About this file
Elk Ridge Middle School Roof Replacement - Construction Documents
This document set comprises architectural, mechanical, and electrical construction drawings and specifications for the Elk Ridge Middle School roof replacement project undertaken by the Jordan School District in South Jordan, Utah. The project involves the removal of existing SBS modified roofing membrane and partial removal of existing insulation, with replacement of a new PVC single-ply roofing system across 150,488 square feet of roof area on the facility's first floor. The project is classified as Occupancy Type E (educational) with Construction Type IIB and includes the removal and reinstallation or replacement of mechanical and electrical equipment as required. Three bid alternates are specified: Base Bid (removal and replacement of existing roofing with new coping), Alternate 01 (removal down to metal roof deck with new roof assembly), and Alternate 02 (removal and reinstallation of existing parapet coping rather than replacement). The construction documents reference applicable codes including the 2021 International Building Code, International Mechanical Code, International Energy Conservation Code, and 2023 National Electrical Code, with project drawings issued as of January 26, 2026.
The project specifications require contractors to field-verify all dimensions and conditions before submitting bids, coordinate phasing with the owner and architect, contain all construction activity within barricades, protect existing facilities, and perform final roof cleaning and washing at substantial completion. Contractors must provide equipment relocation, proper disposal of demolished materials, and patching and repair of existing surfaces affected by construction. The roofing system specification references Section 075419 "Polyvinyl-Chloride (PVC) Roofing" and includes installation of 2 inches of polyiso insulation and 1/2 inch coverboard beneath the PVC membrane. Additional requirements include providing roof walkway pads (minimum 30 inches wide) from access points to rooftop equipment, maintaining 1/4 inch per foot minimum slope across the roof, raising existing curbs to maintain minimum 8 inches of vertical roofing above finished membrane, and providing expansion joint covers where applicable. Mechanical scope includes lifting and resecuring roof-mounted HVAC units, exhaust fans, makeup air units, condensing units, and related equipment; extending ductwork and piping as required; and reflashing all roof penetrations and vents. Electrical scope requires disconnection and reconnection of power to lifted equipment, replacement of wood block supports with UV-rated rubber strut supports, extension of conduits and conductors as needed, relocation of disconnects to maintain code-compliant heights, and removal of abandoned electrical infrastructure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT DATA
CIVIL RIGHTS
2010 ADA Standards for Accessible Design
APPLICABLE CODES
International Building Code (IBC), 2021 ed.
International Mechanical Code (IMC), 2021 ed.
International Mechanical Code (IPC), 2021 ed.
International Energy Conservations Code (IECC), 2021 ed.
National Electrical Code (NEC), 2023 ed.
CRITERIA
Occupancy Classification E
Construction Type IIB
Sprinkled Yes
Building Height: 28'-0" Allowable Height: (2 Stories / 55 Feet)
Building Area - Existing Building Area Is Not Modified 1st Floor (existing) 150,488 GSF 2nd Floor (existing) 2,402 GSF Total (existing) 152,936 GSF Area of Roof Replacement 150,488 SQ. FT.
FIRE-RESISTANCE RATING (IBC TABLE 601)
Construction Type: IIB Primary Structural Frame 0 Exterior Bearing Walls 0 Interior Bearing Walls 0 Exterior Non-Bearing Walls 0 Interior Non-Bearing Walls 0 Floor Construction & Associated Secondary Members 0 Roof Construction & Associates Secondary Members 0
Interior Exit Stairway (IBC Sec 1009.2, 1022) NA Exit Access Stairway (IBC Sec 1009.3) NA Vertical Openings (IBC Sec 712.1.8) NA Shafts (IBC, Sec 713.4) NA
ABBREVIATIONS
AC AIR CONDITIONING
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATE
ARCH ARCHITECTURAL
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BO BOTTOM OF
BOT BOTTOM
BRG BEARING
BYD BEYOND
CB CATCH BASIN
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONF CONFERENCE
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CSK COUNTER SUNK
CTR CENTER
DBE DECK BEARING ELEVATION
DEMO DEMOLITION
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DN DOWN
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DWG DRAWING
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRICAL WATER COOLER
EXP EXPANSION
FD FLOOR DRAIN
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FIN FLR FINISH FLOOR
FLR FLOOR
FT FEET
GA GAUGE/GAGE
GI GALVANIZED IRON
GLU-LAM GLUE LAMINATED
GYP BD GYPSUM BOARD
HC HANDICAPPED
HVAC HEATING, VENTILATION, AIR CONDITIONING
ID INSIDE DIAMETER
INT INTERIOR
ISO ISOMETRIC
JAN JANITOR
JST JOIST
JT JOINT
KD KNOCK DOWN
KOP KNOCKOUT PANEL
LAB LABORATORY
LAV LAVATORY
MAINT MAINTENANCE
MAX MAXIMUM
MECH MECHANICAL
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVER HEAD
OH DR OVERHEAD DOOR
OPP OPPOSITE
PERP PERPENDICULAR
PL PLATE
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PR PAIR
PREFAB PREFABRICATED
QTY QUANTITY
RD ROOF DRAIN
RE: REFER TO
REINF REINFORCED / REINFORCING
REQD REQUIRE / REQUIRED
RFG REFRIGERATOR
RM ROOM
RO ROUGH OPENING
RTD RATED
RTU ROOF TOP UNIT
RV ROOF VENT
SCHED SCHEDULE
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
STD STANDARD
STL STEEL
STRUC STRUCTURAL
SUSP CLG SUSPENDED CEILING
THK THICKNESS
TO TOP OF
TOB TOP OF BEAM
TOS TOP OF SLAB, TOP OF STRUCTURE
TOW TOP OF WALL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VTR VENT THROUGH ROOF
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WF WIDE FLANGE
WH WATER HEATER
WWF WELDED WIRE FABRIC
XFMR TRANSFORMER
GENERAL SYMBOLS
N
NORTH ARROW
A1011
A101
S 3 1 A12 /
EL: 100'-0"
VERTICAL ELEVATION
SPOT ELEVATION
DRAWING
REVISION
ROOM NAME
ROOM NUMBER
KEYED NOTES
DOOR NUMBER
SHEET WHERE DRAWN
BUILDING SECTION
WALL SECTION
DETAIL
EXTERIOR ELEVATION
WINDOW TYPE
PARTITION TYPE
REVISION NUMBER
INTERIOR ELEVATION
SEE PLUMBING, MECHANICAL AND ELECTRICAL FOR DISCIPLINE SYMBOLS
GRID REFERENCE MARK
A1 Starts at lower left corner Number Horizontal Letters Vertical
MHTN SHEET NUMBER
Sheet Number Sequencce Sheet Type Discipline
1'-0"
ROOM
150 SF ROOM VOLUME / AREA
CEILING TAG
SHEET WHERE DRAWN
SHEET WHERE DRAWN
SHEET WHERE DRAWN
SHEET WHERE DRAWN
A 1 01
A101
SIM
CALLOUT
SHEET WHERE DRAWN
B
A
1 2
CASEWORK TYPE
DEPTH
HEIGHT
WIDTH
LEVEL
ELEVATION
A101
SIM
A101
SIM
A101
SIM
A101
SIM
HEIGHT & STC
FIRE RATING
CORE THICKNESS
CORE MATERIAL
THICKNESS (MIL)
STUD SPACING
? ACCESSORY NOTES
STX SIGNAGE TYPE
CONCRETE EARTHGYPSUM
BOARD
INSULATION
RIGID
MASONRY
BRICK
MASONRY
CONCRETE
BLOCK
FINISH WOOD
EIFS
STONE PRECAST
STEEL
GRAVEL BATT
INSULATION
MATERIALS
BLOCKING
PROJECT GENERAL NOTES
VERIFY IN FIELD (VIF): FIELD VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE
BEFORE SUBMITTING A BID OR PROCEEDING WITH ANY PORTION OF THE WORK
CONFLICTS: WHENEVER QUESTIONS ARISE OR CONDITIONS ARE ENCOUNTERED WHICH
ARE NOT COVERED BY, OR ARE IN CONFLICT WITH , THE CONTRACT DOCUMENTS,
CONSULT WITH THE ARCHITECT PRIOR TO TAKING ANY FURTHER ACTION.
CONTRACTOR SHALL REFER TO ENGINEERS DRAWINGS FOR CONSTRUCTION NOT
SHOWN IN ARCHITECTURAL DRAWINGS.
