4. Silver Creek IRSC Appendix C.pdf

PDF 216 KB Posted

Attached to
Silver Creek IRSC Federal contract opportunity
Solicitation number
12363N26Q4205
Issued by
Department of Agriculture Forest Service

About this file

Summary

This is Appendix C from a stewardship contract for the Silver Creek Integrated Restoration and Salvage Contract (IRSC) on the San Isabel National Forest, Salida Ranger District, revised January 27, 2025. The appendix specifies comprehensive road maintenance requirements that the contractor must perform with no compensation from the Forest Service across three phases: pre-haul, during haul, and post-haul operations.

The contractor is responsible for maintaining four road segments totaling approximately 3.32 miles according to five technical specifications (T-800 Definitions, T-803 Surfacing Blading, T-804 Surfacing Repair, T-807 Roadway Vegetation, and T-808 Miscellaneous Structures). The roads include BLM 5325 (1.22 miles), BLM 5327 (0.16 miles), NFSR 878 (0.95 miles), and a Rio Grande National Forest Non-System Route (0.99 miles). Maintenance requirements include surface blading to maintain road crown and drainage; surfacing repair of potholes and soft spots using approved materials from commercial sources or Forest Service borrow areas; roadway vegetation removal to prevent impedance of travel; and maintenance of miscellaneous structures such as cattleguards and gates. The contractor's responsibility for slide and slump repair is capped at a maximum of 20 cubic yards. All work must be performed in compliance with detailed specifications governing material quality, surface preparation, compaction methods, drainage management, and disposal of removed materials at Forest Service-designated sites.

View the file

Other files for this federal contract opportunity

Other files attached to Silver Creek IRSC, newest first.
File Type Posted
A002 Silver Creek IRSC.pdf PDF
A001 Silver Creek IRSC.pdf PDF
7. Silver Creek IRSC CAM.pdf PDF
2. Silver Creek IRSC Appendix A.pdf PDF
3. Silver Creek IRSC Appendix B.pdf PDF
1. 12363N26Q4205 Silver Creek IRSC Call Order.pdf PDF
6. Silver Creek IRSC Vicinity Map.pdf PDF
5. Silver Creek IRSC Traffic Control Plan.pdf PDF
8. Silver Creek IRSC Cruise Summary.pdf PDF
9. Silver Creek IRSC SCA WD20260513.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Silver Creek IRSC San Isabel National Forest Page 1 of 10 Salida Ranger District

Revised 1.27.2025

APPENDIX C

C5.31# – ROAD MAINTENANCE REQUIREMENTS. (9/04) Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:

PRE HAUL

ROAD TERMINI MILES ROAD MAINTENACE T-SPECIFICATIONS

FROM TO T-800 T-803 T-804 T-807 T-808 T-8## T-8## T-8##

BLM5325 US Hwy

JCT w/BLM 5327 1.22 C C C C

BLM 5327 JCT w/BLM

Rio Grande

NF

Boundary

0.16 C C C C

NFSR 878

Rio Grande

NF

Boundary

San Isabel

NF

Boundary

0.95 C C C C C

Rio Grande NF

Non- System Route

NFSR 878 MP 0.99 0.99 C C

DURING HAUL

FROM TO T-800 T-803 T-804 T-807 T-808 T-8## T-8## T-8##

BLM5325 US Hwy

JCT w/BLM 5327 1.22 C C C C

BLM 5327 JCT w/BLM

Rio Grande

NF

Boundary

0.16 C C C C

NFSR 878

Rio Grande

NF

Boundary

San Isabel

NF

Boundary

0.95 C C C C C

Rio Grande NF

Non- System

POST HAUL

FROM TO T-800 T-803 T-804 T-807 T-808 T-8## T-8## T-8##

BLM 5325 US Hwy

JCT w/BLM 5327 1.22 C C C C

Page 2 of 10 Salida Ranger District

BLM 5327 JCT w/BLM

Rio Grande

NF

Boundary

0.16 C C C C

NFSR 878

Rio Grande

NF

Boundary

San Isabel

NF

Boundary

0.95 C C C C C

Rio Grande NF

Non- System

Notes:

C = Contractor Performance Item The maximum volume of Contractor responsibility for Slide and Slump repair is 20 cubic yards O = Optional Contract Line Item NFSR = National Forest Service Road BLM= Bureau of Land Management Road CR = County Road JCT = Junction MP = Milepost EOR = End of Road

Page 3 of 10 Salida Ranger District

ROAD MAINTENANCE T-SPECIFICATIONS FOR STEWARDSHIP CONTRACTS

Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:

Contractor will be responsible for doing all pre, during and post haul road maintenance with no compensation from the Forest Service.

