About this file
This is a Combined Synopsis/Solicitation for commercial logging and forest stewardship services issued by the USDA Forest Service. Solicitation 12363N26Q4205 is a Request for Quotation (RFQ) set aside for small businesses under NAICS code 113310 (Logging) with a 500-employee size standard. The offer due date is September 8, 2026, at 8:00 a.m. MT, and proposals shall remain valid for 60 days after receipt.
The contract requires mandatory and optional land management work activities on the Silver Creek project within the Poncha Loop Management Project on the San Isabel National Forest near Salida, Colorado. Mandatory work includes cutting and removing 618 CCF of included timber, steep slope logging and thinning on 17 acres, non-commercial thinning on 144 acres, hand thinning on 296 acres, and road maintenance on 0.8 miles of NFSR 201C. The timber/product removal price schedule includes Douglas-fir and other conifer sawtimber (541 CCF minimum acceptable offer of $0.25/CCF) and Ponderosa Pine sawtimber (77 CCF minimum acceptable offer of $11.13/CCF). Timber subject to agreement pricing is also available for unestimated non-sawtimber species at a minimum of $0.25/CCF. The period of performance runs from date of award through September 30, 2028. Payment will be made in Stewardship Credits and Appropriated Funds through the Invoice Processing Platform.
Evaluation criteria in descending order of importance are: Technical Approach (significantly more important), Relevant Past Performance (significantly more important), and Utilization of Local Work Forces/Benefit to Local Community, with these technical factors collectively approximately equal to cost/price. A site visit is scheduled for August 18, 2026, at 9:00 AM at the Salida Ranger District Office. Proposals must be submitted electronically as separate technical and price proposals to Keith Brugger (keith.r.brugger@usda.gov) and Matt Daigle (matthew.daigle@usda.gov). All mandatory line items must receive pricing to be considered for award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A002 Silver Creek IRSC.pdf | ||
| A001 Silver Creek IRSC.pdf | ||
| 7. Silver Creek IRSC CAM.pdf | ||
| 2. Silver Creek IRSC Appendix A.pdf | ||
| 3. Silver Creek IRSC Appendix B.pdf | ||
| 6. Silver Creek IRSC Vicinity Map.pdf | ||
| 4. Silver Creek IRSC Appendix C.pdf | ||
| 5. Silver Creek IRSC Traffic Control Plan.pdf | ||
| 8. Silver Creek IRSC Cruise Summary.pdf | ||
| 9. Silver Creek IRSC SCA WD20260513.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0. GENERAL INFORMATION
Document Type: Combined Synopsis/Solicitation Solicitation Number: 12363N26Q4205 Posted Date: 8/6/2026 Original Response Date: 9/8/2026 Current Response Date: 9/8/2026 Product or Service Code: F099 Set Aside: Small Business NAICS Code: 113310-Logging
Contracting Office Address
USDA Forest Service Procurement and Property Services National Stewardship Contracting Branch 1400 Independence Ave. SW, MS-1138 Washington DC 20250-1138
This is a combined synopsis/solicitation for commercial services prepared in accordance with FAR 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued.
Solicitation number 12363N26Q4205 is issued as a request for quotation (RFQ).
