This is a Professional Services Contract form from the State of Michigan Department of Technology, Management and Budget for architectural and engineering design and construction administration services. The contract authorizes a Prime Professional Services Contractor to provide comprehensive professional services including study, schematic design, design development, final design, and construction administration phases for state facility projects. The scope of work encompasses site investigations, civil/structural/mechanical/electrical/plumbing design, specifications preparation in CSI MasterFormat, construction document coordination, construction code compliance and permitting, bidding support, construction administration office services, field inspections, and project close-out documentation including as-built drawings. The contractor must attend all project-related meetings, conduct preconstruction and progress meetings, manage shop drawing submittals, process payment certifications, monitor construction quality and schedule compliance, prepare punch lists, and deliver final operation and maintenance manuals within ninety days of substantial completion. The contract is effective upon execution by the Department and the contractor and remains in effect through project close-out.
Compensation is provided on an hourly billing rate basis for professional, technical, and support staff on a not-to-exceed basis per project phase, with rates including all overhead, fringe benefits, insurance, equipment, and indirect costs. The contractor must document historical operating expenses to justify billing rates and may not apply markup to consultant services beyond five percent. Direct cost reimbursements are allowed for consultant services, soil borings, surveys, laboratory testing, design code compliance fees, and travel expenses beyond one hundred miles. The contractor is ineligible to bid on construction work and must maintain comprehensive insurance including Commercial General Liability of $1,000,000 per occurrence, Professional Liability of $1,000,000 per occurrence, and Workers' Compensation. The contractor indemnifies the State against claims arising from negligence or errors in professional services and must comply with Michigan's nondiscrimination and prevailing wage requirements. All project deliverables, documents, and intellectual property become the property of the State upon completion.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 472_19097.TAP Project Statement.pdf | ||
| Chippewa Bldg 200 M Drawings.pdf | ||
| LEIN Request.pdf | ||
| Chippewa Bldg 300 E Drawings.pdf | ||
| Chippewa Bldg 200 E Drawings.pdf | ||
| URF HVAC 3-14-19 PreProposal Attendance.pdf | ||
| URF HVAC 3-14-19 Walkthru Photos 29-56.pdf | ||
| Chippewa Bldg 100 E Drawings.pdf | ||
| 19097_RFP.pdf | ||
| URF HVAC 3-14-19 Walkthru Photos 1-28.pdf | ||
| Chippewa Bldg 100 M Drawings.pdf | ||
| Chippewa Bldg 300 M Drawings.pdf | ||
| DMB406 Addendum 1 - URF HVAC Repair and Replacement.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Billing Rate - A/E
5/90 (Billing Rate)
Rev 08/11/17
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
This contract authorizes the professional services contractor to provide professional services. (Authority: 1984 PA 431)
CONTRACT FOR PROFESSIONAL SERVICES: Billing Rate – Not to Exceed
THIS CONTRACT, authorized this xxxx day of MONTH in the year two-thousand and eighteen (2018), by the Director, Department of Technology, Management and Budget, BETWEEN the STATE OF MICHIGAN acting through the STATE FACILITIES ADMINISTRATION, DESIGN AND
CONSTRUCTION DIVISION of the DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET, 3111 West St. Joseph Street, Lansing, Michigan, 48917, hereinafter called the State, and
PSC NAME
ADDRESS
CITY, STATE ZIP
the Prime Professional Services Contractor, hereinafter called the Professional, WHEREAS, the Department proposes securing professional services FOR THE FOLLOWING PROJECT:
Project Name & Description
Index No. INDEX NO. Contract Order No. YNO.
File No. FILE NO. Contract Amount $
NOW THEREFORE, the Department and the Professional in consideration of the covenants of this Contract agree as follows:
I. The Professional shall provide the professional architectural and/or engineering services for the Project in the study, design and construction administration, Phase and Task sequence provided in this Professional Services Contract and to the extent authorized by the Department of
Technology, Management and Budget State Facilities Administration (SFA), Design and Construction Division (DCD) [The Department], and be solely responsible for such professional services. The Professional’s services shall be performed in strict accordance with this
Professional Services Contract and be in compliance with the Project/Program Statement.
II. The State of Michigan shall compensate the Professional for providing their professional architectural and/or engineering study, design and construction administration services for the Project in accordance with the conditions of this Professional Services Contract.
IN WITNESS, WHEREOF, each of the parties has caused this Professional Services Contract to be executed in blue pen and ink by its duly authorized representatives on the dates shown beside their respective signatures, with the Contract to be effective upon the date on which the
Professional received a copy executed by the authorized State of Michigan representative(s) by regular, registered, or certified mail or by delivery in person.
FOR THE PROFESSIONAL:
Firm Name Federal Identification (I.D.) Number
Signature Date
Title
FOR THE STATE OF MICHIGAN:
Director, Department of Technology, Management and Budget Date
WHEREAS, this Professional Services Contract constitutes the entire agreement as to the Project between the parties, any Contract Modification of this Contract and the Department’s approved and attached Project/Program Statement scope of work requirements must be in writing, signed by duly authorized representatives of the parties, and shall be in such format and detail as the State may require. No Contract Modification may be entered into to compensate the Professional for correcting, or for responding to claims or litigation for, the Professional firm’s final design Contract
Documents/architectural and engineering design errors, omissions or neglect on the part of the Professional.