T-SPECIFICATIONS

T-SPEC NUMBER SPECIFICATION TITLE

T-800 Definitions T-803 Surfacing Blading T-804 Surfacing Repair T-807 Roadway Vegetation T-808 Miscellaneous Structures

Page 4 of 10 Salida Ranger District

SPECIFICATION T-800 DEFINITIONS

Wherever the following terms or pronouns are used in Specifications T-801 through T-811, the intent and meaning shall be interpreted as follows:

800-1.1 - Agreement. Maintenance projects require a mutually acceptable method to resolve the problems, which arise when incompatible situations arise between drawings and specifications and actual conditions on the ground to allow orderly and satisfactory progress of the maintenance.

These specifications have been developed in anticipation of those problem areas and have provided that such changes will be by Agreement.

It is intended that drawings and specifications will govern unless "on-the-ground" conditions warrant otherwise, when specifications call for "Agreement", "agreed", or "approval" such Agreement or approval shall be promptly confirmed in writing.

800-1.2 - Annual Road Maintenance Plan. A plan prepared by various users of one or several roads. The plan is an Agreement on maintenance responsibilities to be performed for the coming year.

800-1.3 - Base Course. Material used to reinforce Subgrade or, as shown on drawings, placed on Subgrade to distribute wheel loads.

800-1.4 - Berm. Curb or dike constructed to prevent Roadway runoff water from discharging onto embankment slope.

800-1.5 - Borrow. Select Material taken from designated borrow sites.

800-1.6 - Crown, Inslope, and Outslope. The cross slope of the Traveled Way to aid in drainage and traffic maneuverability.

800-1.7 - Culverts. A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually entirely below the elevation of the Traveled Way.

800-1.8 - Drainage Dip. A dip in the Traveled Way which intercepts surface runoff and diverts the water off the Traveled Way. A Drainage Dip does not block the movement of traffic.

800-1.9 - Drainage Structures. Manufactured structures which control the runoff of water from the Roadway including Inslope, overside drains, aprons, flumes, downdrains, downpipes, and the like.

800-1.10 - Dust Abatement Plan. A table which lists the road, dust palliative, application rates, and estimated number of subsequent applications.

800-1.11 - Lead-off Ditches. A ditch used to transmit water from a Drainage Structure or Drainage Dip outlet to the natural drainage area.

800-1.12 - Material. Any substances specified for use in the performance of the work.

800-1.13 - Prehaul Maintenance. Road maintenance work which must be accomplished to maintain the roads to a satisfactory condition commensurate with the Purchaser's use, provided Purchaser's Operations do not damage improvements under B6.22 or National Forest resources and hauling can be done safely. This work will be shown in the Annual Road Maintenance Plan as provided in C5.31#.

Page 5 of 10 Salida Ranger District

Prehaul Maintenance work the Purchaser elects to perform will be in compliance with the Road Maintenance T- Specifications.

800-1.14 - Roadbed. The portion of a road between the intersection of Subgrade and sideslopes, excluding that portion of the ditch below Subgrade.

800-1.15 - Road Maintenance Plan. A table which shows applicable road maintenance specifications to be performed by Purchaser on specific roads.

800-1.16 - Roadside. A general term denoting the area adjoining the outer edge of the Roadway.

800-1.17 - Roadway. The portion of a road within the limits of excavation and embankment.

800-1.18 - Shoulder. That portion of Roadway contiguous with Traveled Way for accommodation of stopped vehicles, for emergency use, and lateral support of base and Surface Course, if any.

800-1.19 - Slide. A concentrated deposit of Materials from above or on backslope extending onto the Traveled Way or Shoulders, whether caused by mass land movements or accumulated raveling.

800-1.20 - Slough. Material eroded from the backslope which partially or completely blocks the ditch, but does not encroach on the Traveled Way so as to block passage of traffic.

800-1.21 - Slump. A localized portion of the Roadbed which has slipped or otherwise become lower than that of the adjacent Roadbed and constitutes a hazard to traffic.

800-1.22 - Special Project Specifications. Specifications which detail conditions and requirements peculiar to the individual project.