EQUIPMENT RELOCATION: RELOCATE EXISTING MECHANICAL AND ELECTRICAL AS
REQUIRED FOR INSTALLATION OF NEW WORK. CONTRACTOR SHALL NOT REMOVE OR
DAMAGE ANY EXISTING CABLING THAT IS TO REMAIN AND/OR NOT NOTED TO BE
REMOVED WHILE INSTALLING NEW CABLING.
MATERIAL DISPOSAL: LEGALLY DISPOSE OF ALL DEMOLISHED OR REMOVED EXISTING
MATERIAL, UNLAESS NOTED OTHERWISE. SALVAGE MATERIAL: COORDINATE WITH THE
OWNER FOR REMOVAL OF EXISTING MATERIAL NOTED TO BE RETURNED TO THE
OWNER.
PHASING: COORDINATE PHASING OF THE WORK WITH THE OWNER AND THE ARCHITECT
TO MEET THE OWNER'S SCHEDULE.
PROTECTION & CLEANING: CONTAIN ALL CONSTRUCTION ACTIVITY WITHIN
CONSTRUCTION BARRICADES OR FENCES. PROTECT OWNER'S EXISTING FACILITIES
AND PROPERTY ADJACENT TO NEW CONSTRUCTION. DURING AND AFTER WORK OF
THIS CONTRACT IS COMPLETE, CLEAN EXISTING AREAS AFFECTED BY THE WORK TO
THE OWNER'S SATISFACTION. THE CONTRACTOR MUST PROTECT AND COVER
EXISTING. SUPPORT AND PROTECT EXISTING UTILITIES, SERVICES, FIRE ALARMS
SYSTEMS, FIRE PORTECTION SYSTEMS, SOUND SYSTEMS, AND INTERCOM SYSTEMS
DURING CONSTRUCTION AND MOVE WHERE REQUIRED.
PATCH & REPAIR: PATCH AND REPAIR EXISTING WALLS, FLOORS, CEILINGS,
LANDSCAPING, PAVING OR OTHER SURFACES AFFECTED BY DEMOLITION OR NEW
CONSTRUCTION TO MATCH THE EXISTING MATERIAL AND FINISH. ANY CONSTRUCTION
ELEMENTS REQUIRING PENETRATIONS THROUGH FIRE RATED CONSTRUCTION SHALL
BE PROPERLY INSTALLED AND PATCHED TO MAINTAIN THE FIRE RATING.
STRUCTURAL: PROVIDE SHORING AND BRACING, AS REQUIRED, TO SUPPORT EXISTING
CONSTRUCTION. CUTTING AND DRILLING OF STRUCTURAL MEMBERS NOT DETAILED
REQUIRES THE WRITTEN PERMISSION OF THE STRUCTURAL ENGINEER.
FINAL CLEANING AND WASHING OF THE ROOF IS REQUIRED AT SUBSTANTIAL
COMPLETION
BID ALTERNATES
1. Base Bid: Provide removal of existing roofing and installation of new roofing system as indicated on the Drawings, in the area indicated on Drawing A101 "Roof Plan" and as specified in Section 075419 "Polyvinyl-Chloride (PVC) Roofing."
a. Remove existing coping and provide new coping. Color to match existing being removed.
b. Include removal and reinstallation, or replacement if indicated, of mechanical and electrical equipment as required.
c. Existing pressure treated nailers to remain in place. Replace damaged pressure treated nailers as required.
2. Alternate 01: Remove existing roofing down to existing metal roof deck and provide new roof assembly as indicated on the drawings, in the area indicated on Drawing A101 "Roof Plan" and as specified in Section 075419 "Polyvinyl-Chloride (PVC) Roofing."
a. Remove existing coping and provide new coping. Color to match existing being removed.
b. Include removal and reinstallation, or replacement if indicated, of mechanical and electrical equipment as required.
c. Existing pressure treated nailers to remain in place. Replace damaged pressure treated nailers as required.
3. Alternate 02: Include all items listed in the Base Bid, with the exception of item a. Replace item a with the following:
a. Remove and reinstall existing parapet coping.
SHEET NUMBER
MHTN Architects, Inc.
420 East South Temple Suite 100 Salt Lake City, Utah 84111 Telephone (801) 595-6700 Telefax (801) 595-6717 www.mhtn.com
MHTN PROJECT NO.
SEAL
DRAWN BY: CHECKED BY:
DESCRIPTIONDATENO.
REVISIONS
CONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT LAST
REVISION DATE.
CONSULTANTS
VICINITY MAP
INDEX TO DRAWINGS -
SHEET NAME
©2016 MHTN ARCHITECTS, INC.
DESCRIPTIONDATENO.
ISSUED
Original drawing is 30 x 42. Do not scale contents of this drawing.
Confidentiality Notice:
This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only.
Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.
ISSUE
/2
/2
:4
:5
P
M
A u to d e s k D o c s /2
J
S D
E lk
R id g e M
S R o o f
R e p la c e m e n t
A
E R
M S
R O
O F
R E
P L A
C E
M E
N T
.r v t
G001
E L K
R
ID
G E
M .S
R
O O
F R
E P
L A
C E
M E
N T
W
E S
T
S
O U
T H
S O
U T
H J
O R
D A
N
U T
A H
J O
R D
A N
S C
H O
O L D
IS
T
R
IC
T
TB CC
2025555
JORDAN SCHOOL DISTRICT
ELK RIDGE M.S. ROOF REPLACEMENT
JANUARY 26, 2026
3659 WEST 9800 SOUTH
SOUTH JORDAN, UTAH 84095
CONSTRUCTION DOCUMENTS
BID #26KP13
CONSTRUCTION DOCUMENTS
INDEX SHEET
JANUARY 26, 2026
CONSTRUCTION DOCUMENTS
GENERAL
G001 INDEX SHEET
ARCHITECTURAL
A101 OVERALL ROOF PLAN
A340 ROOF DETAILS
THIS SET INCLUDES
DRAWINGS THAT NEED TO
BE REPRODUCED IN
COLOR - THESE SHEETS
ARE SO LABELED.
OLSEN & PETERSON ENGINEERS
14 EAST 2700 SOUTH
SALT LAKE CITY, UT 84115
PHONE: 801-486-4646
RESOLUT GROUP
181 EAST 5600 SOUTH #200,
MURRAY, UT 84123
PHONE: 801-532-2196
MECHANICAL ELECTRICAL
MECHANICAL
MP101 MECHANICAL ROOF PLAN
MP501 MECHANICAL ROOF DETAILS
ELECTRICAL
E101 OVERALL ROOF ELECTRICAL PLAN
HICKS
BRIAN
No. 7709037-2202
G
IN
E E R
ONA
O F
E
SS
I
R
UT
A H
TE OF
S
TA
P
L EN
1/27/2026
E1 E2 E2.4 E3 E4 E5 E6
E2.1
E4.1 E4.2
EF
EE
EB
EA
EB.2
EB.1
EA.1
A.3
/8
5/8" / 12" 5/8" / 12"
/8
/8
/2
1/2" / 12"
5/8" / 12"
/8
/8
1/2" / 12" 5/8" / 12"
/8
/2
5/8" / 12" 1/2" / 12"
/8
/2
5/8" / 12" 1/2" / 12"
/8
/2
5/8" / 12" 1/2" / 12"
/8
/8
" / 1
5/8" / 12" 3/4" / 12"
/8
/2
1/2" / 12" 1/2" / 12"
/8
/ 4
5/8" / 12" 1/2" / 12"
/2
/8
5/8" / 12" 1/2" / 12"
/8
/8
5/8" / 12" 3/4" / 12"
/2
" / 1
/8
1/2" / 12" 5/8" / 12"
/2
1/2" / 12" 1/2" / 12" 5/8" / 12" 3/4" / 12" 1/2" / 12" 5/8" / 12"
/4
/8
/4
/2
/4
/8
/8
5/8" / 12" 3/4" / 12"
/4
/8
1/2" / 12" 1/2" / 12"
3/4" / 12"
/4
5/8" / 12"
/8
3/4" / 12"
/4
3/4" / 12"
/8
3/8" / 12"
/4
3/8" / 12"
/8
3/4" / 12"
/4
5/8" / 12"
/8
5/8" / 12"
/8
3/4" / 12"
/2
/4
1/2" / 12"
/4
1/2" / 12"
3/4" / 12"
/4
3/4" / 12"
/2
/8
/8
7/8" / 12" 3/8" / 12"
1/4" / 12" 1/4" / 12"
1/4" / 12" 1/4" / 12"
1/2" / 12"
1/2" / 12"
1/2" / 12"
1/2" / 12"
1/2" / 12"
1/2" / 12"
1/2" / 12"
1/2" / 12"
5/8" / 12"
7/8
12"
/8
/4
/2
/2
/2
/2
1/4" / 12" 1/4" / 12"
B2
A340
B2
A340
B2
A340 B2
A340
B2
A340
D2
A340
D3
A340
D3
A340
D2
A340
D2
A340
D3
A340
D2
A340
C2
A340
C2
A340
C2
A340
D2
A340
D2
A340
C5
A340
B1
A340
B1
A340
B1
A340
B1
A340
1/8" / 12"1/8" / 12"
A340
E2
TYP
A340
E2
TYP
A340
E2
TYP
A340
E2
TYP
74' - 0" 17' - 10" 43' - 4" 14' - 7 3/4" 61' - 2 1/4" 10' - 9 1/2" 5' - 0 3/4"
86' - 1 1/4" 111' - 0 1/2"
424' - 0"
1'
7'
/2
74' - 0" 61' - 2" 75' - 10" 10' - 9 1/2" 105' - 10 1/2" 96' - 4"
424' - 0"
1'
/2
2'
/2
8'
/2
B2
A340
B1
A340 B2
A340
B2
A340
B2
A340
B2
A340
B2
A340
B2
A340
B2
A340
B1
A340
B1
A340
B1
A340
B3
A340
ROOF PLAN GENERAL NOTES
References to sheets below are provided to aid in navigating the drawings.
