4-NW-BC043 Sucia Island Floating Pumpout Pile Installation-drwgs.pdf
PDF 5 MB Posted
- Attached to
- State Parks Project – Floating Pumpout Station Pile Installation at Sucia Island State Park
- Solicitation number
- NW-BC043
- Issued by
- Washington
About this file
Summary
This is a construction drawing set for the Washington State Parks and Recreation Commission's Sucia Island State Park Floating Sewer Pumpout Station project located in San Juan County, Washington. The project involves the installation of two 16-inch diameter galvanized steel piles and the installation of an owner-furnished aluminum floating pumpout barge designed to service recreational vessels. The drawings indicate the work is separated into two distinct contracts: a fabrication contract for procurement and delivery of the pumpout barge and an installation contract for pile procurement and installation plus barge commissioning. The project site is located at Sucia Island State Park (Tax Parcel 282531001000) at coordinates 48°45'7.88"N, 122°54'7.78"W. The piles are specified as ASTM A252 Grade 3 steel with hot-dip galvanized coating, requiring installation to tip elevations of -52.0 feet MLLW with cutoff elevations at +16.0 feet MLLW. The project requires rock socketing with minimum 10-foot embedment into bedrock, vibratory and impact hammering capability, and marine mammal and marbled murrelet monitoring in accordance with permit requirements. The barge is a 32-foot by 34.5-foot aluminum hull vessel with a 3,000-gallon holding tank capacity, featuring manual sewage pumps, washdown capability, and navigation lighting.
The installation contractor is responsible for all materials, labor, equipment, survey control establishment, and environmental protection measures including protection of existing eelgrass beds. The contractor must submit survey control information, drilling and rock socketing plans, and pile logs to the Washington State Parks owner for approval at least 15 business days prior to commencing work. Design standards reference IBC, ANSI/AISC 341 for structural steel, and applicable ASTM standards current as of the bid date. The design loads include 100 psf uniform and 400 lb point loads on deck surfaces, 30 psf snow load, 104 mph design wind speed with wave loads of minimum 250 lb/ft and 2.5-foot significant wave height. The project accommodates design water levels ranging from mean lower low water at 0.0 feet to ordinary high water/high tide line at +10.87 feet MLLW. Compliance with local environmental protection standards, permitting laws, sound attenuation, water quality, and spill prevention requirements is mandatory. Any eelgrass bed damage resulting from contractor activities requires mitigation at no cost to the owner.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORCAS ISLAND
CANADA
UNITED STATES
SUCIA ISLANDS
WALDRON
ISLAND
PATOS ISLAND
NORTH
PROJECT LOCATION
NORTH
VICINITY MAP
APPROVED FOR CONSTRUCTION
Area Manager: AARON DAVIDSON date date
CA
D#
: S
0-
-2
PR
OJ
EC
T
TI
TL
E
S
UC
IA
IS
LA
ND
F
LO
AT
IN
G
SE
W
ER
P
UM
PO
UT
S
TA
TI
ON
INDEX
DESCRIPTIONSHEET
SUCIA ISLAND STATE PARK
SEC-26 T-38-N R-2-W
SAN JUAN COUNTY - TAX PARCEL NUMBER #282531001000
LATITUDE: 48° 45' 7.88°N
LONGITUDE: 122° 54' 7.78°W
SUCIA ISLAND STATE PARK
FLOATING SEWER PUMPOUT STATION
REGION MANAGER
WASHINGTON STATE PARKS
& RECREATION COMMISSION CAPITAL PROGRAM MANAGER
COVER SHEET
PROJECT TEAM
GENERAL NOTES
OVERALL SITE PLAN
PUMPOUT BARGE SITE PLAN
BARGE DETAILS
PUMPOUT BARGE PROFILE
PROJECT LOCATION
SUCIA ISLAND STATE PARK
VANCOUVER ISLAND
BRITISH COLUMBIA
STRAIT OF
GEORGIA
BRITISH COLUMBIA
STRAIT OF
JUAN DE FUCA
PACIFIC OCEAN
WASHINGTON
PROJECT LOCATION
SUCIA ISLAND STATE PARK
HOLLY WILLIAMS, CHAIR
SCOTT MERRIMAN
ALI RAAD
SOPHIA DANENBERG
LAURIE CONNELLY
ALFIE ALVARADO-RAMOS
DIANA DUPUIS, DIRECTOR
06/16/2025
7/8/25
PROJECT TEAM
STATE OF WASHINGTON
PARKS AND RECREATION COMMISSION
1111 ISRAEL ROAD SOUTHWEST
POST OFFICE BOX 42650
OLYMPIA, WASHINGTON 98504-2650
www.parks.wa.gov
WASHINGTON STATE PARKS AND RECREATION COMMISSION
220 N. WALNUT STREET
BURLINGTON, WASHINGTON 98233
JONATHAN GIBSON, P.E.
