460093 ATCT IMAM AB IRAQ BID SCHEDULE COST BREAKDOWN.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Amendment 0002 Air Traffic Control Tower, Iraq
- Solicitation number
- W912ER22R0017
About this file
This file contains a bid schedule and cost breakdown for a federal contract solicitation to repair and upgrade an air traffic control tower in Iraq. The solicitation seeks bids to mobilize and demobilize personnel and equipment, repair and restore the existing tower, and replace specific tower systems and components. Key work includes replacing split units, windows, lighting, wiring, doors and hardware, flooring, paint, insulation, the roof, signage, and concrete. The solicitation also requires replacing lavatory fixtures, air conditioning units, and installing generators with associated automatic transfer switches and electrical work. Bidders must provide itemized pricing for labor, equipment, materials, subcontractors, overhead and profit for each line item. The related federal contract opportunity notice announces Solicitation W912ER22R0017 issued by the U.S. Army Corps of Engineers Middle East District to repair, restore and upgrade the air traffic control tower at Imam Ali Air Base, Iraq. All questions must be submitted through ProjNet and the solicitation and supporting documents should be reviewed for full proposal requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATCT BID SCHEDULE
| ATTACHMENT A - PROPOSAL SCHEDULE | |||
| RFP: | W912ER22R0017 | ||
| PROJECT: | Air Traffic Control Tower, Imam Ali Air Base, Iraq | P2# 460093 | |
| 12-Aug-08 |
ITEM NO. DESCRIPTION QTY UNIT AMOUNT TOTAL TOTAL
| Base Bid Items | |||
| 0001 | Mobilization and Demobilization in Accordance with Contract Documments | 1 | JOB |
0002 Repair, Restore, and upgrade the Air Traffic ControlTower in Accordance with Contract Documments 1 JOB
0003 Chiller, compression type (156kW) As specified in Accordance with Contract Documments 2 EA
0004 Two (2) Generators as specified in Accordance with Contract Documments 2 EA
Total Base Bid Price (Items 0001 thru 0004) $ $
ATCT COST BREAKDOWN
| ATTACHMENT B - COST BREAKDOWN SCHEDULE | ||||||||||||
| RFP: W912ER22R0017 | CONTRACTOR: | |||||||||||
| PROJECT: | Air Traffic Control Tower, Imam Ali Air Base, Iraq | P2# 460093 | ||||||||||
| ITEM | DESCRIPTION | LABOR COSTS | EQUIPMENT COSTS | MATERIAL COSTS | SUBCONTRACTOR COSTS | TOTAL DIRECT COST | HOME OFFICE OVERHEAD (HOOH) | JOBSITE OFFICE OVERHEAD (JOOH) | BOND | TOTAL OVERHEAD/INDIRECT COST | PROFIT | TOTAL CONSTRUCTION COSTS |
| 0001 | Mobilization and Demobilization in Accordance with Contract Documments |
| 0002 | Repair, Restore, and upgrade the Air Traffic ControlTower in Accordance with Contract Documments |
| 0002AA | Service Split Units in CAB in Accordance with Contract Documments |
| 0002AB | Cab Windows replacement in Accordance with Contract Documments |
| 0002AC | Replacement lighting fixtures and replacement lamps |
| 0002AD | Testing, misc. wiring and other electrical devices in Accordance with Contract Documments |
| 0002AE | Replacement wiring devices (receptacles, switches, etc.) in Accordance with Contract Documments |
| 0002AF | Demolition (doors, door hardware, carpet, vinyl flooring, windows, insulation, etc.) in Accordance with Contract Documments |
| 0002AG | Door and door hardware replacement in Accordance with Contract Documments |
| 0002AH | Flooring (epoxy, carpet tile) in Accordance with Contract Documments |
| 0002AI | Painting (Interior, exterior) in Accordance with Contract Documments |
| 0002AJ | Building Window Replacement in Accordance with Contract Documments |
| 0002AK | Wall repair (interior, exterior) in Accordance with Contract Documments |
| 0002AL | Insulation replacement in Accordance with Contract Documments |
| 0002AM | Roof Repair in Accordance with Contract Documments |
| 0002AN | Interior Signage in Accordance with Contract Documments |
| 0002AO | Exterior Concrete Repair and Seal in Accordance with Contract Documments |
| 0002AP | 14" Ceiling diffusers, fixed blade, 4-way throw in Accordance with Contract Documments |
| 0002AQ | Ceiling tile replacement in Accordance with Contract Documments |
| 0002AR | 14.5" x 13.8" insect screen, with frame in Accordance with Contract Documments |
| 0002AS | Lavatory faucet, single handle in Accordance with Contract Documments |
| 0002AT | Toilet flush valve, manual, flapper type in Accordance with Contract Documments |
| 0002AU | Sink faucet, goose neck, single handle in Accordance with Contract Documments |
| 0002AV | Air Conditioning Window Unit in Accordance with Contract Documments |
| 0002AW | Generator installation, ATS installation (with pad) and related wiring |
| 0002AX | AC panels for generator pad, installed in Accordance with Contract Documments |
| 0002AY | 450 A Main breaker with NEMA 4 (IP66) enclosure in Accordance with Contract Documments |
| 0002AZ | Direct burial service cable (Main breaker to ATS) with installation |
| 0002BA | Automatic Transfer Switch with NEMA 4 (IP66) enclosure in Accordance with Contract Documments |
| 0002BB | Fire Pumps - Maintenance and Inspection in Accordance with Contract Documments |
| 0002BC | Fire Pump Fuel Storage Tank Inspection in Accordance with Contract Documments |
| 0002BD | Fire Water Storage Tank Inspection in Accordance with Contract Documments |
| 0003 | Chiller, compression type (156kW) As specified in Accordance with Contract Documments |
| 0004 | Two (2) Generator s as specified in Accordance with Contract Documments |
Total Base Bid Price (Items 0001 thru 0004)