41NHA-S3922 - Cost Schedule.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- Nevada Average Acquisition Cost
- Solicitation number
- 41NHA-S3922
- Issued by
- Nevada
About this file
This is a Cost Proposal Instructions document and Cost Schedule for the Nevada Average Acquisition Cost (NVAAC) project issued by the Nevada Health Authority. The RFP, designated 40DHHS-XXXX, requests services for Certified Public Expenditures Audit Review for Governmental Entities. The contract term spans approximately 4.5 years, divided into five fiscal years: SFY 27 (January 1, 2027 through June 30, 2027), SFY 28 (July 1, 2027 through June 30, 2028), SFY 29 (July 1, 2028 through June 30, 2029), SFY 30 (July 1, 2029 through June 30, 2030), and SFY 31 (July 1, 2030 through December 31, 2030). The contract includes two optional additional years. The scope of work encompasses seven sections: Survey Requirements, Additional Processes, NVAAC Determination Requirements, NVAAC Dissemination, Provider Appeals Process, Reporting, and Transparency Website Ad Hoc Reporting.
Cost proposals must be submitted in PDF format with a title page containing proposer information and proposal opening details. Vendors must provide annual fixed costs for each fiscal year in the specified cost schedule format, with all expenses including travel, per diem, out-of-pocket costs, administrative expenses, and overhead included in the quoted amounts. Detailed backup documentation is required for all cost schedules. All proposal terms, including proposed costs, must remain valid for a minimum of 180 days following the proposal due date, and for the awarded vendor, costs must remain in effect throughout the entire contract term. Monthly invoices shall be submitted to NVHA with billing amounts calculated by dividing the annual fixed cost by twelve months.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 41NHA-S3922 - RFP Technical Proposal Questions.docx | DOCX document | |
| 41NHA-S3922 - Insurance Schedule - RFP.docx | DOCX document | |
| Certification-regarding-lobbying~7.pdf | ||
| 41NHA-S3922 - Business Associate Addendum.docx | DOCX document | |
| 41NHA-S3922-Reference-Questionnaire.docx | DOCX document | |
| 41NHA-S3922 - Request-for-Proposals.docx | DOCX document | |
| 41NHA-S3922 - Scope of Work and Deliverables.docx | DOCX document | |
| Terms-and-conditions-for-services~7.pdf | ||
| 41NHA-S3922-Vendor-Information-Response.pdf | ||
| Standard-form-contract~5.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Proposal Instructions
| COST PROPOSAL INSTRUCTIONS | ||||
| Contents of the cost proposal shall be as follows: | ||||
| 1. | Tab I - Title Page | |||
| The title page shall include the following: | ||||
| A. | Cost Proposal for: | CERTIFIED PUBLIC EXPENDITURES AUDIT REVIEW FOR GOVERNMENTAL ENTITIES |
B. RFP: 40DHHS-XXXX
| C. | Proposer Information: | Name: |
| Address: |
D. Proposal opening date: (Purchasing to complete)
E. Proposal opening time: (Purchasing to complete)
| 2. | Tab II - Cost Proposal | |
| A. | Cost proposal shall be in the format identified in Section XXX, COST SCHEDULE. |
C. Proposers shall provide one (1) PDF Cost Proposal file.
&"Arial,Bold Italic"&A &"Arial,Bold Italic"Page &P
Bid & Deliverable Tab
| 41NHA-S3922 - COST SCHEDULE - Nevada Average Acquisition Cost (NVAAC) |
| INSTRUCTIONS FOR COMPLETING THE COST SCHEDULE |
Vendor Shall:
* Enter the proposed costs in bid Columns C-K for services to be detailed in Vendor Response for the Scope of Work.
* Provide the cost methodology for each year.
| The cost for each deliverable shall be complete and include all expenses, including travel, per diem and out-of-pocket expenses as well as administrative and/or overhead expenses. Detailed backup shall be provided for all cost schedules completed. All proposal terms, including proposed cost, shall remain in effect for a minimum of 180 days after the proposal due date. In the case of the awarded vendor, all proposal terms, including proposed cost, shall remain in effect throughout the contract term. | ||
| ITEM # | PROJECT DELIVERABLES | ANNUAL FIXED COST |
SFY 27-YEAR 1 (PARTIAL)
(01/01/27 - 06/30/27) ANNUAL FIXED COST
SFY 28-YEAR 2
(07/01/27 - 06/30/28) ANNUAL FIXED COST
SFY 29-YEAR 3
(07/01/28 - 06/30/29) ANNUAL FIXED COST
SFY 30-YEAR 4
(07/01/29 - 06/30/30) ANNUAL FIXED COST
SFY 31-YEAR 5 (PARTIAL)
| (07/01/30 -12/31/30) | COST PER 4-YEAR CONTRACT TERM | ADDITIONAL OPTION YEAR 1 | ADDITIONAL OPTION YEAR 2 |
| (05/01/27 - 06/30/27) |
DELIVERABLES FOR SECTIONS 1 - 7:
SECTION 1 - Survey Requirements
SECTION 2 - Additional Processes
SECTION 3 -NVAAC Determination Requirements
SECTION 4 - NVAAC Dissemination
SECTION 5 - Provider Appeals Process
SECTION 6 - Reporting
SECTION 7 -Transparency Website
| Ad Hoc Reporting (Refer to SOW-Section 6 Reporting) | |||||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Note: Invoices shall be submitted monthly to NVHA and as noted in this Cost Schedule. The monthly billing amount shall be determined by dividing the annual fixed cost, as set forth in this Cost Schedule.
&"Arial,Bold Italic"&A &"Arial,Bold Italic"Page &P
File details come from the government source that posted it. Updated .