PROJECT REPRESENTATIVE
TELEPHONE: (360) 755-5262
Jonathan.Gibson@parks.wa.gov
OWNER:
OWNER'S REPRESENTATVE:
PROJECT ARCHITECTURAL AND ENGINEERING CONSULTANTS
PROJECT LEAD: EVAN EDGECOMB, P.E.
PRINCIPAL ENGINEER
TELEPHONE: (425) 977-2592
Evan.Edgecomb@mottmac.com
MOTT MACDONALD
1601 5TH AVE, STE 800
SEATTLE, WA 98101
www.mottmac.com
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
6/26/24
S890-3911-2022-PROJECT TEAM
EE 6/26/24
TM 6/26/24
PY 6/26/24
EE 6/26/24
SHEET 2 OF 7
SUCIA ISLAND
STATE PARK
FLOATING SEWER
PUMPOUT STATION
PROJECT TEAM
NONE
BID SET
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
6/26/24
S890-3911-2022-GENERAL NOTES
EE 6/26/24
TM 6/26/24
PY 6/26/24
EE 6/26/24
SHEET 3 OF 7
SUCIA ISLAND
STATE PARK
FLOATING SEWER
PUMPOUT STATION
GENERAL NOTES
NONE
GENERAL NOTES
1. THESE DRAWINGS WERE DEVELOPED WITH THE INTENT OF SEPARATING THE WORK INTO TWO
CONTRACTS:
A. SEWAGE PUMPOUT BARGE PROCUREMENT, FABRICATION, DELIVERY, AND COMMISSIONING
(PERFORMED BY FABRICATOR CONTRACTOR)
B. INSTALLATION OF SEWER PUMPOUT BARGE AND PROCUREMENT AND
INSTALLATION OF GUIDE PILES (PERFORMED BY INSTALL CONTRACTOR)
2. THESE NOTES CONTAIN GENERAL INFORMATION AND ARE NOT COMPREHENSIVE. VERIFY
INFORMATION PROVIDED HERE WITH THE SPECIFICATIONS AND OTHER REFERENCED
DOCUMENTS. BRING ANY CONFLICTS TO THE ATTENTION OF WASHINGTON STATE PARKS
(OWNER) BEFORE WORK IS INITIATED. THE OWNER WILL RESOLVE ANY SUCH CONFLICT.
3. VERIFY ALL DIMENSIONS AND DETAILS PRIOR TO FABRICATION AND CONSTRUCTION.
4. ABIDE BY ALL APPLICABLE LOCAL ENVIRONMENTAL PROTECTION STANDARDS, PERMITTING LAWS, AND REGULATIONS.
5. FOLLOW ALL APPLICABLE SAFETY REGULATIONS. METHODS OF DEMOLITION, CONSTRUCTION, AND ERECTION OF STRUCTURAL MATERIAL IS THE CONTRACTOR'S RESPONSIBILITY.
6. ALL LOCATIONS OF EXISTING FEATURES ARE APPROXIMATE AND HAVE BEEN ESTABLISHED FROM
AVAILABLE RECORDS AND LIMITED FIELD INVESTIGATIONS.
7. REVIEW SITE CONDITIONS PRIOR TO MOBILIZING ON SITE.
8. UNLESS EXPLICITLY NOTED OTHERWISE, THE FABRICATOR CONTRACTOR IS RESPONSIBLE FOR
ALL WORK SHOWN IN DRAWINGS RELATED TO THE PROCUREMENT, FABRICATION, DELIVERY,
AND PERMITS OF THE SEWER PUMPOUT BARGE, INCLUDING ALL LABOR, MATERIALS, TOOLS, AND
EQUIPMENT.
9. UNLESS EXPLICITY NOTED OTHERWISE, THE INSTALL CONTRACTOR IS RESPONSIBLE FOR ALL
WORK SHOWN IN THE DRAWINGS RELATED TO THE PROCUREMENT AND INSTALLATION OF THE
GUIDE PILES AND THE INSTALLATION AND COMMISSIONING OF THE SEWER PUMPOUT BARGE FOR
OPERATIONS.
