460093 ATCT IMAM AB IRAQ COST BREAKDOWN.pdf
PDF 504 KB Posted
- Attached to
- Amendment 0002 Air Traffic Control Tower, Iraq
- Solicitation number
- W912ER22R0017
About this file
This document contains a cost breakdown schedule and supporting documents for a solicitation seeking repair and restoration services for an air traffic control tower in Iraq. The solicitation number is W912ER22R0017 and was issued by the U.S. Army Corps of Engineers Engineering District Middle East. Services required include electrical work, generator installation, demolition, door and window replacement, flooring installation, painting, ceiling tile replacement, wall and insulation repair, roof repair, signage, and concrete work. Mechanical work includes inspection and maintenance of fire pumps, fuel and water tanks, installation of a chiller unit and air conditioning equipment. Bids are to provide a detailed cost breakdown by line item for all labor, equipment, materials, subcontracting, overhead and profit associated with the work. The selected contractor will be responsible for the repair, restoration and upgrade of the existing air traffic control tower at Imam Ali Air Base to support continued operations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP: W912ER22R0017 CONTRACTOR:
PROJECT: Air Traffic Control Tower, Imam Ali Air Base, Iraq P2# 460093
ITEM DESCRIPTION LABOR COSTS
EQUIPMENT
COSTS
MATERIAL
COSTS
SUBCONTRACTOR
COSTS
TOTAL DIRECT
COST
HOME OFFICE
OVERHEAD
(HOOH)
JOBSITE OFFICE
OVERHEAD
(JOOH)
BOND
TOTAL
OVERHEAD/
INDIRECT
COST
PROFIT
TOTAL
CONSTRUCTION
COSTS
0001 Mobilization and Demobilization in Accordance with Contract Documments
0002 Service Split Units in CAB in Accordance with Contract Documments
0003 Replacement wiring devices (receptacles, switches, etc.) in Accordance with Contract Documments
0004 Replacement lighting fixtures and replacement lamps
0005 Testing, misc. wiring and other electrical devices in Accordance with Contract Documments
0006 Generator installation, ATS installation(with pad) and related wiring
0007 Demolition (doors, door hardware, carpet, vinyl flooring, windows, insulation, etc.) in Accordance with Contract Documments
0008 Door and door hardware replacement in Accordance with Contract Documments
0009 Flooring (epoxy, carpet tile) in Accordance with Contract Documments
0010 Painting (Interior, exterior) in Accordance with Contract Documments
0011 Ceiling tile replacement in Accordance with Contract Documments
0012 Cab Windows replacement in Accordance with Contract Documments
0013 Building Window Replacement in Accordance with Contract Documments
ATTACHMENT B - COST BREAKDOWN SCHEDULE
ITEM DESCRIPTION LABOR COSTS
EQUIPMENT
COSTS
MATERIAL
COSTS
SUBCONTRACTOR
COSTS
TOTAL DIRECT
COST
HOME OFFICE
OVERHEAD
(HOOH)
JOBSITE OFFICE
OVERHEAD
(JOOH)
BOND
TOTAL
OVERHEAD/
INDIRECT
COST
PROFIT
TOTAL
CONSTRUCTION
COSTS
ATTACHMENT B - COST BREAKDOWN SCHEDULE
0014 Wall repair (interior, exterior) in
0015 Insulation replacement in Accordance with Contract Documments
0016 Roof Repair in Accordance with Contract Documments
0017 Interior Signage in Accordance with Contract Documments
0018 Exterior Concrete Repair and Seal in
0019 Fire Pumps - Maintenance and Inspection in Accordance with Contract Documments
0020 Fire Pump Fuel Storage Tank Inspection in Accordance with Contract Documments
0021 Fire Water Storage Tank Inspection in Accordance with Contract Documments
0022 450 A Main breaker with NEMA 4 (IP66) enclosure in Accordance with Contract Documments
0023 Direct burial service cable (Main breaker to ATS) with installation
0024 Automatic Transfer Switch with NEMA 4 (IP66) enclosure in Accordance with Contract Documments
0025 400 kVA (320 kW) Generator in
0026 AC panels for generator pad, installed in
ITEM DESCRIPTION LABOR COSTS
EQUIPMENT
COSTS
MATERIAL
COSTS
SUBCONTRACTOR
COSTS
TOTAL DIRECT
COST
HOME OFFICE
OVERHEAD
(HOOH)
JOBSITE OFFICE
OVERHEAD
(JOOH)
BOND
TOTAL
OVERHEAD/
INDIRECT
COST
PROFIT
TOTAL
CONSTRUCTION
COSTS
ATTACHMENT B - COST BREAKDOWN SCHEDULE
0027 Chiller, compression type (156kW) with NEMA 4 (IP66) enclosure in Accordance with Contract Documments
0028 14" Ceiling diffusers, fixed blade, 4-way throw in Accordance with Contract Documments
0029 14.5" x 13.8" insect screen, with frame in Accordance with Contract Documments
0030 Lavatory faucet, single handle in Accordance with Contract Documments
0031 Toilet flush valve, manual, flapper type in Accordance with Contract Documments
0032 Sink faucet, goose neck, single handle in Accordance with Contract Documments
0033 Air Conditioning Window Unit in
Total Base Bid Price (Items 0001 thru 0033)
File details come from the government source that posted it. Updated .