RE: Mechanical/Plumbing drawings for pipe vent quantities and equipment locations. Provide flashing per roof and mechanical/plumbing details.
Crickets: Provide crickets at roof top mechanical units, roof access hatches and other similar conditions for positive drainage.
Roof Deck Limitations: Do not use the steel roof deck to support loads from plumbing, HVAC ducts, light fixtures, architectural elements or equipment of any kind, UNO. Lightweight suspended acoustical ceilings with a total weight per wire not exceeding 50 pounds may be hung from the steel roof deck. Stagger the hangers to distribute the load over multiple deck flutes.
Walkway Pads: Provide walkway pads as shown, and if not shown, provide pads from all points of roof access (ladders, doors, access hatches) to mechanical equipment, and all other rooftop equipment. Adjust pathways as required to miss penetrations and rooftop equipment that may not be shown on the roof plan.
Slope: Provide ¼” per foot minimum slope across the roof and/or match existing
Roof Membrane at Parapet Walls: Continue membrane up parapet walls, over the top and down the other side, lapping the wood nailers and the material below them by 1” minimum.
Elevation Datum Points: Datum points are to top of deck unless noted otherwise.
Existing Roof Insulation Damage: Remove and replace any physically damaged or water damaged existing roof insulation. Extent shall be determined with architect and owner. (Replacement unit cost provided at bid shall be used w/ owner's direction)
Temporarily remove or move existing equipment & roof ladders as required for removal of existing roofing and for installation of new roofing system.
New metal copings are to match existing metal copings in color, size and profile.
Existing curbs are to be raised as required in order to maintain a minimum of 8" of vertical roofing/flashing above finished roofing membrane. (Typical)
Contractor shall provide expansion joint covers at all locations where joint is exposed to include roof expansion & vertical wall expansion joints.
LEGEND - ROOF PLAN
CRICKETS: R-1 ROOF SYSTEM WITH
TAPERED INSULATION - MAINTAIN 1/4"
PER FOOT SLOPE AT CRICKET VALLEYS
DIRECTION OF SLOPE
(E) PRIMARY AND SECONDARY ROOF DRAINS. REMOVE
PROTECT AND REINSTALL WITH NEW ROOFING
MEMEBRANE. SEE DETAIL E1/A340
REMOVE EXISTING SBS MODIFIED ROOFING MEMBRANE
AND COVERBOARD TO TOP OF EXISTING POLYISO
INSULATION. INSTALL ADDITIONAL 2" POLYISO INSULATION
+ 1/2" COVER BOARD + PVC MEMBRANCE ROOFING
SYSTEM AS SPECIFIED. REMOVE AND REPLACE
MECHANICAL & ELECTRICAL EQUIPMENT AS REQUIRED.
REMOVE EXISTING METAL COPINGS, REPAIR/REPLACE 4X
PRESSURE TREATED NAILERS AT PARAPET AS REQUIRED,
AND REPLACE WITH NEW METAL COPING. (TAPERED
INSULATION AS REQUIRED TO MAINTAIN 1/4"/FT SLOPE AT
CRICKET VALLEYS)
EXISTING ROOF NOT INCLUDED IN PROJECT
WALKWAY PAD - 30" MINIMUM WIDTH - SEE A1/A340
(E) ROOF HATCH. SEE DETAIL C4/A340
ROOF TOP EQUIPMENT - SEE MECHANICAL
EXISTING SMOKE HATCH - SEE MECHANICAL
SHEET NUMBER
E
D D
C
B
A
E
C
B
A
2 3 4 5
1 2 3 4 5
MHTN PROJECT NO.
SEAL
DRAWN BY: CHECKED BY:
SHEET NAME
REVISIONS
CONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT
LAST REVISION DATE.
DESCRIPTIONDATE
MHTN Architects, Inc.
420 East South Temple Suite 100 Salt Lake City, Utah 84111 Telephone (801) 595-6700 Telefax (801) 595-6717 www.mhtn.com
©2015 MHTN ARCHITECTS, INC.
Original drawing is 30 x 42. Do not scale contents of this drawing.
NO.
Confidentiality Notice:
This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only.
Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.
ISSUE
/2
/2
:4
:5
P
M
A u to d e s k D o c s /2
J
S D
E lk
R id g e M
S R o o f
R e p la c e m e n t
A
E R
M S
R O
O F
R E
P L A
C E
M E
N T
.r v t
OVERALL ROOF
PLAN
A101
E L K
R
ID
G E
M .S
R
O O
F R
E P
L A
C E
M E
N T
W
E S
T
S
O U
T H
S O
U T
H J
O R
D A
N
U T
A H
J O
R D
A N
S C
H O
O L D
IS
T
R
IC
T
TB TB
2025555
JANUARY 26, 2026
CONSTRUCTION DOCUMENTS
SCALE: 1" = 20'-0"
ROOF PLAN
KEYNOTES
1 EXISTING ROOF LADDER - REMOVE AS NECESSARY FOR NEW
PARAPET COPING REMOVAL/INSTALLATION. REINSTALL ROOF
LADDER TO ORIGINAL LOCATION
2 PATCH AND PREPARE EXISTING HOLLOW METAL DOOR AND
FRAME FOR NEW SMOOTH PAINT FINISH. MATCH NEW PAINT
COLOR TO EXISTING AS APPROVED BY ARCHITECT
3 PROVIDE CONDUCTOR HEAD AND DOWNSPOUT DOWN TO 12"
ABOVE LOWER ROOF AND REINSTALL SALVAGED CONCRETE
SPLASH BLOCK. MATCH COLOR TO EXISTING COPING
ROOF DETAIL GENERAL NOTES
Terms such as "SEE SPECS," "RE: MECHANICAL" and so forth have been omitted from these details. All details require the general contractor and sub-contractors to refer to other drawings and specifications as required to understand and provide the items indicated and to provide supporting items that may or may not be shown.
The continuous nature of the materials shown in the details is inferred, though the word “continuous” may be omitted from the detail notes.
Any notes within details without the word "EXISTING" in front of it is new work and shall be provided in Bid to Jordan School District
Cleats: Unless specifically noted otherwise, provide continuous cleats.
Backer Rods: Provide backer rods at all joints that incorporate sealants.
Reglet Counter Flashing: Protect in place reglet counter flashing where occurs at EIFS, brick veneer wall, window sill, threshold, etc.
EXISTING SECONDARY
ROOF DRAIN
1 1/4" WATER DAM
ROOF SUMP RECEIVER
UNDERDECK CLAMP
EXISTING PRIMARY ROOF DRAIN
RE: PLUMBING
2" RIGID INSULATION
TAPPERED TO ROOF DRAIN
ROOF SUMP RECEIVER
UNDER DECK CLAMP
1/2": 1' - 0"
SLOPE
EXISTING METAL DECK
EXISTING ROOF
INSULATION TO REMAIN
1/2" COVERBOARD
1' - 6" 3' - 0" 1' - 6"
SECONDARY ROOF DRAIN
PRIMARY ROOF DRAIN
1/2":1'-0"
SLOPE
FACE OF WALL / PARAPET
U N
O
5'
M
IN
3'
6' - 0"
E1
A340
ROOF DRAIN SUMP
EXISTING PIPE
CONTINUOUS SEALANT
DRAW BAND
EXISTING METAL HOOD:
REMOVE AND REINSTALL
EXTEND ROOFING
MEMBRANE BENEATH
HOOD
2" RIGID INSULATION
EXISTING METAL DECK
M
IN
MIN.
