472_19097.TAP Project Statement.pdf
PDF 164 KB Posted
- Attached to
- 472/19097. TAP Chippewa CF- HVAC Repairs & Replacements State and local contract opportunity
- Solicitation number
- RFP 171 190000001271 2
- Issued by
- Cass County, Kincheloe CDP, Michigan
About this file
This Project Statement, issued by the State of Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration Design and Construction Division in partnership with the Michigan Department of Corrections (MDOC) Physical Plant Division, requests comprehensive Professional Services Contract (PSC) proposals for HVAC repairs and replacements at Chippewa Correctional Facility in Kincheloe, Michigan. The project encompasses design and construction services for HVAC upgrades to ACC units in Buildings 100 (Administration), 200 (Food Service/Health Care), and 300 (Education), including replacement of heat pumps and circulation pumps in the 1989 vintage system. Proposals are due March 28, 2019, at 2:00 PM EST, with a mandatory walk-through inspection scheduled for March 14, 2019, at 9:00 AM local time at the facility's Admin Building front desk. RFP questions must be submitted by March 21, 2019. The scope requires completion of Phase 500, 600, and 700 professional services with Phase 400 services as necessary, including design development, permit applications, contract document preparation, construction cost estimates, and construction administration. The project operates within a secure correctional facility requiring LEIN clearance, DOC orientation training, and coordinated facility access for all personnel.
The PSC proposal must include all LARA plan review, permit applications, permitting fees, and Bureau of Fire Services approvals, with a $1,500.00 allowance designated as a reimbursable expense. Proposals must detail manpower costs for Phase 700 inspection services, field and material testing, independent system testing by a third-party agency, and all reimbursable expenses including travel, meals, and lodging. The consultant must provide a proposed design schedule, biweekly progress summaries, construction schedules that maintain facility operations, and billing cost spreadsheets per project. No construction budget has been determined; however, funding is believed sufficient for the requested services. The consultant shall maintain complete project documentation in hard copy format and deliver all files to DTMB's Lansing office upon final payment request. The facility will remain operational throughout construction, with HVAC systems required to maintain functionality during their respective seasons.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Chippewa Bldg 200 M Drawings.pdf | ||
| LEIN Request.pdf | ||
| Chippewa Bldg 300 E Drawings.pdf | ||
| Chippewa Bldg 200 E Drawings.pdf | ||
| Chippewa Bldg 100 M Drawings.pdf | ||
| Chippewa Bldg 300 M Drawings.pdf | ||
| URF HVAC 3-14-19 PreProposal Attendance.pdf | ||
| URF HVAC 3-14-19 Walkthru Photos 29-56.pdf | ||
| Chippewa Bldg 100 E Drawings.pdf | ||
| PSC Sample Contract.pdf | ||
| 19097_RFP.pdf | ||
| URF HVAC 3-14-19 Walkthru Photos 1-28.pdf | ||
| DMB406 Addendum 1 - URF HVAC Repair and Replacement.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-427 (R 6/16)
PROJECT STATEMENT
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
P.O. Box 30026 Lansing, Michigan 48909
FILE NUMBER
472/19097.TAP
INDEX NUMBER(S)
472LMFMainProj
PROPOSAL DUE DATE
March 28, 2019 2:00 pm EST
CLIENT AGENCY
MDOC – Physical Plant Division
PROJECT NAME AND LOCATION
Various HVAC Repairs & Replacements – Chippewa Correctional Facility (URF) PROJECT ADDRESS (if applicable) Chippewa Correctional Facility: 4269 West M-80, Kincheloe, MI 49784
CLIENT AGENCY CONTACT
Andrea Stinson stinsona@michigan.gov
TELEPHONE NUMBER
517-243-0663
DTMB - DCD PROJECT TEAM
Tom Pawlowski pawlowskit@michigan.gov Dan Hall halld22@michigan.gov
TELEPHONE NUMBER
517-242-0973 517-255-4191
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:
March 14, 2019; 9 AM local time; Chippewa Correctional Facility Admin Building front desk.