ABBREVIATIONS
ALUM ALUMINUM
BM BENCHMARK
B.O. BOTTOM OF
CENTERLINE
CLR CLEAR
DF-L DOUGLAS FIR-LARCH
∅/DIA DIAMETER
E EAST/EASTING
EA EACH
EL ELEVATION
E.O. END OF
EW EACH WAY
FH FLATHEAD
FT FEET
FRP FIBER REINFORCED PLASTIC
HDPE HIGH DENSITY POLYETHYLENE
HSS HOLLOW STRUCTURAL SECTION
MAX MAXIMUM
MIN MINIMUM
N NORTH/NORTHING
NTS NOT TO SCALE
O.C. ON CENTER
OHW ORDINARY HIGH WATER
PE POLYETHYLENE
P.T. PRESSURE TREATED
PVC POLYVINYL CHLORIDE
REF FOR REFERENCE ONLY
REV REVISION
SF SQUARE FEET
S.O. START OF
SR STATE ROUTE
SIM SIMILAR
SS STAINLESS STEEL
STA STATION
STD STANDARD
SYM SYMMETRICAL
T THICK
T.O. TOP OF
UHMW ULTRA HIGH
MOLECULAR WEIGHT
UNO UNLESS NOTED OTHERWISE
UV ULTRAVIOLET
W/ WITH
@ AT
' MIN OR FEET
" SECONDS OR INCHES
° DEGREES
CLSURVEY INFORMATION: (APPLIES TO ALL SITE PLANS)
1. CONTRACTOR SHALL ESTABLISH SURVEY CONTROL POINTS AND DATUMS APPROVED BY THE
OWNER. THE SAME DATUMS AND CONTROL POINTS SHALL BE APPLICABLE TO ALL SITES.
CONTRACTOR SHALL SUBMIT SURVEY CONTROL AND DATUM INFORMATION FOR REVIEW AND
APPROVAL BY THE OWNER AT LEAST 15 BUSINESS DAYS PRIOR TO COMMENCING WORK.
WATER LEVELS
1. REFER TO SPECIFIC REQUIREMENTS. WATER LEVELS SHOWN ARE FOR REFERENCE ONLY AND DO
NOT INDICATE CONDITIONS DURING CONSTRUCTION.
CODES AND STANDARDS
1. ALL METHODS AND MATERIALS SHALL CONFORM TO THE IBC, AS AMENDED AND ADOPTED BY THE
LOCAL AUTHORITIES.
2. ALL STRUCTURAL STEEL DESIGN AND CONSTRUCTION SHALL COMPLY WITH ANSI/AISC 341.
3. REFERENCE TO ASTM AND OTHER STANDARDS SHALL MEAN THE LATEST EDITION IN EFFECT ON
THE BID DATE, UNLESS NOTED OTHERWISE IN THESE DOCUMENTS OR DESIGNATED BY THE
GOVERNING CODE.
MATERIALS AND CONSTRUCTION
1. CONTRACTORS ARE RESPONSIBLE FOR ADEQUATE SHORING, BRACING, AND CUTTING OF ALL
COMPONENTS AS REQUIRED FOR SAFETY AND STRUCTURAL INTEGRITY THROUGHOUT
CONSTRUCTION IN ACCORDANCE WITH SOUND PRACTICE AND PER THE SPECIFICATIONS.
2. ALL SHOP DRAWINGS FOR STEEL PILES SHALL BE SUBMITTED TO AND REVIEWED BY THE OWNER
PRIOR TO FABRICATION.
DESIGN LOADS
1. DESIGN LOADS AND REQUIREMENTS SHALL BE IN ACCORDANCE WITH THE CONTRACT
DRAWINGS AND THE SPECIFICATIONS.
2. DEAD LOADS:
SELF WEIGHT OF STRUCTURES, INCLUDING APPURTENANCES AND ATTACHMENTS
3. LIVE LOADS:
· UNIFORM LOAD: 100 PSF OVER DECK SURFACE AREA
· POINT LOAD: 400 LB ACTING ON A 1 SQ FT AREA AT ANY POINT ON DECK SURFACE
4. SNOW LOADS: 30 PSF OVER DECK SURFACE AREA
5. WIND IN ACCORDANCE WITH PROJECT TECHNICAL SPECIFICATIONS:
DESIGN WIND SPEED: V = 104 MPH
WIND IMPORTANCE FACTOR: I = 1.0 (OCCUPANCY CATEGORY ll)
EXPOSURE CATEGORY: = D
6. WAVE LOADS:
· MIN 250 LB/FT
· SIGNIFICANT WAVE HEIGHT: 2.5 FT
· PEAK PERIOD: 2.4 SECONDS
7. DESIGN VESSEL:
THE DESIGN VESSEL FOR THE BARGE IS A 60 FOOT LONG POWER BOAT TIED UP TO THE
BARGE CLEATS.
8. TOWING SPEED TO A MINIMUM OF 10 KNOTS.
STEEL PILES
1. MATERIAL SPECIFICATION
A. ASTM A252, GRADE 3: ALL PILES
2. COATING: HOT-DIP GALVANIZED
3. PILES LENGTHS:
PILING CAPS
1. ALL PILING CAPS SHALL BE BLACK FIBERGLASS AS MANUFACTURED BY CHEYENNE
MANUFACTURING, INC. (1-855-337-1227) OR APPROVED EQUAL.
