40DHHS-S3269 3.3.1 Cost Proposal.docx
DOCX document 17 KB Posted
- Attached to
- Galletti Flooring - SRC
- Solicitation number
- 40DHHS-S3269
- Issued by
- Washoe County, Nevada
About this file
This is a cost proposal document for the 40DHHS-S3269 Sierra Regional Center (SRC) Flooring Maintenance project, involving the Department of Health and Human Services. The document provides a template for vendors to complete their cost breakdown, with designated sections for material costs and labor costs, ultimately calculating a total project cost. While specific details about the flooring maintenance project are limited in this document, it appears to be a solicitation for comprehensive flooring maintenance services at the Sierra Regional Center.
The cost proposal form indicates that vendors must provide a detailed cost breakdown, separating material and labor expenses to arrive at a total project cost. No specific pricing parameters, set-asides, or funding sources are evident from this document. The form suggests that interested vendors will need to complete the template with their specific cost structure for the flooring maintenance project, though additional supporting documentation would be required to fully understand the scope and requirements of the potential contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 40DHHS-S3269 3.1.1 Terms and Conditions for Services.pdf | ||
| 40DHHS-S3269 3.3.2 Proposed Staff Resume.docx | DOCX document | |
| 40DHHS-S3269 3.3.3 Reference Questionnaire~1.pdf | ||
| Certification regarding lobbying.pdf | ||
| Standardformcontract.docx | DOCX document | |
| 40DHHS-S3269 1.1.1 Request for Proposal.docx | DOCX document | |
| Insurance Schedule~5.docx | DOCX document | |
| 40DHHS-S3269 3.2.1 Scope of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
40DHHS-S3269
Sierra Regional Center (SRC) Flooring Maintenance
COST PROPOSAL
Vendor _______________________________________________________________________
| Item |
| Total Cost |
| Material Costs |
| $ |
| Labor Costs |
| $ |
| TOTAL COST OF PROJECT |
| $ |
File details come from the government source that posted it. Updated .