42-Kimball Construction Move Map.pdf
PDF 2 MB Posted
- Solicitation number
- 400 - 25/26
- Issued by
- Illinois
About this file
This is a construction move map for an addition and remodeling project at Kimball Middle School in District U-46, located at 451 N McLean Boulevard, Elgin, Illinois 60123. The document provides detailed floor plans for the lower level, first floor, and second floor of the facility, identifying areas designated for remodeling (marked in red) and addition (marked in AD-1). The maps indicate specific rooms and spaces including classrooms, laboratories, gymnasiums, cafetorium, mechanical areas, storage facilities, and circulation corridors. Color-coded legends distinguish between areas with no storage allowed due to construction requirements (red), areas available for storage (blue), areas with other District U-46 restrictions (orange), and areas with no construction restrictions (white). The document was issued for bid on January 2, 2025, with an addendum issued on January 16, 2025, and was issued for construction on March 19, 2025.
The construction move map includes specific logistical instructions for equipment and material transfer during the summer 2026 moving services. Scheduled dates include teacher pack-up on May 21-22, second floor move-out on May 26-27, first floor move-out on May 28-29, and move-in on July 31. Access restrictions specify that nothing should move through Door 1 after school concludes, with items south of Door 1 to be moved through Door 20, items east of Door 1 through Door 17, and items from north of Door 1 and second floor materials through Door 6. Construction barricades are to be installed immediately upon school dismissal. The document references a complete set of civil, landscape, architectural, theater, structural, mechanical, electrical, plumbing, fire protection, and audio/visual drawings for the full extent of work, indicating a comprehensive renovation project requiring detailed coordination of building access and material movement.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
DN
DN
DN
UP
DN
UP
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
PIPE TUNNEL
PIPE TUNNEL
U N
E X
U N
E X
T U
N N
E L
UNEXCAVATED
UNEXCAVATED
PIPE TUNNEL
P
IP
E T
U N
N E
L
UNEXCAVATED
UNEXCAVATED
PIPE TUNNEL
UNEXCAVATED
PIPE TUNNEL
P
IP
E T
U N
N E
L
P
IP
E T
U N
N E
L
U N
E X
C A
V A
T E
D
P
IP
E T
U N
N E
L
PIPE TUNNEL
P
IP
E T
U N
N E
L
P
IP
E T
U N
N E
L
UNEX
T1
WOMEN
T2
MEN
J-1
JC
MECH
S12
STAIR
EXISTING
KITCHEN
STORAGE
MECH
STORAGE
STORAGE
004B
STORAGE
004C
STORAGE
004A
MECH
S1
STAIR
S2
STAIR
S3
STAIR
011A
FREEZER/
COOLER
TLT
ELEVATOR
BOILER
PANEL ROOM 002A
TRANSFORMER
003A
TOILET
S4
STAIR
DISH WASHER
OPEN FLEX
SPACE
STAIR
UNEXCAVATED
UP
UP
OPEN FLEX
SPACE
UNEXCAVATED
PIPE TUNNEL
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
MASTER PLAN LEGEND
APPROXIMATE AREA OF REMODELING - SEE FULL SET OF CIVIL,
LANDSCAPE, ARCHITECTURAL, THEATER, STRUCTURAL, MECHANICAL,
ELECTRICAL, PLUMBING, FIRE PROTECTION, AND AUDIO/ VISUAL
DRAWINGS FOR FULL EXTENT OF WORK
DESCRIPTION:DATE:
DATE:
PROJECT #
SHEET:
SHEET TITLE:
A D
D
IT
IO
N
A N
D R
E M
O D
E L
IN
G
P R
O J E
C T
K
IM
B A
L L
M
ID
D L E
S C
H O
O L
D
IS
T
R
IC
T U
N M
C L
E A
N B
L V
D
E L
G
IN
IL
AM.0
JANUARY 02, 2025
2023.122
LOWER LEVEL
MASTER PLAN
3/64" = 1'-0"
LOWER LEVEL MASTER PLAN
01.02.2025 ISSUED FOR BID
03.19.2025 ISSUED FOR
CONSTRUCTION
013 T2 T1
J-1
S12
S2 011A
S1
004A
004 004B
004C
S3
003A
S4
002 002A
RED: No storage. Space required for construction.
WHITE: The electrician can work around what is currently here, but no additional storage.
DN
UP
DN
DN
DN
UP
21x48
21x48
21x48
21x48
21x48
21x48
21x48
21x48
21x48
21x48
21x48
21x48
21x48
21x48
21x48
21x48
21x48
21x48
21x48
21x48
21x48
21x48
21x48
21x48 22x48
T ra s h x x
22x48
21x48
21x48
21x48
21x48
21x48
21x48 x x x x x x x x
ICE
24x36 x
R
22x48
22x48 x
R
R
DN
UP
DN
DN
UP
115B
LAUNDRY
115A
TLT
GYMNASIUM
S3
STAIR
V2
VESTIBULE
S12
STAIR
106B
STORAGE
106A
JC
T5
MEN
T6
WOMEN
J2
JC
CLASSROOM
CLASSROOM
T
CIRCULATION
CLASSROOM
CLASSROOM
SPED (SC)
CLASSROOM
CLASSROOM
CULINARY ARTS
T3
WOMEN
T4
MEN
H
CIRCULATION
STAFF LOUNGE
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
108A
SCIENCE LAB
109B
ART LAB 2
101A
OUTDOOR
STORAGE101
STORAGE
146A
IDF
OFFICE
STORAGE
142A
TOILET
144A
TOILET
CIRCULATION
ELEVATOR
109A
ART LAB 1
CLASSROOM
CAFETORIUM
170A
PLATFORM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
S6
STAIR
OFFICE
CLASSROOM
C
CIRCULATION
A
CIRCULATION
108B
SCIENCE LAB
106A
ELEC
SCIENCE LAB
SCIENCE LAB
CONC.
170C
CAFETORIUM
STORAGE
STORAGE
B
CIRCULATION
E
CIRCULATION
123A
OFFICE
LIBRARY MEDIA
CENTER
123B
COMPUTER RM.
STORAGE
OT/PT
BREAKOUT RM
CLASSROOM
CLASSROOM
170B
STORAGE
110A
BREAKOUT RM
108C
SCIENCE PREP
109C
STORAGE
STAFF COLLAB.
104A
LAUNDRY
SPED (SC)
112A
SCIENCE
STORAGE
J7
JC
160A
SCIENCE PREP 164A
SCIENCE PREP
V12
VESTIBULE
V7
VEST.
V15
VESTIBULE
BAND/
ORCHESTRA
CHORAL/
GENERAL MUSIC
J
CORRIDOR
SCIENCE LAB
SERVING
CONC.
OFFICE
DRY STORAGE
T11A
TLT.
T10
TLT RM
FITNESS CENTER
RECEIVING
PREP KITCHEN
DISHWASHING
T12
TLT.
J8
JC
SLWD
TLT
TLT
J3
JC
102B
COUN
102D
COUN
102A
COUN
102F
SOCIAL
102C
CONF.
102G
SOCIAL
CENTRAL HUB
RECEPTION
150B
PRINCIPAL
150A
AP1
151B
TLT
NURSE
150D
FLEX
150J
WORK RM
102H
SRO
150E
CONF. RM
V1
SECURED
VESTIBULE 165
AUXILIARY GYM
CHANGING
CHANGING
141A
STORAGE
102E
RESTORATIVE
JUSTICE
STORAGE
S10
STAIR
ESSENTIAL TECH
RECEIVING
HEALTH FLEX
SECTIONAL
SPACE
155A
MUSIC LIBRARY &
STORAGE
MUSIC OFFICE
ELEC
COOLER
FREEZER
STORAGE
150F
FLEX
150G
FLEX
IDF / AV
109D
KILN
151A
ISOLATION ROOM
150K
TLT
150C
AP2
145A
TLT
STOR
140A
STORAGE
150H
STORAGE
121B
WOMEN
121A
MEN
S2
STAIR
12 13
171819
F
CIRCULATION
G
CIRCULATION
S
CIRCULATION
U
CIRCULATION
AD-1
AD-1
AD-1
AD-1
AD-1
AD-1
AD-1
AD-1
AD-1
AD-1
AD-1
AD-1
AD-1
AD-1
AD-1
AD-1
MASTER PLAN LEGEND
APPROXIMATE AREA OF REMODELING - SEE FULL SET OF CIVIL,
LANDSCAPE, ARCHITECTURAL, THEATER, STRUCTURAL, MECHANICAL,
ELECTRICAL, PLUMBING, FIRE PROTECTION, AND AUDIO/ VISUAL
DRAWINGS FOR FULL EXTENT OF WORK
APPROXIMATE AREA OF ADDITION - SEE FULL SET OF CIVIL, LANDSCAPE,
ARCHITECTURAL, THEATER, STRUCTURAL, MECHANICAL, ELECTRICAL,
PLUMBING, FIRE PROTECTION, AND AUDIO/ VISUAL DRAWINGS FOR FULL
EXTENT OF WORK
1 EXTERIOR DOOR NUMBERS
DESCRIPTION:DATE:
DATE:
PROJECT #
SHEET:
SHEET TITLE:
A D
D
IT
IO
N
A N
D R
E M
O D
E L
IN
G
P R
O J E
C T
K
IM
B A
L L
M
ID
D L E
S C
H O
O L
D
IS
T
R
IC
T U
N M
C L
E A
N B
L V
D
E L
G
IN
IL
AM.1
JANUARY 02, 2025
2023.122
FIRST FLOOR
MASTER PLAN
3/64" = 1'-0"
FIRST FLOOR PLAN
01.02.2025 ISSUED FOR BID
01.16.2025 ADDENDUM #1
03.19.2025 ISSUED FOR
CONSTRUCTION
No access through Door 1 after school is out. Anything south of Door 1 should be moved out through Door 20. Anything east of Door 1 should be moved through Door 17.
S10
109B
109D 109C
109A
108C
108A B
S10 106A
128 126 124 122
S12 123B
123A
107 106
C
121B 121A
T4 T3
114112
110A
A
106B106A
V2
S3
102H 104A 102E102F102G
102 102D
102C102B102A
101 101A
J2 T5
T6
F 100
S6
132 146A
J3131
146 145
V1 G H
145A
144A
141A
140A
142A
143147148150
150A 151A
150K 151B150B
150C
150D 150J
150E 150F 150G155A
J
150H
108B
111 113 115A 117115B
112A
RED: No storage. Space required for construction.
BLUE: Space available for storage.
ORANGE: Space not needed for construction, but U46 has other restrictions.
WHITE: No construction restrictions, but assumed there would be no storage in these areas.
Anything from north of Door 1 and 2nd Floor move out should come out Door 6.
Construction barricades to be put up as soon as school is out.
Scheduled Dates:
- Teacher Pack-up: 5/21-5/22
- 2nd Floor Move Out: 5/26-5/27
- 1st Floor Move Out: 5/28-5/29
- Move In: 7/31
DN
DN
DN
210AA
STORAGE
207A
SENSORY
PLTW
204A
AUDIO/VIDEO
STORAGE
204B
SERVER
208A
WORK ROOM
208B
TOILET
208B
WOMEN
RA
ROOF ACCESS
CLASSROOM
T9
MEN
T8
WOMEN
J6
JC
ELEVATOR
SCIENCE LAB
CLASSROOM
CLASSROOM
CLASSROOM
STAFF COLLAB.
S3
STAIR
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
SCIENCE LAB
SCIENCE LAB
206A
SCIENCE PREP
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
M
CORRIDOR
N
CORRIDOR
SCIENCE LAB
CLASSROOM
BREAKOUT RM
CLASSROOM
CLASSROOM
201B
BREAKOUT RM
201A
STORAGE
FLEX OFFICE
FLEX OFFICE
S10
STAIR
T13A
TLT
J9
JC
CLASSROOM
266A
IDF / ELEC
BREAKOUT RM
STORAGE
T13
TLT RM
260A
SCIENCE PREP
264A
SCIENCE PREP
P
CORRIDOR
R
CIRCULATION
ROOF BELOW
ROOF BELOW
ROOF BELOW
ROOF BELOW
ROOF BELOW
ROOF
BELOW
ROOF
BELOW
ROOF BELOW
ROOF
BELOW
ROOF BELOW
ROOF BELOW
ROOF
BELOW
OPEN TO
BELOW
MEZZANINE
ROOF
BELOW MECH
MEZZANINE OPEN TO
GYM BELOW
OPEN TO
AUX GYM
BELOW
ROOF BELOW
OPEN TO
CAFETORIUM
BELOW
ROOF
BELOW
COURTYARD
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
208C
PRIVACY ROOM
RAMP DOWN
MASTER PLAN LEGEND
APPROXIMATE AREA OF REMODELING - SEE FULL SET OF CIVIL,
LANDSCAPE, ARCHITECTURAL, THEATER, STRUCTURAL, MECHANICAL,
ELECTRICAL, PLUMBING, FIRE PROTECTION, AND AUDIO/ VISUAL
DRAWINGS FOR FULL EXTENT OF WORK
APPROXIMATE AREA OF ADDITION - SEE FULL SET OF CIVIL, LANDSCAPE,
ARCHITECTURAL, THEATER, STRUCTURAL, MECHANICAL, ELECTRICAL,
PLUMBING, FIRE PROTECTION, AND AUDIO/ VISUAL DRAWINGS FOR FULL
EXTENT OF WORK
DESCRIPTION:DATE:
DATE:
PROJECT #
SHEET:
SHEET TITLE:
A D
D
IT
IO
N
A N
D R
E M
O D
E L
IN
G
P R
O J E
C T
K
IM
B A
L L
M
ID
D L E
S C
H O
O L
D
IS
T
R
IC
T U
N M
C L
E A
N B
L V
D
E L
G
IN
IL
AM.2
JANUARY 02, 2025
2023.122
SECOND FLOOR
MASTER PLAN
3/64" = 1'-0"
SECOND FLOOR MASTER PLAN
01.02.2025 ISSUED FOR BID
03.19.2025 ISSUED FOR
CONSTRUCTION
215 216 212
M
S10
210AA
RA
208B
208A 208B
208C
206A
N
S3 204A
T9
T8 J6
201 200201B
201A
RED: No storage. Space required for construction.
BLUE: Space available for storage.
WHITE: No construction restrictions, but assumed there would be no storage in these areas.
204B207A
File details come from the government source that posted it. Updated .