415_480V_PUMP_STATION_RACK_FRONT.pdf

PDF 245 KB Posted

Attached to
Pump Station Renewal & Replacement D25 - Phase I
Solicitation number
CC-6690-25/TAD
Issued by
Seminole County, Florida

About this file

This technical drawing is from the Seminole County Utilities Department - Utilities Engineering Division, depicting a detailed schematic for a 480V Pump Station Rack Front design. The diagram provides a comprehensive front elevation and plan view of an electrical infrastructure setup, specifically focusing on the layout and configuration of electrical components including a power control panel (PCP), demarcation enclosure, meter, disconnects, and associated conduit routing. The drawing includes precise measurements and positioning for various electrical elements, with specific notes about installation requirements, such as using rigid aluminum conduit above grade and transitioning to PVC Schedule 80 below grade or slab.

The technical drawing emphasizes critical installation details, including grounding and bonding system specifications per NEC standards, corrosion protection for metallic components, and specific positioning requirements for electrical equipment. Key components include a NEMA 4X stainless steel powder-coated white power monitor enclosure, stainless steel 316 posts and channels, and type EYSR seal-offs. The diagram is explicitly marked as non-project specific and requires modification and approval by a Florida licensed professional engineer, indicating it serves as a standard reference template for pump station electrical rack installations.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPD

FUSED DISC.METER

PCP

(60"Hx36"Wx16"D)

RESERVED

FOR ATS

DEMARCATION ENCLOSURE

(TYP 3 FOR DUPLEX)

M

IN

. 3 6"

O R

AS

R

EQ

. B

Y C

O D

E O

R W

IN

D

L O

AD

PLAN VIEW

NON-FUSED

DISC.

FRONT ELEVATION

CONDUITS TO

WET WELL

NOTES:

1. THIS DIAGRAM IS NOT PROJECT SPECIFIC. A DIAGRAM SHALL BE MODIFIED AND APPROVED BY A FLORIDA LICENSED

PROFESSIONAL ENGINEER

2. DETAILS 415, 416, 418, 421, & 422 ARE A SET AND ACCOMPANY EACH OTHER.

3. PUMP MOTOR CONDUIT SHALL BE SIZED TO ACCOMMODATE 40% CONDUIT FILL, MINIMUM SIZE SHALL BE 2".

4. GROUNDING AND BONDING SYSTEM SHALL BE INSTALLED AS PER THE NEC, REF. DETAILS 411 & 412.

5. RIGID ALUMINUM CONDUIT SHALL BE USED ABOVE GRADE, TRANSITION TO PVC SCH 80 BELOW GRADE OR SLAB.

6. PROVIDE CORROSION PROTECTION AT ALL METALLIC CONDUIT AND POSTS SET IN CONC. OR DIRECT BURIED.

WATERTIGHT ALUM.

HUB (TYP)

RIGID ALUM. CONDUIT,

TYP ABOVE GRADE

TRANSITION TO

SCH 80 PVC BELOW

GRADE OR SLAB

PROVIDE CLEAR

ACCESS TO GEN.

RECEPTICAL

" M

AX

M

IN

PCP

(60"Hx36"Wx16"D)

DEMARCATION

ENCLOSURE

(TYP 3 FOR

DUPLEX)

P1 P2LI/PI

3" STAINLESS STEEL

316 POST (TYP)

1-1/2" STAINLESS STEEL

316 CHANNEL WITH

STAINLESS STEEL "U"

BOLTS, LOCK WASHERS

AND NUTS (TYP)

STAINLESS STEEL CAP

OR PLUG (TYP)

" M

IN

" M

AX

M

IN

TYPE EYSR

SEAL-OFFS (TYP)

PANEL & RACK

GROUNDING

PM

POWER MONITOR ENCLOSURE

POWER MONITOR

ENCLOSURE

(8"Hx8"Wx6"D)

NEMA 4X STAINLESS STEEL

POWDER COATED WHITE

NEMA 4X STAINLESS STEEL

POWDER COATED WHITE

DATE:

FIGURE:

SEMINOLE COUNTY UTILITIES DEPARTMENT - UTILITIES ENGINEERING DIVISION

480V PUMP STATION RACK FRONT

XX/XX/XX

alaforce Architect

Sheets and Views
415 480V PUMP STATION RACK FRONT

File details come from the government source that posted it. Updated .