteran,’ means a business entity that is 51% or more owned by one or more veterans with a service-connected disability.
‘Qualified Disabled,’ means a business entity that is 51% or more owned by one or more with a service-connected disability.
The vendor represents that it IS _____, a qualified disabled veteran.
The contractor represents and warrants that the company meets the above (when checked) and has attached supporting documentation per the following:
Each bid requesting the Qualified Disabled Veterans (QDV) preference, in accordance with Public Act 22 of 2010, MCL 18.1241.3 shall include a DD214 Proof of Service and Discharge, a Veterans Administration rating decision letter, proof of disability (if the disability is not indicated on the DD214), and appropriate legal documents setting forth the 51% natural persons QDV ownership.
Fraudulent Certification as a Qualified Disabled Veteran may result in debarment under MCL 18.264.
Certification of a Michigan Based Business
(Information Required Prior to Contract Award for Application of State Reciprocity Provisions)
To qualify as a Michigan Based Business:
Vendor must have, during the 12 months immediately preceding this bid deadline:
or If the business is newly established, for the period the business has been in existence, it has:
(Check all that apply):
� Filed a Michigan single business tax return showing a portion, or all the income tax base allocated or apportioned to the State of Michigan pursuant to the Michigan Single Business Tax Act, 1975 PA 228, MCL 208.1 – 208.145:
or
� Filed a Michigan income tax return showing income generated in or attributed to the State of Michigan; or
� Withheld Michigan income tax from compensation paid to the bidder’s owners and remitted the tax to the
Department of Treasury; or
I certify that I have personal knowledge of such filing or withholding, that it was more than a nominal filing for the purpose of gaining the status of a Michigan business, and that it indicates a significant business presence in the state, considering the size of the business and the nature of its activities.
I authorize the Michigan Department of Treasury to verify that the business has or has not met the criteria for a Michigan business indicated above and to disclose the verifying information to the procuring agency.
Bidder shall also indicate one of the following:
� Bidder qualifies as a Michigan business (provide zip code: ________________)
� Bidder does not qualify as a Michigan business (provide name of State: _____________).
� Principal place of business is outside the State of Michigan, however service/commodity provided by a location within the State of Michigan (provide zip code: (___________).
Fraudulent Certification as a Michigan business is prohibited by MCL 18.1268 § 268. A BUSINESS THAT PURPOSELY OR WILLFULLY SUBMITS A FALSE CERTIFICATION THAT IT IS A MICHIGAN BUSINESS OR FALSELY INDICATES THE STATE IN WHICH IT HAS ITS PRINCIPAL PLACE OF BUSINESS IS GUILTY OF A FELONY, PUNISHABLE BY A FINE OF NOT LESS THAN $25,000 and subject to debarment under MCL 18.264.
Bidding and Contract Document (R 11/25) Multiple DOC Facilities, Tank Painting & Minor Repairs File No. 472/25212.SDW
BID BOND
BID SUBMITTED ON the _______ day of ________________, 20____.
Bid Security is in the form of a Bid Bond _______ Bid Bond form has been duly executed _______; or
A Bank Certified or Cashier's check ___ or Money Order ___ is attached to this page ____ (If Bid Security is by Check or Money Order, the original check or money order must be delivered to the issuing office before Bid Due Time. ALL other SIGMA bid submittals are also still to be made).
If the Bidder is an Individual:
Name of Individual: _________________________________________________________
Name & Title of Person Authorized to sign: ___________________________________________
Signature: _________________________________________________________ (If not the Individual, Attach Power of Attorney) Date
Doing Business as: _________________________________________________________
Business Address: _________________________________________________________
County of registration _________________________
Telephone: _________________________ FAX: ______________________
If the Bidder is a Partnership:
By: _________________________________________________________ (True Name of the Partnership)
Partner Authorized to Sign Date
Signature: _________________________________________________________ (Attach evidence of Authority to sign) Date
Business Address: _________________________________________________________
County of registration _________________________
Telephone: _________________________ FAX _______________________
If the Bidder is a Corporation:
By: _________________________________________________________ (Legal Corporation Name)
Name & Title of Authorized Officer: __________________________________________________
Signature: _________________________________________________________ (Attach evidence of Authority to sign) Date
Name & Title of Officer Attesting: __________________________________________________
Signature: _________________________________________________________ Date
Business Address: _________________________________________________________
Telephone: _________________________ FAX _______________________
(State of Incorporation): _________________________________________________________
If The Bidder is A Joint Venture: JOINT VENTURE SIGNATURES MUST BE AS PROVIDED IN INSTRUCTIONS TO BIDDERS.