8"
EXISTING ROOF
INSULATION TO REMAIN
1/2" COVERBOARD
M
IN
EXISTING ROOF
INSULATION TO REMAIN
MANUFACTURER'S ANCHORAGE
SYSTEM APPROPRIATE TO THE
SUBSTRATE
SINGLE-PLY FLASHING -
FULLY ADHERED TO WALL
TERM BAR FASTENED 8"
OC WITH GROMMETTED
FASTENERS
SEALANT
EXISTING METAL COUNTER
FLASHING TO REMAIN -
PROTECT IN PLACE
RE-APPLY SEALANT
EXISTING METAL DECK
2" RIGID INSULATION
1/2" COVERBOARD
SLOPE
AS R
EQ'D
FACE OF EXISTING MASONRY
PROVIDE SEALANT
BETWEEN METAL
FLASHING ASSEMBLY
AND METAL COPING
METAL COPING
EXISTING PARAPET WALL
EXISTING BACKER ROD
AND SEALANT
(WHERE APPLICABLE)
METAL SADDLE FLASHING
ATTACHED TO MASONRY
WALL IN BED OF SEALANT
. SCREW ANCHORS W/
METAL BACKED
NEOPRENE WASHERS
MIN.
6"
2"
2"
EXISTING ROOF HATCH
EXISTING METAL DECK
EXISTING ROOF
INSULATION TO REMAIN
8" M
IN
EXISTING NAILER
MANUFACTURER'S STANDARD WIDTH - 30" MIN ROOF ASSEMBLY -
SEE ROOF TYPES
WALKWAY PAD
ROOFING NOT SHOWN
FOR CLARITY.
NOTE:
BUILDING EXPANSION JOINT
ROOF EXPANSION JOINT
NOTCH METAL COPING TO
CLEAR SADDLE (TYP.)
SHEET METAL SADDLE - ANCHOR
SECURELY TO BLOCKING
EXPANSION JOINT ASSEMBLY
ROOF EXPANSION JOINT
AS OCCURS
D3
A340
D2
A340
SURFACE MOUNTED REGLET
SEALANT
SNAP-IN METAL COUNTER
FLASHING
EXPANSION JOINT ASSEMBLY
EXISTING ROOF INSULATION
TO REMAIN
EXISTING BATT INSULATION
EXISTING WALL
EXISTING METAL DECK
SLOPE
EXISTING WALL
EXISTING PRESSURE
TREATED PLATE
EXISTING PLYWOOD ON 2X STUDS
2" RIGID INSULATION
ROOFING SYSTEM
EXISTING ROOFING SYSTEM
EXTEND ROOFING SYSTEM
UP AND OVER EXISTING 2X
BLOCKING
EXISTING 2X BLOCKING
1/2" COVERBOARD
4"
1 1/2"
EXISTING CONT. WOOD CANT
FOAM ROD TUBING
EXISTING 2"X CURB
1/2" COVER BOARD
ROOFING SYSTEM
2" RIGID INSULATION
EXISTING 2X BLOCKING
EXISTING ROOFING
SYSTEM
EXISTING ROOF DECK
AND STRUCTURE
1/2" COVERBOARD
FLASHING
MEMBRANE, HOT-AIR
WELD
PRE-FINISHED METAL COPING MATCH
EXISTING - LAP JOINT W/ SEALANT
EXISTING 2X NAILER
2" RIGID INSULATION
ROOFING SYSTEM
EXISTING METAL DECK
EXISTING WALL ASSEMBLY
4"
ROOF MEMBRANE WRAP OVER PARAPET
EXISTING PRESSURE TREATED BLOCKING
SCREW ANCHORS W/ METAL
BACKED NEOPRENE WASHERS
1/2" COVERBOARD
EXISTING ROOF INSULATION TO REMAIN
3" 1"
3" M
IN1"
4"
M
IN1"
PRE-FINISHED METAL COPING -
LAP JOINT W/ SEALANT
EXISTING WALL ASSEMBLY
ROOF MEMBRANE WRAP OVER PARAPET
EXISTING PRESSURE TREATED BLOCKING
SCREW ANCHORS W/ METAL
BACKED NEOPRENE WASHERS
@ 18" O.C., BOTH SIDES
SHAPED 2X TREATED NAILER
SINGLE PLY ROOF MEMBRANE
WRAP OVER CAP
2" RIGID INSULATION
EXISTING ROOFING SYSTEM
EXISTING DECK
1/2" COVERBOARD
EXISTING 4X8 WOOD SHAPED
CANT, REPAIR AS NECESSARY
WITH PRESSURE TREATED
BLOCKING
GALV. METAL COPING
CONT. METAL HOOK STRIP
ATTACHED PER MANUFACTURER
RECOMMENDATIONS
/8
F
.V
1/ 2"
M
IN
EXISTING ANCHOR BOLT
FLASHING MEMBRANE, HOT-AIR
WELD
EXISTING MASONRY
MODIFIED BITUMAN BUILD UP
MEMBRANE LAYERS TO BE REMOVED
PERLITE TO BE REMOVED
POLYISO INSULATION BOARD TO REMAIN
COVERBOARD TO REMAIN
PERLITE TO REMAIN1
1/
4" 1/
2"
1/ 2"
3/ 4"
3/ 4"
SINGLE PLY ROOF MEMBRANE
2" RIGID INSULATION
EXISTING ROOFING SYSTEM
DECK TO REMAIN EXISTING DECK
EXISTING ROOF ASSEMBLY NEW ROOF ASSEMBLY
1/2" COVERBOARD
/4
F
.V
SINGLE PLY ROOF MEMBRANE
RIGID INSULATION (R-30 MIN.)
EXISTING DECK
BID ALTERNATE #1
NEW ROOF ASSEMBLY
1/2" COVERBOARD
PRE-FINISHED METAL COPING MATCH
EXISTING - LAP JOINT W/ SEALANT
2" RIGID INSULATION
ROOFING SYSTEM
EXISTING METAL DECK
EXISTING WALL ASSEMBLY
4"
ROOF MEMBRANE WRAP OVER PARAPET
EXISTING PRESSURE TREATED BLOCKING
SCREW ANCHORS W/ METAL
BACKED NEOPRENE WASHERS
1/2" COVERBOARD
EXISTING ROOF INSULATION TO REMAIN
3" 1"
EXISTING ROOF
INSULATION TO REMAIN
MANUFACTURER'S ANCHORAGE
SYSTEM APPROPRIATE TO THE
SUBSTRATE
SINGLE-PLY FLASHING -
FULLY ADHERED TO WALL
TERM BAR FASTENED 8"
OC WITH GROMMETTED
FASTENERS
SEALANT
EXISTING METAL COUNTER
FLASHING TO REMAIN -
PROTECT IN PLACE
RE-APPLY SEALANT
EXISTING METAL DECK
2" RIGID INSULATION
1/2" COVERBOARD
SHEET NUMBER
E
D D
C
B
A
E
C
B
A
2 3 4 5
1 2 3 4 5
MHTN PROJECT NO.
SEAL
DRAWN BY: CHECKED BY:
SHEET NAME
REVISIONS
CONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT
LAST REVISION DATE.
DESCRIPTIONDATE
MHTN Architects, Inc.
420 East South Temple Suite 100 Salt Lake City, Utah 84111 Telephone (801) 595-6700 Telefax (801) 595-6717 www.mhtn.com
©2015 MHTN ARCHITECTS, INC.
Original drawing is 30 x 42. Do not scale contents of this drawing.
NO.
Confidentiality Notice:
This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only.
Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.