EELGRASS BEDS
1. EQUIPMENT OPERATION, INCLUDING SPUDDING, PROPWASH, AND SIMILAR CONSTRUCTION
ACTIVITIES WHICH COULD AFFECT THE EELGRASS IS PROHIBITED IN CLOSE PROXIMITY TO THE
EELGRASS BEDS.
2. EELGRASS BEDS SHALL NOT BE DISTURBED.
3. MITIGATION OF ANY DAMAGED EELGRASS AS A RESULT OF INSTALL CONTRACTOR ACTIVITIES IS
THE INSTALL CONTRACTOR'S RESPONSIBILITY TO PROVIDE AT NO COST TO THE OWNER.
EELGRASS CONDITION WILL BE MONITORED BASED ON COMPARISON OF PRE- AND
POST-CONSTRUCTION SURVEYS CONDUCTED BY THE OWNER.
PILE DRIVING1. FABRICATOR CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL DESIGN OF THE
PUMPOUT BARGE, IN ACCORDANCE WITH THESE DRAWINGS AND
SPECIFICATIONS.
2. FABRICATOR CONTRACTOR TO DESIGN PUMPOUT BARGE TO BE COMPATIBLE
WITH THE DESIGNED GUIDE PILES THROUGH THE DESIGN WATER LEVELS.
3. CONSTRUCT THE HULL IN ACCORDANCE WITH USCG APPROVED MARINE
CONSTRUCTION PRACTICES AND WORKMANSHIP IN ADDITION TO THE RULES
AND CLASSIFICATION FOR ALUMINUM VESSELS, INCLUDING, BUT NOT LIMITED
TO, MATERIALS AND WELDING PROCEDURES, HULL CONSTRUCTION, AND SURVEY
AFTER CONSTRUCTION.
4. FABRICATOR CONTRACTOR TO DELIVER AND LAUNCH COMPLETED PUMPOUT
BARGE AT THE MARINE CREW PIER AT CORNET BAY IN THE DECEPTION PASS
STATE PARK (200 CORNET BAY RD, OAK HARBOR, WA 98279). COORDINATE DATE
AND TIME OF DELIVERY WITH THE OWNER.
PUMPOUT BARGE
TIDAL WATER LEVELS (MLLW)
MEAN LOWER LOW WATER (DESIGN LOW)
MEAN HIGH WATER
MEAN HIGHER HIGH WATER
HIGH TIDE LINE / ORDINARY HIGH WATER (DESIGN HIGH)
0.00 FT
7.86 FT
8.66 FT
10.87 FT
PILE CUTOFF ELEVATION - PILE TIP ELEVATION +3 FT
(MINIMUM) (REFER TO PILE SCHEDULE ON SHEET 7 FOR
CUTOFF AND TIP ELEVATIONS)
ALUMINUM HULL
1. MATERIAL SPECIFICATION 5086
2. CORROSION PROTECTION: GALVANIC ANODES (ZINC)
1. UTILIZE A TEMPLATE OR DRIVING FRAME TO MAINTAIN PROPER ALIGNMENT OF PILE DURING INSTALLATION. PILES SHALL BE INSTALLED TO ACHIEVE THE MINIMUM TIP ELEVATIONS SHOWN ON THE DRAWINGS. SELECT AND MOBILIZE APPROPRIATELY SIZED DOWN-THE-HOLE, VIBRATORY, AND IMPACT HAMMERS, AS REQUIRED TO ACHIEVE THE PILE TIP DEPTHS SHOWN ON SHEET 7 WITHOUT DAMAGING THE PILING, IN COMPLIANCE WITH THE RELEVANT PERMIT AND PROJECT DOCUMENTS.
SUBMIT PILE LOGS TO THE OWNER. MAINTAIN HAMMERS IN PROPER ALIGNMENT DURING
INSTALLATION OPERATIONS BY USE OF LEADS OR GUIDES ATTACHED TO THE HAMMER AND DRILL.
REMOVE AND REPLACE PILES DAMAGED DURING INSTALLATION AT THE CONTRACTOR'S EXPENSE.
2. ROCK SOCKETING WILL LIKELY BE REQUIRED FOR PILE INSTALLATION. MOBILIZE EQUIPMENT AND PERSONNEL FOR DRILLING AND ROCK SOCKETING. SUBMIT A DRILLING AND ROCK SOCKETING PLAN
TO THE OWNER FOR APPROVAL AT LEAST 15 BUSINESS DAYS PRIOR TO COMMENCING WORK.