This acquisition is set aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
The associated North American Industrial Classification System (NAICS) code for this procurement is 113310- Logging, with a small business size standard of 500 Employees. The product service code is F099. The government will award a firm-fixed price (FFP) contract resulting from this combined synopsis/solicitation to the responsible offeror whose offer, conforming to the synopsis/solicitation, will be most advantageous to the government (as determined by the solicitation evaluation criteria). All responsible sources may submit a quotation which will be considered by the agency, and proposals shall be valid for 60 days after the date of receipt for the solicitation Points of Contact
Matt Daigle, Acquisition Program Support Officer, 605-415-9057, matthew.daigle@usda.gov
Keith Brugger, Contracting Officer, 307-321-3901, keith.r.brugger@usda.gov
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV.2/2012)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.21
The SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE 1 OF
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 24
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICIATION ISSUE DATE
12363N26Q4205 August 6, 2026
7. FOR SOLICITATION INFORMATION
CALL:
EMAIL CONTACT PREFERRED
a. NAME b. TELEPHONE NUMBER 8. OFFER DUE DATE/ LOCAL TIME
Keith Brugger 307-321-3901 9/08/2026 8:00 a.m. MT
9. ISSUED BY CODE 363N 10. THIS ACQUISITON IS UNRESTRICTED OR SET ASIDE 100% FOR:
USDA Forest Service Procurement and Property Services National Stewardship Contracting Branch 1400 Independence Ave. SW, MS-1138 Washington DC 20250-1138
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMAN- OWNED
SMALL BUSINESS PROGRAM
EDWOSB
NAICS:
HUBZONE SMALL BUSINESS 113310
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS 8(A)
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A RATED
ORDER UNDER DPAS (15 CFR 700)
13b. Rating
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 363N 16. ADMINISTERED BY CODE 363N
SAN ISABEL NATIONAL FOREST
SALIDA RANGER DISTRICT
5575 Cleora Ranger District Salida, CO 81201
USDA-FS – Procurement & Property Services National Procurement Operations Stewardship Contracting Branch 1400 Independence Ave. SW, MS-1138 Washington DC 20250-1138
17A. CONTRACTOR/OFFEROR CODE FACILITY
CODE 18a. PAYMENT WILL BE MADE BY CODE 363N
Name:
Address:
Email:
Telephone No:
*Invoice Processing Platform (IPP):
All invoices must be submitted electronically through the Invoice Processing Platform Via www.IPP.gov.
*All Invoices for Non-Monetary Stewardship Credits must be submitted to the Forest COR via email.* SAM UEI:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19. 20. 21. 22. 23. 24.
ITEM N0. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
SILVER CREEK IRSC
ROCKY MOUNTAIN RESTORATION PROJECT (RMRP)
STEWARDSHIP BPA
SAN ISABEL NATIONAL FOREST
SALIDA RANGER DISTRICT
See attached Schedule of items
25. ACCOUNTING AND APPROPRIATION DATA
N/A
26. TOTAL AWARD AMOUNT (For Govt. Use Only) N/A
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED
ADDENDA ARE ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN VIA
ELECTRONIC (email) to Keith Brugger keith.r.brugger@usda.gov and Matt Daigle matthew.daigle@usda.gov
ONE (1) COPY TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS
AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF.______ OFFER DATED ____________,
YOUR OFFER ON S OLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES
WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED http://www.ipp.gov/ mailto:keith.r.brugger@usda.gov mailto:matthew.daigle@usda.gov
SILVER CREEK IRSC SAN ISABEL NATIONAL FOREST
SOLICITATION 12363N26Q4205 SALIDA RANGER DISTRICT
1. GENERAL INFORMATION:
Proposals shall be valid for 60 days after the date of receipt for the solicitation. If additional time is needed, an extension will be requested. Refer to Section 25 for instructions on preparing your proposal and pricing. Submit technical proposals and price proposals separately, via email, to the individual(s) shown in box 28 of page 1.
SCHEDULE OF ITEMS
MANDATORY WORK ACTIVITIES:
ITEM
NO.
