This addendum is issued by the City of Palm Coast, Florida for the A1A Sewer Force Main Mala Compra to Marineland project (ITB-UT-26-06). The project involves the construction of over 17,569 linear feet of new sewer force main along A1A, consisting of approximately 4,253 linear feet of 14-inch polyethylene force main via directional drilling and approximately 13,316 linear feet of 12-inch polyvinyl chloride force main via open cut construction. Bids are due on May 5, 2026. To be considered responsive, all bidders must include a signed and dated copy of this addendum with their bid submittal, and all required forms must be notarized.

The project site includes areas with coquina shell and rock fragments mixed within sand, requiring contractors to be prepared with specialized excavation equipment as needed. Addendum No. 1 was issued on April 6, 2026 to incorporate clarifications, additions, omissions, deletions, or changes to the contract documents prior to the bid deadline. Except as specified in the addendum, all work shall be in accordance with the project drawings and specifications. Bidders must acknowledge receipt of the addendum by providing a signature, date, printed name and title, and company name with their submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1

Project: A1A Sewer Force Main Mala Compra to Marineland

Issue Date: 4/6/2026

Due Date: 5/5/2026

Intent: This addendum is issued in order to incorporate the following clarifications, additions, omissions, deletions, or changes into the Contract Documents prior to the date bids are due. Except as hereinafter specified, the work shall be in accordance with the drawings and specifications.

For your bid to be considered RESPONSIVE, a signed and dated copy of the Addendum must be included with the bid submittal and Forms must be notarized.

Question, Statement and/or Response

Please Note: The bid plans have been uploaded to public files.

Acknowledgment:

Signature and Date

Printed Name and Title

Company Name

END OF ADDENDUM NO. 1