3. ENVIRONMENTAL PROTECTION MEASURES, INCLUDING MARINE MAMMAL MONITORING AND
MARBLED MURRELET MONITORING ARE A REQUIREMENT OF THE PROJECT PERMITS. INSTALLATION
CONTRACTOR SHALL CONDUCT WORK IN ACCORDANCE WITH MONITORING REQUIREMENTS. MARINE
MAMMAL MONITORING AND MARBLED MURRELET MONITORING WILL BE PERFORMED BY OTHERS.
4. DETERMINE FINAL PILE LOCATIONS TO CORRESPOND WITH THE LOCATIONS OF PILE HOOPS ON THE
PUMPOUT BARGE.
5. DO NOT DEMOBILIZE PILE INSTALLATION EQUIPMENT PRIOR TO OWNER AND ENGINEER
ACCEPTANCE OF AS-BUILT PILE LOCATIONS AND PLUMBNESS. REMOBILIZATION DUE TO
NON-CONFORMANCE IN PILE INSTALLATION WILL BE AT THE CONTRACTOR'S EXPENSE.
6. REFER TO SPECIFICATIONS REGARDING SOUND ATTENUATION, WATER QUALITY, AND SPILL
PREVENTION REQUIREMENTS.
*DATUMS PROVIDED BY NOAA STATION 9449161 VILLAGE POINT
MHW
MHHW
MHW
MHHW
MHHW
HTL-OHW
HTL-
OHW
HTL-OHW
LEGEND
PUMPOUT BARGE (TO BE PROVIDED BY
FABRICATION CONTRACTOR AND
INSTALLED BY INSTALL CONTRACTOR)
-5
-13
-5
EXISTING BUOYS
(TO REMAIN)
EXISTING CONTOUR-10
EXISTING MOORAGE DOCK
-10
-10
-5
-20
-15
0 MLLW
-5
-10
HARNDEN ISLAND
(PARCEL 282641001000)
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
6/26/24
EE 6/26/24
TM 6/26/24
PY 6/26/24
EE 6/26/24
SHEET 4 OF 7
SUCIA ISLAND
STATE PARK
FLOATING SEWER
PUMPOUT STATION
OVERALL SITE PLAN
1" = 60'
NOTES:
1. BATHYMETRIC SURVEY PROVIDED BY DELPHIS IN 2018.
2. HORIZONTAL DATUM IN WASHINGTON STATE PLANE, NORTH ZONE, US FT.
3. VERTICAL DATUM IN MEAN LOWER LOW WATER.
4. NO BENCHMARKS EXIST IN THE VICINITY.
OVERALL SITE PLAN
60'
120'
S890-3911-2022-
OVERALL SITE PLAN
BID SET
MEAN HIGH WATERMHW
MEAN HIGHER HIGH WATERMHHW
HIGH TIDE LINE /
ORDINARY HIGH WATER
HTL-OHW
FOSSIL BAY
EBB
FLOOD
-5
MHW
MHW
MHW MHW
MHHWMHHW
MHHW
MHHW MHHW
MHW
MHW
MHW
MHHW
MHHW
MHHW
MHHW
MHHW
HTL-OHW
HTL-OHW
HTL-O
HW
HTL-
OHW
HTL-OHW
HTL-OHW
HTL-OHW HTL-OHW
PUMPOUT BARGE
(2) 16"Ø GALV. STEEL PILES
(TO BE INSTALLED BY THE
INSTALL CONTRACTOR)
EELGRASS (TO BE PROTECTED), TYP.
(OBSERVED BY GRETTE ASSOCIATES
AUGUST 19, 2020)
-13
-12
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
6/26/24
EE 6/26/24
TM 6/26/24
PY 6/26/24
EE 6/26/24
SHEET 5 OF 7
SUCIA ISLAND
STATE PARK
FLOATING SEWER
PUMPOUT STATION
PUMPOUT BARGE
SITE PLAN
1" = 20'
NOTES:
1. BATHYMETRIC SURVEY PROVIDED BY DELPHIS IN 2018.
2. HORIZONTAL DATUM IN WASHINGTON STATE PLANE, NORTH ZONE, US FT.
3. VERTICAL DATUM IN MEAN LOWER LOW WATER.
4. NO BENCHMARKS EXIST IN THE VICINITY.
5. SEE SHEET 7 FOR PILE SCHEDULE.
PROPOSED SITE PLAN
20'
40'
5 6
A 5 7
-13
-11
-10
-5
0 MLLW
+5
-14
-15
-20
F2
F1
S890-3911-2022-
PUMPOUT BARGE SITE PLAN
BID SET
-14
-14
LEGEND
EXISTING CONTOUR-10
MEAN HIGH WATERMHW
MEAN HIGHER HIGH WATERMHHW
HIGH TIDE LINE /
ORDINARY HIGH WATER
HTL-OHW
EELGRASS
EXISTING BUOY
(TO REMAIN)
EXISTING BUOY
(TO REMAIN)
FOSSIL BAY
EBB
FLOOD
4"
BULL RAIL (TYP.)