DESCRIPTION OF
MANDATORY WORK ACTIVITIES UNIT ESTIMATED
QUANTITY UNIT PRICE TOTAL PRICE
1 Cut and Remove Included Timber CCF 618 N/A N/A
Steep Slope Logging Cut & Forward and Steep Slope Non-Commercial Thinning and Decking
Acre 17 $ $
3 Non Commercial Thinning and Decking Acre 144 $ $
4 Hand Thinning Non Included Material Acre 296 $ $
5 Road Maintenance NFSR 201C Miles 0.8 $ $
TIMBER/PRODUCT REMOVAL PRICE SCHEDULE:
SPECIES PRODUCT ESTIMATED
QUANTITY
UNIT OF
MEASURE
MINIMUM
ACCEPTABLE
OFFER
OFFER
(FLAT) TOTAL OFFER
Douglas-fir and other conifer species (Live
& Dead)
Sawtimber 541 CCF $0.25 $ $
Ponderosa Pine (Live &
Dead) Sawtimber 77 CCF $11.13 $ $
Total – All Products $
TIMBER SUBJECT TO AGREEMENT PRICE SCHEDULE:
Schedule Notes
Note: These schedules are for pricing/payment purposes. Refer to Section 25, Instructions to Offerors for business proposal requirements. Evaluation criteria used by the Forest Service for proposals is in Section 27 of this solicitation.
Note: Enter a quantity and Offer (Flat) in the Timber Removal Price Schedule if Timber Subject to Agreement (TSA) is being requested in the Technical Proposal. No entry indicates no desire to remove TSA. TSA quantity will be negotiated and agreed to at award or by modification post award.
Note: Price Proposals MUST be provided on ALL Items in Schedules: Mandatory Work and Optional Work Activities and Timber or other products Removal Price Schedule. Unit prices prevail.
A site visit is scheduled for August 18th, 2026 to view the project area and discuss the objectives of this contract.
The meeting will take place at 9:00 AM local time at Salida Ranger District Office 5575 Cleora Ranger District Salida, CO 81201
PERIOD OF PERFORMANCE IS FROM DATE OF AWARD THROUGH September 30, 2028
SPECIES PRODUCT ESTIMATED
QUANTITY
UNIT OF
MEASURE
MINIMUM
ACCEPTABLE
OFFER
OFFER (FLAT)
Douglas-fir and other species (Live & Dead)
Non-Sawtimber Unestimated CCF $0.25 $
2. LAND MANAGEMENT ACTIVITIES.
The Forest Service is executing this procurement under the stewardship contracting authority provided under Section 8205 of Public Law 113-79, the Agricultural Act of 2014 as amended under Section 204 & 207 of the Consolidated Appropriations Act (Omnibus Bill 2018). Stewardship authority grants the Forest Service Chief or designee the authority to aggregate contractual requirements into stewardship projects and solicit those requirements utilizing full and open competition.
Performance of land management activities shall be in accordance with Project Description and Work Specifications. Payment for Land Management Work Activities in Schedule of Items will be made in Stewardship Credits and Appropriated Funds.
All Base Work Activities (Mandatory) shall be performed. Optional activities are listed in order of planned priority. Award may be made for optional items in any order that the Contracting Officer determines is in the best interest of the Government.
3. FEDERAL ACQUISITION REGULATION (FAR) AND UNITED STATES DEPARTMENT OF AGRICULTURE
ACQUISITION REGULATION (AGAR) CLAUSES AND PROVISIONS
The clauses and provisions contained herein are applicable to any order awarded as a result of this solicitation.
The terms and conditions set forth herein supersede all other terms and conditions. Acceptance of the order in accordance with (IAW) FAR 12.201-1(b)(2) constitutes acceptance of all terms and conditions contained herein.
As part of the Revolutionary FAR Overhaul (RFO), system updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
4. FAR 52.212-4 CONTRACT TERMS AND CONDITIONS - COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (NOV 2023)
See parent BPA for full clause text and associated addenda.
5. FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of the clause may be accessed electronically at Internet address https://www.acquisition.gov or https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52.