MANDATORY (Check box if Mandatory)
LLEEIINN CCHHEECCKK PPrroovviiddee LLEEIINN iinnffoorrmmaattiioonn ((aattttaacchheedd ffoorrmm,, aavvaaiillaabbllee eelleeccttrroonniiccaallllyy)) ffoorr aallll ppeerrssoonnnneell ppllaannnniinngg ttoo aatttteenndd tthhee WWaallkk--TThhrroouugghh IInnssppeeccttiioonn ttoo TTrraaccyy FFaalloorr,, PPhhyyssiiccaall PPllaanntt DDiivviissiioonn ((MMDDOOCC)) vviiaa eemmaaiill aatt:: ffaalloorrtt@@mmiicchhiiggaann..ggoovv,, aatt lleeaasstt 55 bbuussiinneessss ddaayyss pprriioorr ttoo tthhee WWaallkk-- TThhrroouugghh IInnssppeeccttiioonn.. PPeerrssoonnnneell wwhhoo sshhooww uupp ffoorr tthhee mmeeeettiinngg wwiitthhoouutt pprriioorr LLEEIINN cclleeaarraannccee wwiillll nnoott bbee aaddmmiitttteedd..
SERVICES REQUESTED:
Provide a complete PSC Proposal for all required Professional Architectural and Engineering Services in compliance with the State of Michigan, Department of Technology Management and Budget (DTMB) Project Statement Form (DTMB427), DTMB Billing Rate Professional Services Contract and the DTMB 430 RFP Billable Rate Form (DTMB 430), and DTMB State Facilities Administration, Design and Construction Division (DCD) policies and procedures for:
Complete Phase 500, 600, and 700 services, with Phase 400 services as necessary, to produce plans, permit applications, and contract documents for Various HVAC Repairs & Replacements – Chippewa Correctional Facility, Kincheloe, MI. Complete Phase 500, 600 and 700 PSC services are required, and there may be other services yet undefined that may be proposed by either the Client Agency or the PSC in an effort to identify a system design that best serves the Owner. The Contract Document development for the HVAC Repairs and Replacements shall be compatible with existing MDOC operational and custody requirements.
Project Description:
The Agency desires that HVAC upgrades be made to the ACC Units on building 100 Administration, building 200 Food Service/Heath Care, building 300 Education, and circulation pumps due to currently spending excessive hours performing maintenance and waiting for repair parts during system shutdowns, of the existing 1989 vintage system.
System review and overhaul are necessary to upgrade to the current floorplan and needs. Review of the entire system, including evaluation of which components even remain operational or functional, is necessary. Consideration should go beyond replacement-in-kind and include potential upgrades to present-day technologies and efficiencies.
Work is at an operating correctional facility, and work will be located in areas considered to be within the secure perimeter. Work within secure perimeter requires escorts coordinated with URF custody staff. Access in all locations is strictly controlled, monitored and may be subject to delays due to both test- and actual-mobilizations by correctional personnel that necessitates work shutdown. Vehicle access and use on correctional facility property is strictly controlled, requires escorts and must be coordinated in advance. Tool and equipment use requires regular and routine inventorying. In addition to LEIN clearances, DOC facility orientation video training, and site sign-in/sign-out with URF are mandatory for all project personnel.
All design considerations should comply with the Michigan DOC Guidelines. A project construction budget has not been determined.
mailto:stinsona@michigan.gov mailto:pawlowskit@michigan.gov mailto:halld22@michigan.gov mailto:falort@michigan.gov
Professional Services:
Professional services shall also include, but are not limited to:
• The PSC shall be responsible for gathering and verifying all base information required for proper design of the
HVAC upgrades, which include ACC Units on Buildings 100, 200, and 300.
• Priorities shall be based on the facilities needs.
• Replacement of the heat pumps in all buildings shall be included.
• Phase 500, 600 and 700 design and construction services. Include any required Phase 400 tasks necessary for complete Contract Document development in the Phase 500 Proposal technical summary.
• The PSC shall include in their proposal if required LARA Plan Review Permit application and Construction Code approval, and all permits and standards required to be met by this project. Include in the reimbursement category of the Phase 500 Proposal cost summary of your proposal the cash allowance(s) listed below.