VIEW AND PRINT THIS DRAWING IN COLOR
ISSUE
/2
/2
:4
:5
P
M
A u to d e s k D o c s /2
J
S D
E lk
R id g e M
S R o o f
R e p la c e m e n t
A
E R
M S
R O
O F
R E
P L A
C E
M E
N T
.r v t
ROOF DETAILS
A340
E L K
R
ID
G E
M .S
R
O O
F R
E P
L A
C E
M E
N T
W
E S
T
S
O U
T H
S O
U T
H J
O R
D A
N
U T
A H
J O
R D
A N
S C
H O
O L D
IS
T
R
IC
T
Author Checker
2025555
JANUARY 26, 2026
CONSTRUCTION DOCUMENTS
SCALE: 1 1/2" = 1'-0"
E1
ROOF DRAIN DETAIL -METAL DECK
SCALE: 3/4" = 1'-0"
E2
ROOF DRAIN PLAN
SCALE: 1 1/2" = 1'-0"
E3
PIPE PENETRATION DETAIL
SCALE: 1 1/2" = 1'-0"
C2
TERMINATION DETAIL
SCALE: 1" = 1'-0"
E4
FLASHING DETAIL
SCALE: 1 1/2" = 1'-0"
C4
ROOF HATCH DETAIL
SCALE: 1 1/2" = 1'-0"
A1
WALKWAY PAD DETAIL
SCALE: 3/4" = 1'-0"
C3
BUILDING TO ROOF EXPANSION
SCALE: 1 1/2" = 1'-0"
C5
ROOF TO WALL JOINT
SCALE: 1 1/2" = 1'-0"
D2
ROOFING AREA SEPARATION DETAIL
SCALE: 1 1/2" = 1'-0"
D3
EXPANSION JOINT
SCALE: 1 1/2" = 1'-0"
B1
PARAPET DETAIL
SCALE: 1 1/2" = 1'-0"
C1
PARAPET DETAIL
SCALE: 3" = 1'-0"
B2
FASCIA-COPING DETAIL
SCALE: 6" = 1'-0"
D1
EXISTING AND NEW ROOF CONSTRUCTION
SCALE: 1 1/2" = 1'-0"
B3
PARAPET DETAIL
E1
E1
E2
E2
E2.4
E2.4
E3
E3
E4
E4
E5
E5
E6
E6
E2.1
E2.1
E4.2
EFEF
EEEE
EDED
ECEC
EBEB
EAEA
EC.1EC.1
EB.2EB.2
EB.1EB.1
EA.1EA.1
A.3A.3
8"ø (E)
8"ø (E)
8"ø (E)
4"(E)
6"ø (E)
1/2"(E) 3/4"(E)
2"(E)
2"(E)
3/4"(E)
1/2"(E)
6"ø (E) 4"ø (E)
2"(E)
26"x26" CURB
3"(E)
4"(E)
4"(E)
20"ø (E) 30"ø (E)
12" CURB 3" VENT
20"ø (E)
30"ø (E)
8"ø (E)4"ø (E)
4"(E)
2"(E)
10"ø (E)
2"(E)
8"ø (E)
8"ø (E)
4"(E)
2"(E)
4"(E) 4"(E)
2"(E)
2"(E)
2"(E)
8"ø (E)
2"(E)
2"(E)
6"ø (E)6"ø (E)
2"(E)
2"(E)
2"(E)
2"(E)
4"(E)
2"(E)
2"(E)
2"(E)
2"(E)
4"(E)
2"(E)
2"(E)
3"ø (E)
2"(E)
2"(E)
2"(E)
8"ø (E)
2"(E)
2"(E)
2"(E) 10"ø (E)
10"ø (E) 10"ø (E)
2"(E)
10"ø (E) 10"ø (E)
2"(E)
2"(E)2"(E)2"(E)
2"(E)
2"(E)
2"(E)
2"(E) 2"(E)
2"(E)
2"(E)
2"(E)
2"(E)
2"(E)
2"(E)
2"(E)
2"(E)
4"(E)
2"(E)
2"(E)2"(E)
2"(E)
2"(E)
2"(E)
2"(E)2"(E) 2"(E)
4"(E)
2"(E)
2"(E)
4"(E)
4"(E) 4"(E)
2"(E)
4"(E)
6"ø (E)
9"ø (E)
2"(E)
6"ø (E)
9"ø (E)
6"ø (E) 9"ø (E)
2"(E)
3/4"(E)
3/4"(E)
3/4"(E)
3/4"(E)
3/4"(E)
2"(E)
2"(E)
2"(E)
MAU(E)
MAU(E)
42"x122" CURB
42"x122"
CURB
EF(E)
36"x36" CURB42"x24"
CURB
3"(E)
EF(E)
24"x24"
CURB
EF(E)
25"x25"
CURB
RH(E)
54"x54"
CURB
RH(E)
EF(E)
25"x25"
CURB
EF(E)
29"x29"
CURB
EF(E)
25"x25"
CURB
EF(E)
25"x25"
CURB
EF(E)
25"x25"
CURB
EF(E)
EF(E)
26"x26"
CURB
25"x25"
CURB
AC(E)
67"x19"
CURB
EF(E)
25"x25"
CURB
EF(E)
25"x25"
CURB
EF(E)
18"x18"
CURB
EF(E)
EF(E)
25"x25" CURB 25"x25"
CURB
EF(E)
25"x25"
CURB
EF(E) 25"x25"
CURB
EF(E)
25"x25"
CURB
EF(E)
25"x25"
CURB
EF(E)
22"x22"
CURB
RTU(E)
RTU(E)
RTU(E)
RTU(E)RTU(E)
70"x40"
CURB
70"x40"
CURB
70"x40"
CURB
132"x384"
CURB
78"x68"
CURB
78"x66"
CURB
186"x189"
CURB
90"x90"
CURB
59"x59"
CURB
59"x59"
CURB
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 6"
RD
2 6"
RD
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 6"
RD
2 6"
RD
1 6"
RD
2 6"
RD
1 6"
RD
2 6"
RD
1 4"
RD(E)
2 4"
RD(E)1 6"
RD
2 6"
RD
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 6"
RD
2 6"
RD
2 6"
RD
1 6"
RD
1 6"
RD
2 6"
RD
1 4"
RD(E)
2 4"
RD(E)
1 6"
RD
2 6"
RD
1 4"
RD(E)
2 4"
RD(E)
1 4"
RD(E)
2 4"
RD(E)
1 1
13 13
13 13
PH(E) PH(E)
PH(E)
PH(E)
PH(E)
PH(E)
PH(E)
SHEET NUMBER
E
D D
C
B
A
E
C
B
A
2 3 4 5
1 2 3 4 5
MHTN PROJECT NO.
SEAL
DRAWN BY: CHECKED BY:
SHEET NAME
REVISIONS
CONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT
LAST REVISION DATE.
DESCRIPTIONDATE
MHTN Architects, Inc.
420 East South Temple Suite 100 Salt Lake City, Utah 84111 Telephone (801) 595-6700 Telefax (801) 595-6717 www.mhtn.com
©2015 MHTN ARCHITECTS, INC.
Original drawing is 30 x 42. Do not scale contents of this drawing.
NO.
Confidentiality Notice:
This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only.
Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.
ISSUE
/2
/2
:4
:3
A
M
A u to d e s k D o c s /2
J
S D
E lk
R id g e
M S
R o o f R e p la c e m e n t M
E C
H
J S
D E
L K
R
ID
G E
M S
R O
O F
R E
P L A
C E
M E
N T
.r v t
MECHANICAL
ROOF PLAN
MP101
E L K
R
ID
G E
M .S
R
O O
F R
E P
L A
C E
M E
N T
W
E S
T
S
O U
T H
S O
U T
H J
O R
D A
N
U T
A H
J O
R D
A N
S C
H O
O L D
IS
T
R
IC
T
Author Checker
2025555
JANUARY 26, 2026
CONSTRUCTION DOCUMENTS
SCALE:
4' - 0"
8' - 0"
16' - 0"
1" = 20'-0"
OVERALL MECHANICAL ROOF PLAN
N
1 REMOVE ANY EXISTING CAP AND FLASHING AND INSTALL
NEW AIR ADMITTANCE VENT CAP ON PIPE VENT. SEE
2/MP501. NEW FLASHING BY DIVISION 7. FIELD VERIFY
VENT SIZE.
2 EXISTING EXHAUST FAN TO REMAIN. FAN SHALL BE
LIFTED FROM EXISTING CURB AND RESECURED AS
NECESSARY FOR ROOFING INSTALLATION. SEE DETAIL
4/MP501.
3 REMOVE EXISTING DUCT PENETRATION, CAP BELOW
ROOF AND REPAIR ROOF DECK.
4 EXISTING ROOF HOOD SHALL REMAIN. HOOD SHALL BE
LIFTED FROM EXISTING CURB, DUCT EXTENDED, HOOD
RAISED AND RESECURED AS NECESSARY FOR ROOFING
INSTALLATION.