EACH JOINT VENTURER SIGNING THE BID MUST SIGN IN THE MANNER INDICATED FOR AN INDIVIDUAL, A PARTNERSHIP OR A CORPORATION. IF MORE THAN TWO JOINT VENTURERS OF THE SAME TYPE ARE INCLUDED, USE ADDITIONAL PAGES. JOINT VENTURE STATE OF INCORPORATION ___________________ OR COUNTY OF REGISTRATION
Bidding and Contract Document (R 11/25) Multiple DOC Facilities, Tank Painting & Minor Repairs File No. 472/25212.SDW
POST-BID SUBMITTALS
The PSC will request this submittal after bid opening. Complete and submit these items within two business days after the request.
BIDDER’S EXPERIENCE MODIFICATION RATING (EMR) ____________
Attach letter of explanation if the Bidder does not have an EMR.
PROPOSED PROJECT SUPERINTENDENT _______________________________
Attach brief resume or list of similar successful projects.
LIST OF SIMILAR PROJECTS COMPLETED BY THE BIDDER
Please list at least three completed projects of similar size and complexity to the project being bid, with reference contact information
REFERENCE #___
Owner: _____________________________________________________________________________________
Project/Contract Name: ________________________________________________________________________
Location of Project/Contract: ____________________________________________________________________
Contract Price: _______________________ Project/Contract Started: ____________ Completed: ____________
Owner's Representative (Name and Telephone): _____________________________________________________
Scope of Project/Contract: ______________________________________________________________________
REFERENCE #___
Owner: _____________________________________________________________________________________
Project/Contract Name: ________________________________________________________________________
Location of Project/Contract: ____________________________________________________________________
Contract Price: _______________________ Project/Contract Started: ____________ Completed: ____________
Owner's Representative (Name and Telephone): _____________________________________________________
Scope of Project/Contract: ______________________________________________________________________
REFERENCE #___
Owner: _____________________________________________________________________________________
Project/Contract Name: ________________________________________________________________________
Location of Project/Contract: ____________________________________________________________________
Contract Price: _______________________ Project/Contract Started: ____________ Completed: ____________
Owner's Representative (Name and Telephone): _____________________________________________________
Scope of Project/Contract: ______________________________________________________________________
Bidding and Contract Document (R 11/25) Multiple DOC Facilities, Tank Painting & Minor Repairs File No. 472/25212.SDW
POST BID SUBMITTALS: LIST OF SUBCONTRACTORS
The Apparent Low Bidder shall nominate for each Division of Specification and/or trade category, the Subcontractor to be awarded Sub-agreements, including the apparent Low Bidder if work is to be self-performed. The Apparent Low Bidder will ensure that all Subcontractors have a current State Project Registration in compliance with PA10 of 2023, as amended in PA110 of 2024. Nominated subcontractors shall not be removed, replaced, or added to except by written request for good reason, subject to Owner acceptance. Notwithstanding anything to the contrary, the Owner has the right to object, regardless of cause, to any asbestos abatement Subcontractor nominated by the Contractor to be awarded a Sub-agreement that has 5 or more notices of violation of environmental regulations, or has been subject to an administrative consent order or a consent judgment involving environmental regulations, within the immediately preceding 5 years.
Division, Specification Section Nominated Amount of Subcontract and/or Trade Subcontractor(s)
1.________________________ _________________________ __________________
2.________________________ _________________________ __________________
3.________________________ _________________________ __________________
4.________________________ _________________________ __________________
5.________________________ _________________________ __________________
6.________________________ _________________________ __________________
7.________________________ _________________________ __________________
8.________________________ _________________________ __________________
9.________________________ _________________________ __________________
10._______________________ _________________________ __________________
11._______________________ _________________________ __________________
12._______________________ _________________________ __________________
13._______________________ _________________________ __________________
14._______________________ _________________________ __________________
The undersigned Apparent Low Bidder _____________________________________________________________ certifies that all the information and data furnished in this List of Subcontractors are current, accurate and complete as of the date stated below.
Signed by:____________________________Name_______________________________ Title ________________________ on this __________ day of ____________________, 20_______.
Bidding and Contract Document (R 11/25) Multiple DOC Facilities, Tank Painting & Minor Repairs File No. 472/25212.SDW
PERFORMANCE BOND
SURETY COMPANY REFERENCE No. __________________________________
That "the Contractor," ___________________________________________________, a corporation ___, individual ___, partnership ___, joint venture ___ of the State of __________________, qualified to do business in the State of Michigan, as Principal, and "the Surety," ____________________________________________________________________, of the State of _________________, as surety, are held and bound unto the State of Michigan, "the Owner," as Obligee, in the amount of __________________________________________________________________________ Dollars ($_________________), for the payment of which the Contractor and Surety bind themselves, their respective heirs, successors, legal representatives and assigns, jointly and severally, in compliance with 1963 PA 213, as amended, MCL 129.201 et seq.