4"
KEEL (TYP.)
END VIEW
SIDE VIEW
2' M
AX
FR
EE
BO
AR
D
" M
IN
FR
EE
BO
AR
D
MANUAL PUMP FOR BOAT PUMPOUT
EDSON #557 MANUAL OFFSET DRIVE SIDE
INLET PUMP - BRONZE WITH #261-25-150 HOSE
ASSEMBLY (THREE TOTAL - TWO FOR PUMPOUT
AND ONE FOR MANUAL WASHDOWN PUMP)
STORAGE COMPARTMENT
WITH LOCKABLE LID
MANUAL
WASHDOWN PUMP
MAST FOR SIGNAGE AND 4"
ALUMINUM VENT STACK WITH
CHARCOAL VENT FILTER
PORTA-POTTI DUMP STATION
PLUMBED TO HOLDING TANK,
KECO KLEEN-A-POTTEE,
MODEL NO.: 300-C, OR EQUAL
2" ALUMINUM
PIPE BULL
RAIL (TYP.)
14"
STAINLESS
STEEL
CLEAT, TYP.
KEEL (TYP. OF 2)
4"Ø ACCESS HOLE
THROUGH BARGE
PUMP INTAKEHOLDING TANK,
SEE NOTE 2
BLACK
PILE CAP
REMOVABLE PILE HOOP
(SEE DETAIL, THIS SHEET)
TOP VIEW FENDER (TYP.)
BULL RAIL (TYP.) 14" CLEAT 3 EACH
SIDE (TYP.)
REMOVABLE PILE HOOPS (TYP.)
(SEE DETAIL, THIS SHEET)
'-0
" M
AX
9" (TYP.)
12"
32'-0"
16"
4" (TYP.)
ZINC ANODES,
SEE NOTE 13
16" GALV. STEEL PILING
(TO BE INSTALLED BY
THE INSTALL CONTRACTOR)
FENDER (TYP.)
HOLDING TANK,
SEE NOTE 12
TOWING / LIFTING EYELET
(1 ON EACH CORNER)
(2) MANUAL SEWAGE PUMPS, TYP.
MANUAL
WASHDOWN PUMP
SIGNAGE W/ ALUMINUM
MOUNTS ATTACHED TO MAST
34'-6"
24"Ø HINGED
HULL ACCESS
HATCH
PILE HOOP
TOWING / LIFTING
EYELET, TYP.
C
PI
LE
A
ND
B
AR
GE
L
6"
3000 HENDERSON
HEAVY DUTY FENDER
OR EQUAL, BOTH SIDES
HOSE STAND
C BARGEL
VENT STACK
HOSE
STAND, TYP.
2"Ø DOWN TUBE
3"Ø SUCTION PIPE
STORAGE
COMPARTMENT
(2) 24"Ø
HINGED TANK
ACCESS HATCH
24"Ø HINGED HULL
ACCESS HATCH
DUMP STATION
(4) NAVIGATION
LIGHTS, TYP.
HOSE
STAND, TYP.
(2) STAINLESS STEEL
DOWNTUBE PIPES
SIGN 1
SIGN
SIGNS
3 & 4
LOCKABLE ALUMINUM BOX
COVER OVER PUMP, TYP.
ALUMINUM TANK
HOUSING, SEE NOTE 14
PORTA-POTTI
OUTLET PIPE,
EXTEND 20" FROM
BOTTOM OF TANK
STAINLESS STEEL
DOWNTUBE PIPE
3" SUCTION PIPE, WITH FEMALE
CAMLOCK COUPLING AT THE
TOP AND PLACE 1" ABOVE THE
BOTTOM OF THE TANK
REMOVABLE
PILE HOOP DETAILS
(N.T.S.)
7/
8"
5/16"Ø HOLE, SECURE WITH
1/4" x 2' S.S. EXTENDED
PRONG COTTER PIN
1 1/4"Ø STAINLESS STEEL
CLEVIS PIN x 10" LONG
BASE PLATE 3'-2"
8"
1/4TYP
FABRICATE FROM 1/4"
MARINE GRADE ALUMINUM UNO
MARINE GRADE
ALUMINUM PIPE 1/2"
WALL THICKNESS, MIN.
REMOVABLE RUB BLOCK
3/4" x 18" UHMW, SEE SPECS REAM PIPE ENDS
UHMW BUSHING (TYP.)