ARTICLE I
PROFESSIONAL SERVICES SCOPE OF WORK
The Professional shall provide all professional services, technical staff, and support personnel necessary to achieve the Project as described in the
Project/Program Statement, in the best interest of the State, and be within the Professional’s fee(s) herein authorized by the State. Project services shall comprise, without exception, every professional discipline and expertise necessary to meet all the requirements as described in the
Project/Program Statement and be in accordance with the industry-accepted standard requisites for professional practice and services. The
Professional’s services include attendance at all Project related meetings and conferences. Professional services for this Project shall be provided in the Phase/Task sequence shown below and shall be rendered in accordance with the Professional’s attached Project Study, Design, and Proposed
Construction Schedule. The Professional’s study, design and proposed construction schedule shall be detailed, undated, and time sequence related for all Phase/Task services appropriate for the Project. The Professional shall field-check and verify the accuracy of all drawings and any data furnished by the Department, the State/Client Agency or any other Project related source. The Professional is ineligible to bid on the construction work of any Bidding Documents produced under this Contract. The Professional shall not employ or consult with any firms in completing the
Professional’s obligations herein who it anticipates will be a construction Bidder for the Project or any part thereof, unless specifically authorized, in writing, by the Department. The Professional acknowledges that the Department is the first interpreter of the Professional’s performance under this
Contract.
The Professional acknowledges by signing this Professional Services Contract having a clear understanding of the requested Project and of the professional study, design and construction administration services required by the Department to provide it, and further agrees that the terms and conditions of this Professional Services Contract provide adequate professional fee(s) for the Professional to provide the requested Project. No increase in fee to the Professional will be allowed unless there is a material change made to the Project as described in the attached
Project/Program Statement and the change in scope to the Project/Program Statement is accepted and approved in writing, by the Project Director and the Professional. Professional services shall not be performed and no Project expenses shall be incurred by the Professional prior to the issuance of a written and signed Professional Services Contract and a Contract Order authorizing the Professional to start the Project work.
Compensation for Department directed changes to the Project or modifications to the Project will be provided to the Professional by a Contract
Modification and/or Contract Change Order signed by the Department and the Professional.
Soil Erosion and Sedimentation Control in the State of Michigan is regulated under the 1994 Public Act 451, as amended – The Natural Resources
Environmental Protection Act, Part 91 – Soil Erosion and Sedimentation Control. Soil Erosion and Sedimentation Control associated with this
Contract will be monitored and enforced by the Department.
The Professional shall immediately inform the Department whenever it is indicated that the Professional’s authorized Project not-to-exceed Budget may be exceeded. The Professional shall make recommendations to the Department for revisions to the Project to bring the Project Cost back to the
Professional’s original authorized Budget amount. Any revision to the Project must be accepted and approved by the Department in writing.
The professional services may also include participation in legislative presentations as described in the “Major Project Design Manual for
Professional Services Contractors and State/Client Agencies” and as the legislature or the Department may prescribe.
No substitution of any “Key Principal Personnel/Employee” essential for the successful completion of the Project and identified in the Professional’s attached Project Organizational Chart will be allowed by the Professional for this Contract without the prior written consent from the Project Director.
Before any “Key Principal Personnel/Employee” substitution takes place, the Professional shall submit a written request to the Project Director, and this substitution request shall include the following information: (1) A request in writing for a No Cost Contract Modification; (2) Detailed written justification for this substitution; (3) The Professional’s qualifications of any proposed “Key Principal Personnel/Employee” replacement; and (4) A written statement from the Professional assuring the Department that the Project scope of work will not be adversely affected by this substitution.
This request to modify their Professional Services Contract must be accepted and approved in writing by the Project Director and the Director of the
Department.
The Department will designate an individual to serve as the Project Director for the Project scope of work who shall be fully acquainted with the
Project/Program Statement and have the authority to render Project decisions and furnish information promptly. Except in connection with issues under the Article 12 - Contract Claims and Disputes text, the Project Director will exercise general management and administration for the
Professional’s services in so far as they affect the interest of the State. The Professional shall indemnify, defend, and hold harmless the State against exposure to claims arising from delays, negligence, or delinquencies by the Professional for the professional services of this Contract.
-3-
During the construction administration services of this Project, the Professional shall be required to complete and submit, the on-site Inspection record form titled “DMB-452, The Professional’s Inspection Record” for all on-site Inspection visits to the Project site. The Professional’s Inspection
Record shall be completed and signed by the Professional and submitted monthly, with the original document sent to the Project Director and copies sent to the State/Client Agency and Construction Contractor. The Professional’s Inspection Record shall accompany the Professional’s monthly submitted payment request.
The “DMB-460, Project Procedures” documents package containing Department forms for use during construction administration shall be used by the Professional in the administration of this Contract.