The Contractor has entered into "the Contract" with the Owner for _______________________________________________ _______________, "the Work," covered by the Contract Documents, which are incorporated into this Performance Bond by this reference.
If the Contractor faithfully performs and fulfills all the undertakings, covenants, terms, conditions, warranties, indemnifications and agreements of the Contract Documents within the Contract Time (including any authorized changes, with or without notice to the Surety) and during the Correction Period, and if the Contractor also performs and fulfills all the undertakings, covenants, terms, conditions, warranties, indemnifications and agreements of any and all duly authorized modifications of the Contract Documents, then THIS
OBLIGATION IS VOID, OTHERWISE TO REMAIN IN FULL
FORCE AND EFFECT.
A. No change in Contract Price or Contract Time, "or equal" or substitution or modification of the Contract Documents (including addition, deletion, or other revision) releases the Surety of its obligations under this Section 00610 Performance Bond. The Surety expressly waives notice of any such change in Contract Price or Contract Time, "or equal" or substitution or modification of the Contract Documents (including addition, deletion, or other revision).
B. This Performance Bond must be solely for the protection of the Owner and its successors, legal representatives or assigns.
C. It is the intention of the Contractor and Surety that they must be bound by all terms and conditions of the Contract Documents (including, but not limited to General Conditions and this Performance Bond). However, this Performance Bond is executed pursuant to 1963 PA 213, as amended, MCL 129.201 et seq., and if any provision(s) of this Performance Bond is/are illegal, invalid, or unenforceable, all other provisions of this Performance Bond must nevertheless remain in full force and effect, and the Owner must be protected to the full extent provided by 1963 PA 213, as amended, MCL 129.201 et seq.
IMPORTANT: The Surety must be authorized to do business in the State of Michigan by the Department of Licensing and Regulatory Affairs, must be listed on the current U.S. Department of the Treasury Circular 570, and, unless otherwise authorized by the Owner in writing, must have at least an A- Best's rating and a Class VII or better financial size category per current A. M. Best Company ratings.
Name, Address and Telephone of the Surety: Address and Telephone of Agent, who is either a resident of, or whose principal office is maintained in, the State of Michigan
Signed and sealed this __________ day of _______________________, 20_____.
THE CONTRACTOR: (Print Full Name and Sign) By:___________________________________________________________
WITNESS ______________________________ Name & Title: __________________________________________________
Telephone No. _________________________________________________
THE SURETY: (Print Full Name and Sign) Agent: ________________________________________________________
WITNESS ______________________________ Attorney-in-Fact: ________________________________________________
Telephone No. _______________________________________________
Email:. _____________________________________________________
Bidding and Contract Document (R 11/25) Multiple DOC Facilities, Tank Painting & Minor Repairs File No. 472/25212.SDW
PAYMENT BOND
SURETY COMPANY REFERENCE No.___________________________________
“the Contractor,” ___________________________________________________, a corporation ___, individual ___, partnership ___, joint venture ___ of the State of __________________, qualified to do business in the State of Michigan, as Principal, and “the Surety,” ____________________________________________________________________, of the State of _________________, as surety, are held and bound unto the State of Michigan, “the Owner,” as Obligee, in the amount of __________________________________________________________________________ Dollars ($_________________), for the payment of which the Contractor and Surety bind themselves, their respective heirs, successors, legal representatives and assigns, jointly and severally, in compliance with 1963 PA 213, as amended, MCL 129.201 et seq.
The Contractor has entered into “the Contract” with the Owner for _____________________________________________ __________________, “the Work,” covered by the Contract Documents, which are incorporated into this Payment Bond by this reference.
If the Contractor promptly pays all claimants supplying labor or materials to the Contractor or to the Contractor’s Subcontractors in the prosecution of the Work, then THIS
OBLIGATION IS VOID, OTHERWISE TO REMAIN IN FULL
FORCE AND EFFECT.
A. All rights and remedies on this Payment Bond are solely for the protection of all claimants supplying labor and materials to the Contractor or the Contractor’s Subcontractors in the prosecution of the Work and must be determined in accordance with Michigan Law.
B. No change in Contract Price or Contract Time, “or equal” or substitution or modification of the Contract Documents (including addition, deletion, or other revision) must release the Surety of its obligations under this Payment Bond. The Surety hereby expressly waives notice of any such change in Contract Price or Contract Time, “or equal” or substitution or modification of the Contract Documents (including addition, deletion, or other revision).