1/2" WELDED STUDS WITH NUTS & WASHERS
TO SECURE RUB PLATE TO BASE PLATE
1/2" x 8" x 3' LONG (BASE PLATE)
MARINE ALUMINUM FLAT BAR
WELD BASE PLATE TO BARGE,
CONTINUOUS WELD AROUND FULL
PERIMETER OF PLATE
7/
8"
1/4" ALUMINUM END
CAP, WELDED TO HSS
ALUMINUM BAR 2" X 1/8"
(ALLOY 5052) CORNER
WRAP, WELDED ALL AROUND
4X4 ALUMINUM TUBE
(ALLOY 6061 T6)
4"
1/2" UHMW
1'-10"
2' -3
HSS TUBE, TYP.
PIPE, TYP.
CORNER WRAP BAR
PILE HOOP
1/
4"
PLAN VIEW
ELEVATION VIEW
PIPE, TYP.
SIDE VIEW
PILE HOOP
CORNER WRAP BAR
WELD FROM BASE PLATE
TO ALUMINUM HULL
1/4 TYP
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
6/26/24
S890-3911-2022-BARGE DEATAILS
EE 6/26/24
TM 6/26/24
PY 6/26/24
EE 6/26/24
SHEET 6 OF 7
SUCIA ISLAND
STATE PARK
FLOATING SEWER
PUMPOUT STATION
BARGE DETAILS
1" = 3'
3'
6'
DETAIL - PUMPOUT BARGE 1
5 6NOTES:
1. SEWAGE PUMPOUT BARGE TO BE PROVIDED BY THE FABRICATION CONTRACTOR.
2. BARGE AND HOLDING TANK SHALL HAVE TWO 24"Ø MIN. ROUND ACCESS HATCHES TO BE USED FOR PUMPING OUT SEWAGE. BOTH THE HULL AND TANK SHALL BE FULLY SEALED TO PREVENT ANY LEAKS TO PROVIDE A REDUNDANT
CONTAINMENT SYSTEM.
3. FREEBOARD SHALL NOT EXCEED 24".
4. FREEBOARD SHALL NOT BE LESS THAN 12" UNDER BOTH TOTAL LIVE AND DEAD LOADING.
5. INNER TANK SHALL BE WATERTIGHT AND SHALL HAVE A BAFFLE SCHEME WITHIN THE TANK LIMITS.
6. STORAGE COMPARTMENT TO BE PROVIDED FOR CLEANING SUPPLIES AND REPLACEMENT PARTS. COMPARTMENT SHALL HAVE A LOCKABLE ACCESS. MAY BE A SINGLE COMPARTMENT USED FOR ALL EQUIPMENT.
7. BACKUP PUMP HANDLE SHALL HAVE A REMOVABLE CLEVIS PIN FOR SECURING IN PLACE.
8. PROVIDE LIFTING EYES TO THE HULL SUITABLE FOR LIFTING THE ENTIRE BARGE OUT OF THE WATER.
9. PROVIDE PERMANENT MARKINGS ON SIDE OF HULL TO INDICATE APPROXIMATE TANK LEVEL.
10. PROVIDE (4) SIGNS ATTACHED TO THE MAST COMPLYING WITH THE CLEAN VESSEL ACT GRANT PROGRAM REQUIREMENTS, SEE SPECIFICATIONS FOR DETAILS. SIGNS TO BE MOUNTED TO ALUMINUM PLATES CONNECTED
TO THE MAST.
11. FABRICATOR CONTRACTOR TO PROVIDE EXTRA RUB BLOCKS FOR SHIMMING THE PILE HOOPS.
12. HOLDING TANK SHALL HAVE A 3,000 GALLON CAPACITY AND BE LOCATED IN THE BARGE IN SUCH A MANNER AS TO
PRODUCE EVEN DISPLACEMENT DURING FILLING AND PUMPING.
13. ATTACH ANODE TO HULL AS TO NOT BE DAMAGED BY VESSEL MOORAGE.
14. CREATE A WATERTIGHT TANK HOUSING WITHIN THE HULL OF THE BARGE. FABRICATE A REMOVABLE, WATERTIGHT TOP TO BE BOLTED TO THE HULL OF THE BARGE VIA FLANGES AROUND THE PERIMETER OF TANK HOUSING.
EL
EV
AT
IO
N
IN
F
EE
T (M
LL
W
EL
EV
AT
IO
N
IN
F
EE
T (M
LL
W
-15
-10
-5
-15
-10
-5
EXISTING MUDLINE
PILE TIP
(SEE PILE SCHEDULE)
DESIGN LOW (MLLW)
EL 0.00'
MHW
EL +7.86'
MHHW
EL +8.66'
DESIGN HIGH (HTL / OHW)
EL +10.87'
PILE CUTOFF
(SEE PILE SCHEDULE)
16" GALV. STEEL PILES
(TO BE PROVIDED BY
INSTALL CONTRACTOR)
SEWAGE PUMPOUT BARGE (TO BE PROVIDED
BY FABRICATION CONTRACTOR AND
INSTALLED BY INSTALL CONTRACTOR)
SIGN 1
SIGN
SIGNS
3 & 4
BEDROCK,
SEE NOTE 2
DR
IL
LE
D
EM
BE
D
IN
TO
B
ED
RO
CK
(M
IN
. 1
0' -0
SE
E
NO
TE
STEEL PIPE PILE
ROCK SOCKET FOR PILE,
SEE NOTES 2 AND 3
PILE CUTOFF EL.