5 GAS PIPING FOR MECHANICAL UNIT SHALL BE FLASHED
AND RECONNECTED TO UNIT. SEE DETAIL 1/MP501.
6 EXISTING WATER TO EVAPORATIVE COOLER SHALL BE
FLASHED AND RECONNECTED TO UNIT. SEE DETAIL
1/MP501.
7 EXISTING DRAIN LINE AT MAKE-UP AIR UNIT TO BE
REFLASHED. SEE DETAIL 1/MP501.
8 EXISTING VENT OR FLUE TO REMAIN. INSTALL NEW
FLASHING AND RAIN COLLAR AS PER DETAIL 6/MP501.
9 EXISTING MAKE UP AIR UNIT TO REMAIN. UNIT AND
DUCTWORK SHALL BE LIFTED FROM EXISTING CURB AND
RESECURED AS NECESSARY FOR ROOFING
INSTALLATION. SEE DETAIL 3/MP501.
10 REMOVE EXISTING ABANDONED ROOF CURB COMPLETE.
REPAIR ROOF DECK.
11 EXISTING ROOF TOP UNIT TO REMAIN. UNIT SHALL BE
LIFTED FROM EXISTING CURB AND RESECURED AS
NECESSARY FOR ROOFING INSTALLATION. SEE DETAIL
8/MP501.
12 RAISE EXISTING LOUVERED PENTHOUSE 12". MINIMUM
HEIGHT ABOVE NEW FINISHED ROOF TO BOTTOM OF
PENTHOUSE TO BE 12".
13 EXISTING PRIMARY AND SECONDARY ROOF DRAINS AND
DOMES TO REMAIN. RE-TIGHTEN ALL DRAINS AS A PART
OF NEW ROOFING. CONTRACTOR TO CONFIRM
CONDITION OF EACH DRAIN PRIOR TO COMPLETION.
DRAIN(S) TO BE REPLACED IF DRAIN IS BROKEN UNDER
UNIT PRICING LISTED IN SPECIFICATIONS.
14 EXTEND EXISTING PLUMBING VENT A MINIMUM OF 18"
ABOVE ROOF. (TYP)
15 EXISTING DRYER VENT TO REMAIN. INSTALL NEW
FLASHING AND RAIN COLLAR AS PER DETAIL 10/MP501.
16 REMOVE ABANDONED PIPE ROOF PENETRATION
COMPLETE, CAP ANY ABANDONED PIPING BELOW ROOF
DECK (TYP).
17 EXISTING CONDENSING UNIT TO REMAIN. UNIT AND CAP
SHALL BE LIFTED FROM EXISTING CURB AND
RESECURED AS NECESSARY FOR ROOFING
INSTALLATION. SEE DETAIL 11/MP501.
18 REPLACE EXISTING 25"X25" CURB AND ADAPTOR WITH
NEW CURB MATCH THE EXISTING EXHAUST FAN.
19 EXISTING LOUVER MECHANICAL MEZZANINE. ROOFING
BY DIVISION 7 SHALL EXTEND UP TO THE EXTERIOR OF
THE BOTTOM LOUVER BLADES.
20 EXISTING GAS FIRED EXHAUST PIPE AND CURB TO
REMAIN.
21 REMOVE SHEET METAL SECTION OF FLUE AND LEAVE
THE EXISTING PVC FLUE ONLY. REFLASH AND INSTALL
NEW RAIN COLLOAR AS PER DETAIL 6/MP501.
22 EXISTING KITCHEN EXHAUST FAN TO REMAIN. FAN
SHALL BE LIFTED FROM EXISTING CURB AND
RESECURED AS NECESSARY FOR ROOFING
INSTALLATION. SEE DETAIL 5/MP501.
REFERENCE NOTES#
M
IN
NOTE: VERIFY EXACT
REQUIREMENTS WITH
ROOF MANUFACTURER
NEW ROOF SYSTEM
FLASHING BY ROOFING
CONTRACTOR
FLASHING RAIN COLLAR
WITH CLAMP BY ROOFING
CONTRACTOR
CAULKING (TYPICAL)
EXISTING OR NEW PIPE
18" SQUARE
FLASHING FLANGE BY
ROOFING CONTRACTOR
M
IN
M
IN
NOTE: VERIFY EXACT
REQUIREMENTS WITH
ROOF MANUFACTURER
NEW VENT PIPE
EXTENSION WHERE
REQUIRED
CAULKING (TYPICAL)
VENT FLASHING RAIN
COLLAR WITH CLAMP BY
ROOFING CONTRACTOR
VENT FLASHING BY
ROOFING CONTRACTOR
NEW ROOF SYSTEM
18" SQUARE
FLASHING FLANGE
BANDED COUPLING PER
MANUFACTURERS
REQUIREMENTS
STUDOR ALUMINUM
COVER
STUDOR MAXI-VENT AIR
ADMITTANCE VALVE
NEW 'NO-HUB' PIPE
CONNECTION BELOW
ROOF DECK WHERE
NOTED TO EXTEND VTR
EXISTING VENT PIPE
DO NOT LINE MAKE-UP AIR DUCTWORK
EXISTING MAKE-UP AIR UNIT
12" MIN. 12" MIN.
REMOVE & REINSTALL UNIT
AS REQUIRED FOR NEW
ROOF
EVAPORATIVE SECTION
SUPPORT
RE-FLASH CURB WATER-
TIGHT. EQUIPMENT
BASE/CURB.
EXISTING MAKE UP AIR DUCT
M
IN
CURB SHALL BE
INSTALLED BEFORE
NEW ROOF IS
APPLIED
ANCHOR FAN SECURELY
TO CURB W. 1/4 LAG
SCREWS (8 REQ'D)
CANT STRIP
EXISTING EXHAUST DUCT
FROM BELOW, EXTEND AS REQUIRED
EXISTING GRAVITY BACKDRAFT
DAMPER
NEW ROOF LINE
EXTEND CURB AS REQUIRED.
WOOD BLOCKING SAME
THICKNESS AS INSULATION
EXISTING EXHAUST FAN
BIRDSCREEN
EXTEND CURB AS
REQUIRED
NEW ROOF LINE
WOOD BLOCKING. SAME
THICKNESS AS INSULATION
EXTEND EXISTING DUCT AS REQUIRED.EXISTING METAL DECK
ROOF INSULATION
CANT STRIP
ANCHOR FAN SECURELY
TO CURB WITH 1/2"
BOLTS (8 PLACES)
EXISTING UP-BLAST
EXHAUST FAN
12"
CURB SHALL BE
INSTALLED BEFORE
NEW ROOF IS
APPLIED
M
IN
PROVIDE NEW
BREIDERT TYPE VENT
CAP
RAIN COLLAR BY
ROOFING CONTRACTOR
NEW ROOF LINE
'DO NOT' ANCHOR FLASHING TO
DUCT. DUCT MUST MOVE FOR ROOF
EXPANSION
EXISTING VENT PIPE
NEW DUCT CONNECTION TO
EXISTING BELOW ROOF DECK
CAULK (TYP)
ROOF FLASHING BY ROOFING
CONTRACTOR
EXISTING ROOF HOOD
PRE-FABRICATED CURB
W/ WOOD NAILERS. TOP
OF CURB TO BE 12" MIN.
ABOVE ROOF LINE
EXTEND DUCT OVER
SIDE OF CURB & SOLDER
ROOF INSULATION
WOOD BLOCKING SAME
THICKNESS AS ROOF
INSULATION
EXISTING MOTORIZED ATC
DAMPER AND DUCTWORK
NEW ROOF LINE
CANT STRIP
LAG (8 PLACES)
BIRD SCREEN
NOTE:
CURB TO BE INSTALLED
BEFORE ROOFING IS APPLIED
EXTEND EXISTING
DUCTWORK AS REQUIRED
CURB EXTENSION
EXISTING ROOF TOP UNIT
UNIT TO BE INSTALLED
LEVEL. SHIM UNDER ROOF
MOUNTING AS NECESSARY
NEOPRENE GASKET
BETWEEN UNIT AND
ROOF MOUNTING
FRAME
COUNTER FLASHING BY
GENERAL CONTRACTOR
ROOF FLASHING
NEW ROOF LINE
ROOF MOUNTING FRAME
TO BE ANCHORED
SECURELY TO ROOF JOISTS CANT STRIP
EXISTING ROOF MOUNTING
FRAME
FURNISHED WITH UNIT. EXTEND
AS REQUIRED.