C. It is the intention of the Contractor and Surety that they must be bound by all terms and conditions of the Contract Documents (including, but not limited to this Payment Bond). However, this Payment Bond is executed pursuant to 1963 PA 213, as amended, MCL 129.201 et seq., and if any provision(s) of this Payment Bond is/are illegal, invalid, or unenforceable, all other provisions of this Payment Bond must nevertheless remain in full force and effect, and the Owner must be protected to the full extent provided by 1963 PA 213, as amended, MCL 129.201 et seq.
IMPORTANT: The Surety must be authorized to do business in the State of Michigan by the Department of Licensing and Regulatory Affairs, must be listed on the current U.S. Department of the Treasury Circular 570, and, unless otherwise authorized by the Owner in writing, must have at least an A- Best’s rating and a Class VII or better financial size category per current A. M. Best Company ratings.
Name, Address and Telephone of the Surety:
Address and Telephone of Agent, who is either a resident of, or whose principal office is maintained in, the State of Michigan
Signed and sealed this __________ day of _______________________, 20_____.
THE CONTRACTOR: (Print Full Name and Sign) By:___________________________________________________________
WITNESS ______________________________ Name & Title: __________________________________________________
Telephone No. _________________________________________________
THE SURETY: (Print Full Name and Sign) Agent: ________________________________________________________
WITNESS ______________________________ Attorney-in-Fact: ________________________________________________
Telephone No. ____________________________________________________
Email: _________________________________________________________
Bidding and Contract Document (R 11/25) Multiple DOC Facilities, Tank Painting & Minor Repairs File No. 472/25212.SDW
TABLE OF CONTENTS
CONTRACT FORMS
BID SUMMARY FORM
BID SCHEDULE
QUALIFIED DISABLED VETERAN (QDV) BUSINESS REPRESENTATION
CERTIFICATION OF A MICHIGAN BASED BUSINESS
ASBESTOS ABATEMENT ATTESTATION
BID BOND
POST-BID SUBMITTALS
PERFORMANCE BOND
PAYMENT BOND
TABLE OF CONTENTS
DIVISION 00 BIDDING REQUIREMENTS AND CONTRACT CONDITIONS
SECTION TITLE PAGE
00010 PRE-BID INFORMATION 00-1
00100 INSTRUCTIONS TO BIDDERS 00-2
00120 SUPPLEMENTARY INSTRUCTIONS 00-7
00200 INFORMATION TO BIDDERS 00-7
00700 GENERAL CONDITIONS 00-8
00750 SPECIAL WORKING CONDITIONS 00-20
00800 SUPPLEMENTARY CONDITIONS 00-20
00900 ADDENDA 00-21
DIVISION 01 - GENERAL REQUIREMENTS
01010 SUMMARY OF WORK 01-10
01020 ALLOWANCES 01-10
01025 MEASUREMENT AND PAYMENT 01-10
01030 ALTERNATES 01-10
01040 COORDINATION 01-10
01050 FIELD ENGINEERING 01-20
01060 REGULATORY REQUIREMENTS 01-20
01090 REFERENCES 01-40
01100 PROJECT PROCEDURES 01-40
01200 PROJECT MEETINGS 01-50
01300 SUBMITTALS 01-60
01400 QUALITY CONTROL 01-90
01500 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 01-90
01600 MATERIAL AND EQUIPMENT 01-100
01650 FACILITY START-UP 01-100
01700 CONTRACT CLOSE-OUT 01-110
01800 MAINTENANCE 01-110
APPENDIX I – GLOSSARY
APPENDIX II – SPECIAL WORKING CONDITIONS
APPENDIX III – SPECIAL PROJECT PROCEDURES
APPENDIX IV – RESERVED
APPENDIX V – PREVAILING WAGE
APPENDIX VI – ADDENDA
APPENDIX VII – CORRECTIONAL FACILITY LOCATION MAP
APPENDIX VIII – FIELD INSPECTION REPORTS
APPENDIX IX – TECHNICAL SPECIFICATIONS
DRAWINGS - BOUND HEREIN
Bidding and Contract Document (R 11/25) Multiple DOC Facilities, Tank Painting & Minor Repairs File No. 472/25212.SDW
DIVISION 00
BIDDING REQUIREMENTS AND CONTRACT CONDITIONS
Bidding and Contract Document (R 11/25) Multiple DOC Facilities, Tank Painting & Minor Repairs File No. 472/25212.SDW
00-1
SECTION 00010 PRE-BID INFORMATION
1. Invitation to Bid (ITB) - Your firm is invited to submit a Bid. The State of Michigan as the Owner will receive bids electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService, for Multiple DOC Facilities, Tank Painting and Minor Repair, until 2:00 p.m., ET, on May 20, 2026. The State reserves the right to cancel this Invitation to Bid (ITB) or change the date and time for submitting Bids by announcing same at any time before the established date and time for Bid opening. Bids must remain open for acceptance by the Owner for no less than the Bid hold period. Contractor may agree to extend the Bid hold period. However, any such extension must be based upon no increase in the Bid Price and/or Contract Time.