(SEE PILE SCHEDULE)
PILING CAP
PILE TIP EL.
(SEE PILE SCHEDULE)
MUDLINE
(ELEVATION VARIES)
TOP OF BEDROCK
(ELEVATION VARIES)
VI
BR
AT
OR
Y
HA
M M
ER
IN
ST
AL
LA
TI
ON
(D
EP
TH
V
AR
IE
S)
SE
E
NO
TE
OVERBURDEN,
SEE NOTE 2
PILE SCHEDULE
PILE ID
F1
F2
PILE SIZE
16"Ø X 0.5"
NORTHING
645105.03
645083.89
EASTING
1142361.53
PILE TIP
ELEVATION
(MLLW)
-52.0'
-52.0'
PILE CUTOFF
ELEVATION
(MLLW)
+16.0'
+16.0'
PILING CAP
Y
Y16"Ø X 0.5"
1142334.31
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
6/26/24
EE 6/26/24
TM 6/26/24
PY 6/26/24
EE 6/26/24
SHEET 7 OF 7
SUCIA ISLAND
STATE PARK
FLOATING SEWER
PUMPOUT STATION
PUMPOUT BARGE
PROFILE
AS NOTED
A 5 7
PROFILE - PUMPOUT / BARGE
5'
10'
PILE ELEVATION
2'
4'
1. INSTALL CONTRACTOR SHALL USE A VIBRATORY HAMMER TO INSTALL THE PILE UNTIL
REFUSAL. IF HARD DRIVING CONDITIONS ARE ENCOUNTERED BEFORE REACHING THE
SPECIFIED TIP ELEVATION, UTILIZE AN IMPACT HAMMER TO PROGRESS PILE. IF THERE IS
NO OBSERVABLE PROGRESS WITH THE IMPACT HAMMER, UTILIZE A DOWN THE HOLE
HAMMER AND DRILL DEEP ENOUGH TO SEAT THE PILE A MINIMUM OF 10 FEET INTO THE
HARD LAYER OR UNTIL SPECIFIED TIP ELEVATION HAS BEEN ACHIEVED. USE THE IMPACT
HAMMER AFTER DRILLING TO SEAT THE PILE INTO THE DRILLED PORTION OF SOIL.
2. FOR SOIL AND SITE CONDITIONS, SEE GEOLOGIC AND GEOTECHNICAL ENGINEERING
SERVICES REPORT "SUCIA ISLAND STATE PARK IMPROVEMENTS, SAN JUAN COUNTY,
WASHINGTON" DATED NOVEMBER 25, 2020 AS DEVELOPED BY GEOENGINEERS, INC.
3. INSTALL CONTRACTOR SHALL ENSURE THAT BOULDERS AND OTHER OBSTRUCTIONS ON
SITE DO NOT INTERFERE WITH THE PILE DRIVING AND INSTALLATION. CONTRACTOR
SHALL LOCALLY MOVE ANY SUCH OBSTRUCTIONS TO ENSURE THAT PILES ARE INSTALLED
IN THE CORRECT LOCATION AND ACHIEVE THE MINIMUM EMBEDMENT INTO ROCK AS
SHOWN ON THE DRAWINGS. NO EXCAVATION OF THE SUBSTRATE IS ALLOWED.
4. REFER TO SPECIFICATIONS SECTION 316216 FOR TOLERANCES IN PILE INSTALLATION.
5. INSTALL CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE PILE DRIVING WORK
WITH THE NEW BARGE DESIGN TO ENSURE COMPATIBILITY AND TO ENSURE THE BARGE
FUNCTIONS AS INTENDED THROUGH THE FULL RANGE OF RANGE OF MOTION BETWEEN
THE DESIGN WATER LEVELS AND WAVES.
NOTES
S890-3911-2022-
PUMPOUT BARGE PROFILE
| Sheets and Views |
| 1 COVER SHEET |
| 2 PROJECT TEAM |
| 3 GENERAL NOTES |
| 4 OVERALL SITE PLAN |
| 5 PUMPOUT BARGE SITE PLAN |
| 6 BARGE DETAILS |
| 7 PUMPOUT BARGE PROFILE |
File details come from the government source that posted it. Updated .