800-1.23 - Subgrade. Top surface of Roadbed upon which Base Course or Surface Course is constructed. For roads without Base Course or Surface Course, that portion of Roadbed prepared as the finished wearing surface.

800-1.24 - Surface Course. The Material placed on Base Course or Subgrade primarily to resist abrasion and the effects of climate. Surface Course may be referred to as surfacing.

800-1.25 - Surface Treatment Plan. A table which lists the roads and surface treatments to be applied.

800-1.26 - Traveled Way. That portion of Roadway, excluding Shoulders, used for the movement of vehicles.

800-1.27 - Turnouts. That portion of the Traveled Way constructed as additional width on single lane roads to allow for safe passing of vehicles.

800-1.28 - Water Source. A place designated on the Road Maintenance Map for acquiring water for road maintenance purposes.

800-1.29 - Waterbar. A dip in the Roadbed which intercepts surface runoff and diverts the water off the Roadway.

A Waterbar is not designed to be traversable by logging trucks.

Page 6 of 10 Salida Ranger District

SPECIFICATION T-803 SURFACE BLADING

DESCRIPTION:

1.1—Surface blading is keeping a native or aggregate Roadbed in a condition to facilitate traffic and provide proper drainage. It includes maintaining the Crown, Inslope or Outslope of the Traveled Way, Turnouts, and Shoulder; repairing Berms; blending approach road intersections; and cleaning bridge decks, Drainage Dips, and Lead-off Ditches.

REQUIREMENTS:

3.1—Surface blading shall be performed before, during, and after Contractor's use as often as necessary to facilitate traffic and proper drainage.

3.2—The surface blading shall preserve the existing cross-section. Surface irregularities shall be eliminated and the surface left in a free-draining state and to a smoothness needed to facilitate traffic. Surface Material which has been displaced to the Shoulders or Turnouts shall be returned to the Traveled Way. The blading operation shall be conducted to prevent the loss of surface Material and to provide for a thorough mixing of the Material being worked.

3.3—Water, taken from Water Sources designated on Contract Area Map shall be applied during blading if sufficient moisture is not present to cut, mix, or compact the surface Material.

3.4—On native surfaced roads, Material generated from backslope sloughing, and ditch cleaning may be blended with the surface Material being worked. On aggregate surfaced roads, this Material shall not be blended with Surface or Base Course Material unless agreed otherwise.

3.5—Roadway backslopes or Berms shall not be undercut, nor shall new Berms be established unless agreed otherwise.

Berms shall be repaired by placing Material, as needed to restore the Berm, to reasonably blend with existing line, grade, and cross-section.

3.6—Drainage Dips and Lead-off Ditches shall be cleaned and maintained to reasonably blend with existing line, grade, and cross-section.

3.7—Intersecting roads shall be bladed for a distance of 50 feet to assure proper blending of the two riding surfaces.

3.8 —Rocks or other Material remaining on the Traveled Way after the final pass that are larger than 4 inches in diameter or are larger than the maximum size of imported surfacing shall be removed from the Traveled Way. Unless otherwise designated by the Forest Service, the oversized Material shall be disposed of by sidecasting. Sidecasting into streams, lakes, or water courses will not be permitted.

3.9—Material resulting from work under this specification shall not remain on or in structures, such as Culverts, overside drains, cattleguards, ditches, Drainage Dips, and the like.

3.10—Material resulting from work under this specification, plus any other accumulated debris, shall be removed from bridge decks and the deck drains opened. This includes existing debris under pre haul maintenance.

Page 7 of 10 Salida Ranger District

SPECIFICATION T-804 SURFACING REPAIR

1.1—Surfacing repair is repairing potholes or small soft areas in the Traveled Way. It includes area preparation and furnishing and placing all necessary Materials, and other work necessary to repair the surface.

MATERIALS:

2.1—Material used in the repair of soft areas on aggregate or native surfaced roads may be acquired from approved commercial sources, designated Forest Service Borrow areas, or Borrow sources agreed to. The quality and quantity of the imported Material used in the repair will be limited to that needed to provide a stable Traveled Way for hauling and to minimize damage to the road and adjacent resources. The quantity of imported surface repair Material used in the appraisal estimate will be shown on Road Maintenance Plan.

However, the magnitude of the work may vary depending on Contractor’s hauling schedule and ground conditions.

2.2—Material used in the repair of bituminous pavements may be acquired from local commercial sources.