2. Work Description - The Work, Multiple DOC Facilities, Tank Painting and Minor Repair, DTMB File No. 472/25212.SDW includes, but is not necessarily limited to:
Water Storage Tank Painting and Minor Repair.
The sites are located at:
Jackson Correctional Facility, 4000 Cooper, Jackson, MI 49201 Lakeland Correctional Facility, 141 1st St., Coldwater, MI 49036 Macomb Correctional Facility, 34625 26 Mile Rd, New Haven, MI 48048 Marquette Branch Prison, 1960 US41 South, Marquette, MI 49855 Newberry Correctional Facility, 3001 Newberry Ave, Newberry, MI 49868 Oaks Correctional Facility, 1500 Caberfae Hwy, Manistee, MI 49660 Woodland Correctional Facility, 9036 M36, Whitmore Lake, MI 48189, as shown on the Drawings.
3. Bidding Documents - Sets of Bidding Documents may be obtained at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService .
4. Bid Security - Each Bid must enclose a duly executed Bid Security, in the amount of five percent (5%) of the Bidder's Base Bid, paid to the “State of Michigan” in the form of a certified or cashier’s check or money order drawn upon a bank insured by an agency of the Federal Government, or a bid bond signed by both the Contractor and authorized surety company. If Bid Security is by check or money order, such certified or cashier’s check or money order must be delivered in original copy before the Bid Due Time to:
State Facilities Administration Design & Construction Division
3111 W. St. Joseph Street Lansing, Michigan 48917
All other Bid information must be submitted via SIGMA as per standard bidding procedure
5. Pre-Bid Conference - A mandatory pre-bid conference will be held via Microsoft Teams on May 6, 2026, at 9:00 a.m. ET. All bidders must RSVP with your name, company name, email address and phone number to Susan Wheaton at the State of Michigan at wheatons1@michigan.gov. no later than 3:00 p.m. May 5, 2026. A tour will not be held on the same day. Tour dates, if requested, will be determined at the mandatory pre-bid meeting. All prospective Bidders and other parties interested in the Work are encouraged to attend the tour, if held. Addenda may be issued in response to issues raised at the pre-bid conference and tour, or as the Owner and/or Professional may otherwise consider necessary. An individual is only permitted to represent one bidder at a mandatory Pre-Bid Conference.
The purpose of the pre-bid conference is to answer questions on the day of the meeting. Other inspection visits may be allowed if needed. Individuals needing special services to fully participate in the meeting due to a disability will be determined for each facility, as needed.
FOR CORRECTIONAL FACILITIES ONLY: All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vender/Contractor LEIN Request five business days prior to the meeting date, (LEIN Request For CAJ-1037 attached to Bid posting). Send the LEIN Request form, filled out and signed, by email to SmithD76@michigan.gov & FrostS1@michigan.gov . The email “Subject” must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting).
6. SIGMA VENDOR NUMBER: If you are bidding a State job for the first time, visit the State of Michigan SIGMA website, https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService, and follow the “SOM VSS User Guide for New Vendors” instructions, located under Forms and Reference Documents. Registration is required for bid submission. Do not wait until the last minute to submit a proposal, as the SIGMA system requires the creation of an account and entry of certain information, in addition to uploading and submitting the materials. The SIGMA system will not allow a proposal to be submitted after the proposal deadline, even if a portion of the proposal has been updated.
Bidding and Contract Document (R 11/25) Multiple DOC Facilities, Tank Painting & Minor Repairs File No. 472/25212.SDW
00-2
Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 373-4111 or
(888) 734-9749.
7. Equal Employment Opportunity - Covenants to not discriminate in employment by Contractors, Subcontractors and Suppliers required by Law are contained in Instructions to Bidders and General Conditions and are applicable to the Work and any Sub-agreement under the Contract.
8. Contract Times - The Contract Times and the associated liquidated damages are specified in the Contract.
9. Contact Person - All requests or inquiries concerning the Bidding Documents, or the Work must be addressed to: Keith Nelson, Nelson Tank Engineering & Consulting, Inc., keith@nelsontank.com. Questions will be accepted until May 14, 2026, at 12:00 p.m. ET.
