This document is an Amendment No. 1 to Request for Proposal (RFP) No. 421909 for 591 MHz RF Amplifier Systems. The amendment incorporates Attachment A - Clarification Questions and Answers, and extends the proposal due date through September 20, 2024, 4:00 PM EST, with the clarification questions due date extended through September 6, 2024. The RFP is for the procurement of two (2) 591 MHz, 200 kW RF amplifier systems and two (2) 591 MHz, 400 kW RF amplifier systems, to be issued by the Department of Energy Office of Science. The amendment clarifies that with 10% of failed transistors, the amplifier shall still deliver 400 kW.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Property and Procurement Management Division
Building 1005S P.O. Box 5000
Upton, NY 11973-5000
Date: 07/09/2024
AMENDMENT NO. 1
to
Request for Proposal (RFP) No. 421909
For
591 MHz RF Amplifier Systems
GENERAL: This Amendment No. 1 is to amend Request for Proposal RFP No. 421909 as follows.
1. Incorporate Attachment A – Clarification Questions and Answers dated July 09, 2024, into RFP No. 421909 by reference.
2. Extend the proposal due date through September 20, 2024, 4:00PM EST. The Clarification Questions due date shall be extended through September 6, 2024.
All other terms, conditions, and provisions of this RFP shall remain unchanged.
Material, work, and workmanship, except where specified otherwise in this Amendment shall conform to all requirements of Contract Documents and become a part thereof.
Please confirm receipt of this Amendment No. 1 via email to the following.
Bill Koncelik wkoncelik@bnl.gov
(631) 344-5281 mailto:wkoncelik@bnl.gov
Attachment A
RFP No. 421909
Clarification Questions and Answers
1. Due to the fact, that July is the main vacation season, we would like to ask kindly, if the
Proposal Due date could be shifted to 25th of August 24?
Answer: The proposal due date shall be extended through September 20, 2024, 4:00PM
EST. The Clarification Questions due date shall be extended through September 6, 2024.
2. Reference - 5. Attachment C - Technical Specification, Doc No. EIC-RFS-SPC-006 Rev 03.pdf
RF and Redundancy:
ref. § 3.1.5 Redundant operation (page 10)
We do not fully understand, if the requirement requires that with 10% of failed transistors the amplifier shall still deliver 400 kW at <= 1.5 dB compression or the maximum achievable output power may be reduced, but all other parameters shall be achieved.
Would this specification fulfill your wishes ?:
If up to 5% of transistors fail the amplifier can continue operation and achieves still 400 kW output power at or below 1.5 dB compression. AND
If up to 10% of transistors fail, the amplifier can continue operation but max. achievable output power can be reduced to 355 kW
Answer: Yes.
Yes, only natural degradation shall occur.
3. Reference - 5. Attachment C - Technical Specification, Doc No. EIC-RFS-SPC-006 Rev 03.pdf
LED Indications, Push-Buttons, Time counter, Flow indicator
(! this question does not include § 3.1.16.1 Local/remote switch, which is always realized as real hardware switch!)
There are several chapters require analogue LEDs, pushbuttons, displays for total operational times, water flow measurement:
§3.1.1.16.2 and §3.1.18 Local switches for amplifier states §3.1.17.1 Flow meter §3.1.17.2 Run Time hour meter §3.1.17.3 Digital RF Power Meter §3.1.18 LED Status Indicator
All tasks listed above and data archiving are typically done in our amplifiers by a Panel PC and its LabView GUI.
Clearly, much more possibilities for read out and handling is given by a Panel-PC GUI compared to the required hardware elements.
Nevertheless, there may be a special reason, that BNL wants to have the listed features explicitly realized as hardware elements.
Answer: BNL wants to have the listed features realized as hardware elements. This information can be displayed by a Panel PC in addition to the hardware elements.
4. Is it in the spirit of BNL if a Local GUI is implemented which overtakes the tasks required in the 5 chapters listed above, or prefers BNL that the listed tasks are realized in hardware LEDs, displays and push buttons, independent if a local GUI is available?
Crash Switch = Emergency Push Button?
§3.1.1.16.3 Crash Off switch
Is the Crash OFF switch meant as Emergency button or shall it be used differently.
If it acts as emergency button, it deactivates not only the two redundant contactors (AC off) but also the mechanical AC main switch in front of the contactors.
This AC Main switch is only switched off by severe faults, like doors are opened, smoke detection gives alarm etc.
Or is the Crash-Off switch additionally to a normal emergency switch off but switches only RF off and both AC contactors but not the mechanical AC main switch?
Answer: We would like this information to be displayed on the amplifier, not a GUI.
The Crash OFF switch is meant as a mechanical Emergency button. Pressing this switch shall instantly inhibit the RF amplifier system by bringing it to the OFF state. In the OFF state the DC power supplies shall be off, and the RF transistors gates inhibited. The Mains power to the controller & remote interface should still be on. To disable the crash, the button must be mechanically reset.