All Project professional services will be consistent with the Department’s current "Major Project Design Manual for Professional Services Contractors and State/Client Agencies" unless otherwise approved in writing by the Department.
The professional services required for each Phase of this Contract shall be performed by the Prime Professional and their Consultants in accordance with service descriptions in this article. The following service descriptions outlined in this Contract represents the Department’s standard of care method for describing the Professional’s responsibilities for providing the professional services of this Contract, but by inclusion, or omission, do not limit or exclude any regular or normal professional services necessary to accomplish the Project and be in accordance with the approved Project
Budget and the industries accepted requisites for professional practice and standards. However, all of the services outlined in this Contract may or may not be applicable to the Project/Program Statement and will require the Professional to identify only the services that are applicable for the
Project at hand. The Professional shall determine and coordinate the interface of the services required for the Project at hand and be responsible for identifying any additional services necessary to successfully complete their Project.
The following professional services, if they become necessary and essential for completing the Project, will be individually rendered by the
Professional, only upon specific written authorization by the Department and the Project Director to the Professional and for the purpose, and to the extent so authorized.
Should litigation occur as a result of this Project, only if through no fault of the Professional, the Professional firm shall be compensated by the
Department on an actual hourly billing rate basis at the rate set forth in this Contract by a Contract Modification and/or Contract Change Order, if required to assist the Department of Attorney General, State Affairs Division in providing the professional services necessary during the course of litigation.
LITIGATION: The Professional shall provide all information, presentations, depositions, testimony as “expert witness”, and similar or related services, on behalf of the Department, as may be required in relation to the professional services of the study, design and construction of this
Project.
ACCOUNTING: The Professional shall provide all specialized categorizations and distributions of the costs of study, design and construction services, construction costs, and operational costs, as may be required according to purpose specific parameters.
PUBLIC AWARENESS: The Professional shall provide all design and construction related services to assist in, and make presentations of the professional services of the study, design, construction and operational aspects of the Projects as may be required for public meetings, hearings, and similar informational activities.
PHASE 500 - FINAL DESIGN
Prepare for progressive, periodic review, Final Design Documents which shall revise, refine, amplify and depict, in detail, the Project as described and required by the Project/Program Statement and any approved preliminary design. Final Design Documents shall be prepared in Phases/Bid packages appropriate to the Project, schedule, and funding.
The proposed Final Design Documents shall document a complete and constructible Project. Final Design Documents shall incorporate and comply with all current, applicable regulations, ordinances, construction codes and statutes, and must have accomplished all reviews by appropriate federal, State or any local authorities having jurisdiction before presentation to the Department for acceptance and advertisement for bidding. Where design approvals are required, the Professional shall acquire and provide them. The Final Design Documents shall be without ambiguity and must be so complete that no significant design decision is left to the discretion of any Bidder, manufacturer, or supplier. The Final Design Documents will not define, quantify, or in any other way represent any work as being assignable to, or to be performed by, any Consultant or sub-consultant, except for fire suppression systems.
Bidding Documents shall consist of, but are not limited to, the Final Design Documents, including final architectural and/or engineering drawings and specifications, special, general, and supplemental conditions of the Construction Contract, and modifications, if any, to standard documents provided by the Department.
-4-
Such standard documents may consist of, but are not limited to, the project advertisement, the Instructions to Bidders, the proposal forms, general, supplemental, and any special conditions of the Construction Contract, and the standard form of agreement between the Department and the
Construction Contractor. The Professional may not substitute any other special, general, and supplemental conditions for the Construction Contract or other standard documents provided by the Department. The Professional may not revise, other than the fillable portions of the general conditions, or use any additional general condition requirements unless the revisions or requirements are accepted and approved by the Department in writing.
In addition to the requirements herein, the professional services for this Project shall include, but are not limited to, those set forth in “MICHSPEC
2001 Edition of The Owner and Contractor Standard Construction Contract and General Conditions for Construction (Long Form)” or the current
DMB DCSPEC – Bidding and Contract Document for Minor Projects as adopted and modified by the State of Michigan and incorporated into the
Construction Contract, plus such other Department standard documents and general conditions as may be part of the Construction Contract.
The Contract Documents shall consist of the Bidding Documents and all Addenda and attachments necessary to provide a complete Construction
Contract for the Project.
Task 501 COORDINATION: Review approved preliminary design drawings with the Project Team and solicit revisions. Incorporate any revisions and design refinements. Present proposed final design documents to the State/Client Agency and the Department for their review at the 50 percent and 90 percent completion intervals and at such other times as the Department deems necessary to completely develop and monitor the Project
Preside at all Project related meetings and prepare and distribute minutes of all meetings, reports of on-site visitations, correspondence, memoranda, telephone, and other conversations or communications. Where essential or significant information is established or evaluated and/or critical decisions are made, whether in meetings, conversation or email correspondence, include that information or decisions in formal project correspondence and distribute copies to the Project Team within two (2) business days of the date of occurrence, or include such information and decisions in the immediately subsequent project meeting minutes. Meeting minutes shall be distributed within five (5) business days of the meeting.