10. Award - Subject to any agreed extension of the period for holding Bids, Bids must remain valid for acceptance by the Owner for
60 Calendar Days after the date of Bid opening. In addition, the Owner expressly reserves the right, within the Owner's sole discretion, to reject any or all Bids, to waive any irregularities, to issue post-Bid Addenda and re-bid the Work without re-advertising, to re-advertise for Bids, to withhold the award for any reason the Owner determines and/or to take any other appropriate action.
11. Performance and Payment Bonds – A performance bond and a payment bond are required for all contracts over $50,000.00 for the contract award amount.
END OF SECTION 00010
SECTION 00100 INSTRUCTIONS TO BIDDERS
1. PREPARATION OF BID: Execute Bid fully and properly. Bid Summary Form (DTMB -0401D) and Bid Form Attachments must be used and completely filled out for the Bid to be considered responsive and meeting the requirements of the contract solicitation.
All Bid prices must be printed or typed in both words and figures.
2. BID CHECKLIST: Submit Bid Summary Form with original signatures plus Bid Form Attachments in accordance with the electronic bidding procedures on the SIGMA VSS website.
A complete Bid will consist of the following forms, which are included immediately following the Bid Summary Form:
Bids SUBMIT THESE Bid Forms and Bid Form Attachments All Bids □ Signed and completed Bid Summary Form (DTMB-0401D).
□ Bid Schedule.
□ Qualified Disabled Veteran (QDV) Business Representation.
□ Bid Security in the amount of 5% of Base Bid Price.
If Bid Security is by check or money order, such certified or cashier’s check or money order must be delivered in original copy before the Bid Due Time to:
State Facilities Administration Design & Construction Division
3111 W. St. Joseph Street Lansing, Michigan 48917
All other Bid information must be submitted via SIGMA as per standard bidding procedure
□ Signature Authorization or copy of the partnership agreement if signed by all partners.
□ State Project Registration (SPR) for the Contractor and subcontractors (if applicable pursuant to 2023 PA 10, as amended, MCL 408.1101 et seq.)
□ Other Forms: None
Over $50K □ Forms listed under All Bids.
□ Payment and Performance Bond (upon issuing the Notice of Award).
Bidding and Contract Document (R 11/25) Multiple DOC Facilities, Tank Painting & Minor Repairs File No. 472/25212.SDW
00-3
Over $100K □ Forms listed under All Bids.
□ Certification of a Michigan Based Business.
□ Payment and Performance Bond (upon issuing the Notice of Award).
Over $250K □ Forms listed under All Bids.
□ Certification of a Michigan Based Business.
□ Payment and Performance Bond (upon issuing the Notice of Award).
Apparent Low Bidders ONLY (upon request from the Professional)
□ Experience Modification Rating (EMR), or a letter stating why the Bidder does not have one.
□ Identification of the proposed project superintendent, with a resume or list of similar projects handled by that individual.
□ A list of at least three (3) projects completed by the Bidder, within the last three (3) years of similar size and complexity, with contact information for references for each.
□ A list of nominated sub-contractors, including proposed self-performed categories, for each Division/Trade/etc.
3. BID SUBMISSION: Bids must be submitted electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService.
4. BID GUARANTEE: Each proposal must be accompanied by either a bank certified or cashier's check on an open, solvent bank or a bid bond with an authorized surety company (the surety must be listed on the current U.S. Department of the Treasury Circular 570) in the amount of five percent of the base bid payable to the State of Michigan, as a guarantee of good faith. If the successful Bidder fails to furnish satisfactory bonds and insurance within fifteen Calendar Days after Notice of Award, such guarantee must be forfeited to the State as liquidated damages. If Bid Security is by check or money order, such certified or cashier’s check or money order must be delivered in original copy before the Bid Due Time to the Issuing Office. The bid security, exclusive of bid bonds, of all unsuccessful Bidders will be returned when an award is made or upon substitution of a bid bond. The bid security of the successful Bidder will be returned when the performance bond and labor and material bond are approved.
5. Left Blank Intentionally.
6. MICHIGAN BASED BUSINESS CERTIFICATION: All Bidders submitting Bids in excess of $100,000.00 must complete the
Certification of Michigan Based Business. This information will determine if a Bidder qualifies as a "Michigan" business for purposes of application of reciprocity where applicable.
