415_480V_PUMP_STATION_RACK_FRONT.pdf

PDF 245 KB Posted

Attached to
Pump Station Renewal & Replacement D25 - Phase I
Solicitation number
CC-6690-25/TAD
Issued by
Seminole County, Florida

About this file

Summary

This document is a technical diagram from the Seminole County Utilities Department showing the electrical and structural specifications for a 480V pump station rack installation. The diagram outlines the front elevation and plan view of the pump station equipment rack, which is part of the Pump Station Renewal & Replacement D25 - Phase I project. The project involves comprehensive improvements at three lift stations: Wembly Park, Heathrow Woods #2, and Carrington Park, with additional scope including the demolition of Lake Sylvan Oaks and installation of gravity sewer to an adjacent manhole. The contractor must be a State of Florida certified General Contractor, Underground Utility, and Electrical contractor with experience in pump station renewal, replacement, or rehabilitation. The project timeline extends 160 days to Substantial Completion and an additional 20 days to Final Completion, totaling 180 days from Notice to Proceed. A mandatory pre-proposal meeting is scheduled for September 3, 2025, at Sawyer Lake Park, with bid responses due September 24, 2025, at 2:00 p.m. The Engineer's estimated project cost is $3,262,335.00.

The diagram specifies technical requirements for the pump station rack, including specifications for fused and non-fused disconnects, power monitor enclosures, conduit specifications, and grounding and bonding systems in accordance with the National Electrical Code. All work must comply with Florida engineering standards and receive approval by a Florida-licensed Professional Engineer. The contract requires comprehensive insurance coverage with limits of $1,000,000 per occurrence for most categories, including Workers' Compensation, Commercial General Liability, Business Automobile Liability, Excess/Umbrella Liability, Pollution Liability, and Professional Liability. Contractors are subject to liquidated damages of $250 per day for project delays, with 5% retainage applied to construction progress payments. Minority and Women-owned Business Enterprises are encouraged to participate, and bidders must submit electronic responses through the Seminole County website at https://secure.procurenow.com/portal/seminolefl.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPD

FUSED DISC.METER

PCP

(60"Hx36"Wx16"D)

RESERVED

FOR ATS

DEMARCATION ENCLOSURE

(TYP 3 FOR DUPLEX)

M

IN

. 3 6"

O R

AS

R

EQ

. B

Y C

O D

E O

R W

IN

D

L O

AD

PLAN VIEW

NON-FUSED

DISC.

FRONT ELEVATION

CONDUITS TO

WET WELL

NOTES:

1. THIS DIAGRAM IS NOT PROJECT SPECIFIC. A DIAGRAM SHALL BE MODIFIED AND APPROVED BY A FLORIDA LICENSED

PROFESSIONAL ENGINEER

2. DETAILS 415, 416, 418, 421, & 422 ARE A SET AND ACCOMPANY EACH OTHER.

3. PUMP MOTOR CONDUIT SHALL BE SIZED TO ACCOMMODATE 40% CONDUIT FILL, MINIMUM SIZE SHALL BE 2".

4. GROUNDING AND BONDING SYSTEM SHALL BE INSTALLED AS PER THE NEC, REF. DETAILS 411 & 412.

5. RIGID ALUMINUM CONDUIT SHALL BE USED ABOVE GRADE, TRANSITION TO PVC SCH 80 BELOW GRADE OR SLAB.

6. PROVIDE CORROSION PROTECTION AT ALL METALLIC CONDUIT AND POSTS SET IN CONC. OR DIRECT BURIED.

WATERTIGHT ALUM.

HUB (TYP)

RIGID ALUM. CONDUIT,

TYP ABOVE GRADE

TRANSITION TO

SCH 80 PVC BELOW

GRADE OR SLAB

PROVIDE CLEAR

ACCESS TO GEN.

RECEPTICAL

" M

AX

M

IN

PCP

(60"Hx36"Wx16"D)

DEMARCATION

ENCLOSURE

(TYP 3 FOR

DUPLEX)

P1 P2LI/PI

3" STAINLESS STEEL

316 POST (TYP)

1-1/2" STAINLESS STEEL

316 CHANNEL WITH

STAINLESS STEEL "U"

BOLTS, LOCK WASHERS

AND NUTS (TYP)

STAINLESS STEEL CAP

OR PLUG (TYP)

" M

IN

" M

AX

M

IN

TYPE EYSR

SEAL-OFFS (TYP)

PANEL & RACK

GROUNDING

PM

POWER MONITOR ENCLOSURE

POWER MONITOR

ENCLOSURE

(8"Hx8"Wx6"D)

NEMA 4X STAINLESS STEEL

POWDER COATED WHITE

NEMA 4X STAINLESS STEEL

POWDER COATED WHITE

DATE:

FIGURE:

SEMINOLE COUNTY UTILITIES DEPARTMENT - UTILITIES ENGINEERING DIVISION

480V PUMP STATION RACK FRONT

XX/XX/XX

alaforce Architect

Sheets and Views
415 480V PUMP STATION RACK FRONT