Task 502 SPECIFICATIONS: Prepare final design specifications in the format defined below and with Phasing as appropriate for the
Project. Include a schedule of all required submittals, a construction materials testing schedule, and all other necessary schedules. Specifications shall be coordinated with the final design architectural and/or engineering drawings and shall be prepared in the 2004 MasterFormat Outline by the Construction Specifications Institute (C.S.I.). The final design architectural and/or engineering specifications shall clearly define the Project design and construction requirements indicating the type and quality of materials, products, and workmanship.
Sustainable Design shall be used wherever possible by the Professional in their Project design. The United States Green
Building Council’s (USGBC) LEED Scorecard will be used as an index of the materials and design strategies used in the Project but the USGBC certificate will not be required. Sustainable Design is defined in this Contract as the Professional’s use of
Project design resources with no negative impact to the natural ecosystems, an emphasis on overall energy efficiency, recycling, reduction of waste, and achieving a net enhancement of the Project.
Performance specifications shall be used when feasible. If not, the Professional shall name at least three (3) acceptable materials, products or systems and the specifications shall contain an "or equal" clause. Whenever possible, recycled materials and/or Michigan-manufactured products shall be named and given first preference. Proprietary specifications or allowances may be permitted with the Department's acceptance and written approval, but only for special, unavoidable conditions.
Provide Project specifications to the Department for procurement of items to be pre-purchased through existing State contracts or separate bids. A list of building construction materials and productions manufactured in Michigan may be obtained at http://www.michigan.gov/buymichiganfirst/0,1607,7-225-48676-209976--,00.html.
Task 503 CIVIL/SITE STAGING DESIGN: If the Professional did not obtain a site specific geotechnical testing program for this Project and advise the Department during the Schematic Design Phase, they shall retain a civil/site survey Consultant and a geotechnical testing Consultant and coordinate their proposed architectural and/or engineering services to prepare and provide a preliminary geotechnical site investigation and site staging design as directly related to the Project. Coordinate a site specific testing program to identify and/or confirm the Project site underground conditions and to accurately specify the proposed construction contractual requirements. This includes, but is not limited to access, traffic control, demolition, Soil Erosion and Sedimentation Control, engineered fill, utilities, removal of obstructions/contaminations, borrow and spoil areas, bracing, shoring, waterproofing, dewatering, dredging, and similar work. Determine and prepare a list of required civil/site drawings as related to the Project.
Illustrate and coordinate any off-site work necessary for a completely functioning Project. Revise as required.
http://www.michigan.gov/buymichiganfirst/0,1607,7-225-48676-209976--,00.html
-5-
Soil Erosion and Sedimentation Control shall be implemented in accordance with the current edition of the Department's compliance manual and 1994 PA 451, as amended – The Natural Resources Environmental Protection Act, Part 91 – Soil
Erosion and Sedimentation Control. Submit final civil/site design drawings depicting Soil Erosion and Sedimentation Control measures to the Department’s Soil Erosion and Sedimentation Control Program for review in accordance with 1994 PA 451, as amended.
Task 504 STRUCTURAL: Prepare and render complete structural final design documents.
Task 505 MECHANICAL/HVAC/PLUMBING/UTILITIES: Prepare and render complete mechanical, plumbing, and utility system final design documents.
Task 506 ELECTRICAL: Prepare and render complete electrical system final design documents.
Task 507 ARCHITECTURAL/ENGINEERING: Prepare and render complete architectural and/or engineering final design documents.
Assist the Department in the determination of and specification of furnishings, colors, and finish selections if required in the defined Project.
Task 508 DRAFTING: Prepare complete final design architectural and/or engineering drawings for Bidding Documents on sheet size approved by Project Director using applicable State of Michigan standards as defined in the “Major Project Design Manual for
Professional Services Contractors and State/Client Agencies.”
The Professional shall field-check and verify the accuracy of all existing and proposed drawings and any data furnished by the
Department, the State/Client Agency or any other Project related source.
The Project Bidding Documents derived from the Final Design drawings shall be made available and converted if necessary, to the AutoCAD computer drafting system. Bidding Documents shall be provided to the Department for advertisement by the
Department. One compact disc (CD) and one print copy for records retention, beyond review and approval sets, of the Bidding
Documents will also be provided.
The Project Contract Documents derived from the Project Bidding Documents shall be made available and converted if necessary, to the AutoCAD computer drafting system. One compact disc (CD) and three signed and sealed print copies (for records retention, Project Director, and provision to the Construction Contractor) beyond review and approval sets, of the
Contract Documents will also be provided. The signed and sealed print sets are the controlling Contract Documents for this
Project.
The software name and release number used to produce the Design Contract drawings will be clearly identified on the compact disk (CD).
Task 509 CHECKING CONTRACT DOCUMENTS: Check and coordinate all proposed Bidding and Contract Documents for completeness and accuracy. Prepare Bidding and Contract Documents that will protect the Department from unexpected construction cost increases, schedule delays or claims for reason of defective or incomplete rendering of the Professional’s design, or for any delinquency by the Professional for performance of the professional design services under this Contract. Check the adequacy of all spaces and clearances. Cross-check and coordinate the requirements of all proposed final design drawings between the architectural and/or engineering design disciplines for completeness, accuracy, and consistency, and conflict avoidance.
Similarly, cross-check and coordinate all proposed final design drawings against the Project specifications. Mark each drawing with the name of the checker and with the written signature approval of the appropriate Professional “Key Principal
Personnel/Employee.”
Task 510 CONSTRUCTION CODES AND PERMITS: The Professional’s Contract Documents shall comply with the State of Michigan
Construction Code, 1972 PA 230, as amended, the State of Michigan Energy Code, the Americans with Disabilities Act (ADA)
Accessibility Guide requirements, the State of Michigan Barrier-Free Access Code requirements, and all Project related construction code requirements in effect at the time of award of this Contract. Assist the Department in obtaining approval of the
Project and its design by appropriate governmental regulating and/or code enforcement authorities.
Project Bidding Documents may not be advertised until plan review approval is obtained.
Except as otherwise provided for in this Contract, code compliance and plan review approval(s) shall be performed by the
Department of State Police, Fire Marshal Division, the Department of Licensing and Regulatory Affairs, Bureau of Construction
Codes, Plan Review Division. Code compliance and plan review approval fees shall be paid by the Professional as a reimbursable expense, unless otherwise provided for.
-6-
Submit all modeling, testing, design data, and appropriate drawings and applications for all permits, tests, and approvals, which the Department is required to secure as a prerequisite authorization for the Project's approval. Submit Soil Erosion and
Sedimentation Control plans/drawings to the Department’s Soil Erosion and Sedimentation Control Program as the enforcing authority for this Project, no later than at the 90 percent final design stage.
Provide energy efficient design features and summary calculations to demonstrate Project compliance with the State of Michigan
Energy Code requirements. Submit documents for review in a timely manner allowing appropriate time for review/permitting processes by respective authorities, such that the Project schedule is not unnecessarily delayed. Assist the State/Client Agency to secure any appropriate construction code waivers.
Incorporate all required modifications into the Bidding Documents. Follow through to ensure issuance of the construction codes and permits approvals. Secure all required design approvals before submitting the final design documents to the Project Team for the final design document review of Task 515. Any approval secured in initial plan review and permitting does not relieve the
Professional from complying with code official’s construction field inspections enforcement requirements.
Task 511 CONSTRUCTION TESTING PROGRAM: Coordinate Project on-site survey and appropriate research to identify site specific abnormal construction conditions. Coordinate site specific geotechnical testing program of areas, consistent with the design and siting requirements. Identify and confirm the site underground conditions sufficiently to accurately specify the construction contractual requirements. Establish the required construction quality control and materials testing program. Define and specify the types of Project construction tests required, the approximate quantities to be tested and the projected cost thereof.
Prepare quality control and material testing services program Bidding Documents for the construction quality control and material testing services. The Department will retain an independent professional quality control and material testing services firm for the construction testing at the 50 percent completion review stage. Testing services shall be estimated and identified as an authorized reimbursable expense item in this Contract.
Task 512 HAZARDOUS MATERIALS: Where the Project involves work in an existing building and/or utility system, assist the Department to determine the scope of potential hazardous materials contamination that may require testing, abatement and/or removal by the
Department, prior to the renovation and/or during the new construction work of the Project. Hazardous materials testing and removal for this Project will be performed by the Department by separate Contract. Coordinate the professional design services of this Contract with any hazardous material removal services required to implement this Project. Include for the Department's use, architectural and/or engineering drawings and specifications for all restoration work necessary following completion of the removal/abatement Project. Revise the final design drawings, specifications and schedule, if necessary, to reflect the impact of the hazardous material removal/abatement on the existing State/Client Agency facility operations.
Task 513 DESIGN AND CONSTRUCTION BUDGET: The Professional shall be responsible for all costs incurred by it, necessitated by for rebidding a Project if it is over Budget due to their design. Submit in writing the itemized estimate of the construction costs with each final design review. Include all construction Bid packaging and Phasing. Determine the amount and adequacy of any construction contingency. Upon submittal of the 90 percent complete final design documents, confirm an accurate itemized construction cost estimate in writing to the Department. Confirm that the total Project construction cost is predicted to be within the Project Budget.
Notify the Department in writing if it becomes evident during the final design phase that the Project cannot be constructed within the Professional’s estimated construction Budget. Unless the Department determines the problem to be outside the control or responsibility of the Professional, the Professional shall revise their final design drawings and specifications to produce a complete design for the Project within the Professional’s original estimated construction Budget cost, and will otherwise be responsible for any costs incurred by the Department in rebidding the Project.
Assist the Department to rebid the Project in accordance with the Task 516 construction bidding/contracting procedures.
Task 514 CONSTRUCTION SCHEDULE: Determine the appropriate proposed construction schedule to be part of the Construction
Contract. Give consideration to all principal influencing factors, including, but not limited to, current and projected material delivery times, local labor contract periods, and other historical principal causes of delays.
Task 515 FINAL DESIGN BIDDING DOCUMENTS REVIEW: Provide complete final design documents review. When the final design is 50 percent complete, submit the final design documents to the Project team for their review. If the final design appears to exceed the
Project Budget, review with the Department all cost reduction design options. Incorporate at 90 percent completion, all required design modifications applicable to the Project, and resubmit to the Project Director. Confirm in writing that the requirements of
Tasks 509 and 510 have been met.
-7-
Submit 100 percent complete sets of Bidding Documents to the Project Team for their final review. Submit final design documents first to the State/Client Agency for their final design review of the programmatic design conformance. Submit Bidding Documents to the Department for their review and revise as necessary to incorporate all review comments required for Department written acceptance of the Bidding Documents.
Task 516 CONSTRUCTION BIDDING AND CONTRACTING: Assist the Department in the construction bidding and contracting process.
The State of Michigan will advertise for bids on-line and award and hold the Construction Contract. Prepare and distribute
Bidding Documents and instructions as required to accommodate predetermined construction Bid packages and/or Phases.
Maintain a construction Bidders' list. Conduct pre-bid meetings and issue pre-bid meeting minutes and bidder’s lists. Issue
Addenda to all construction Bidders as required. Include in each Addendum complete specifications for the Project, if such specifications are not part of the Bidding Documents.
The Professional will be compensated by the Department with a Contract Change Order for providing the professional services necessary to rebid the Project for reason of defaulted or disqualified construction Bidder(s) or unacceptable price range as required by the design and construction Budget text of Task 513. The Professional’s construction bidding and contracting procedure services for Task 516 are not complete until: (1) The lowest responsive, responsible qualified construction Bidder’s Bid has been selected and accepted by the Department; and (2) The lowest responsive, responsible qualified construction Bidder's
Construction Contract has been executed.
Construction Bid Evaluation and Recommendation of Construction Contract Awards: Review and evaluate the submitted construction Bids. Provide the Department with a written recommendation for the apparent lowest responsive, responsible qualified construction Bidder for the Project Construction Contract award(s) within five (5) business days of the date of the
Department’s construction Bid opening. Exempt from recommendation any firm that in the Professional’s opinion is unqualified for the Project (documentation required) or that the Professional has a business association with on this Project, and any firm, that the Professional has used in preparation of the Contract Documents or for any estimating work related to the Project.
The Professional shall conduct pre-contract meetings with responsive, responsible qualified construction Bidder(s) to review the following items: (1) Understanding of the design intent of the Contract Documents; and (2) To advise and assist the Construction
Contractor(s) in understanding the requirements of the Department’s standard form of Construction Contract Documents, Project scope of work, and its Construction Contract award procedures.
Unless otherwise designated in the Department’s Notice of Intent to Award letter to the recommended Construction Contractor, within fifteen (15) calendar days from the date that the Notice of Intent to Award letter was mailed to the Construction Contractor, the Construction Contractor recommended for the award of the Construction Contract shall (a) Fill out and execute the
Department’s, MICHSPEC 2001 Edition of the Owner and Contractor Standard Construction Contract and General Conditions for
Construction (Long Form)” standard form documents Section 00500, Contract Agreement and the Section 00800, Supplementary
Conditions, in triplicate; (b) Execute Section 00610, Performance Bond, and the Section 00620, Payment Bond (and attach to each bond a separate, certified copy of Power of Attorney); and (c) Return to the Department, the Construction Contractor’s executed Section 00500, Contract Agreement, Section 00610, Performance Bond, and Section 00620, Payment Bond forms, evidence of Certificates of Insurance and any other legal documents required for submittal by the Department’s, Notice of Intent to Award letter.
Task 517 FINAL DESIGN CORRECTION PROCEDURES: Correct at no additional cost to the Department any design errors or omissions and/or other Project related deficiencies identified during the 600 and 700 Construction Phase. All reproduction costs for design interpretations, clarifications, and Bulletins related to the Professional’s final design errors or omissions and similar or avoidable costs shall be accounted as part of the Professional’s calculated hourly billing rates. Provide design clarifications and interpretations of the Contract Documents requirements necessary to: (1) Adequately describe the Project work; (2) Adapt architectural and/or engineering final design documents during construction to accommodate field conditions identified during construction; (3) Refine design details that are not feasible and identified during construction; and (4) Comply with current construction/building codes, and all other Project related design and construction matters as may be necessary to produce a complete Project.
Design Interpretations and Clarifications: For elements of construction having no change in cost to the State the Professional will:
(1) Provide instructions, and/or design interpretations and clarifications for design details within five (5) business days of the
Construction Contractor's request, record same, in writing; and (2) Revise the Professional’s original final design architectural and/or engineering drawings and specifications as appropriate to the Project. Marking and initialing of drawings is not an acceptable form of written instruction.
-8-
Bulletin Authorization: Request authorization from the Project Director to issue each individual Bulletin. The Professional’s
Bulletin Authorization request will: (1) Identify the problem requiring the change; (2) Describe clearly if such problem arises from the architectural and/or engineering final design errors or omissions; (3) Identify the anticipated design cost and the estimated construction cost to implement the change(s); and (4) Describe clearly in the Professional’s opinion which part, if any, of the design and/or construction costs are the obligation of the State, the Professional or the Construction Contractor. Include a
Contract Modification request for any work outside the Project. Identify any anticipated Project design or construction schedule implications.
Bulletins: All reproduction costs for design interpretations and clarifications and Bulletins related to the Professional’s architectural and/or engineering final design errors or omissions and similar or avoidable costs shall be accounted as part of the
Professional’s calculated hourly billing rates. Describe, by Bulletin, design revisions necessary to correct the architectural and/or engineering final design errors or omissions, to address previously unidentified on-site field design conditions, to reduce costs and for all other matters approved by the Department involving costs or credit to the State. Postponement of action on items in order to accumulate multi-item Bulletins is not permitted.
Prepare and issue Bulletins within ten (10) business days of receipt of the Department's authorization. Bulletins shall be in such form and detail as the Department may prescribe. The Professional shall incorporate all accepted Bulletin revisions or design interpretations into the appropriate originals of all applicable Contract Documents. Such revised drawings and specifications shall be issued as part of Bulletins. Each Bulletin shall prescribe a time schedule for the Construction Contractor's response. Provide up to five (5) copies of each Bulletin to the Department and distribute as the Department may direct.
Provide the Construction Contractor with the following number of Bulletin copies: (1) For construction costs less than one (1) million dollars, provide two (2) copies; and (2) All others, provide five (5) copies.
Evaluate the Construction Contractor's price quotation(s) and review and attempt to negotiate with the Construction Contractor to provide the Department with costs that are consistent with the value of the Project Bulletin(s). Recommend appropriate action to the Department regarding the Construction Contractor's quotations within five (5) business days of receipt thereof.
PHASE 600 - CONSTRUCTION ADMINISTRATION - OFFICE SERVICES
During the construction Phase of this Project, the “DMB-460, Project Procedures” documents package shall be used by the Professional in the administration of this Contract.
The Professional shall use the “DMB-452, The Professional’s Inspection Record” for all on-site Inspection visits to the Project site. The form shall be completed and signed by the Professional and compiled monthly with the original form document sent to the Department’s, Project Director and a copy sent to the Construction Contractor. The on-site Inspection record standard document form shall be completed and accompany the
Professional’s monthly payment request.
The Professional shall provide all required construction administration services and timely professional and administrative initiatives as the circumstances of the Project construction may require in order to allow the design intent requirements of the Professional’s Contract Documents to be successfully implemented into a completed Project through the Construction Contractor’s completion of the Construction Contract work.
In observed cases which may involve danger to human life, immediate safety hazards to personnel, existing or impending damage to the Project, to
State/Client Agency property or to other property; as may be impacted by the Project, the Professional shall inform the Construction Contractor(s) of the situation and their observations. The Professional shall immediately record and report such situations to the Department and certify any accrued
Project costs in writing.
The Professional shall have access to the Construction Contractor(s) work at all times.
Establish and maintain effective construction administration office procedures, systems and records to progressively, and exclusively, manage and control the Professional’s obligations, commitments, achievements, and expenditures under this construction Phase administration.
Monitor the quality and progress of the Project construction Phase work. Maintain all necessary Project records, provide on-site visitation reports, and provide all administrative office action as may be necessary to inform the Construction Contractor(s), in writing, with respect to their compliance with the design intent of the Contract Documents.
Advise and assist the Department in taking all practical steps necessary to address and complete the Project in the event of performance delays or defaults by the Construction Contractor(s).
Task 601 COORDINATION: Coordinate the Professional’s staff, Consultants, and all other Project related resources.
-9-
Preside at all Project related meetings and prepare and distribute minutes of all meetings, reports of on-site visitations, correspondence, memoranda, telephone, and other conversations or communications. Where essential or significant information is established or evaluated and/or critical decisions are made, whether in meetings, conversation or email correspondence, include that information or decisions in formal project correspondence and distribute copies to the Project Team within two (2) business days of the date of occurrence, or include such information and decisions in the immediately subsequent project meeting minutes. Meeting minutes shall be distributed within five (5) business days of the meeting.
Task 602 SHOP DRAWINGS, SUBMITTALS, and APPROVALS: Monitor, evaluate, and provide administrative action as necessary to achieve timely processing of shop drawings and such other submittals and approvals that are the responsibility of the
Professional. Maintain a record of all required, received, rejected, and approved submittals of shop drawings, color/material samples, finishes, and other items requiring the Professional’s approval. Notify the Construction Contractor(s), in writing, (copy to the Department) of delinquent submittals, the consequences of such delays, and prescribe a time schedule for their submittal/resubmittal, which will not jeopardize the Construction Contract completion date.
No design revisions will be made as part of the Professional’s review and approval of shop drawings, or other submittals. In addition to all other functions, the Professional’s approval of shop drawings shall verify the submittals furnished by the
Construction Contractor(s) conforms to the design intent of the Professional’s Contract Documents/architectural and/or engineering drawings and specifications requirements. Provide written approval or rejection of shop drawings within ten (10) business days of receipt in the Professional’s office. Provide and distribute up to five (5) copies of approved submittals as directed by the Department.
Task 603 PAYMENT PROCEDURES: Monitor, evaluate, and provide timely administrative action, as necessary, to certify or reject, as appropriate, and process the Construction Contractor's schedule of costs and monthly submitted payment requests.
Payment by the State of Michigan to the Construction Contractor shall be based on the Construction Contractor’s approved completion of Contract work performed prior to the date of each monthly submitted payment request. Payment to the
Construction Contractor for each monthly submitted payment request invoice shall be made to the Construction Contractor within thirty (30) consecutive calendar days following the Department’s receipt and approval of an approved payment request invoice from the Professional. Certification or rejection of all submitted payment requests will be made by the Professional, in writing, within ten (10) business days of receipt in the Professional’s office. The Professional shall certify to the Department, in writing, the dollar amount the Professional determines to be due to the Construction Contractor for their monthly submitted payment request or the Professional shall return the payment request to the Construction Contractor indicating the specific reasons in writing for rejecting the Construction Contractor’s monthly submitted payment request certification.
Issue an appropriate certificate for payment only pursuant to a correctly prepared and accurate payment request and only for acceptable Project work. Payment certification shall constitute a written representation by the Professional, to the Department, that based on their Construction Administration on-site field Inspections, and the Professional's evaluations of field reports, test results, and other appropriate and available factors, the quantity and quality of Project work for which the payment request is certified has been accomplished by the Construction Contractor in accordance with the design intent of the - Contract Documents and that the payment request is consistent with the quantity and quality of acceptable Project work in place, and that the acceptable materials are properly stored on-site and/or off-site.
No payment request certificate shall be submitted that requests payment for disputed Project work or any Project work showing deficient test results. No payment request certificate may be submitted after the Construction Contract completion date which does not provide for withholding of assessable and/or projected liquidated damages. Pursuant to the Department's notification, the Professional’s certification shall reduce from the amount earned, two (2) times the amount of any current prevailing wage rate payment deficiency, as certified by the Department of Licensing and Regulatory Affairs, Wage and Hour Division against the
Construction Contractor or any subcontractor or supplier thereof. Payment request rejections shall be accompanied with a written explanation and a copy shall be submitted to the Project Director and Department Field Representative.
Task 604 CONSTRUCTION SCHEDULE PROGRESS: Monitor, evaluate, and provide timely administrative action, as necessary, to determine whether the Construction Contractor's construction work schedule and progress appear to be adequate to achieve the
Project on time and on schedule. Notify the Department, in writing, within three (3) business days of receipt of the Construction
Contractor's proposed Project construction schedule, or amendments thereto, if in the Professional’s opinion such construction schedule will produce the Project within the allotted Construction Contract completion time. Notify the Construction Contractor and the Department, in writing, if in the Professional’s opinion such schedule should be accepted or rejected. Revise the construction schedule of Task 514 to show that the proposed on-site visitations of Tasks 703-706 are consistent with the actual events of the Project construction schedule.
-10-
Give prompt, written notification to the Construction Contractor(s) and to the Department of inadequate construction schedule progress. Unless the Department determines that the needs of the Project require other action the Professional shall proceed as follows: (1) Investigate at the time of occurrence, any areas of inadequate progress whose consequence may be a delay in, or increased cost for, a work item; (2) Notify the Construction Contractor(s) and the Department of the Professional’s opinion of the problem and responsibility for the delay and costs. Advise whether the delay in any work may result in delays in the Construction
Contract completion date; and (3) Advise the Construction Contractor(s) and the Department, in writing, of recommended action(s) by respective parties necessary to facilitate actions by the Construction Contractor to complete the Project construction on schedule.
Bulletin Costs: During the 600 and 700 Construction Phase, review and evaluate the Construction Contractor's quotations for
Bulletin work. Negotiate as appropriate to assure the Department's costs commensurate with the actual value of the Project work. Provide the Department with written recommendation(s) within five (5) business days of receipt of the quotation.
Evaluate any documentable impact on the Project construction schedule claimed by the Construction Contractor(s) arising from
Bulletin work. Provide appropriate and timely action under terms allowable under the Construction Contract, to implement any
Bulletin work which the Professional and the Department consider critical to the Project construction schedule, but whose cost is disputed.
Within ten (10) business days of its receipt, evaluate and provide the Department with appropriate written recommendations, along with an analysis of any request by the Construction Contractor(s) for a time extension of their Construction Contract completion date. No recommendation for a Construction Contract time extension may be submitted to the Department which is not substantiated by the Professional’s technical review and evaluation of the Project construction schedule showing critical path work, noncritical path work, and float time for the complete Project and any work at issue and having such detail as to clearly…