If a mixing table is required, the location shall be approved by the Forest Service. The bituminous mixture to be used by the Contractor shall be approved by the Forest Service. The Contractor’s share of the quality of bituminous mixture used in the appraisal estimate will be shown on Road Maintenance Plan. However, Contractor’s share of the work may vary depending on Contractor’s hauling schedule, ground conditions, other traffic, etc.

REQUIREMENTS:

3.1—Work under this specification shall be performed in a timely manner to reduce further deterioration of the Traveled Way.

3.2—Soft spots on aggregate or native surfaces shall be repaired by placing the imported Surface Course on top of the soft spot. Layers of imported Material shall be placed until a firm surface is produced.

3.3—Bituminous Pavement Repairs—The areas to receive bituminous pavement repairs will be marked on the road surface by the Forest Service just prior to Contractor performing the work.

3.4—Potholes (deep patch)—Surface Course and Base Course Materials shall be excavated to a depth necessary to reach firm, suitable Material. The minimum depth of excavation shall be 2 inches and the maximum depth of excavation shall be to the top of the Subgrade.

The edges of the prepared hole shall be extended to form a vertical face in unfractured asphalt surfacing.

The prepared hole shall generally be circular or rectangular in shape, dry, and cleaned of all loose Material.

Prepared potholes shall be patched or barricaded immediately.

The faces of the prepared hole shall be tacked with a slow-setting emulsified asphalt.

The bituminous mixture shall be placed in layers not exceeding a compacted depth of 2 inches. Each layer shall be compacted thoroughly with hand or mechanical tampers or rollers. Compaction shall not be done with equipment wheels.

Upon completion, the compacted patch in the pothole shall be flush, with a tolerance or approximately ¼ inch to ½ inch above the level of the adjacent pavement.

Page 8 of 10 Salida Ranger District

3.5—Skin Patches—Bituminous mixture shall be distributed uniformly with feathered edges in layers not to exceed 2 inches compacted depth. When multiple layers are ordered, joints shall be offset at least 6 inches between layers.

Each layer shall be compacted by two passes with a 7-10 ton steel roller or comparable vibratory roller.

3.6—Asphalt Berm—Damaged segments of Berm shall be removed and the exposed ends beveled at approximately 45 degrees from vertical. The Berm foundation shall be cleaned and patched as necessary.

The foundation and joining surfaces shall be coated with a slow-setting emulsified asphalt. Asphalt mix shall be placed and compacted to conform with the shape and alignment of the undamaged segment.

3.7—Disposal—All Materials removed from potholes, patches, and Berms shall be disposed of at disposal sites designated by the Forest Service.

Page 9 of 10 Salida Ranger District

SPECIFICATION T-807 ROADWAY VEGETATION

1.1—This work consists of cutting vegetative matter including brush and trees from within the Roadway limits.

REQUIREMENTS:

3.1—Remove all vegetative matter which impedes vehicular travel or interferes with road maintenance operations, such as surface blading and ditch and culvert cleaning shall be removed. Downed timber meeting utilization standards shall be cut in appropriate lengths and decked along the Roadside in locations where the Traveled Way or sight distances will not be impaired.

3.2— Vegetative matter removed from the Roadway shall be treated by the specified method and as required by C6.7#.

Page 10 of 10 Salida Ranger District

SPECIFICATION T-808 MISCELLANEOUS STRUCTURES

1.1—Maintenance of miscellaneous structures includes cattleguards, gates, and other similar structures that have been previously installed to insure safe and efficient operation of the road.

MATERIALS:

2.1—Any Materials needed in the maintenance of miscellaneous structures shall be similar in type and quality to the Material in the structure being maintained.

REQUIREMENTS:

3.1—Cattleguards—Loose rails shall be welded or bolted back in place.

Excess Material carried into the cattleguard shall be removed when drainage is blocked or when it reaches 6 inches from the bottom of the cattleguard frame. Drainage into and from the cattleguard shall be kept open.

3.2—Gates shall be kept in good repair and made to swing easily. Hinges or latches shall be repaired if not operating properly.

Brush and debris shall be removed from within the swinging radius.

C5.31# – ROAD MAINTENANCE REQUIREMENTS. (9/04) Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
ROAD MAINTENANCE T-SPECIFICATIONS FOR STEWARDSHIP CONTRACTS
SPECIFICATION T-803 SURFACE BLADING
SPECIFICATION T-804 SURFACING REPAIR
SPECIFICATION T-807 ROADWAY VEGETATION
SPECIFICATION T-808 MISCELLANEOUS STRUCTURES