7. POST-BID SUBMITTAL: For all projects, the Professional may request a Post-Bid Submittal from the Apparent Low
Bidders. The Apparent Low Bidders must submit to the Professional, within two Business Days after receipt of the Professional’s request,
• Experience Modification Rating (EMR), or a letter stating why the Bidder does not have one.
• Identification of the proposed project superintendent with a resume or list of similar projects managed by that individual.
• A list of at least three (3) projects completed by the Bidder, within the last three (3) years of similar size and complexity, with contact information for references for each.
Failure to provide the submittals may disqualify the Bid.
8. SIGNATURES: All Bids, notifications, claims, and statements must be signed as follows:
(a) Corporations: Signature of official must be accompanied by a certified copy of the Resolution of the Board of Directors authorizing the individual signing to bind the corporation.
(b) Partnerships: Signature of one partner must be accompanied by a signed copy of the legal document (e.g., Power of Attorney or partnering agreement) authorizing the individual signing to bind all partners. If Bid is signed by all partners, no authorization is required.
(c) Individual: No authorization is needed. Each signature must be witnessed.
9. BID PRICES: The Bidder’s Base Bid and Alternate Bid prices must include, and payment for completed Work will compensate in full for: all services, obligations, responsibilities, management, supervision, labor, materials, devices, equipment, construction
Bidding and Contract Document (R 11/25) Multiple DOC Facilities, Tank Painting & Minor Repairs File No. 472/25212.SDW
00-4 equipment, general conditions, permits, patent fees and royalties, testing, inspection and approval responsibilities, warranties, temporary facilities, small tools, supplies, Bonds, insurance, taxes, mobilization, close-out, overhead and profit and all connections, appurtenances and any other incidental items of any kind or nature, as are necessary to complete the Work, in a neat, first quality, workmanlike and satisfactory manner in accordance with the Drawings and Specifications and as otherwise required to fulfill the requirements of the Bidding Documents. For each Cash Allowance item, the Bidder must include, within the Bid, all labor costs, construction equipment costs, insurance and Bond premiums and other general conditions costs and Fees (Bidder’s and Subcontractors’) to complete Work associated with the material, equipment, or other designated item to be furnished under the Cash Allowance. For each Provisionary Allowance, the Bidder must include, within the Bid, insurance, premiums (not recoverable as labor burden) and Bond premiums required to complete Work that may be ordered under a Provisionary Allowance.
10. INSPECTION OF BIDDING DOCUMENTS AND SITE CONDITIONS: The Bidder must carefully review and inspect all documents referenced and made part of this ITB, site conditions, all applicable statutes, regulations, ordinances, and resolutions addressing or relating to the goods and services under this contract. Failure to do so or failure to acquire clarifications and answers to any discovered conflicts, ambiguities, errors, or omissions in the Bidding Documents will be at the Bidder’s sole risk.
11. SAFETY REQUIREMENTS AND LAWS: The Bidder awarded the Contract must comply with all applicable federal, state, and local Laws including health and safety regulations, environmental protection, permits and licensing.
12. INTERPRETATIONS AND ALTERATIONS TO THE BID AND BIDDING DOCUMENTS: All requests for clarification or interpretation of the Bidding Documents, all proposals for any modifications to the Bidding Documents, all requests for information and all other questions or inquiries about the Bidding Documents and/or the Work shall be submitted in writing to the Contact Person identified in the Bid Documents. Requests or inquiries received less than seven Calendar Days before the date of Bid opening will be answered only if (a) the response can be given through an Addendum made available at least seventy-two hours before Bid opening (counting Business Days only), (b) the Bid opening is postponed by Addendum, or (c) the Work is rebid without readvertising following the issuance of post-Bid Addenda.
Bidders must not rely upon any oral statements or conversations regarding interpretations, clarifications, corrections, additions, deletions or other revisions or information to the Bidding Documents. Any addition, limitation or provision made with or attached to the Bid may render it non-responsive and/or irregular and be a cause for rejection. The Owner reserves the right to issue a post-Bid Addendum after opening the Bids and set a new date for the receipt and opening of sealed Bids. The Bidder acknowledges that any quantities of Unit Price Work given in this ITB are approximate only and payments will be made only for actual quantities of Unit Price Work completed in accordance with the Contract Documents.
13. MODIFICATION OF BID: The entire bid must be resubmitted on the SIGMA VSS website.
14. BID WITHDRAWAL: Except for timely filed claims of mathematical or clerical errors granted by the State, no Bid may be withdrawn within sixty Calendar Days after the Bid Opening time and date or before the Bid expiration date without forfeiting Bid security. The request to withdraw a Bid due to error must be submitted in writing along with the supporting documents within two Business Days after the date of Bid Opening. The claim must describe in detail the error(s), include a signed affidavit stating the facts of the alleged error(s) and request that the Bidder be released from its Bid. The review of the claim and its supporting documents by the State is only for the purpose of evaluating the Bidder’s request and must not create duty or liability on the State to discover any other Bid error or mistake. The sole liability of any Bid error or mistake rests with Bidder.
15. OBJECTION TO THE AWARD: A Bidder may file a written protest with the Director-DCD to object to the Apparent Low Bidder. This objection must be filed within seven Calendar Days after the date of Bid opening and must describe in detail the basis for the protest and request a determination. The Director-DCD will either dismiss or uphold the protest and notify the protestor within ten Calendar Days after receipt of the written protest.
16. BID IRREGULARITIES: The following irregularities on any Bid Form or Bid Form Attachment must be resolved as follows:
(a) between SIGMA entry and signed Bid Summary attachment, the signed Bid Summary attachment will be used.
(b) between words and figures, the words must be used.
(c) between any sum, computed by the Bidder, and the correct sum, the sum computed by the Bidder must be used.
(d) between the product, computed by the Bidder, of any quantity and Bid Unit Price and the correct product of the Unit Price and the quantity of Unit Price Work, the product extended by the Bidder must be used.
(e) between a stipulated Allowance and the amount entered, the Allowance must be used.
(f) any mobilization pay item exceeding the maximum specified must be ignored and the Bid must remain unchanged.
(g) if any Bidder fails or neglects to bid a Unit Price for an item of Unit Price Work but shows an "Bid Price" for that item, the missing unit price must be computed from the respective quantity and the Item Bid Price shown.
(h) if any Bidder fails or neglects to show a "Bid Price" for an item of Unit Price Work but bids a unit price, the missing Bid Price must remain as “zero”; and
(i) if any Bidder fails or neglects to enter a Bid Price in both words and figures, the Bid Price printed or typed, whether in words or figures, must be used.
Bidding and Contract Document (R 11/25) Multiple DOC Facilities, Tank Painting & Minor Repairs File No. 472/25212.SDW
00-5
17. CERTIFICATION: The bidder certifies to the best of its knowledge and belief that, within the past three (3) years, the bidder, an officer of the bidder, or an owner of a 25% or greater interest in the bidder:
(a) Has not been convicted of a criminal offense incident to the application for or performance of a contract or subcontract with the State of Michigan or any of its agencies, authorities, boards, commissions, or departments.
(b) Has not had a felony conviction in any state (including the State of Michigan).
(c) Has not been convicted of a criminal offense which negatively reflects on the bidder’s business integrity, including but not limited to, embezzlement, theft, forgery, bribery, falsification, or destruction of records, receiving stolen property, negligent misrepresentation, price-fixing, bid rigging, or a violation of state or federal anti-trust statutes.
(d) Has not had a loss or suspension of a license or the right to do business or practice a profession, the loss or suspension of which indicates dishonesty, a lack of integrity, or a failure or refusal to perform in accordance with the ethical standards of the business or profession in question.
(e) Has not been terminated for cause by the Owner.
(f) Has not failed to pay any federal, state, or local taxes.
(g) Has not failed to comply with all requirements for foreign corporations.
(h) Has not been debarred from participation in the bid process pursuant to Section 264 of 1984 PA 431, as amended, MCL
18.1264, or debarred or suspended from consideration for award of contracts by any other State or any federal Agency.
(i) Has not been convicted of a criminal offense or other violation of other state or federal law, as determined by a court of competent jurisdiction or an administrative proceeding, that in the opinion of DTMB indicates that the bidder is unable to perform responsibly or which reflects a lack of integrity that could negatively impact or reflect upon the State of Michigan, including but not limited to, any of the following offenses under or violations of:
1. The Natural Resources and Environmental Protection Act, 1994 PA 451, MCL 324.101 to 324.90106.
2. A persistent and knowing violation of the Michigan Consumer Protection Act, 1976 PA 331, MCL 445.901 to 445.922.
3. A finding that the bidder failed to pay the wages and/or fringe benefits as required by applicable law.
4. Repeated or flagrant violations of 1978 PA 390 MCL 408.471 to 408.490 (law relating to payment of wages and fringe benefits).
5. A willful or persistent violation of the Michigan Occupational Health and Safety Act, 1974, PA 154, MCL 408.10001 to 408.1094, including: a criminal conviction, repeated willful violations that are final orders, repeated violations that are final orders, and failure to abate notices that are final orders.
6. A violation of federal or state civil rights, equal rights, or non-discrimination laws, rules, or regulations.
7. Been found…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .