467011 Regrade Gravel Unpave ORG lot Drawings.pdf

PDF 3 MB Posted

Attached to
Regrading & Graveling of Unpaved ORG Lots-Mitchell Complex
Solicitation number
25IFB12975
Issued by
Day County, South Dakota

About this file

This is a set of engineering drawings and specifications prepared by SPN & Associates for the South Dakota Army National Guard's CFMO #467011 project to regrade and regravel unpaved organizational (ORG) lots at the Mitchell Complex in Mitchell, South Dakota. The project involves regrading and regraveling work on unpaved lots, including installation of concrete valley gutters, erosion control measures, silt fencing, straw wattles, and a cantilevered sliding gate. The drawings include detailed site plans, grading plans, and construction details for both north and south lots at the facility, with specific requirements for crushed concrete, salvaged gravel surfacing, and proper drainage.

The drawings provide comprehensive technical specifications including typical gravel surfacing sections, fence and gate details, erosion control measures, and a Storm Water Pollution Prevention Plan (SWPPP). Key quantities include 3" crushed concrete surfacing, 3" salvaged gravel, concrete valley gutters, chain link fencing, and various erosion control measures. The project requires coordination with existing site infrastructure including sanitary sewer lines, water lines, and other utilities. The drawings are certified by a Professional Engineer registered in South Dakota and include revisions dated 1/10/20.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDUSTRIAL ROAD

AIRPORT INDUSTRIAL

TO

W

ER

R O

AD

AI

R

PO

R

T R

O

AD

FI

AL

A R

O

AD

NO

RTH HARM

O

N DRIVE

N O

R

TH

H

AR

M O

N D

R

IVE

AIRPORT ROAD

NATIONAL GUARD ROADNATIONAL GUARD ROAD

LAKE MITCHELL

O H

LM

AN

ST

R

EE

T

HENDRICKSON

SD ARMY

NATIONAL

GUARD

Mitchell, South Dakota 57301-0398 Phone: (605) 996-7761 - Fax: (605) 996-0015

2100 North Sanborn Boulevard - P.O. Box 398

Engineers - Planners - Surveyors

& Associates

SPN

CFMO #467011

REGRADING AND

REGRAVELING OF

UNPAVED ORG LOTS

MITCHELL COMPLEX

Mitchell, South Dakota

Cover

VICINITY MAP

LOCATION MAP

REGRADING AND GRAVELING

CFMO #467011

MITCHELL COMPLEX

OF UNPAVED ORG LOTS

INDEX OF SHEETSLEGEND

AutoCAD SHX Text Total Sheets:

AutoCAD SHX Text Sheet Name:

AutoCAD SHX Text Sheet Number:

AutoCAD SHX Text Located in:

AutoCAD SHX Text Plan Horiz. Scale:

AutoCAD SHX Text Drawn By:

AutoCAD SHX Text Checked By:

AutoCAD SHX Text Date:

AutoCAD SHX Text Project No.:

AutoCAD SHX Text File Name:

AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.

AutoCAD SHX Text Certificate

AutoCAD SHX Text Revisions

AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.

AutoCAD SHX Text 1/10/25

AutoCAD SHX Text #16402 - SD Dept of Military National Guard

AutoCAD SHX Text 16402

AutoCAD SHX Text 01/10/2025

AutoCAD SHX Text

JPM

AutoCAD SHX Text

NJZ

AutoCAD SHX Text None

AutoCAD SHX Text

BROWN

AutoCAD SHX Text

MARSHALL

AutoCAD SHX Text

ROBERTS

AutoCAD SHX Text

DAY

AutoCAD SHX Text

SPINK

AutoCAD SHX Text

GRANT

AutoCAD SHX Text

CLARK

AutoCAD SHX Text

CODINGTON

AutoCAD SHX Text

CORSON

AutoCAD SHX Text

ZIEBACH

AutoCAD SHX Text

DEWEY

AutoCAD SHX Text

POTTER

AutoCAD SHX Text

CAMPBELL

AutoCAD SHX Text

WALLWORTH

AutoCAD SHX Text

FAULK

AutoCAD SHX Text McPHERSON

AutoCAD SHX Text

EDMUNDS

AutoCAD SHX Text

JERAULD

AutoCAD SHX Text

SANBORN

AutoCAD SHX Text

MINER

AutoCAD SHX Text

LAKE

AutoCAD SHX Text

MOODY

AutoCAD SHX Text

AURORA

AutoCAD SHX Text

DAVISON

AutoCAD SHX Text

HANSON

AutoCAD SHX Text McCOOK

AutoCAD SHX Text

MINNEHAHA

AutoCAD SHX Text

DEUEL

AutoCAD SHX Text

HAMLIN

AutoCAD SHX Text

BEADLE

AutoCAD SHX Text

KINGSBURY

AutoCAD SHX Text

BROOKINGS

AutoCAD SHX Text

JACKSON

AutoCAD SHX Text

MELLETTE

AutoCAD SHX Text

JONES

AutoCAD SHX Text

LYMAN

AutoCAD SHX Text

HAAKON

AutoCAD SHX Text

STANELY

AutoCAD SHX Text

SULLY

AutoCAD SHX Text

HUGHES

AutoCAD SHX Text

BUFFALO

AutoCAD SHX Text

HYDE

AutoCAD SHX Text

BRULE

AutoCAD SHX Text

HAND

AutoCAD SHX Text

HARDING

AutoCAD SHX Text

PERKINS

AutoCAD SHX Text

BUTTE

AutoCAD SHX Text

PENNINGTON

AutoCAD SHX Text

CUSTER

AutoCAD SHX Text

LAWRENCE

AutoCAD SHX Text

MEADE

AutoCAD SHX Text

CHARLES

AutoCAD SHX Text

MIX

AutoCAD SHX Text

DOUGLAS

AutoCAD SHX Text

HUTCHINSON

AutoCAD SHX Text

TURNER

AutoCAD SHX Text

LINCOLN

AutoCAD SHX Text

BON HOMME

AutoCAD SHX Text

YANKTON

AutoCAD SHX Text

CLAY

AutoCAD SHX Text

UNION

AutoCAD SHX Text

BENNETT

AutoCAD SHX Text

TODD

AutoCAD SHX Text

TRIPP

AutoCAD SHX Text

GREGORY

AutoCAD SHX Text

PROJECT

AutoCAD SHX Text 1 Cover Sheet Cover Sheet 2 Existing Layout Existing Layout 3-4 Site Plan Site Plan 5-6 Grading Grading 7-13 Details Details 14-16 SWPPPSWPPP

AutoCAD SHX Text

FALL RIVER

AutoCAD SHX Text W

AutoCAD SHX Text = Existing Fire Hydrant

AutoCAD SHX Text = Existing Light Pole

AutoCAD SHX Text = Existing Sign

AutoCAD SHX Text = Existing Chain Linked Fence

AutoCAD SHX Text

MITCHELL

AutoCAD SHX Text

OGLALA LAKOTA

AutoCAD SHX Text = Existing Valve

AutoCAD SHX Text = Existing Power Pole

AutoCAD SHX Text = Existing Water Line

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text = Existing Sanitary Sewer Manhole

AutoCAD SHX Text G

AutoCAD SHX Text = Existing Gas Meter

AutoCAD SHX Text = Existing Guy Wire

AutoCAD SHX Text = Existing Tree

AutoCAD SHX Text = Existing Fiber Optic Line

AutoCAD SHX Text = Existing Overhead Electric Line

AutoCAD SHX Text = Existing Sanitary Sewer Line

AutoCAD SHX Text = Existing Contour

AutoCAD SHX Text = Proposed Contour

AutoCAD SHX Text

PROJECT LOCATION

AutoCAD SHX Text Project Name:

Mitchell, South Dakota 57301-0398 Phone: (605) 996-7761 - Fax: (605) 996-0015

2100 North Sanborn Boulevard - P.O. Box 398

Engineers - Planners - Surveyors

& Associates

SPN

Mitchell, South Dakota

Existing Layout

CFMO #467011

REGRADING AND

REGRAVELING OF

UNPAVED ORG LOTS

MITCHELL COMPLEX

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text M

AutoCAD SHX Text

CM

AutoCAD SHX Text

GV

AutoCAD SHX Text G

AutoCAD SHX Text

GV

AutoCAD SHX Text

CM

AutoCAD SHX Text T

AutoCAD SHX Text Gas Valve w/ Bollards

AutoCAD SHX Text Asphalt Surface

AutoCAD SHX Text Asphalt Surface

AutoCAD SHX Text Asphalt Surface

AutoCAD SHX Text Concrete Surface

AutoCAD SHX Text Bollard

AutoCAD SHX Text Gravel Surface

AutoCAD SHX Text Asphalt Surface

AutoCAD SHX Text Gate

AutoCAD SHX Text Gate

AutoCAD SHX Text Gate

AutoCAD SHX Text Gate

AutoCAD SHX Text Gate

AutoCAD SHX Text Gate

AutoCAD SHX Text Gate

AutoCAD SHX Text Gate

AutoCAD SHX Text Gravel Surface

AutoCAD SHX Text Gravel Surface

AutoCAD SHX Text Asphalt Surface

AutoCAD SHX Text 18" Dia.

AutoCAD SHX Text 18" Dia.

AutoCAD SHX Text 18" Dia.

AutoCAD SHX Text 18" Dia.

AutoCAD SHX Text 24" Dia.

AutoCAD SHX Text 24" Dia.

AutoCAD SHX Text 3" Dia.

AutoCAD SHX Text 3" Dia.

AutoCAD SHX Text 36" Dia.

AutoCAD SHX Text Gas Valve w/ Bollards

AutoCAD SHX Text 6" Dia.

AutoCAD SHX Text Gravel Surface

AutoCAD SHX Text Gravel Surface

AutoCAD SHX Text Gravel Surface

AutoCAD SHX Text Gravel Surface

AutoCAD SHX Text Dirt Surface

AutoCAD SHX Text Existing Sanitary Manhole Rim Elev. = 1293.65 W Inv. = 1278.85 (8" PVC) S Inv. = 1278.75 (8" PVC)

AutoCAD SHX Text Existing Sanitary Manhole (Oil Water Separation Unit) Rim Elev. = 1297.15 E Inv. = 1289.85 (6" PVC) W Inv. = 1290.45 (6" PVC)

AutoCAD SHX Text 10" AC Water Main

AutoCAD SHX Text 8" PVC Water Main

AutoCAD SHX Text Communication Manhole

AutoCAD SHX Text Utility Shed

AutoCAD SHX Text Valve Unit

AutoCAD SHX Text Hatch Opening

AutoCAD SHX Text Existing Sanitary Manhole Rim Elev. = 1297.26 E Inv. = 1289.76 (6" PVC) S Inv. = 1289.66 (8" PVC)

AutoCAD SHX Text Inlet Grate Rim Elev. = 1297.80 Inv. = 1292.70

AutoCAD SHX Text 12" PVC Water Main

AutoCAD SHX Text Existing 18" RCP Culvert E Inv. = 1296.62 (Flared End) W Inv. = 1296.44 (Flared End)

AutoCAD SHX Text Communication Manhole

AutoCAD SHX Text Oil Water Separation Unit

AutoCAD SHX Text 8" PVC Sanitary Sewer

AutoCAD SHX Text 8" PVC Sanitary Sewer

AutoCAD SHX Text 8" PVC Water Main

AutoCAD SHX Text National Guard Road

AutoCAD SHX Text South Dakota Army National Guard Armory

AutoCAD SHX Text Airport Road

AutoCAD SHX Text Fiala Road

AutoCAD SHX Text 8" PVC Sanitary Sewer

AutoCAD SHX Text Existing Sanitary Manhole Rim Elev. = 1296.28 W Inv. = 1280.63 (8" PVC) E Inv. = 1280.43 (8" PVC)

AutoCAD SHX Text Existing Sanitary Manhole Rim Elev. = 1297.34 N Inv. = 1289.09 (4" VCP) NE Inv. = 1288.46 (8" VCP) SE Inv. = 1289.13 (6" VCP) S Inv. = 1288.51 (6" VCP) SW Inv. = 1288.79 (6" VCP) NW Inv. = 1288.93 (6" VCP)

AutoCAD SHX Text Meter Pit

AutoCAD SHX Text Valve Unit

AutoCAD SHX Text Inlet Grate Rim Elev. = 1297.80 Inv. = 1292.29

AutoCAD SHX Text Gravel Surface

AutoCAD SHX Text 6" PVC Water Main

AutoCAD SHX Text Existing Sanitary Manhole Rim Elev. = 1296.57 N Inv. = 1287.82 (8" PVC) -Inside Drop W Inv. = 1290.57 (3" PVC FM) -Inside Drop E Inv. = 1281.77 (8" PVC)

AutoCAD SHX Text Existing Sanitary Manhole (Oil Water Separation Unit) Rim Elev. = 1297.13 E Inv. = 1291.43 (8" PVC) W Inv. = 1289.83 (6" PVC)

AutoCAD SHX Text Approximate Water Service Location (Not Field Located)

AutoCAD SHX Text Cold Storage

AutoCAD SHX Text Shed

AutoCAD SHX Text Asphalt Surface

AutoCAD SHX Text 8" VCP Sanitary Sewer

AutoCAD SHX Text Cold Storage

AutoCAD SHX Text Total Sheets:

AutoCAD SHX Text Sheet Name:

AutoCAD SHX Text Sheet Number:

AutoCAD SHX Text Located in:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Plan Horiz. Scale:

AutoCAD SHX Text Drawn By:

AutoCAD SHX Text Checked By:

AutoCAD SHX Text Date:

AutoCAD SHX Text Project No.:

AutoCAD SHX Text File Name:

AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.

AutoCAD SHX Text Certificate

AutoCAD SHX Text 01/10/2025

AutoCAD SHX Text

JPM

AutoCAD SHX Text

NJZ

AutoCAD SHX Text 1" = 100'

AutoCAD SHX Text #16402 - SD Dept of Military National Guard

AutoCAD SHX Text 16402

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Top Nut Fire Hydrant Elev. = 1299.82 5/8" Rebar w/ Cap Elev. = 1293.00 5/8" Rebar w/Cap Elev. = 1293.89 Top Nut Fire Hydrant Elev. = 1299.41 5/8" Rebar w/Cap Elev. = 1295.66 5/8" Rebar w/Cap Elev. = 1297.06

AutoCAD SHX Text

BENCHMARK LEGEND

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Revisions

AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.

1/10/25

Phone: (605) 996-7761 - Fax: (605) 996-0015

2100 North Sanborn Boulevard - P.O. Box 398

Engineers - Planners - Surveyors

& Associates

SPN

Mitchell, South Dakota

Site Plan North Lot

CFMO #467011

REGRADING AND

REGRAVELING OF

UNPAVED ORG LOTS

MITCHELL COMPLEX

Plan Quantities

AutoCAD SHX Text G

AutoCAD SHX Text Cold Storage

AutoCAD SHX Text Cold Storage

AutoCAD SHX Text South Dakota Army National Guard Armory

AutoCAD SHX Text 8" Concrete Valley Gutter w/ 6" Granular Base 327 SY

AutoCAD SHX Text Grading: Cut = 122 CY Fill = 307 CY Assumed 3" Salvaged Gravel: 577 CY 3" Crushed Concrete: 577 CY Concrete Sections: 129 CY Unclassified Excavation = 521 CY

AutoCAD SHX Text Seed, Fertilize, & Mulch 563 SY

AutoCAD SHX Text Silt Fence 40 LF

AutoCAD SHX Text 3" Crushed Concrete 3" Salvaged Gravel 2733 SY

AutoCAD SHX Text 3" Crushed Concrete 3" Salvaged Gravel 4189 SY

AutoCAD SHX Text 282.30'

AutoCAD SHX Text 31.33'

AutoCAD SHX Text 144.49'

AutoCAD SHX Text 47.08'

AutoCAD SHX Text Straw Wattle 20 LF

AutoCAD SHX Text 12.17'

AutoCAD SHX Text 5.00'

AutoCAD SHX Text 75.92'

AutoCAD SHX Text 8.00'

AutoCAD SHX Text 8" Concrete Surfacing w/ 6" Granular Base 5 SY

AutoCAD SHX Text 204.79'

AutoCAD SHX Text 20.00'

AutoCAD SHX Text Straw Wattle 20 LF

AutoCAD SHX Text Remove, Salvage, & Reset Fence 20 LF

AutoCAD SHX Text 286.48'

AutoCAD SHX Text 80.56'

AutoCAD SHX Text Shed

AutoCAD SHX Text Construction area shall be secured when construction work is not taking place on site. All Access points shall be fenced off to prevent unauthorized entry.

AutoCAD SHX Text 6" Barrier Curb 20 LF

AutoCAD SHX Text Temporary Security Fence 45 LF

AutoCAD SHX Text Total Sheets:

AutoCAD SHX Text Sheet Name:

AutoCAD SHX Text Sheet Number:

AutoCAD SHX Text Located in:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Plan Horiz. Scale:

AutoCAD SHX Text Drawn By:

AutoCAD SHX Text Checked By:

AutoCAD SHX Text Date:

AutoCAD SHX Text Project No.:

AutoCAD SHX Text File Name:

AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.

AutoCAD SHX Text Certificate

AutoCAD SHX Text 01/10/2025

AutoCAD SHX Text

JPM

AutoCAD SHX Text

NJZ

AutoCAD SHX Text 1" = 50'

AutoCAD SHX Text #16402 - SD Dept of Military National Guard

AutoCAD SHX Text 16402

AutoCAD SHX Text Revisions

AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.

Phone: (605) 996-7761 - Fax: (605) 996-0015

2100 North Sanborn Boulevard - P.O. Box 398

Engineers - Planners - Surveyors

& Associates

SPN

Mitchell, South Dakota

Grading North Lot

CFMO #467011

REGRADING AND

REGRAVELING OF

UNPAVED ORG LOTS

MITCHELL COMPLEX

AutoCAD SHX Text G

AutoCAD SHX Text

INSET A

AutoCAD SHX Text Total Sheets:

AutoCAD SHX Text Sheet Name:

AutoCAD SHX Text Sheet Number:

AutoCAD SHX Text Located in:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Plan Horiz. Scale:

AutoCAD SHX Text Drawn By:

AutoCAD SHX Text Checked By:

AutoCAD SHX Text Date:

AutoCAD SHX Text Project No.:

AutoCAD SHX Text File Name:

AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.

AutoCAD SHX Text Certificate

AutoCAD SHX Text 16402

AutoCAD SHX Text 01/10/2025

AutoCAD SHX Text

JPM

AutoCAD SHX Text

NJZ

AutoCAD SHX Text 1" = 50'

AutoCAD SHX Text #16402 - SD Dept of Military National Guard

AutoCAD SHX Text INSET A Scale: 1" = 20'

AutoCAD SHX Text Cold Storage

AutoCAD SHX Text Cold Storage

AutoCAD SHX Text South Dakota Army National Guard Armory

AutoCAD SHX Text Shed

AutoCAD SHX Text Revisions

AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.

Phone: (605) 996-7761 - Fax: (605) 996-0015

2100 North Sanborn Boulevard - P.O. Box 398

Engineers - Planners - Surveyors

& Associates

SPN

Mitchell, South Dakota

Grading South Lot

CFMO #467011

REGRADING AND

REGRAVELING OF

UNPAVED ORG LOTS

MITCHELL COMPLEX

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

GV

AutoCAD SHX Text G

AutoCAD SHX Text

GV

AutoCAD SHX Text

CM

AutoCAD SHX Text T

AutoCAD SHX Text 8" VCP Sanitary Sewer

AutoCAD SHX Text Total Sheets:

AutoCAD SHX Text Sheet Name:

AutoCAD SHX Text Sheet Number:

AutoCAD SHX Text Located in:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Plan Horiz. Scale:

AutoCAD SHX Text Drawn By:

AutoCAD SHX Text Checked By:

AutoCAD SHX Text Date:

AutoCAD SHX Text Project No.:

AutoCAD SHX Text File Name:

AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.

AutoCAD SHX Text Certificate

AutoCAD SHX Text 16402

AutoCAD SHX Text 01/10/2025

AutoCAD SHX Text

JPM

AutoCAD SHX Text

NJZ

AutoCAD SHX Text 1" = 60'

AutoCAD SHX Text #16402 - SD Dept of Military National Guard

AutoCAD SHX Text Cold Storage

AutoCAD SHX Text South Dakota Army National Guard Armory

AutoCAD SHX Text Revisions

AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.

Phone: (605) 996-7761 - Fax: (605) 996-0015

2100 North Sanborn Boulevard - P.O. Box 398

Engineers - Planners - Surveyors

& Associates

SPN

Mitchell, South Dakota

Details

CFMO #467011

REGRADING AND

REGRAVELING OF

UNPAVED ORG LOTS

MITCHELL COMPLEX

AutoCAD SHX Text

TYPICAL GRAVEL SURFACING SECTION

AutoCAD SHX Text 3" Crushed Concrete

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text 3" Salvaged Gravel Surfacing

AutoCAD SHX Text Contractor Furnished Fill

AutoCAD SHX Text Total Sheets:

AutoCAD SHX Text Sheet Name:

AutoCAD SHX Text Sheet Number:

AutoCAD SHX Text Located in:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Plan Horiz. Scale:

AutoCAD SHX Text Drawn By:

AutoCAD SHX Text Checked By:

AutoCAD SHX Text Date:

AutoCAD SHX Text Project No.:

AutoCAD SHX Text File Name:

AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.

AutoCAD SHX Text Certificate

AutoCAD SHX Text 16402

AutoCAD SHX Text 01/10/2025

AutoCAD SHX Text

JPM

AutoCAD SHX Text

NJZ

AutoCAD SHX Text None

AutoCAD SHX Text #16402 - SD Dept of Military National Guard

AutoCAD SHX Text Nine (9) #4 Bars @ 10" O.C. Min. 3" cover on sides, Min. 2" cover on bottom.

AutoCAD SHX Text Slope = 1/2" per Ft.

AutoCAD SHX Text Slope = 1/2" per Ft.

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text

SECTION VIEW OF 8" CONCRETE VALLEY GUTTER

AutoCAD SHX Text

(SCALE: NONE)

AutoCAD SHX Text #4 Bars @ 24" O.C. Min. 3" cover on sides, Min. 2" cover on bottom.

AutoCAD SHX Text NOTE: Longitudinal construction joints shall be tied together with No. 5 epoxy coated deformed tie bars spaced at 24" center to center.

AutoCAD SHX Text 8" Scarify and Recompact

AutoCAD SHX Text Varies (10:1 to 20:1)

AutoCAD SHX Text Varies (5:1 Max)

AutoCAD SHX Text

TYPICAL DITCH SECTION

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

FENCE CLEARANCE DETAIL

AutoCAD SHX Text Clearance (2" Maximum)

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

20" DIA. X 3'-6" CONCRETE

AutoCAD SHX Text

ENCASEMENT AND BASE

AutoCAD SHX Text

DOUBLE 1/2" ISOLATION

AutoCAD SHX Text

JOINT FILLER AND 5/8"

AutoCAD SHX Text 36"

AutoCAD SHX Text

DEEP JOINT SEALER

AutoCAD SHX Text

MIN. 1/4" CROWN

AutoCAD SHX Text

TO DRAIN

AutoCAD SHX Text

BOLLARD DETAIL

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

6" STEEL POST FILLED W/ CONCRETE W/ SAFETY YELLOW PLASTIC COVER

AutoCAD SHX Text 4'

AutoCAD SHX Text 1'-4"

AutoCAD SHX Text Revisions

AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.

Phone: (605) 996-7761 - Fax: (605) 996-0015

2100 North Sanborn Boulevard - P.O. Box 398

Engineers - Planners - Surveyors

& Associates

SPN

Mitchell, South Dakota

Details

CFMO #467011

REGRADING AND

REGRAVELING OF

UNPAVED ORG LOTS

MITCHELL COMPLEX

AutoCAD SHX Text Total Sheets:

AutoCAD SHX Text Sheet Name:

AutoCAD SHX Text Sheet Number:

AutoCAD SHX Text Located in:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Plan Horiz. Scale:

AutoCAD SHX Text Drawn By:

AutoCAD SHX Text Checked By:

AutoCAD SHX Text Date:

AutoCAD SHX Text Project No.:

AutoCAD SHX Text File Name:

AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.

AutoCAD SHX Text Certificate

AutoCAD SHX Text 16402

AutoCAD SHX Text 01/10/2025

AutoCAD SHX Text

JPM

AutoCAD SHX Text

NJZ

AutoCAD SHX Text None

AutoCAD SHX Text #16402 - SD Dept of Military National Guard

AutoCAD SHX Text

SILT FENCE CONSTRUCTION

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

AutoCAD SHX Text 3'

AutoCAD SHX Text 2'

AutoCAD SHX Text 6'

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text Flow

AutoCAD SHX Text Flow

AutoCAD SHX Text Flow

AutoCAD SHX Text Flow

AutoCAD SHX Text Flow

AutoCAD SHX Text Wheel Compact Soil

AutoCAD SHX Text Excavate trench

AutoCAD SHX Text

AutoCAD SHX Text Drive wood or metal posts

AutoCAD SHX Text

AutoCAD SHX Text Attach woven wire or other durable material

AutoCAD SHX Text

AutoCAD SHX Text Attach fabric

AutoCAD SHX Text

AutoCAD SHX Text Backfill trench

AutoCAD SHX Text

NOTE:

AutoCAD SHX Text Fabric shall be attached with a total of 4 plastic or wire ties per post.

AutoCAD SHX Text Staple Fabric into Trench at Each Post

AutoCAD SHX Text 3' to 4'

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text Flow

AutoCAD SHX Text 2" to 3"

AutoCAD SHX Text 3" Trench

AutoCAD SHX Text 9" Min.

AutoCAD SHX Text

EROSION CONTROL STRAW WATTLE

AutoCAD SHX Text Straw wattle

AutoCAD SHX Text 1"x2" Wood stake

AutoCAD SHX Text Wood Stake (Typical)

AutoCAD SHX Text Wattle shall be centered about ditch

AutoCAD SHX Text Wood Stake (Typical)

AutoCAD SHX Text Flow

AutoCAD SHX Text

DETAIL A

AutoCAD SHX Text

ELEVATION VIEW

AutoCAD SHX Text

PLAN VIEW

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text Revisions

AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.

Phone: (605) 996-7761 - Fax: (605) 996-0015

2100 North Sanborn Boulevard - P.O. Box 398

Engineers - Planners - Surveyors

& Associates

SPN

Mitchell, South Dakota

Details

CFMO #467011

REGRADING AND

REGRAVELING OF

UNPAVED ORG LOTS

MITCHELL COMPLEX

AutoCAD SHX Text Total Sheets:

AutoCAD SHX Text Sheet Name:

AutoCAD SHX Text Sheet Number:

AutoCAD SHX Text Located in:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Plan Horiz. Scale:

AutoCAD SHX Text Drawn By:

AutoCAD SHX Text Checked By:

AutoCAD SHX Text Date:

AutoCAD SHX Text Project No.:

AutoCAD SHX Text File Name:

AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.

AutoCAD SHX Text Certificate

AutoCAD SHX Text 16402

AutoCAD SHX Text 01/10/2025

AutoCAD SHX Text

JPM

AutoCAD SHX Text

NJZ

AutoCAD SHX Text None

AutoCAD SHX Text #16402 - SD Dept of Military National Guard

AutoCAD SHX Text

POST TOP

AutoCAD SHX Text

FABRIC AREA

AutoCAD SHX Text

L (NOT TO SCALE)

AutoCAD SHX Text

PROVIDE CONCRETE FOOTING (*)

AutoCAD SHX Text

1'-1" [330MM]

AutoCAD SHX Text 6"

AutoCAD SHX Text H

AutoCAD SHX Text 30"

AutoCAD SHX Text

TRUSS ROD

AutoCAD SHX Text

KEEPER

AutoCAD SHX Text

CHAIN LINK FABRIC

AutoCAD SHX Text 12'-0"

AutoCAD SHX Text 7'-0"

AutoCAD SHX Text 30'-0"

AutoCAD SHX Text 42'-3"

AutoCAD SHX Text

4 (FABRIC) / 2 (W/O)

AutoCAD SHX Text

OVERHANG

AutoCAD SHX Text

GUIDE ROLLER ASSEMBLY

AutoCAD SHX Text

CHAIN LINK FABRIC

AutoCAD SHX Text

TENSION ROD

AutoCAD SHX Text

FRAME HT

AutoCAD SHX Text

(OMIT FABRIC)

AutoCAD SHX Text

3" [76MM] NOMINAL

AutoCAD SHX Text

TRUSS ROD

AutoCAD SHX Text

TRACK

AutoCAD SHX Text

TRUCK ASSEMBLY

AutoCAD SHX Text

TENSION ROD

AutoCAD SHX Text 2" x 4" BOTTOM RAIL

AutoCAD SHX Text

(3) STRANDS OF BARBED WIRE, EA CONSISTING OF 2 STRAND LINE WIRE W/ 4 PT BARBS

AutoCAD SHX Text

2" [50MM] SQ UPRIGHT

AutoCAD SHX Text

NOMINAL HEIGHT (H)

AutoCAD SHX Text

OPENING (F/F)

AutoCAD SHX Text

GATE POSTS (G)

AutoCAD SHX Text

LENGTH (L)

AutoCAD SHX Text

BAYS / OVERHANG

AutoCAD SHX Text (*) POST SIZE AND ASSOCIATED FOOTING DIAMETER TO BE DETERMINED BY MANUFACTURER, BASED ON LEAF WEIGHT & DIMENSION. MINIMUM FOOTING DIAMETERS (TO BE FILLED W/4000 PSI CONC): 40" FOR 8" POST; 36" FOR 6" POST; 24" FOR4" POST; OTHER SIZES TO BE DESIGNED BY MFR OR KTR. NO FOOTING WIDTH SHALL BE LESS THAN 4(X) THE POST WIDTH.

AutoCAD SHX Text

2" [50MM] SQ UPRIGHT

AutoCAD SHX Text

2" SQ UPRIGHT

AutoCAD SHX Text

2" [50MM] SQ UPRIGHT

AutoCAD SHX Text

2" [50MM] SQ UPRIGHT

AutoCAD SHX Text

4" [102MM] MIN POST (*) (TYP)

AutoCAD SHX Text

4" MIN POST (*)(TYP)

AutoCAD SHX Text

POST

AutoCAD SHX Text

TOPS

AutoCAD SHX Text

DOMED

AutoCAD SHX Text NOTE: BARBED WIRE NOT SHOWN ON FENCE PORTION FOR CLARITY. SEE SHEET UFC S-701 FOR BARBED WIRE TYPE.

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text Typical Single Cantilevered Sliding Gate Elevation

AutoCAD SHX Text Revisions

AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.

AutoCAD SHX Text 1/10/25

AutoCAD SHX Text 1'-6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 1'-10"

AutoCAD SHX Text 45°0'0"'

AutoCAD SHX Text 1'-0"

AutoCAD SHX Text 1'-0"

AutoCAD SHX Text

LINE POST

AutoCAD SHX Text

CORNER POST

AutoCAD SHX Text

1/4" LARGE FLANGE STRUCTURAL BLIND RIVET (TYP)

AutoCAD SHX Text

LOCK PIN OR Z CUT IN BARBWIRE ARM (TYP)

AutoCAD SHX Text

LOCK PIN OR Z CUT IN BARBWIRE ARM (TYP)

AutoCAD SHX Text

BARBED WIRE STRAND (TYP)

AutoCAD SHX Text

BARBED WIRE STRAND (TYP)

AutoCAD SHX Text

1/4" LARGE FLANGE STRUCTURAL BLIND RIVET (TYP)

AutoCAD SHX Text

SCALE: NONE

Single Extension Arm Details

Phone: (605) 996-7761 - Fax: (605) 996-0015

2100 North Sanborn Boulevard - P.O. Box 398

Engineers - Planners - Surveyors

& Associates

SPN

Mitchell, South Dakota

Details

CFMO #467011

REGRADING AND

REGRAVELING OF

UNPAVED ORG LOTS

MITCHELL COMPLEX

X X X X X X X X X X X X

AutoCAD SHX Text Total Sheets:

AutoCAD SHX Text Sheet Name:

AutoCAD SHX Text Sheet Number:

AutoCAD SHX Text Located in:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Plan Horiz. Scale:

AutoCAD SHX Text Drawn By:

AutoCAD SHX Text Checked By:

AutoCAD SHX Text Date:

AutoCAD SHX Text Project No.:

AutoCAD SHX Text File Name:

AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.

AutoCAD SHX Text Certificate

AutoCAD SHX Text 16402

AutoCAD SHX Text 01/10/2025

AutoCAD SHX Text

JPM

AutoCAD SHX Text

NJZ

AutoCAD SHX Text None

AutoCAD SHX Text #16402 - SD Dept of Military National Guard

AutoCAD SHX Text

POST CAP

AutoCAD SHX Text

TENSION WIRE

AutoCAD SHX Text

BRACE RAILS

AutoCAD SHX Text

3/8" DIA TRUSS ROD

AutoCAD SHX Text

LINE POST

AutoCAD SHX Text

CHAIN LINK FENCE FABRIC

AutoCAD SHX Text

POST CAP

AutoCAD SHX Text

CORNER, END OR PULL POST

AutoCAD SHX Text

FINISHED GRADE

AutoCAD SHX Text 6"

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text

AS REQUIRED

AutoCAD SHX Text

10'-0" MAX SPACING

AutoCAD SHX Text PROVIDE CONCERETE FOOTING. DIAMETER OF FOOTING SHALL BE 4X POST DIAMETER (TYP UON)

AutoCAD SHX Text

TIE WIRES (TYP) ALONG TOP RAILS AND POSTS

AutoCAD SHX Text

TENSION WIRE

AutoCAD SHX Text 2"

AutoCAD SHX Text

6'-0" MINIMUM

AutoCAD SHX Text

TYP UON

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text Typical Fence and Corner Panel Elevation

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text Typical 3 Strand Barbed Wire &

AutoCAD SHX Text Single Extension Arm Configuration

AutoCAD SHX Text Revisions

AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.

Phone: (605) 996-7761 - Fax: (605) 996-0015

2100 North Sanborn Boulevard - P.O. Box 398

Engineers - Planners - Surveyors

& Associates

SPN

Mitchell, South Dakota

Details

CFMO #467011

REGRADING AND

REGRAVELING OF

UNPAVED ORG LOTS

MITCHELL COMPLEX

x xxxxx x x

AutoCAD SHX Text Total Sheets:

AutoCAD SHX Text Sheet Name:

AutoCAD SHX Text Sheet Number:

AutoCAD SHX Text Located in:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Plan Horiz. Scale:

AutoCAD SHX Text Drawn By:

AutoCAD SHX Text Checked By:

AutoCAD SHX Text Date:

AutoCAD SHX Text Project No.:

AutoCAD SHX Text File Name:

AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.

AutoCAD SHX Text Certificate

AutoCAD SHX Text 16402

AutoCAD SHX Text 01/10/2025

AutoCAD SHX Text

JPM

AutoCAD SHX Text

NJZ

AutoCAD SHX Text None

AutoCAD SHX Text #16402 - SD Dept of Military National Guard

AutoCAD SHX Text

BRACE RAILS

AutoCAD SHX Text

3/8" DIA TRUSS ROD

AutoCAD SHX Text

PROVIDE CONCERETE FOOTING. DIAMETER OF FOOTING SHALL BE 4X POST DIAMETER

AutoCAD SHX Text

TIE WIRES (TYP) ALONG TOP RAILS AND POSTS

AutoCAD SHX Text 2"

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text Typical Fence and Braced Panel Elevation

AutoCAD SHX Text

FENCE POST

AutoCAD SHX Text

#8 AWG SOLID COPPER WIRE

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text

ATTACH TO METAL FENCE POST WITH GROUND CLAMP

AutoCAD SHX Text

MOLDED EXOTHERMIC WELD OR APPROVED CLAMP-TYPE FITTING OF BRONZE.

AutoCAD SHX Text

5/8" DIA COPPER-CLAD COPPER-CLAD COPPER-CLAD STEEL GROUND ROD

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text Grounding Detail

AutoCAD SHX Text

OPENING (F/F)

AutoCAD SHX Text

TO OPEN

AutoCAD SHX Text

ONLY

AutoCAD SHX Text 5/8"

AutoCAD SHX Text

LOWER

AutoCAD SHX Text

UPRIGHTS

AutoCAD SHX Text

INTERIOR

AutoCAD SHX Text G

AutoCAD SHX Text

FENCELINE

AutoCAD SHX Text

F/F = INTERIOR FACE TO INTERIOR FACE

AutoCAD SHX Text

OUTSIDE FACE TO OUTSIDE FACE

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text Gate Plan

AutoCAD SHX Text Revisions

AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.

Phone: (605) 996-7761 - Fax: (605) 996-0015

2100 North Sanborn Boulevard - P.O. Box 398

Engineers - Planners - Surveyors

& Associates

SPN

Mitchell, South Dakota

Details

CFMO #467011

REGRADING AND

REGRAVELING OF

UNPAVED ORG LOTS

MITCHELL COMPLEX

AutoCAD SHX Text Total Sheets:

AutoCAD SHX Text Sheet Name:

AutoCAD SHX Text Sheet Number:

AutoCAD SHX Text Located in:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Plan Horiz. Scale:

AutoCAD SHX Text Drawn By:

AutoCAD SHX Text Checked By:

AutoCAD SHX Text Date:

AutoCAD SHX Text Project No.:

AutoCAD SHX Text File Name:

AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.

AutoCAD SHX Text Certificate

AutoCAD SHX Text 16402

AutoCAD SHX Text 01/10/2025

AutoCAD SHX Text

JPM

AutoCAD SHX Text

NJZ

AutoCAD SHX Text None

AutoCAD SHX Text #16402 - SD Dept of Military National Guard

AutoCAD SHX Text

FITTINGS NOTES

AutoCAD SHX Text

1. METRIC DIMENSIONS ARE NOMINAL EQUIVALENTS TO U.S. DIMENSIONS. 2. ALL FITTINGS MATERIAL SHALL BE AS SPECIFIED.

AutoCAD SHX Text

BRACE BAND

AutoCAD SHX Text

ROUND LINE POST

AutoCAD SHX Text

5/16" [8MM] BOLT W/HEX NUT

AutoCAD SHX Text

BRACE OR BOTTOM RAIL

AutoCAD SHX Text

RAIL END W/ OFFSET LUG

AutoCAD SHX Text

ELEVATION - ROUND POST

AutoCAD SHX Text

PLAN - ROUND POST

AutoCAD SHX Text

PLAN - ROUND POST

AutoCAD SHX Text

ELEVATION - ROUND POST

AutoCAD SHX Text 9-GAGE STEEL TIE WIRE (15" O.C. MAX. AND WITHIN 4" FROM TOP AND BOTTOM OF FABRIC)

AutoCAD SHX Text

FENCE FABRIC

AutoCAD SHX Text

9-GAGE STEEL TIE WIRES (2'-0" O.C. MAX.)

AutoCAD SHX Text

ELEVATION TOP OR BRACE RAIL ATTACHMENT

AutoCAD SHX Text

TWIST

AutoCAD SHX Text

SELVAGE

AutoCAD SHX Text T & B

AutoCAD SHX Text

TRUSS ROD

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text Line Post Details

AutoCAD SHX Text

TRACK / RAIL

AutoCAD SHX Text

2" SQ UPRIGHT

AutoCAD SHX Text 2" x 4" RAIL

AutoCAD SHX Text

2" SQ STIFFENER

AutoCAD SHX Text

WELDED JOINT

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text Typical Truck Assembly

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text

OFFSET HINGE ASSEMBLY

AutoCAD SHX Text

STANDARD U-BOLT

AutoCAD SHX Text

RETAINER BOLT

AutoCAD SHX Text

HINGE COLLAR

AutoCAD SHX Text

HINGE BOLT

AutoCAD SHX Text

LATCH

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text Offset Hinge Detail

AutoCAD SHX Text 3/16"

AutoCAD SHX Text

SECURING HOLE FOR LOCK

AutoCAD SHX Text

LATCH ASSEMBLY

AutoCAD SHX Text

LATCH ASSEMBLY

AutoCAD SHX Text

STANDARD U-BOLT

AutoCAD SHX Text

STANDARD U-BOLT

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text Fulcrum Latch Detail

AutoCAD SHX Text & Track Section

AutoCAD SHX Text Revisions

AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.

AutoCAD SHX Text 1/10/25

AutoCAD SHX Text

FABRIC BAND

AutoCAD SHX Text

BRACE OR BOTTOM RAIL

AutoCAD SHX Text

CORNER OR END OR GATE POST

AutoCAD SHX Text

TURNBUCKLE

AutoCAD SHX Text

TENSION BAR

AutoCAD SHX Text

TENSION OR

AutoCAD SHX Text

RAIL END W/ OFFSET LUG

AutoCAD SHX Text

BRACE BAND

AutoCAD SHX Text

BOLT & NUT

AutoCAD SHX Text

BRACE RAIL

AutoCAD SHX Text

TRUSS ROD

AutoCAD SHX Text

ELEVATION

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

SCALE: NONE

Corner or End Posts

Phone: (605) 996-7761 - Fax: (605) 996-0015

2100 North Sanborn Boulevard - P.O. Box 398

Engineers - Planners - Surveyors

& Associates

SPN

Mitchell, South Dakota

Details

CFMO #467011

REGRADING AND

REGRAVELING OF

UNPAVED ORG LOTS

MITCHELL COMPLEX

AutoCAD SHX Text Total Sheets:

AutoCAD SHX Text Sheet Name:

AutoCAD SHX Text Sheet Number:

AutoCAD SHX Text Located in:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Plan Horiz. Scale:

AutoCAD SHX Text Drawn By:

AutoCAD SHX Text Checked By:

AutoCAD SHX Text Date:

AutoCAD SHX Text Project No.:

AutoCAD SHX Text File Name:

AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.

AutoCAD SHX Text Certificate

AutoCAD SHX Text 16402

AutoCAD SHX Text 01/10/2025

AutoCAD SHX Text

JPM

AutoCAD SHX Text

NJZ

AutoCAD SHX Text None

AutoCAD SHX Text #16402 - SD Dept of Military National Guard

AutoCAD SHX Text Revisions

AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.

AutoCAD SHX Text 1/10/25

AutoCAD SHX Text Valley Gutter

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text Barrier Curb for Fence

AutoCAD SHX Text

(SCALE: NONE)

AutoCAD SHX Text Barrier Curb

AutoCAD SHX Text 1'

AutoCAD SHX Text 1'

AutoCAD SHX Text Section View

AutoCAD SHX Text 3D View

AutoCAD SHX Text Fence

AutoCAD SHX Text Valley Gutter

AutoCAD SHX Text Barrier Curb

AutoCAD SHX Text Barrier Curb

AutoCAD SHX Text Valley Gutter

AutoCAD SHX Text Barrier Curb

AutoCAD SHX Text Opening for Drainage

AutoCAD SHX Text Profile View

AutoCAD SHX Text Valley Gutter

AutoCAD SHX Text Fence to be reinstalled on Barrier Curb

Fence

Phone: (605) 996-7761 - Fax: (605) 996-0015

2100 North Sanborn Boulevard - P.O. Box 398

Engineers - Planners - Surveyors

& Associates

SPN

Mitchell, South Dakota

SWPPP

CFMO #467011

REGRADING AND

REGRAVELING OF

UNPAVED ORG LOTS

MITCHELL COMPLEX

WEST HURON

STORM WATER POLLUTION PREVENTION PLAN

(The numbers right of the title headings are reference numbers to the

GENERAL PERMIT FOR STORM WATER DISCHARGES ASSOCIATED WITH

CONSTRUCTION ACTIVITIES)

vSTAFF TRAINING/SWPPP IMPLEMENTATION (5.4 1-2) To promote stormwater management awareness specific for this project, the Contractor's Erosion Control Supervisor should provide correspondence of how the SWPPP will be implemented. The Contractor's Erosion Control Supervisor is responsible for providing this information at the preconstruction meeting, and subsequently completing an attendance log, which should identify site-specific implementation of the SWPPP and the names of the personnel who attended the preconstruction meeting. Documentation of the preconstruction meeting will be filed with the SWPPP documents.

vSITE DESCRIPTION (5.4 3) Ø Project Limits: See Sheet 3 Ø Project Description: See Title Sheet (5.4 3.a) Ø Site Map(s): See Title Sheet and Plans (5.4 4.(a)-(r)) Ø Major Soil Disturbing Activities (check all that apply) Clearing and grubbing Excavation/borrows Grading and shaping Filling Cutting and filling Other (describe):

Ø Total Project Area: 69.79 Ac (5.4 3.b.)

Ø Total Area To Be Disturbed: 7.0 Ac (5.4 3.b) Ø Total Area To Be Disturbed At One Time: 7.0 Ac (5.4 3.c) Ø Existing Vegetation and Percent Vegetation Cover: Ditches, 2% Ø Soil Properties: NA (5.4 3.e) Ø Name of Receiving Water Body/Bodies: Tributary to Lake Mitchell (5.4 3.f) vORDER OF CONSTRUCTION ACTIVITIES (5.4 3.h) Ø The Contractor will enter the Start Dates.

vEROSION AND SEDIMENT CONTROLS (5.4 5.(a)-(f)) Ø Perimeter Controls (See Detail Plan Sheets) (The Contractor will check all that apply and enter Start Dates.)

Ø Structural Erosion and Sediment Controls (The Contractor will check all that apply and enter Start Dates.)

Ø Dust Controls (The Contractor will check all that apply and enter Start Dates.)

Ø Dewatering BMPs (The Contractor will check all that apply and enter Start Dates.)

· Wetland Avoidance Will construction and/or erosion and sediment controls impinge on regulated wetlands? Yes No If yes, the structural and erosion and sediment controls have been included in the total project wetland impacts and have been included in the 404 permit process with USACE.

Ø Storm Water Management (5.4 7.(a)-(c))

Storm water management will be handled by temporary controls outlined above, and permanent controls needed to meet permanent storm water management needs in the post construction period. Permanent controls will be shown on the plans and noted as permanent.

Description Start Date

Install perimeter protection where runoff sheets from site.

Clearing and grubbing.

Remove and store topsoil.

Stabilize disturbed areas.

Install sidewalk and curb and gutter.

Complete final grading and paving.

Reseed areas disturbed by construction activities.

Description Start Date

Temporary or Permanent Seeding

Sodding

Planting

Mulching (Straw or Cellulose Fiber)

Erosion Control Blankets or Mats Vegetation Buffer Strips

Roughened Surface (e.g. tracking)

Hydro Mulch

Soil Stabilizer

Bonded Fiber Matrix

Other:

Description Start Date

Natural Buffers

Silt Fence

Erosion Control Wattles Temporary Berm/Windrow

Floating Silt Curtain

Stabilized Construction Entrances Entrance/Exit Equipment Tire Wash

Other:

Description Start Date

Tarps & Wind impervious fabrics

Watering

Stockpile location/orientation

Dust Control Chlorides

Other:

Description Start Date

Sediment Basins Dewatering Bags

Weir Tanks Temporary Diversion Channel

Other:

Description Start Date

Temporary Sediment Barriers

Erosion Bales Temporary Slope Drain

Turf Reinforcement Mat Riprap

Gabions/Gabion Mattress

Check Rock Dams Sediment Traps/Basins

Culvert Inlet Protection

Transition Mats

Area Drain Inlet Protection

Curb Inlet Protection Interceptor Ditch

Concrete Washout Facility

Work Platform Temporary Water Barrier

Temporary Water Crossing

Permanent Stormwater Ponds Permanent Open Vegetated Swales

Natural Depressions to allow for Infiltration

Sequential Systems (Combined Practices)

Other:

Ø Stabilization Practices (See Detail Plan Sheets) (Stabilization measures shall be initiated as soon as possible, but in no case later than 14 days after the construction activity in that portion of the site has temporarily or permanently ceased. Initiation of final or temporary stabilization may exceed the 14-day limit if earth disturbing activities will be resumed within 21 days.)

(The Contractor will check all that apply and enter Start Dates.)

Ø Other Storm Water Controls (5.4 8.b) Waste Disposal

All liquid waste materials will be collected and stored in sealed metal containers approved by the project engineer. All trash and construction debris from the site will be deposited in the approved containers. Containers will be serviced as necessary, and the trash will be hauled to an approved disposal site or licensed landfill. All onsite personnel will be instructed in the proper procedures for waste disposal, and notices stating proper practices will be posted in the field office. The general contractor's representative responsible for the conduct of work on the site will be responsible for seeing waste disposal procedures are followed.

Hazardous Waste

All hazardous waste materials will be disposed of in a manner specified by local or state regulations or by the manufacturer. Site personnel will be instructed in these practices, and the individual designated as the contractor's on-site representative will be responsible for seeing that these practices are followed.

Sanitary Waste Portable sanitary facilities will be provided on all construction sites. Sanitary waste will be collected from the portable units in a timely manner by a licensed waste management contractor or as required by any local regulations.

vMaintenance and Inspection (3.20 1 and 4.1) Ø Maintenance and Inspection Practices

· Inspections will be conducted at least once every 7 calendar days or every 14 calendar days and within 24 hours of precipitation that exceeds 0.25 inches or snowmelt that generates runoff. You must keep a properly maintained rain gauge on your site.

· All controls will be maintained in good working order. Necessary repairs will be initiated within 24 hours of the site inspection report.

Silt fence will be inspected for depth of sediment and for tears in order to ensure the fabric is securely attached to the posts and that the posts are well anchored.

Sediment buildup will be removed from the silt fence when it reaches 1/3 of the height of the silt fence.

Sediment basins and traps will be checked. Sediment will be removed when the depth reaches approximately 50 percent of the structure's capacity, and at the conclusion of the construction.

All seeded areas will be checked for bare spots, washouts, and vigorous growth free of significant weed infestations.

Inspection and maintenance reports will be prepared for each site inspection, this form will also be used to document changes to the SWPPP. A copy of the completed inspection form will be filed with the SWPPP documents.

The contractor's site superintendent is responsible for inspections. Maintenance, repair activities are the responsibility of the contractor. The Contractor will complete the inspection and maintenance reports and distribute copies to the owner and engineer.

AutoCAD SHX Text Total Sheets:

AutoCAD SHX Text Sheet Name:

AutoCAD SHX Text Sheet Number:

AutoCAD SHX Text Located in:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Project Name:

AutoCAD SHX Text Plan Horiz. Scale:

AutoCAD SHX Text Drawn By:

AutoCAD SHX Text Checked By:

AutoCAD SHX Text Date:

AutoCAD SHX Text Project No.:

AutoCAD SHX Text File Name:

AutoCAD SHX Text I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of South Dakota.

AutoCAD SHX Text Certificate

AutoCAD SHX Text 16402

AutoCAD SHX Text 01/10/2025

AutoCAD SHX Text

JPM

AutoCAD SHX Text

NJZ

AutoCAD SHX Text None

AutoCAD SHX Text #16402 - SD Dept of Military National Guard

AutoCAD SHX Text Revisions

AutoCAD SHX Text Changes Per Owner Review. Revisions By NJZ.

Phone: (605) 996-7761 - Fax: (605) 996-0015

2100 North Sanborn Boulevard - P.O. Box 398

Engineers - Planners - Surveyors

& Associates

SPN

Mitchell, South Dakota

SWPPP

CFMO #467011

REGRADING AND

REGRAVELING OF

UNPAVED ORG LOTS

MITCHELL COMPLEX

WEST HURON

vNon-Storm Water Discharges (5.4 10) The following non-storm water discharges are anticipated during the course of this project (The Contractor will check all that apply).

Ø Discharges from water line flushing.

Ø Pavement wash-water, where no spills or leaks of toxic or hazardous materials have occurred.

Ø Uncontaminated ground water associated with dewatering activities.

vSpill Prevention (5.4 8) Ø Material Management Housekeeping

· Only needed products will be stored on-site by the contractor.

· Except for bulk materials the contractor will store all materials under cover and in appropriate containers.

· Products shall be kept in their original containers with the original manufacture's label.

· Material mixing will be conducted in accordance with the manufacturer's recommendations.

· Whenever possible, all products will be completely used before properly disposing of the container off site.

· The manufacturer's directions for disposal of materials and containers will be followed.

· The contractor's site superintendent will inspect materials storage areas regularly to ensure proper use and disposal.

· Dust generated will be controlled in an environmentally safe manner.

· Vegetation areas not essential to the construction project will be preserved and maintained as noted on the erosion control plans.

Hazardous Materials

· Products will be kept in original containers unless the container is not resealable.

· Original labels and material safety data sheets will be retained in a safe place to relay important product information.

· If surplus product must be disposed of, manufacturer's label directions for disposal will be followed.

· Maintenance and repair of all equipment and vehicles involving oil changes, hydraulic system drain down, de-greasing operations, fuel tank drain down and removal, and other activities which may result in the accidental release of contaminants will be conducted on an impervious surface and under cover during wet weather to prevent the release of contaminants onto the ground.

· Wheel wash water will be collected and allowed to settle out suspended solids prior to discharge. Wheel wash water will not be discharged directly into any storm water system or storm water treatment system.

· Potential pH-modifying materials such as: bulk cement, cement kiln dust, fly ash, new concrete washings, concrete pumping, and mixer washout waters will be collected on site and managed to prevent contamination of storm water runoff.

vMaterials Inventory (5.4 9.(a)-(c)) The following materials or substances are expected to be present on the site during the construction period. These materials will be handled as noted under the headings "EROSION AND SEDIMENT CONTROLS" and "SPILL PREVENTION" (The Contractor will check all that apply).

Ø Concrete and Portland Cement Ø Detergents Ø Paints Ø Metals Ø Bituminous Materials Ø Petroleum Based Products Ø Cleaning Solvents Ø Wood Ø Cure Ø Texture Ø Chemical Fertilizers Ø Herbicides Ø Diesel Exhaust Fluid Ø Other:

Ø Product Specific Practices (5.4 9) Petroleum Products

All on-site vehicles will be monitored for leaks and receive regular preventive maintenance to reduce the chance of leakage. Petroleum products will be stored in tightly sealed containers which are clearly labeled.

Fertilizers Fertilizers will be applied only in the amounts recommended by the supplier. Once applied, fertilizers will be worked into the soil to limit the exposure to storm water. Fertilizers will be stored in an enclosed area. The contents of partially used fertilizer bags will be transferred to sealable containers to avoid spills.

Paints All containers will be tightly sealed and stored when not required for use. The excess will be disposed of according to the manufacturer's instructions and any applicable state and local regulations.

Concrete Trucks Contractors will provide designated truck washout areas on the site. These areas must be self contained and not connected to any storm water outlet of the site.

Upon completion of construction washout areas will be properly stabilized.

Ø Spill Control Practices (5.4 8) In addition to the previous housekeeping and management practices, the following practices will be followed for spill prevention and cleanup if needed.

For all hazardous materials stored on site, the manufacturer's recommended methods for spill clean up will be clearly posted. Site personnel will be made aware of the procedures and the locations of the information and cleanup supplies.

Appropriate cleanup materials and equipment will be maintained by the contractor in the materials storage area on-site. As appropriate, equipment and materials may include items such as booms, dust pans, mops, rags, gloves, goggles, kitty litter, sand, sawdust, and plastic and metal trash containers specifically for clean up purposes.

All spills will be cleaned immediately after discovery and the materials disposed of properly.

The spill area will be kept well ventilated and personnel will wear appropriate protective clothing to prevent injury from contact with a hazardous substance.

After a spill a report will be prepared describing the spill, what caused it, and the cleanup measures taken. The spill prevention plan will be adjusted to include measures to prevent this type of spill from reoccurring, as well as clean up instructions in the event of reoccurrences.

The contractor's site superintendent, responsible for day-to-day operations, will be the spill prevention and cleanup coordinator. The contractor is responsible for ensuring that the site superintendent has had appropriate training for hazardous materials handling, spill management, and cleanup.

Ø Spill Response (5.4 8) The primary objective in responding to a spill is to quickly contain the material(s) and prevent or minimize migration into storm water runoff and conveyance systems. If the release has impacted on-site storm water, it is critical to contain the released materials on-site and prevent their release into receiving waters. If a spill of pollutants threatens storm water or surface water at the site, the spill response procedures outlined below must be implemented in a timely manner to prevent the release of pollutants.

The contractor's site superintendent will be notified immediately when a spill or the threat of a spill is observed. The superintendent will assess the situation and determine the appropriate response.

If spills represent an imminent threat of escaping erosion and sediment controls and entering receiving waters, personnel will be directed to respond immediately to contain the release and notify the superintendent after the situation has been stabilized.

Spill kits containing appropriate materials and equipment for spill response and cleanup will be maintained by the contractor at the site.

If oil sheen is observed on surface water (e.g. settling ponds, detention ponds, swales), action will be taken immediately to remove the material causing the sheen. The contractor will use appropriate materials to contain and absorb the spill. The source of the oil sheen will also be identified and removed or repaired as necessary to prevent further releases.

If a spill occurs the superintendent or the superintendent's designee will be responsible for completing the spill reporting form and for reporting the spill to SD

DANR.

Personnel with primary responsibility for spill response and clean up will receive training by the contractor's site superintendent or designee. The training must include identifying the location of the spill kits and other spill response equipment and the use of spill response materials.

Spill response equipment will be inspected and maintained as necessary to replace any materials used in spill response activities.

vSpill Notification (7.2 1.(a)-(i)) In the event of a spill, the contractor's site superintendent will make the appropriate notification(s), consistent with the following procedures:

Ø A reportable spill is a quantity of 25 gallons or more or any spill of oil which:

1) violates water quality standards, 2) produces a "sheen" on a surface water, or 3) causes a sludge or emulsion must be reported immediately to the National Response Center .

Ø Any spill of oil or hazardous substance to waters of the state must be reported immediately by telephone to the SD DANR.

vPost Construction Stormwater Management (5.4 7.(a)-(c))

Storm management will be handled by temporary controls outlined in "Description and maintenance of control measures" and any permanent controls needed to meet permanent stormwater management needs in the post construction period will be shown in the plans and noted as permanent.

vInfeasibility Document (5.4 11)

If it is determined to be infeasible to comply with any of the requirements of the Stormwater Permit, the infeasibility determination must be thoroughly documented in the SWPPP.

vRequired SWPPP Modifications (5.6)

Ø Conditions Requiring SWPPP Modifications (5.6 1) The SWPPP must be modified, including the site map(s) in response to any of the following conditions.

When a new operator responsible for implementation of any part of the

SWPPP begins work on the site.

When changes to the construction plans, sediment and erosion control measures, or any best management practices on site that are no longer accurately reflected in the SWPPP. This includes changes made in response to corrective actions triggered by inspections.

To reflect areas on the site map where operational control has been transferred (including the date of the transfer) or has been covered under a new permit since initiating coverage under this general permit.

If inspections by site staff, local officials, SDDANR, or U.S. EPA determine that SWPPP modifications are necessary for compliance with the Stormwater Permit.

To reflect any revisions to applicable federal, state, or local requirements that affect the control measures implemented at the site.

If approved to reflect any changes in chemical water treatment systems or controls, including the use of a different water treatment chemical, age rates, different areas, or methods of application.

Ø Deadlines for SWPPP Modification (5.6 2) Any required revisions to…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .