4190491_PWS.pdf
PDF 288 KB Posted
- Attached to
- REPAIR -- PILOT WARNING ALARM SET
- Solicitation number
- FA852425Q0009
About this file
This Performance Work Statement (PWS) details repair services for the TH-1H Pilot Warning Alarm Set (NSN 6340-01-153-8073) for the United States Air Force. The objective is to repair the alarm set to ensure a serviceable end-item through inspection, testing, and disassembly, conforming to the original equipment manufacturer's technical specifications. The contract period will run from September 2025 to September 2026, not exceeding 12 months, and will be performed at the contractor's facility.
Key performance requirements include meeting delivery schedules, repairing and returning assets in serviceable condition, providing timely reporting in CAVAF, and maintaining high-quality standards. The PWS specifies strict performance thresholds, such as allowing only one delivery schedule slippage per quarter, limiting deliverable rejections, and permitting no more than one Product Quality Deficiency Report during the 12-month performance period. The repair work supports the TH-1H helicopter program, which is a training platform designed to develop comprehensive pilot skills and enable smooth transitions to other rotary wing aircraft like the CV-22 and Combat Search and Rescue-X helicopters.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| Air Force T.O. 12P2-2TM55-1-3.pdf | ||
| PROVISIONS_CLAUSES.docx | DOCX document | |
| 4214390_CDRL.pdf | ||
| 4217992_PKGRQMT_REPORT.pdf | ||
| GFPFA852425Q0009_1.pdf | ||
| 4217990_TRNSPDATA_REPORT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 PWS_FD2060-25-00334 PWS REVISION: 00
Performance Work Statement for
Repair of Pilot Warning Alarm Set Applicable to the TH-1H Helicopter
Program
Purchase Request: FD2060-25-00334
9 July 2025
Page 2 PWS_FD2060-25-00334 PWS REVISION: 00
1.0 Description of Services:
Objective(s): This Performance Work Statement (PWS) describes the services required to repair the TH-1H Pilot Warning Alarm Set (NSN 6340-01-153-8073, PN 205-074-033-103). The extent of repair work required to ensure a serviceable end-item shall be determined by the inspection, test, bench-check, and required disassembly; and shall conform to the original equipment manufacturer’s (OEM’s) technical data and specifications. The original design of the end-item and parts thereof, or the design functional capabilities of the end-item, shall not be changed, modified, or altered unless such changes are authorized in writing by the Procuring Contracting Officer (PCO) or specified by publication or directive listed in this PWS. As is reiterated in the below Services Summary (SS), the Contractor shall
(1) meet the delivery schedule for all requirements in accordance with (IAW) the delivery schedule included per contract line item number (CLIN) in the corresponding contract, (2) repair and return each asset to the Government in serviceable condition, and (3) provide timely and accurate reporting in
CAVAF.
1.1 Benefit to the United States Air Force (USAF): This acquisition will benefit the United States Air Force (USAF) by ensuring serviceable inventory of this part, thus enabling the TH-1H helicopter program to continue training pilots and aircrew-members who will be conducting combat search and rescue missions in support of the U.S. warfighter and its allies.
1.2 Background: The TH-1H is a refurbished Bell UH-1H helicopter with an installed Huey II kit, which encompasses a more powerful engine, new dynamic components, a new nose, and tail boom.
The cockpit and mission equipment upgrades include a change from analog to digital cockpit, the addition of crashworthy seats, and total re-wiring. The upgraded avionics components are almost exclusively commercial-off-the-shelf (COTS) items. These modifications transformed a legacy helicopter (i.e. UH-1H) into a state-of-the-art training platform (i.e. TH-1H) compatible with future operational aircraft. This undergraduate training helicopter platform develops comprehensive pilot skills and enables a more rapid transition of those skills across multiple aircraft. The TH-1H’s advanced electronics provide expanded training opportunities and improved operational capabilities by upgrading the engine, transmission, and rotor system. It has multi-function displays allowing for future upgrades and provides new aircrews with a seamless transition from the TH-1H to a follow-on rotary wing aircraft such as the CV-22 and the Combat Search and Rescue-X helicopters.
[CONTINUE TO NEXT PAGE]
Page 3 PWS_FD2060-25-00334 PWS REVISION: 00
2.0 Services Summary (SS):
Performance Objective PWS Reference Performance Threshold Meet delivery schedule for all requirements
4.0 Contractor shall repair and ship assets
to the Government within the agreed number of days in the contract after receipt of item or receipt of order, whichever is later. Only one (1) schedule slippage is allowed per contract quarter. In the event there is a need for long-lead-time parts, the Contractor shall notify the Government PCO within ten calendar days of making this determination.
Quality of CDRL deliverable 4.2.1 There shall be no more than one (1) rejection of any deliverable. There shall be no more than one (1) total rejection(s) of deliverables per contract quarter. The Government will reject a deliverable if any technical errors or one (1) or more minor errors are found within the deliverable. The rejected deliverable shall be corrected and resubmitted within ten (10) business days of notification of Government rejection.
Receipt of CDRL deliverable 4.2.2 There shall be no more than one (1) late receipt(s) of deliverables per contract quarter. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.
Comply with the quality levels of repair necessary to return assets to serviceable condition
4.3.8 There shall be no more than one Product
Quality Deficiency Reporting (PQDR) during this 12-month period of performance.
Page 4 PWS_FD2060-25-00334 PWS REVISION: 00
Maintain prompt and correct CAV-AF Reporting
4.7 The Contractor shall provide data on
the actions conducted for each unit. The Contractor shall report monthly or as actions occur.
Table 1: Services Summary
3.0 Government Property and Services:
3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in their possession in accordance with the Federal Acquisition Regulation (FAR) and applicable supplements (further details are included in the next paragraph) and as specified in the contract/order.
3.2 Government Property to be Provided: No Government property such as material, equipment, and information used to perform repairs will be provided IAW this PWS; however, the repairable assets being provided to the Contractor are identified and tracked as Government Furnished Property (GFP) and will be referenced as such.
3.3 Loss of Government Property
3.3.1 Definition of Loss of Government Property: “Loss of Government property” means unintended loss of (or damage to) Government property including property that cannot be found after a reasonable search; loss due to inadequate storage; loss due to lack of security and/or theft; damage requiring repair to restore the item to usable condition; or damage that renders the property useless for its intended purpose, i.e. Beyond Economical Repair (BER). Loss of Government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing.
Unless otherwise stated in the contract/order, loss of Government property does not include normal and reasonable inventory adjustments, i.e. losses of low priority consumable material, such as common hardware, as agreed to by the Contractor and the Government Property Administrator.
3.3.2 Reporting Loss of Government Property: The Contractor shall report loss of Government property in the GFP Module located in PIEE, https://piee.eb.mil/piee-landing/.
3.3.3 Return or Retention of Government Property: All property provided by the Government remains the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the Procuring Contracting Officer (PCO) directs the Contractor to retain the property for continued use under a successor contract. All Government property shall be returned to the Government in the condition provided unless approved in advance by the PCO. All material generated under the contract/order becomes the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the PCO directs the Contractor to retain the material for continued use under a successor contract.
4.0 Technical Requirements: The Contractor is required to perform depot level repair of the TH-1H Pilot Warning Alarm Set (NSN 6340-01-153-8073, PN 205-074-033-103). There shall be no more than one late delivery per contract quarter. The Contractor shall notify the Government if the delivery
Page 5 PWS_FD2060-25-00334 PWS REVISION: 00 of any asset will not meet the scheduled delivery date specified in the contract. In the event there is a need for long-lead-time parts, the Contractor shall notify the Government PCO within ten calendar days of making this determination. The Contractor shall repair and ship assets to the Government within the agreed number of days in the contract after receipt of item or receipt of order, whichever is later.
4.1 Period and Place of Performance
4.1.1 Contract/Order Period of Performance: The period of performance for the contract/order will begin in September of FY25 and end in September of FY26;
however, it will not exceed a total duration of 12 months.
4.1.2 Place of Performance: These services shall be performed at the Contractor’s facility.
4.2 Contract Data Requirements List(s) (CDRL)
Document Identifier 1-Year Effort
DID Title PWS Reference
A001 DI-
MGMT-
81838
Commercial Asset Visibility-Air Force (CAV-AF) Reporting
4.7
A002 DI-
MGMT-
80441D
Government Property Inventory Report
4.3.10.1
A003 DI-
PSSS-
81995A
Contract Depot Maintenance Production Reports
4.3.10.2
A004 DI-
MGMT-
81803A
IUID Marking Plan
4.4.2
A005 DI-
MGMT-
81804A
IUID Marking Activity, Validation, and Verification Report
4.4.4
A006 DI-
MISC-
81832
Counterfeit Prevention Plan
(CPP)
4.6
A007 DI-
SAFT-
81563
Accident/Incident Report
5.5.2
A008 DI-
QCIC-
80125B
GIDEP Alert-Safe Alert Report
4.8
Table 2: CDRLs
Page 6 PWS_FD2060-25-00334 PWS REVISION: 00
4.2.1 Quality of CDRL Deliverables: There shall be no more than one (1) rejection of any deliverable.
There shall be no more than one total rejection of deliverables per contract quarter. The Government will reject a deliverable if any technical errors (i.e. one or more minor errors) are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS, and/or contract. A minor error is exemplified by a typographical error, a grammatical error, etc. The rejected deliverable shall be corrected and resubmitted within ten business days of notification of Government rejection.
4.2.2 Receipt of CDRL Deliverables: CDRL deliverables shall be submitted via Wide Area WorkFlow (WAWF) and submitted directly to the MFT member identified on the CDRL. There shall be no more than one late receipt of deliverables per contract quarter. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.
4.3 Maintenance Records
4.3.1 Condemnation and Overhaul: The Contractor shall be required to repair all assets provided by the government unless the Procuring Contracting Officer (PCO) via the Administrative Contracting Officer (ACO) provides written direction indicating otherwise.
Requests for condemnation shall be submitted in writing through the ACO to the PCO within ten calendar days following the initial inspection/functional testing. Condemnations shall not be requested due to the unavailability of replacement parts. Condemnations may only be granted if the item inducted for repair manifests one or more of the following conditions:
a. Physical damage has affected greater than 75 percent of the material within the end-item (i.e. crushed).
b. Burn damage has affected greater than 80 percent of the internal electrical components and connections of the end-item.
c. Repair cost is greater than 75 percent of the cost to purchase a new end-item.
d. Beyond Economical Repair (BER): Requests for condemnation shall be submitted in writing to the Government PCO within five workdays of the intent to condemn.
Condemnation authority shall be requested when the cost to repair the asset exceeds 75 percent of the unit’s replacement cost. The Contractor shall not charge the full repair cost but instead will only charge the negotiated firm-fixed-price associated with the BER Contract Line Item Number (CLIN). The PCO retains the right to request enlarged color photographs of any proposed condemned end-item. The photographs shall clearly portray the extent of damage to the end-item and/or effects of overheating. One photograph shall be of the entire end-item showing the part number and serial number.
The results of any electrical testing performed on the end-item shall also be submitted for review. The Contractor shall be required to submit the proposed condemned end-item to the Government’s technical representative for evaluation, confirmation, and/or disposition instructions.
4.3.2 Teardown, Test, and Evaluation (TT&E): TT&E is performed by the Contractor to determine (1) the cause of failure and (2) the extent of tasks needed prior to conducting actual repair of the item. When situations occur where an asset is provided to the Contractor for repair, but the Contractor's inspection concludes that the item is "No Fault Found", they shall notify the PCO of such findings within five workdays and specify the part number. The Contractor shall not charge the full repair cost, but only the NFF or TT&E actions according to the negotiated CLIN.
Page 7 PWS_FD2060-25-00334 PWS REVISION: 00
4.3.3 The Government is authorized to replace condemned end-items with replacement repairable end-items of the same NSN at no additional cost. The Contractor is authorized reclamation from condemned units. The Contractor shall request authorization from the PCO prior to reclaiming any items from the condemned unit. The Contractor shall report the use of reclaimed items to the
PCO.
4.3.4 Accessory and Component Reuse, Repair, and Replacement: Items received which are misidentified, misdirected, or have Air Force recoverable subassemblies missing shall be reported through the ACO to the PCO, and to 411 SCMS/GULBA for disposition instructions. Missing repairable Expendability, Reparability, Recoverability Code (ERRC) “T” subassemblies that are generated as part of the Next Higher Assembly (NHA) and subsequently require condemnation will be replaced by the Government. The replacement item may be repairable or serviceable. The repair (if required) and the installation of the replacement item into the NHA will be accomplished at no additional cost.
4.3.5 Upon approval by the Government, the Contractor is authorized to cannibalize Shop Replaceable Units (SRU) necessary to accomplish timely completion to meet production schedule and/or accomplish repair of Mission Capable (MICAP) requirements. All cannibalized components will be returned to a pre-cannibalized condition. The Contractor shall maintain a record of the part number (as well as serial number) of each cannibalized unit from which parts/components were removed and installed.
4.3.6 Facility Requirements: The Contractor shall provide a facility for performing the contracted work-scope. The facility shall serve as the depot to carry out the repair and will include Contractor-owned test equipment, fixtures, adapters, and workbenches needed to return each asset to serviceable condition.
4.3.7 Repairable components will be repaired IAW the OEM’s technical data and specifications for the item.
4.3.8 Quality: The Contractor’s quality program shall be established and maintained IAW the prescribed higher-level quality standard or equivalent. The Contractor’s quality program shall meet the requirements of ISO 9001:2015 or equivalent. When requested, the Contractor shall assist the cognizant Contract Administration Office in evaluating Product Quality Deficiency Reports (PQDR) and exhibits for defects reported on items repaired under this contract to determine the root cause for deficiencies. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies shall be an integral part of the Contractor’s Quality Program. The Contractor shall establish and maintain a program to accomplish the requirements set forth in Air Force T.O. 00-35D-54, Technical Manual: USAF Deficiency Reporting, Investigation, and Resolution (01-SEP-2015). There shall be no more than one PQDR during this 12-month period of performance.
4.3.9 The Contractor shall complete DD Form 1574 Serviceable Tags IAW MIL-STD-129.
They shall ensure the DD Form 1574 Serviceable Tag is attached to the asset.
4.3.10 Maintenance Records, Forms, and Publications
4.3.10.1 Government Property Inventory Report: The Contractor shall perform an annual 100% physical inventory during the period of performance of this contract. This shall include any subcontractor inventories where GFP has been provided by the Government to receive repair services.
Page 8 PWS_FD2060-25-00334 PWS REVISION: 00
All results, findings, and corrective actions of any annual physical inventories shall be provided to the Government in accordance with FAR Part 52.245-1(f)(1)(iv), Physical Inventory. (CDRL A002, DI- MGMT-80441D, Government Property Inventory Report)
4.3.10.2 Maintenance Records, Forms, and Publications: Contract Depot Maintenance Production Reports shall require the Contractor to submit monthly production status reports for the duration of the delivery order. The Contractor shall ensure the delivery schedule is met for all requirements. After receipt of order and assets, the Contractor shall repair and ship assets to the Government within the negotiated number of calendar days that are stated in the contract. (CDRL A003, DI-PSSS-81995A, Contract Depot Maintenance Production Reports)
4.3.10.3 Over and Above: Over and above (O&A) work (as defined in this paragraph) requires prior approval by the PCO. O&A work is defined as additional labor and material needed to make the item functional, such as Line Replaceable Units (LRUs) which do not include a full complement of Shop Replaceable Units (SRUs), units that are not in a proper configuration, units that are returned due to operation outside designed limits, mishandling, and misuse or battle damage. O&A charges may be considered for approval to cover the cost of disposing of any assets deemed “beyond economical repair.” O&A charges may also be considered for approval to cover the costs of any updates, repairs, modifications, etc. to existing test equipment/computers required as a result of the implementation of security software patches on the test equipment and computers. O&A does not cover inflation on Firm Fixed Priced contracts, nor is it intended to account for the contractor’s oversight of potential cost-drivers that were not originally identified when bidding on the solicitation. The contractor shall (in good faith) only request O&A funding when the scope of the effort is significant. The contractor shall submit to the PCO a detailed quote and teardown report for each unit requiring O&A work and shall not proceed with any work until the O&A is approved, the basic contract is modified, and the O&A is funded on a Task Order.
4.4 Item Unique Identification (IUID)
4.4.1 IUID Requirements: Item identification and valuation, referred to as Unique Item Identification (IUID), is a method of marking items with unique item identifiers which have machine-readable data elements. Unique item identification is required for all items that are to be delivered to the DoD that meet the criteria established IAW the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract.
4.4.2 Item Unique Identification: The Contractor shall mark items IAW Military Standard (MIL-STD)-130N, Department of Defense Standard Practice / Identification Marking of U.S.
Military Property. The plan must be approved by the Government Engineering organization prior to implementation. (CDRL A004, DI-MGMT-81803A, IUID Marking Plan)
4.4.3 IUID Registry: In accordance with the DoD Guide to Uniquely Identifying Items Assuring Valuation, Accountability and Control of Government Property, the Government user will add item(s) to the DoD IUID Registry. The Government user or Contractor representative responsible for causing “life cycle events” (i.e., abandoned, consumed, destroyed by accident, destroyed by combat, donated, exchanged – repair, exchanged – sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold
– foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update the item record(s) in the DoD IUID Registry.
4.4.4 IUID Marking Activity, Validation, and Verification Report: The Contractor shall provide
Page 9 PWS_FD2060-25-00334 PWS REVISION: 00 an IUID Marking Activity and Verification Report. A key attribute for the report is the Verification column which indicates pass/fail for each item’s Data Matrix Symbol Quality. (CDRL A005, DI- MGMT-81804A, IUID Marking Activity, Validation, and Verification Report)
4.5 Packaging
4.5.1 The Contractor shall package and mark end-items and components IAW the contract’s Air Force Materiel Command (AFMC) Form 158, Packaging Requirements; MIL-STD-129P, Department of Defense Standard Practice / Military Marking for Shipment and Storage; MIL- STD- 130N, Department of Defense Standard Practice / Identification Marking of U.S. Military Property;
and MIL-STD-2073-1D, Standard Practice for Military Packaging. The Contractor shall ensure that classified material is packaged, marked, and shipped IAW DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM). The Contractor shall package and mark material in accordance with other applicable Government regulations including, but not limited to, those regarding security, safety and environmental concerns.
4.5.2 The Contractor shall package and mark material for movement, shipment, receipt, and storage in a manner that ensures the protection and preservation of the material for shipment and storage at the destination. As applicable, the Contractor shall package electronic parts susceptible to static discharge damage IAW MIL-STD-1686C, Military Standard: Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices).
4.5.3 In accordance with MIL-STD-2073-1D, shipping containers received, which meet the requirements of the AFMC Form 158 and are suitable for return shipment of serviceable assets, shall be reclaimed and stored for reutilization. Unsuitable shipping containers shall be disposed of and replaced with new containers that meet the requirements of the AFMC Form 158.
4.6 Counterfeit Prevention Plan (CPP): The Contractor shall establish and maintain a counterfeit electronic part detection and avoidance system to mitigate the risk of counterfeit electronic parts being installed in end-items or otherwise entering the USAF/DoD inventory. These policies and procedures shall be documented in a CPP for submission and approval in accordance with the Data Item Description (DID) DI-MISC-81832 and accomplished for all specified contract items. DI-MISC- 81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the DoD-adopted SAE 5553, Aerospace Standard, Counterfeit Electronics Parts;
Avoidance, Detection, Mitigation, and Disposition shall also apply. (CDRL A006, DI-MISC-81832, Counterfeit Prevention Plan (CPP))
4.7 Commercial Asset Visibility-Air Force (CAV-AF) Reporting: The Contractor is required to comply with all CAV-AF requirements identified in the CDRLs and attachments to the contract and shall report production in CAV-AF. Additionally, upon completion of the repair, the contractor is required to print the DD1348-1 (in triplicate) from CAV-AF. One copy is to be placed inside the box with the returnable repair asset, one outside the box, and one copy will be electronically uploaded to WAWF as part of the Receiving Report (DD250). The Contractor shall provide data on the actions conducted for each unit and report as actions occur. If CAV-AF training is required, Contractor personnel may send an email to: 406scms.cav.af.ar@robins.af.mil. (CDRL A001, DI-MGMT- 81838, Commercial Asset Visibility-Air Force (CAV-AF) Reporting)
Page 10 PWS_FD2060-25-00334 PWS REVISION: 00
4.8 Government-Industry Data Exchange Program (GIDEP) Alert-Safe Alert Report: The Contractor shall participate in GIDEP in accordance with GIDEP Operations Manual S0300-BT- PRO-010, Government-Industry Data Exchange Program. (CDRL A008, DI-QCIC-80125B, Government-Industry Data Exchange Program Alert-Safe Alert Report)
4.9 Joint Government and Contractor Inspections
4.9.1 Defense Contract Management Agency (DCMA) will participate in all steps of the incoming unpacking steps performed by the Contractor on every component funded for repair.
4.9.2 DCMA will participate in the Contractor’s process to package the components prior to shipment to the Government.
4.10 Missing on Induction
4.10.1 The Contractor shall identify end-items with components and/or parts that are “Missing upon Induction” found via incoming inspection and test or during unpacking. The Contractor shall notify the Government PCO in writing with a list of missing parts to include part number, quantity, and item description.
4.10.2 End-items with components and/or parts that are “Missing upon Induction” will require incorporating a “Missing Part CLIN” to allow payment for replacement parts.
5.0 General Information
5.1 Continuation of Mission-Essential Services During a Crisis: Services Acquisition Lead (SAL) as defined by DAFI 63-138 has determined these services are not mission-essential and will not continue in the event of a crisis.
5.2 Security Requirements
5.2.1 Actual knowledge and/or generation of classified information and/or Controlled Unclassified Information (CUI) are not expected to be necessary for the performance of this contract/order.
Contractor personnel are required to comply with security requirements to preclude potential security incidents or violations. If a change in the security classification of the contract/order becomes necessary after the contract/order award, the Contractor shall make a reasonable effort to continue performance of tasks under the contract/order in compliance with the change in security classification in Security Requirements.
5.2.2 Government Security Regulations: The Contractor shall ensure personnel, information, system, property, facility and international security requirements are met. The Contractor shall comply with Government security regulations including, but not limited to, DoD 5200.2-R, Personnel Security Program; DoD 5220.22-M; DoD Directive (DoDD) 5205.02E, DoD Operations Security (OPSEC) Program; DoD Manual 5205.02-M, DoD Operations Security (OPSEC) Program Manual.
5.2.3 Security Clearance: Contractor clearances are not required under this contract. Contractor personnel shall not be authorized access to classified information and/or CUI and classified items or be permitted to work on classified projects and/or programs without a valid security clearance
Page 11 PWS_FD2060-25-00334 PWS REVISION: 00 and a need-to-know. If security clearances become necessary after the contract/order award, the Contractor shall ensure applicable Contractor personnel obtain valid security clearances appropriate to the access required for proper accomplishment of contract/order requirements.
5.2.4 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall ensure compliance with DoDD 5205.02E and DoD Manual 5205.02-M to protect United States (U.S.) Government interests.
5.2.5 Security Incident or Violation: The Contractor shall immediately notify the Government Security Office of any potential or actual security incident or violation including potential or actual unauthorized disclosure or compromise of classified information and/or CUI, as applicable.
5.2.6 Security of Contractor System(s): The Contractor shall ensure that the security of Automated Information System(s) (AIS) at the Contractor’s facility is capable of precluding potential security incidents or violations including potentially unauthorized disclosure or compromise of classified information and/or CUI, as applicable.
5.2.7 Access to Government System(s): The Government will provide contractor/subcontractor personnel access to system(s) necessary to perform tasks under the contract/order. The Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified or classified Government Automated Information System (AIS) have the respective background check or security investigation conducted. At a minimum, the Contractor shall ensure contractor/subcontractor personnel who require access to an unclassified AIS have a National Agency Check with Inquiries (NACI) conducted. Upon completion/termination of the contract/order or transfer/termination of contractor/subcontractor personnel, the Contractor shall ensure the system account(s) are closed.
5.2.7.1 Access to AutoTAR/ETAR for AFMC Form 202 submission: Contractor must contact the assigned Procurement Contracting Officer (PCO) and/or the assigned Contracting Officer Representative (COR) in order to obtain a Non-classified Internet Protocol Router Network Enterprise Alternate Token System (NEATS) smart card which will allow them to access the system.
Contractor shall contact WR-AFLCMC/WIU Rotary Engineering, to coordinate submission of an automated System Authorization Access Request (Form 2875) for system access and registration in the AutoTAR/ETAR system and registration within the AutoTAR/ETAR application (https://afsc202.robins.af.mil).
5.2.7.2 Access to the Enhanced Technical Information Management System (ETIMS): The contractor must have a Technical Order Distribution Office (TODO) account in order to obtain copies of the referenced WS publications. If an account has not been established, the Offeror must establish a TODO account upon contract award by processing an AFTO Form 43, USAF TODO Assignment or Change Request in accordance with TO 00-5-1. The IBM Lotus version of the AFTO Form 43 can be downloaded at http://www.e-publishing.af.mil/. Alternatively, prospective contractor TODOs may download and use the pdf version of the AFTO Form 43 at https://techdata.wpafb.af.mil/toprac/form cv cs.htm. All versions of the form include detailed completion instructions. Local TOMA for Weapon System tech data access will be provided after AFTO Form 43 is authorized.
5.3 Environmental Management System (EMS): Services will be performed at the Contractor’s facility; therefore, the local EMS requirements do not apply to this effort. This statement does not exempt the Contractor from any other Federal, State, or local https://afsc202.robins.af.mil/
Page 12 PWS_FD2060-25-00334 PWS REVISION: 00 statutes/requirements.
5.4 Agency Affirmative Procurement Programs: In accordance with FAR 23.404, Agency Affirmative Procurement Programs, 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list (https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products) and/or United States Department of Agriculture (USDA)-designated products included in the bio-based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio-based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.
5.5 Safety Requirements
5.5.1 Contractor Environmental, Safety, and Occupational Health Compliance: The Contractor shall comply with Government Safety and Health regulations including, but not limited to, Public Law 91-596, Occupational Safety and Health Act (OSHA), and DoD Directive 4715.01E, Environmental, Safety, and Occupational Health (ESOH). The Contractor shall establish and maintain a safety and health program detailed in a written Contractor’s Safety and Health Plan (SHP). The Contractor shall require all subcontractors to comply with required safety, health and fire standards.
5.5.2 Mishap Notification/Investigation: In accordance with DAFI 91-204, Safety Investigations and Reports, the Contractor shall report mishaps involving damage or injury to USAF assets/interests. The Contractor shall ensure the USAF is notified of mishaps. The Contractor shall contact the Contracting Officer (CO) or the Contracting Officer’s Representative (COR), if available, or another MFT member by telephone within eight (8) hours of any damage to government property where the dollar value exceeds $600,000.00, and within two workdays for any damage to government property less than $600,000.00 during the execution of the contract. Mishap notifications shall contain, at a minimum, the following information:
a. Contract, contract number, name and title of person(s) reporting
b. Date, time, and exact location of accident/incident
c. Brief narrative of accident/incident (events leading to accident/incident)
d. Cause of accident/incident (if known)
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
If requested by the designated CO or COR, the Contractor shall immediately secure the mishap scene (and damaged property) and impound pertinent maintenance and training records until released by the https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products http://www.biopreferred.gov/
Page 13 PWS_FD2060-25-00334 PWS REVISION: 00
Government’s safety office. Such a release shall be accomplished through the Contracting Officer.
The Contractor shall cooperate and assist Government personnel in the investigation of the mishap and submit an Accident/Incident Report within 48 hours of the mishap. [CDRL A007, Accident/Incident Report, DI-SAFT-81563]
5.6 Inspection of Services: Inspection of Services will be accomplished in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract. The Government reserves the right to inspect Contractor performance.
5.7 Trafficking in Persons: The Contractor shall comply in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons. http://www.state.gov/j/tip
5.8 Invoicing/Payment and Receipt/Acceptance: The Contractor shall submit/process payment requests and receipt/acceptance documents via WAWF.
5.9 Service Contract Reporting (SCR): The contract does not meet the DoD Contract Reporting criteria or the dollar threshold (i.e. total obligations >$3M); therefore, SCR does not apply.
6.0 Appendices
Appendix A: References
Publication Number Publication Title
Publication Date
Specific Paragraph Reference
AFI 91-204 Safety Investigations and Reports 15 May 80 Para(s) 2.4.6.1.1;
1.3.1.1; and 2.4.6.1.2
DoDD 4715.1E Environmental, Safety, and Occupational Health (ESOH)
19 Mar 05 Entire
DoD Manual 5205.02-M
DoD Operations Security (OPSEC) Program Manual
3 Nov 08 Entire
DoD 5205.02E DoD Operations Security (OPSEC) Program
20 Jun 12 Entire
32 CFR Part 117 National Industrial Security Program Operating Manual
24 Feb 2021 Entire
GIDEP Operations Manual S0300-BT-
PRO-010
Government-Industry Data Exchange Program (GIDEP)
15 Sep 10 Entire
ISO 9001:2008 Quality Management Systems Requirements
May 2012 Entire http://www.state.gov/j/tip
Page 14 PWS_FD2060-25-00334 PWS REVISION: 00
MIL-STD-129 Military Marking for Shipment and Storage
18 Feb 14 (Rev “R”) Entire
MIL-STD-129P
With Change 4
Military Marking for Shipment and Storage
19 Sep 07 Entire
MIL-STD-130N
(w/Change 1)
DoD Standard Practice Identification Marking of U.S.
16 Nov 12 Entire
MIL-STD-1686C Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies, and Equipment
25 Oct 95 Entire
MIL-STD-2073-1d Standard Practice for Military Packaging
10 May 02 Entire
Public Law 91-596 Occupational Safety and Health Act
(OSHA)
1 Jan 04 Entire
T.O. 00-20-2 Maintenance Data Documentation Sep 2010 Entire
T.O. 00-25-234 General Shop Practice Requirement for the Repair Maintenance and Test of Electrical Equipment
Aug 1998 Chg. 38 Sep 2009
Entire
T.O. 00-35D-54 USAF Deficiency Reporting, Investigation, and Resolution
Oct 2009 Entire
| Performance Work Statement |
| for |
| Repair of Pilot Warning Alarm Set |
| Applicable to the TH-1H Helicopter Program |
| Purchase Request: FD2060-25-00334 |
| 2.0 Services Summary (SS): |
| 3.0 Government Property and Services: |
| 3.3 Loss of Government Property |
| 4.1 Period and Place of Performance |
| 4.2 Contract Data Requirements List(s) (CDRL) |
| 4.3 Maintenance Records |
| 4.3.10 Maintenance Records, Forms, and Publications |
| 4.4 Item Unique Identification (IUID) |
| 4.5 Packaging |
| 5.0 General Information |
| 5.2 Security Requirements |
| 5.5 Safety Requirements |
| 6.0 Appendices |
File details come from the government source that posted it. Updated .