RIGID INSULATION
TREATED WOOD NAILER STRIP TO
BE ANCHORED TO ROOF
MOUNTING FRAME
ANCHOR UNIT SECURELY TO ROOF
CURB. MIN. 6 LOCATIONS
ROOF LINE
12" MIN.
M
IN
EXTEND EXISTING
DUCTWORK AS REQUIRED
SHEET METAL PAN
AT PENTHOUSE
M
IN
EXISTING PENTHOUSE
PRE-FABRICATED CURB W/ TREATED
WOOD NAILERS. TOP OF CURB TO BE
18" MIN. ABOVE ROOF LINE
EXTEND DUCT OVER
SIDE OF CURB &
SOLDER
ROOF INSULATION
TREATED WOOD BLOCKING.
SAME THICKNESS AS
INSULATION
EXISTING ROOF DECK
NEW ROOF LINE
CANT STRIP
LAG (8 PLACES)
1 1/2" RIGID
INSULATION
WOOD BLOCKING
3/4" PLYWOOD WITH
SHEET METAL CAP
SLOPE CURB FOR
DRAINAGE (TYPICAL)
EXTEND EXISTING
DUCTWORK AS REQUIRED
NOTE:
CURB TO BE INSTALLED
BEFORE ROOFING
MEMBRANE IS APPLIED
M
IN
SLOPE
SEAL WATERTIGHT
DRYER DISCHARGE FITTING
WITH BACKDRAFT DAMPER
RAIN COLLAR
BY ROOFING CONTRACTOR
NEW ROOF LINE
EXISTING ALUMINUM CLOTHES
DRYER VENT
ROOF FLASHING 'DO NOT' ANCHOR
FLASHING TO DUCT. DUCT MUST
MOVE FOR ROOF EXPANSION
EXISTING OUTDOOR
CONDENSING
UNIT
3/4" TREATED PLYWOOD
ON TOP OF RAILS
3/4" STEEL STOVE BOLT IN
RECESS W/ 2" WASHER
INDIVIDUAL REFRIGERANT
PIPING AND CONDUIT FLASHING
1 PIECE 22 GAUGE GALV.
SHEET METAL PANS OVER TOP
OF BASE. ALL JOINTS, SEAMS,
AND FLASHINGS SHALL BE
SOLDERED
PROVIDE NEOPRENE PADS
WHERE UNIT SITS ON PLATFORM
NOTE:
PROVIDE EQUIPMENT BASE AT OUTDOOR CONDENSING
UNITS. ANCHOR BASE SECURELY TO STRUCTURE AND
EQUIPMENT TO BASE. BASE SHALL BE LARGE ENOUGH
FOR ALL UTILITIES TO RISE THRU BASE. COVER OVER
BASE SHALL BE ONE PIECE WATER RIGHT TURNED OVER
EDGES, FLASH AT UTILITIES
ANCHOR C.U.
SECURELY TO CURB.
(4-PLACES)
TREATED WOOD RAILS TO
FORM A CONTINUOUS
CURB. BOLT EACH SECTION
TO ROOF IN 3 PLACES
ROOF FLASHING
12" CLEAR MIN.
NEW ROOF LINE
EXISTING ROOF
STRUCTURE
DRILL THRU ROOF
STRUCTURE & BOLT
DOWN EQUIPMENT
RAIL
3/4" NUT & 3"
DIA. WASHER
ROOF INSULATION
SHEET NUMBER
E
D D
C
B
A
E
C
B
A
2 3 4 5
1 2 3 4 5
MHTN PROJECT NO.
SEAL
DRAWN BY: CHECKED BY:
SHEET NAME
REVISIONS
CONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT
LAST REVISION DATE.
DESCRIPTIONDATE
MHTN Architects, Inc.
420 East South Temple Suite 100 Salt Lake City, Utah 84111 Telephone (801) 595-6700 Telefax (801) 595-6717 www.mhtn.com
©2015 MHTN ARCHITECTS, INC.
Original drawing is 30 x 42. Do not scale contents of this drawing.
NO.
Confidentiality Notice:
This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only.
Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.
ISSUE
/2
/2
:4
:3
A
M
A u to d e s k D o c s /2
J
S D
E lk
R id g e
M S
R o o f R e p la c e m e n t M
E C
H
J S
D E
L K
R
ID
G E
M S
R O
O F
R E
P L A
C E
M E
N T
.r v t
MECHANICAL
ROOF DETAILS
MP501
E L K
R
ID
G E
M .S
R
O O
F R
E P
L A
C E
M E
N T
W
E S
T
S
O U
T H
S O
U T
H J
O R
D A
N
U T
A H
J O
R D
A N
S C
H O
O L D
IS
T
R
IC
T
Author Checker
2025555
JANUARY 26, 2026
CONSTRUCTION DOCUMENTS
NTSSCALE: MP501
1PIPE THRU ROOF PENETRATION DETAIL
NTSSCALE: MP501
2VENT THRU ROOF DETAIL
NTSSCALE: MP501
3MAKE-UP AIR UNIT DETAIL
NTSSCALE: MP501
4ROOF MOUNTED EXHAUST FAN DETAIL
NTSSCALE: MP501
5KITCHEN HOOD ROOF MOUNTED EXHAUST FAN
NTSSCALE: MP501
6TYPICAL DUCT PENETRATION AT ROOF DETAIL
NTSSCALE: MP501
7ROOF HOOD DETAIL
NTSSCALE: MP501
8ROOF MOUNTED AIR CONDITIONING UNIT DETAIL
NTSSCALE: MP501
9ROOF PENTHOUSE DETAIL
NTSSCALE: MP501
10TYPICAL DRYER DUCT TERMINATION AT ROOF DETAIL
NTSSCALE: MP501
11AC OUTDOOR UNIT DETAIL
E1 E2 E2.4 E3 E4 E5 E6E2.1 E4.1 E4.2
EF
EE
ED
EC
EB
EA
EC.1
EB.2
EB.1
EA.1
A.3
E2
E2
E9 E2
E2E2
E9
E2
E2
E2
E12
E12
E12
E12
E12
E2
E2
E2
E2
E2
E2
E2
E16
E2
E2
E2
E2
E2
E2
EXIST. SATELLITE SYSTEM E1
SECURE BLOCK TO GROUND
USING MANUFACTURER
RECOMMENDATIONS
C-PORT BLOCK
OR APPROVED
EQUAL
ALL THREAD ADJUSTABLE
STANDS
UNITRUT SUPPORT
RMC CONDUIT
FLASHING
CAULKING
ROOFING
12"
CURB MIN.
24" MIN.
FROM ROOF
DECK
WATERTIGHT FLEXIBLE
CONDUIT WHIP FROM
DISCONNECT TO RACEWAY
ELECTRICAL DISCONNECT
(NEMA 3R)
GENERAL NOTES
1. COORDINATE WITH THE ROOFING CONTRACTOR TO PROVIDE APPROPRIATE ROOF JACK.
THE JACK SHALL BE SIZED TO FIT TIGHTLY TO RACEWAY FOR WEATHER-TIGHT SEAL.
COORDINATE WORK AND REQUIREMENTS UNDER ROOFING SECTION OF SPECIFICATIONS.
2. CONTRACTOR SHALL NOT INSTALL ELECTRICAL CONDUIT(S) THROUGH THE NEW
MECHANICAL CURB AND/OR DUCTWORK. LOCATE ELECTRICAL CONDUITS A MINIMUM OF
12" AWAY FROM MECHANICAL CURB ALONG WITH MAINTAINING A MINIMUM OF 12"
BETWEEN ANY OTHER CONDUIT AND ANY OTHER ROOF PENETRATION.
3. NO ELECTRICAL WIRES OF EITHER HIGH OR LOW VOLTAGE TO RUN INSIDE ANY CURBS.
WEATHERPROOF DUPLEX
RECEPTACLE
ROOF MOUNTED HEATING & AIR CONDITIONING UNIT
SECURELY FASTEN TO BUILDING STRUCTURE TO ELIMINATE ANY
MOVEMENT, TWISTING,TO ELIMINATE ANY MOVEMENT,
TWISTING, SWAYING ETC. GROUND CONDUIT TO ROOF
STRUCTURE
NOTES:
PROVIDE SERVICE RECEPTACLE WITHIN 25' OF MECHANICAL
UNIT.PROVIDE WEATHER RESISTANT GFCI DUPLEX AND INTERMATIC
1010MXD WEATHERPROOF COVER.
