4-I. CBI Form 3.pdf
PDF 355 KB Posted
- Attached to
- Traffic Signal Loop Installation
- Solicitation number
- 269-2026-209
- Issued by
- Mecklenburg County, Charlotte City, North Carolina
About this file
This is a Subcontractor/Supplier Utilization Commitment form (CBI Form 3) for the City of Charlotte, North Carolina, related to Project 269.2026.209 for Traffic Signal Loop Installation. The form must be submitted at the time of proposal opening and requires proposers to identify all Minority/Women/Small Business Enterprises (M/W/SBEs) and other subcontractors and suppliers intended for use on the contract across all tiers. M/W/SBEs must be currently certified with the City as of the proposal opening date to receive credit toward contract goals. The form includes designated fields for the MWBE, MBE, MSBE, WBE, MWSBE, and SBE goals, along with sections to list M/W/SBE vendors and non-M/W/SBE subcontractors and suppliers with descriptions of work and NIGP commodity codes.
Proposers must submit a separate Letter of Intent (CBI Form 4) for each M/W/SBE listed within three business days of receiving a request from the City, executed by both the M/W/SBE and the proposer, or the City will not count the proposed utilization toward contract goals. Proposers must maintain the level of M/W/SBE participation stated in the contract throughout its duration and comply with replacement and scope change procedures outlined in Section 5 of the CBI Administrative Procedures Manual. All subcontractors and suppliers must be registered with the City of Charlotte's vendor database. Failure to properly complete and submit CBI Form 3 with the proposal, or to comply with the CBI Policy and Administrative Procedures Manual requirements, constitutes grounds for proposal rejection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 9-J. Contract Exceptions.pdf | ||
| 10-B. RFP 269.2026.209.pdf | ||
| 5-D. Proposal Submission Form.pdf | ||
| 3-G. Debar Cert.pdf | ||
| 6-E. References Form.pdf | ||
| 7-C. Sample Services Contract 2025.pdf | ||
| 8-H. Anti Lobby Cert.pdf | ||
| 2-F. Price Schedule.xlsx | XLSX spreadsheet | |
| 1-A. Bonfire, EUNA Guide.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Version 06-2023
CBI FORM 3: Subcontractor / Supplier Utilization Commitment Project 269.2026.209
This form MUST be submitted at the time of Proposal Opening. Copy this CBI Form 3 as needed.
Failure to properly complete and submit Form 3 with the Proposal constitutes grounds for rejection of the Proposal.
Per Section 3.5 of the CBI Administrative Procedures Manual, the Subcontractor/Supplier Utilization Commitment (CBI Form 3), captures information regarding the MWSBEs and other subcontractors and suppliers that the Proposer intends to use on the Contract FOR ALL TIERS.
M/W/SBEs must satisfy the requirements of Section 2 of the CBI Administrative Procedures Manual in order to count the work they intend to perform on the contract with its own current workforces towards the Contract Goal, and must list themselves below.
Proposer Name:
Project Name:
MWBE Goal: MBE Goal:
MSBE Goal: WBE Goal:
MWSBE Goal: SBE Goal:
List below all M/W/SBEs that you intend to use on this Contract. NOTE: You will only receive credit for M/W/SBEs that are currently certified with the City as of the Proposal Opening Date.
M/W/SBE Vendor Name
(Non-Hauling Services) Description of work / materials NIGP Code
CBI FORM 3: Subcontractor / Supplier Utilization Commitment
List below all non-M/W/SBEs (subcontractors and suppliers) that you intend to use on this Contract
Vendor Name Description of work / materials NIGP Commodity Code
Version 06-2023
Letters of Intent submitted upon notice from the City
Per Section 3.5 of the CBI Administrative Procedures Manual, within three (3) Business Days after receiving a request from the City
(or within such longer time as may be communicated by the City in writing), Proposers must submit a separate Letter of Intent (CBI
Form 4) for each M/W/SBE listed on CBI Form 3. Each Letter of Intent must be executed by both the M/W/SBE and the
Proposer. The City shall not count proposed M/W/SBE utilization for which it has not received a Letter of Intent by this deadline. The
Proposer is still obligated to pay the M/W/SBE the full amount listed on the Contract with the M/W/SBE regardless of what percentage is actually counted towards the M/W/SBE Goal.
Adding subcontractors or suppliers after submitting this form
Nothing in this certification shall be deemed to preclude you from entering into subcontracting arrangements after submission of this form. However, per the CBI Administrative Procedures Manual, you must comply with the following:
• You must maintain the level of M/W/SBE participation stated in the Contract throughout the duration of the Contract, except as specifically allowed in Section 5
• If you need to terminate or replace a M/W/SBE, you must comply with Section 5.3
• If the scope of work on the Contract increases, or if you elect to subcontract any portion of work not identified on this form as being subcontracted, then you must comply with Section 5.4
• A Letter of Intent (CBI Form 4) must also be submitted for each M/W/SBE you add subsequent to contract award.
All Subcontractors and Suppliers must be registered with the City of Charlotte.
Pursuant to the City’s Vendor Registration Policy, each subcontractor or supplier (non-MBE/SBE, WBEs, SBEs and MBEs) that you use on this contract must be registered in the City’s vendor database.
Signature
Your signature below indicates that the undersigned firm certifies and agrees that:
(a) It has complied with all provisions of the CBI Policy and Administrative Procedures Manual; and,
(b) Failure to properly document such compliance in the manner and within the time periods established by the CBI Policy and
Administrative Procedures Manual shall constitute grounds for rejection of your proposal.
Signature of Authorized Official Printed Name Title Submittal Date
File details come from the government source that posted it. Updated .