About this file

This Additional Specifications document details the flooring removal and replacement project for Matheson Jr High School under Invitation for Bids (IFB) 4-JF26-016-IFB issued by Granite School District in Utah. The project encompasses comprehensive flooring work across multiple rooms and areas throughout the school facility, including classrooms, offices, hallways, auditorium, media center, and entry points. The specifications outline precise measurements and quantities for various flooring materials and installation components across all designated areas. Total project quantities include 7,374 yards of carpet to be removed and replaced (consisting of 1,400 yards of broadloom carpet and 6,182 yards of carpet tile), 2,767 square feet of hard surface LVT (luxury vinyl tile), 140 yards of walk-off tile, 9,475 linear feet of cove base, 897 linear feet of transition materials, 62 linear feet of stair nosing, and 547 linear feet of stairwrap. Additional work includes floor preparation for LVT installation totaling 2,767 square feet and installation of broadloom, walk-off tile, and carpet tile throughout the facility.

The District will supply all adhesives, resilient tile, carpet tile, broadloom, walk-off tile, base materials, transition pieces, and nosing epoxy required for the project. The contractor is responsible for providing any additional supplies or materials needed to complete the work beyond those supplied by the District. Contractors must perform complete demo and installation services for all flooring components, including hardwood surface VCT (vinyl composition tile) removal totaling 2,605 square feet and replacement with specified materials. The bid specifications provide room-by-room detail of measurements and material quantities to enable accurate contractor bidding and project execution.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

JF26-016-IFB_Matheson Jr. High
Room #/ locationcarpet measurementyardshard surface measurementsqftcove base L(lf)Transition (lf)Stair nosing (lf)Walk off MeasurementsyardsBroadloom measurementyards
Rm.10430X1653.310x101001209x0X0
Rm.10530X30100x01183x0X0
Rm.10630X30100x01183x0X0
Rm.10730X30100x01183x0X0
Rm.10830X30100x01183x0X0
Rm.10930X30100x01183x0X0
Rm.11030X30100x01183x0X0
Rm.11130X30100x01183x0X0
Rm.11230X30100x01183x0X0
Rm.11330X30100x01493x0X0
Rm.1150X0030x309001183x0X0
Rm.11675X41341.78x64820920x0X0
Rm.12043X30143.3x01366x0X0
Counseling Center20X2555.6x012712x0X0
Office 112X1216x0430x0X0
Office 212X1013.3x0400x0X0
Office 312X1013.3x0400x0X0
Office 412X1013.3x0400x0X0
Faculty0X0030x309001593x0X0
Work Room0X0030x154501253x0X0
Front Office/Main39X2086.7x01669x0X0
Office Hallways/Main30X2583.3x02020x0X0
Principal19X1225.3x0540x0X0
Asst. Principal #114X1218.7x0450x0X0
Asst. Principal #216X1221.3x0480x0X0
Board Rm.22X1229.3x0650x0X0
Office #1/Main12X1013.3x0410x0X0
Office #2/Main12X1013.3x0410x0X0
Office #3/Main12X1013.3x0410x0X0
Office #4/Main/Police12X1013.3x0410x0X0
Conf. Rm./Main27X1545x0780x0X0
Mail Rm./Main25X1541.7x0910x0X0
Time Out #10X008x64803x0X0
Time Out #20X008x64803x0X0
TimeOut/ Storage8X65.3x0250x0X0
Safe/ Main7X43.1x0150x0X0
Auditorium Entry0X00x01905x014X76118
Aud.Entry Int. S.E.0X00x0520x014X2539
Aud.Entry Int. N.E.0X00x0846x010X4449
Aud.Entry Int. N.W.0X00x0846x010X4449
Aud.Entry Int. S.W.0X00x0520x014X2539
Aud. Closet N.W.0X00x0360x08X109
Booth Tech. Entry S.W.0X00x0900x027X1957
Upper Booth/Mezz.0X00x01940x075X25208
Top Aisle0X00x000x0155X14241
Mid. E. to W. Aisle0X00x000x0144X8128
Lower Aisle0X00x000x090X12120
Steps0X00x000x052X1269
Side Stair E.0X00x000x015X1525
Side Stair W.0X00x000x015X1525
Aud. Carpet Walls0X00x000x044X315
Side Aisles0X00x000x0140X578
Middle Aisles0X00x0350570x0125X683
Media Center/All75X75625x090815x0X0
Rm.20431X1655.110x101001209x0X0
Rm.20530X30100x01153x0X0
Rm.20630X2790x01153x0X0
Rm.20730X30100x01153x0X0
Rm.20830X30100x01153x0X0
Rm.20930X30100x01153x0X0
Rm.21030X30100x01153x0X0
Rm.21130X30100x01153x0X0
Rm.21230X30100x01153x0X0
Rm.21330X40133.3x01346x0X0
Rm.21448X30160x01506x0X0
Rm.21539X30130x01003x0X0
Rm.21741X30136.7x01353x0X0
Rm.21875X41341.78x64820526x0X0
Rm.21941X30136.7x01306x0X0
Rm.22030X30100x01153x0X0
Rm.22130X30100x01153x0X0
Rm.22230X30100x01153x0X0
Rm.22330X30100x01153x0X0
Rm.22430X30100x01153x0X0
Rm.22530X30100x01153x0X0
Rm.22630X2790x01103x0X0
Rm.22816X3155.110x101001209x0X0
Custodial Office12X912x0403x0X0
Rm.134 /Drama44X44215.1x0187662x0X0
Band Rm.1 W.10X1011.1x0370x0X0
Band Rm.2 Mid.10X1011.1x0370x0X0
Band Rm.3 E.10X1011.1x0370x0X0
Band/Storage15X15255x525840x0X0
Band/Hall34X622.7x0536x0X0
Rm.143/Orchestra55X45275x01856x0X0
Rm.14440X23102.2x01213x0X0
Rm.14540X23102.2x01213x0X0
X0x0x0X0
Main Entry0X00x002523x2051.1X0
N.W. Entry0X00x0401212x1824X0
N.E. Entry0X00x0401212x1824X0
S.W. Entry0X00x034016x1119.6X0
S.E. Entry0X00x034016x1119.6X0
Front Hall Ramp4X7834.7x01608x0X0
Hall Ramp to Cateteria12X108144x02080x0X0
X0x0x0X0
Totals6182.82767947589762138.21353
carpetyardshard surface (LVT)sqftcove base (lf)Transition (lf)Stair nosing(lf)Walk off tileyardsBroadloomyards
DemoInstall
broadloom/walkoff/ carpet tile7374yardshardserface LVT2767SqftWalkoff tile140yrds
covebase9,475LFCarpet tile6182yardsStairwrap547LF
transition897LFBroadloom Carpet1400yards
Hardserface VCT2605Sqftcovebase9475LF
floor prep for LVT2767SqftTransition897LF
District will supply all of the following materials for project
Broadloom Adhesive
Resilient tile Adhesive
Carpet tile Adhesive
carpet tile
Broadloom
walk off tile
Resilient tile
Base
Base Adhesive
Transition
Contact Adhesive
Noseing epoxy
Any additional supplies or materials needed to complete project are to be supplied by contractor