PROVIDE NEMA 3R DISCONNECT/STARTER REQUIRED. REFER TO
SPECIFICATIONS FOR COORDINATION REQUIREMENTS WITH
MECHANICALSHOP DRAWINGS PRIOR TO RELEASING EQUIPMENT AND
PERFORMING ROUGN-IN.
HICKS
BRIAN
No. 7709037-2202
G
IN
E E R
ONA
O F
E
SS
I
R
UT
A H
TE OF
S
TA
P
L EN
Project #: 251099
SHEET NUMBER
E
D D
C
B
A
E
C
B
A
2 3 4 5
1 2 3 4 5
MHTN PROJECT NO.
SEAL
DRAWN BY: CHECKED BY:
SHEET NAME
REVISIONS
CONTRACTOR TO VERIFY DRAWINGS IN FIELD USE REFLECT
LAST REVISION DATE.
DESCRIPTIONDATE
MHTN Architects, Inc.
420 East South Temple Suite 100 Salt Lake City, Utah 84111 Telephone (801) 595-6700 Telefax (801) 595-6717 www.mhtn.com
©2015 MHTN ARCHITECTS, INC.
Original drawing is 30 x 42. Do not scale contents of this drawing.
NO.
Confidentiality Notice:
This document is intended for use on the Project identified herein by individuals and companies involved in the design, permitting, bidding and construction of the Project. MHTN Architects, Inc. grants limited rights to distribute and reproduce this document for this express purpose only.
Distribution, printing or copying this document for purposes other than those indicated is strictly prohibited. If a digital copy of this document is received in error, please delete it.
VIEW AND PRINT THIS DRAWING IN COLOR
ISSUE
1/27/2026
/2
/2
:1
:2
A
M
A u to d e s k D o c s /2
J S
D E lk R id g e M
S R o o f
R e p la c e m e n t
J S
D E lk R id g e M
S R o o f R e p la c e m e n t E
L E
C .r v t
OVERALL ROOF
ELECTRICAL
PLAN
E101
E L K
R
ID
G E
M .S
R
O O
F R
E P
L A
C E
M E
N T
W
E S
T
S
O U
T H
S O
U T
H J
O R
D A
N
U T
A H
J O
R D
A N
S C
H O
O L D
IS
T
R
IC
T
Author Checker
2025555
JANUARY 27, 2026
CONSTRUCTION DOCUMENTS
GENERAL ELECTRICAL REROOF NOTES
1. EXISTING CONDITIONS: LOCATIONS OF ROOF-MOUNTED EQUIPMENT AND PENETRATIONS ARE
DIAGRAMMATIC. DIVISION 26 SHALL FIELD VERIFY EXACT LOCATIONS OF ALL ELECTRICAL
APPARATUSES, CONDUITS, AND CIRCUITS PRIOR TO WORK. CONFIRM EXACT SCOPE OF ROOF
DEMOLITION WITH ARCHITECTURAL PLANS.
2. PROTECTION OF RACEWAYS: PROTECT ALL EXISTING ELECTRICAL CONDUIT AND EQUIPMENT
TO REMAIN. CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY CONDUIT OR WIRING
DAMAGED DURING THE ROOFING PROCESS.
3. CONDUIT SUPPORTS (CRITICAL): REPLACE ALL EXISTING WOOD BLOCK SUPPORTS WITH NEW
UV-RATED RECYCLED RUBBER STRUT SUPPORTS (E.G., C-PORT, DURA-BLOK, OR EQUAL).
SPACE SUPPORTS PER NEC. DO NOT PLACE CONDUIT DIRECTLY ON NEW ROOF MEMBRANE.
4. UNIT LIFTING & RECONNECTION: WHERE MECHANICAL UNITS ARE LIFTED TO ACCOMMODATE
NEW INSULATION OR CURBS, DIVISION 26 SHALL:
• DISCONNECT POWER PRIOR TO LIFTING.
• EXTEND CONDUIT AND CONDUCTORS AS REQUIRED TO REACH THE NEW CONNECTION
HEIGHT. (ALLOW FOR SLACK IN FLEX).
• RECONNECT AND VERIFY ROTATION/PHASING.
5. OBSTRUCTIONS: RELOCATE, REWIRE, OR DIVERT ANY ELECTRICAL CONDUIT OR DEVICE THAT
OBSTRUCTS THE INSTALLATION OF NEW FLASHING, CRICKETS, OR ROOFING MATERIAL.
6. DISCONNECT HEIGHT: VERIFY EXISTING DISCONNECT SWITCHES REMAIN ACCESSIBLE AND AT
CODE-COMPLIANT HEIGHTS ABOVE THE NEW ROOF SURFACE. ADJUST MOUNTING HEIGHT IF
REQUIRED.
7. DEMOLITION: REMOVE ALL ABANDONED RACEWAYS, BOXES, AND CONDUCTORS BACK TO
THE SOURCE. EXISTING RACEWAYS MAY BE REUSED ONLY IF THEY ARE IN GOOD CONDITION
AND COMPLIANT WITH CURRENT SPECS.
8. COORDINATION: SEE SHEETS ARCHITECTURAL SHEET FOR PHOTOS OF EXISTING ROOF
CONDITIONS. COORDINATE ALL PENETRATIONS WITH ROOFING CONTRACTOR TO ENSURE
WARRANTY COMPLIANCE.
1" = 20'-0"
OVERALL ROOF ELECTRICAL PLAN
KEYNOTES
E1 SATELLITE SYSTEM DEMOLITION: DISCONNECT AND REMOVE EXISTING SATELLITE DISH, MOUNTING
HARDWARE, AND CABLING BACK TO SOURCE. OFFER EQUIPMENT TO OWNER FOR SALVAGE; IF
REJECTED, LEGALLY DISPOSE OF ALL MATERIALS OFF-SITE. COORDINATE WITH ROOFING
CONTRACTOR TO ENSURE ANY ROOF PENETRATIONS ARE SEALED WEATHERTIGHT.
E2 EXHAUST FAN (LIFT & RECONNECT): UNIT TO BE LIFTED FOR ROOFING. DISCONNECT POWER PRIOR TO LIFT. REPLACE EXISTING FLEX WHIP WITH NEW LIQUID-TIGHT FLEXIBLE METAL CONDUIT (LFMC).
EXTEND CONDUCTORS AS REQUIRED TO ACCOMMODATE NEW CURB HEIGHT. RECONNECT POWER
AND VERIFY PHASE ROTATION.
E9 MAKE-UP AIR UNIT (LIFT & RECONNECT): MUA TO BE LIFTED FOR ROOFING. DISCONNECT POWER
AND ANY ASSOCIATED 120V CONTROL/CONVENIENCE WIRING. REPLACE FLEX WHIPS WITH NEW
LFMC. RELOCATE DISCONNECT AND EXTEND ALL CONDUCTORS AS REQUIRED FOR NEW HEIGHT.
VERIFY DISCONNECT HANDLE REMAINS AT CODE-COMPLIANT HEIGHT (6'-7" MAX). RECONNECT AND
VERIFY ROTATION.
E12 ROOFTOP UNIT (LIFT & RECONNECT): RTU TO BE LIFTED FOR ROOFING. DISCONNECT POWER AND
120V CONNECTIONS. REPLACE DETERIORATED FLEX WITH NEW LFMC. RELOCATE DISCONNECT
AND EXTEND CONDUCTORS AS REQUIRED TO REACH NEW CONNECTION POINT (ALLOW FOR DRIP
LOOP). RECONNECT AND VERIFY ROTATION
E16 AC CONDENSING UNIT (LIFT & RECONNECT): CONDENSING UNIT TO BE LIFTED FOR ROOFING.
DISCONNECT POWER AND 120V CONNECTIONS. REPLACE DETERIORATED FLEX WITH NEW LFMC.
RELOCATE DISCONNECT AND EXTEND CONDUCTORS AS REQUIRED TO REACH NEW CONNECTION
POINT (ALLOW FOR DRIP LOOP). RECONNECT AND VERIFY ROTATION.
NTS
DIAGRAM C-PORT CE CONDUIT SUPPORTF103
NTS
DIAGRAM
TYPICAL - ROOF MOUNTED MECHANICAL
EQUIPMENT ROUGH-IN REQUIREMENTSG008
| Sheets |
| G001_INDEX SHEET |
| A101_OVERALL ROOF PLAN |
| A340_ROOF DETAILS |
| MP101_MECHANICAL ROOF PLAN |
| MP501_MECHANICAL ROOF DETAILS |
| E101_OVERALL ROOF ELECTRICAL PLAN |
File details come from the government source that posted it. Updated .