• Contract Document development that meets the approval of the MDOC and all related Code requirements.
• Providing 50% and Final (100%) estimates of construction costs for developed plans.
• Development of a construction schedule that avoids negatively impacting facility operations.
• Submittal of 50% and 90% Contract documents for Owner review, posting on SIGMA-VSS, Best Value Bid
Evaluation, PSC recommendation of Contract Award, and Contract Administration.
• Development of a construction schedule that avoids negatively impacting facility operations.
• Submittal of 4 full-size, sealed hardcopy sets of Contract Documents, including addenda, to DTMB DCD contracts staff for Contract execution upon agenda approval.
• Construction cost estimates.
• Maintaining an inclusive, transparent and informative relationship with DTMB and MDOC.
Proposal:
The PSC proposal shall include:
1. All required LARA and Bureau of Fire Services plan review, permit application preparation, permitting fees, reimbursements and approvals.
2. Contract Documents utilizing the current State of Michigan, DTMB, State Facilities Administration, Design and Construction Division, DC SPEC General Conditions and the Master Spec format.
3. Clear documentation of the number of meetings proposed during the design and construction administration phases and indicate whether the meetings are proposed to be on-site, face to face, by telephone, or in specific electronic format.
4. Include any required Phase 400 tasks necessary for complete Contract Document development in the Phase 500 Proposal technical summary.
5. All manpower and costs required for proper Phase 700 Inspection Services. Include all reimbursable costs for inspection services; including, travel, meals and lodging for the Phase 700 reimbursement line item and include an itemized list of these costs. Assume that project meetings are concurrent with project site inspections.
6. All field, material and other testing required for the proper design and construction of the improvements shall be identified and included in the PSC Technical proposal and the costs itemized in the PSC Cost proposal as reimbursements. Final system testing by an independent testing agency to verify the sequence of operation meets the Bureau of Fire Services requirements.
7. Provide a proposed PSC design schedule. The Owner desires to have the design completed as soon as possible.
8. Provide a biweekly progress summary email to the project team, briefly documenting the prior 2-week’s progress by the PSC and display the initial project schedule and current schedule status.
9. Provide a spread sheet to indicate billing costs per each project.
10. Include a $1,500.00 LARA Plan Review Allowance and Permit application as a Reimbursable expense.
The budget for this work is believed to be reasonable to accommodate the services requested. However, in the event it is insufficient to fund all of the Phases requested, it is anticipated that proposal revision will be requested by addendum to award to the selected firm as many of the proposed services as funding allows. It is currently anticipated that additional funding will be sought if needed to address any Phases not included in the initial award.
The PSC shall be required to maintain a complete project file of all project documentation including, but not limited to, base information, contract documents, all correspondence, all e-mails, all RFI’s and answers, Field Orders and communication telephone logs. The project files shall be maintained in a hard copy format and delivered to the Lansing office of the DTMB Design and Construction Division with the PSC final Payment Request.
Attachments:
Chippewa Bldg 100 E Drawings Chippewa Bldg 100 M Drawings Chippewa Bldg 200 E Drawings Chippewa Bldg 200 M Drawings Chippewa Bldg 300 E Drawings
Chippewa Bldg 300 M Drawings
There are limited design documents for the existing features. All information that is available will be made accessible to the successful consultant for review and reproduction.
NIGP CODES
90607, 90644, 92507, 92533¸92567, 91036, DESIRED SCHEDULE OF WORK
Facility will be operational and occupied for its intended purpose throughout construction. Schedule construction according to the seasons. ACC shall remain functional during the cooling seasons and heat functional during the heating season. Professional is to provide a proposed schedule with their proposal that takes into consideration feedback obtained from the facility during the pre-proposal walk-through with respect to optimal and unacceptable times of access.
ACCEPTING RFP QUESTIONS UNTIL: March 21, 2019. Submit RFP questions in writing via email to pawlowskit@michigan.gov and halld22@michigan.gov .
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, DEQ, DNR, and MIOSHA), and any other local regulations and standards that may apply.
This form is required to be a part of the professional service contract. (Authority: 1984 PA 431)