FAR 52.204-13 System for Award Management—Maintenance (NOV 2025) FAR 52.222-90 Addressing DEI Discrimination by Federal Contractors (APR 2026) FAR 52.232-40 Providing Accelerated Payment to Small Business Subcontractors (MAR 2023) FAR 52.240-91 Security Prohibitions and Exclusions (NOV 2025) FAR 52.244-6 Subcontracts for Commercial Products and Commercial Services (NOV 2025) https://www.acquisition.gov/ https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
6. PROJECT DESCRIPTION
(a) Description of Work- The Silver Creek Stewardship IRSC is part of the Poncha Loop Management Project located on the Salida Ranger District of the San Isabel National Forest, approximately 15 miles southwest of Salida, Colorado. The purpose of the Silver Creek Stewardship IRSC is to:
• Implement an integrated pest management program emphasizing silvicultural management of timber stands to prevent and control insect infestations and disease.
• Increase the age class diversity and sustain and improve the cover of aspen stands.
• Reduce the risk of high intensity wildland fire and restore and maintain healthy, diverse, fire adapted ecosystems to provide improved resilience and sustainability.
• Reduce accumulations of hazardous fuels.
• Help to meet the local demand for forest products.
• Increase protection of private land, authorized uses including electric transmission lines, and structures adjacent to and within the project area.
• Provide a diversity of habitat types (stages and conditions) for a range of species.
(b) Resulting Contract – This BPA call will be issued against the Rocky Mountain Restoration Project BPA when ordered by warranted contracting personnel. The resultant contract will be a commercial services contract with requirements for timber removal.
(c) Project Location- The project is in the Poncha Loop Project EA project area southwest of Salida, Colorado. The legal description is T.48.N., R.8.E., Sections 7, 8, 17, 18, 19, and 20 NMPM, Chaffee and Saguache Counties, Colorado.
7. SPECIFICATIONS
General specifications for each Contract Activity individually described by an item number in the Schedule of Items can be found in Appendix A. Specifications for timber removal are found in Appendix B and associated road maintenance plans and specifications are insounds go Appendix C for Stewardship related projects.
Projects that include road construction and/or reconstruction may include Appendix D.
8. FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after receipt of Notice to Proceed or Order for specific work items, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than September 30, 2028. The time stated for completion shall include final cleanup of the premises.
Except as this contract otherwise provides, the Government shall order all services within the scope that are required by Government activities specified in the Schedule only with the vendor holding this contract for the specified services. Timber Removal activities shall be scheduled and carried out in accordance with the Timber Removal Specifications in Appendix B or C and as approved by the Contracting Officer.
9. FOREST PRODUCT APPRAISAL METHODOLGY
Minimum acceptable offer rates for Timber and Product removal were determined using standard Forest Service appraisal methodologies. The skidding and yarding costs for included products was calculated on a weighted average of the products associated with normal ground-based volumes and products associated with steep slopes in the appraisal.
10. TIMBER PRODUCT VOLUME ESTIMATION
Quantities listed in Timber/Product removal schedules are estimates only. Volume quantities are made available with the understanding that values shown are Forest Service estimates and are not guaranteed.
Contractors are urged to examine the contract areas and make their own estimates.
11. PERIOD OF PERFORMANCE
The period of performance of this contract is from date of award through September 30, 2028.
12. CONTRACT OPERATIONS SCHEDULE
Contractor shall, before commencing operations, provide in writing an annual Operating Schedule of anticipated major activities and needs for logging Included Timber and completing stewardship projects, such as logging, road maintenance, and construction. Upon reasonable notice to Forest Service, such schedule shall be subject to modifications necessitated by weather, markets, or other unpredictable circumstances.
Contractor’s Operations may be conducted outside Normal Operating Season. “Normal Operating Sea- son” is the period(s) beginning and ending on the dates stated below.
Timeframe Restriction Description
30 days prior to beginning work on work items in units 3, 5, and 7
Contractor shall submit Plan of Operations 30 days prior to beginning work to give Forest Service time to implement Forest Area Closure.
December 15 to March 15
Either Option 1 or Option 2 would be implemented within the project area:
Option 1 - Seasonal implementation restrictions for timber harvest and associated activities would be implemented on winter range within the project area from December 15 through March 15.
Or
Option 2 - At the entrance of all temporary roads used to access a treatment areas within winter range, a locked gate would be used to restrict all motor vehicle access / use except for authorized administrative use (Forest Service personnel or authorized contractors and permittees).
13. POST AWARD CONFERENCE
A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at Salida Ranger District Office, 5575 Cleora Rd., Salida, CO.
14. AGAR 452.204-70 MODIFICATION FOR CONTRACT CLOSEOUT (JAN 2025)
Upon contract closeout for contracts utilizing anything other than cost reimbursement:
(a) If unliquidated funds in the amount of $1000 or less remain on the contract, the Contracting Officer (CO) shall issue a unilateral modification for deobligation. The contractor will receive a copy of the modification but will not be required to provide a signature. The CO shall immediately proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.
(b) Upon contract closeout for contracts utilizing SAP: if unliquidated funds of more than $1000 remain on the contract, the CO shall issue a bilateral modification for deobligation. The contractor will receive a copy of the modification and will be required to provide a signature. (The CO may also request a “Contractor Release of Claims” be completed by the contractor, although not required for contracts and orders using SAP.) If the bilateral modification and Release of Claims are not returned to the CO within 60 days, the CO shall release the modification as unilateral and proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.
(c) Upon contract closeout for contracts utilizing anything other than cost reimbursement, if unliquidated funds of more than $1000 remain on the contract, the CO shall issue a bilateral modification for deobligation. The contractor will receive a copy of the modification and a “Contractor Release of Claims” and will be required to provide a signature on both forms. If the bilateral modification and Release of Claims are not returned to the CO within 120 days, the CO shall release the modification as unilateral and proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.
15. KEY PERSONNEL
(a) The Contractor shall assign to this contract the following key personnel:
Overall Project Manager Field Representative Individual Sub-Managers – Individuals supervising individual sub-contracts for work items not covered by personnel noted previously herein.
(b) During the first 90 days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
Key Personnel- Representatives:
Unless otherwise agreed, Contractor shall designate, in writing, a representative who is authorized to receive notices in regard to performance under this contract and take related action. In no case shall Contractor designate any representative to this contract who is currently debarred, proposed for debarment, or suspended by the Federal Government. Contractor’s representative shall provide a copy of the contract to Contractor’s field supervisor and persons authorized to assume responsibilities in the field super- visor’s absence. Prior to initial operations and after shutdowns of 10 days or more, Contractor’s representative shall notify Forest Service 2 days, excluding weekends and Federal holidays, before any operations begin on Contract Area.
Contractor’s representative shall designate, in writing, a field supervisor, one of whose responsibilities shall be on-the-ground direction and supervision of Contractor’s Operations. The field supervisor shall be readily available to the area of operations when operations are in progress and shall be authorized to receive notices in regard to performance under this contract and take related action. The responsibilities of the field supervisor shall include the safeguarding of National Forest resources and performance within the terms of the contract.
Contractor representative will furnish Forest Service with names of persons authorized to assume responsibilities in field supervisor’s absence. Such delegations may be made a part of Contractor’s annual Operating Schedule.
Unless Contracting Officer designates another Forest Service representative and notifies Contractor in writing, the COR is the representative of Forest Service. Forest Service representative shall:
(a) Receive notice in regard to performance under this contract,
(b) Take action in relation to this contract, and
(c) Be readily available to the area of service work activities and logging operations.
Contracting Officer shall designate other on-the-ground representatives in writing along with their specific contractual responsibilities and authority. Representatives with authority delegated in writing are the only Forest Service personnel authorized to provide notice or take related actions under the contract. Such delegation shall be made within 60 days of contract award.
16. NOTICES
Notices by either party as to action taken or to be taken by the other respecting this contract shall be made in writing to the other party’s designated representative unless otherwise agreed.
17. PROTECTION MEASURES NEEDED FOR PLANTS, ANIMALS, CULTURAL RESOURCES, AND CAVE
RESOURCES
Locations of known areas needing special measures for the protection of plants, animals, cultural resources, and/or cave resources are shown on Contract Area Map and/or identified on the ground. Special protection measures needed to protect such known areas are identified in Appendix B.
In addition to any special protection measures noted, Contractor has a general duty to protect all known and identified resources referenced in this Subsection from damage or removal during Contractor’s operations.
Discovery of additional areas, resources, or members of species needing special protection shall be promptly reported to the other party, and operations shall be delayed or interrupted at that location, if Contracting Officer determines there is risk of damage to such areas, resources, or species from continued operations.
Wheeled or track-laying equipment shall not be operated in areas identified as needing special measures for the protection of cultural resources, except on roads, landings, tractor roads, or approved skid trails. Unless agreed otherwise, trees will not be felled into such areas. Contractor may be required to backblade skid trails and other ground disturbed by Contractor’s operations within such areas in lieu of required cross ditching.
Contractor shall immediately notify Forest Service if disturbance occurs to any area identified as needing special protection measures and shall immediately halt operations in the vicinity of the disturbance until Forest Service authorizes Contractor to proceed. Contractor shall bear costs of resource evaluation and restoration to identified sites. Such payment shall not relieve Contractor from civil or criminal remedies otherwise provided by law.
Forest Service has exercised due diligence and followed established protocols in identifying known areas needing special protection measures. Nevertheless, nothing in this provision shall be interpreted as creating any warranty that all locations and special measures for the protection of plants, animals, cultural resources, and cave resources have been described herein, elsewhere in the contract, or designated on the ground.
Label on Contract Area Map
Restrictions
Equipment and crews shall not operate within identified areas. ATP is identified on the ground with white flagging.
ATP 1
Equipment and crews shall not operate within identified areas. ATP is identified on the ground with white tracer paint and white flagging.
18. PROTECTION OF IMPROVEMENTS
So far as practicable, the Contractor shall protect all physical improvements including, but not limited to, roads, trails, ditches, fences, waterlines, and other improvements, existing in the contract area, determined to have continuing need or use, and designated on the Contract Area Map.
The Contractor shall keep all roads and trails needed for fire protection or other purposes and designated on the Contract Area Map reasonably free of equipment and products, slash, and debris resulting from the Contractor’s operations. The Contractor shall make timely restoration of any such improvements damaged by the Contractor’s operations and, when directed (because of such operations) shall move such improvements if and as specified by the Forest Service.
All protected improvements will be protected from damage by the Contractor. If any protected improvements are disturbed, the Contractor shall immediately contact the COR and will be liable for the cost of repairs.
PROTECTED IMPROVEMENTS
IMPROVEMENT DESCRIPTION LOCATION
Roads All Roads (including associated features) As identified on Contract Area Map
Land Survey Monuments Protection of land survey monuments in Unit 10 and adjacent to Unit 3
As identified on Contract Area Map
Gates
At MP 0.00 and MP 0.55 on NFSR 205. Two along the fencline at the entrance to the existing temporary roads along the southeastern portion of the Contract Area Boundary. Two on BLM 52056 at the Rio Grande NF boundary with BLM and at the San Isabel NF boundary with BLM.
As identified on Contract Area Map
Fences
In and adjacent to Units 1, 3, and 5 and along the Contract Area Boundary that is also the Forest Boundary. Additional protection measured required in C6.223.
As identified on Contract Area Map
Cattleguards Located throughout contract area, one on NFSR 201, one on NFSR 201C, one on NFSR 878, and two along NFST 1336.
As identified on Contract Area Map
Pipeline In the eastern portion of unit 5.
As identified on Contract Area Map
Sign On NFSR 201C and NFST 1336.
As identified on Contract Area Map
Water Tank In the eastern portion of unit 5 and in the southeastern portion of the contract area, adjacent to Forest Boundary.
As identified on Contract Area Map
Forest Service shall notify all utility companies, or other parties affected, and make arrangements for all necessary adjustments of the public utility fixtures, pipelines, and other appurtenances likely to be affected by Contractor’s Operations.
When Contractor’s Operations are adjacent to properties of railway, telephone, or power companies, or other property, work shall not begin until Contractor has identified actions necessary to prevent damage.
Contractor shall cooperate with the owners of any underground or overhead utility lines in their removal and/or rearrangement operations in order that these operations may progress in a reasonable manner, utility duplication or rearrangement work may be reduced to a minimum, and services shall not be unnecessarily interrupted.
In the event of interruption to utility services be- cause of accidental breakage or as a result of lines being exposed or unsupported, Contractor shall promptly notify the proper authority and shall cooperate with that authority in the restoration of service until the service is restored.
When materials are to be hauled across the tracks of any railway, Forest Service will make arrangements with the railroad for the use of any existing crossing or for any new crossing required. Contractor shall make arrangements for use of alternate crossings. All construction work to be performed by Contractor on the rail-road right-of-way shall not damage railroad company’s property.
19. STREAMCOURSE PROTECTION
“Streamcourses” that are subject to provisions of this Section are shown on Contract Area Map. Unless otherwise agreed, the following measures shall be observed to protect Streamcourses:
(a) Contractor’s Operations shall be conducted to prevent debris from entering Streamcourses, except as may be authorized under paragraph (d). In event Contractor causes debris to enter Streamcourses in amounts that may adversely affect the natural flow of the stream, water quality, or fishery resource, Contractor shall remove such debris as soon as practicable, but not to exceed 48 hours, and in an agreed manner that will cause the least disturbance to Streamcourses.
(b) Culverts or bridges shall be required on Temporary Roads at all points where it is necessary to cross Streamcourses. Such facilities shall be of sufficient size and design and installed in a manner to provide unobstructed flow of water and to minimize damage to Streamcourses. Trees or products shall not be otherwise hauled or yarded across Streamcourses unless fully suspended.
(c) Wheeled or track-laying equipment shall not be operated in Streamcourses, except at crossings designated by Forest Service or as essential to construction or removal of culverts and bridges.
(d) Flow in Streamcourses may be temporarily diverted only if such diversion is necessary for Contractor’s planned construction and Forest Service gives written authorization. Such flow shall be restored to the natural course as soon as practicable and, in any event, prior to a major storm runoff period or runoff season.
Label on Contract Area Map Restrictions
All measures included above in clause 17. Streamcourse Protection apply.
20. PROTECTION OF PROPERTY
In maintenance, construction and reconstruction of roads, Contractor shall not unnecessarily remove, deface, injure, or destroy trees, shrubs, or other natural features, unless specifically authorized. To the extent practicable, Contractor shall confine operations to within the clearing limit or other areas designated in the contract and prevent the depositing of rocks, excavated materials, stumps, or other debris outside these limits.
Material that falls outside these limits shall be retrieved, disposed of, or incorporated in the work to the extent practicable and necessary to protect adjacent resource values, unless otherwise agreed.
21. AGAR 452.236-70 EMERGENCY RESPONSE, FIRE SUPPRESSION, AND LIABILITY.
(a) Contractor's Responsibility for Responding to Emergencies. When directed by the contracting officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). This is considered to be within the general scope of the contract. An equitable adjustment for the temporary use of employees and equipment will be made under the Contract Terms and Conditions—Commercial Products and Commercial Services Changes clause, FAR 52.212-4 (c).
(b) Contractor's Responsibility for Fire Fighting. The Contractor, under the provisions of FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents, subcontractors, or employees subject to the fire classifications listed in subsection (c).
(c) Fire Suppression Costs. The Contractor's obligations for cost of fire suppression vary according to three classifications of fires as follows:
(1) Operations Fire. An “operations fire” is a fire caused by the Contractor's operations other than a negligent fire. The Contractor agrees to reimburse the Forest Service for such cost for each operations fire, subject to a maximum dollar amount of [Contracting Officer insert amount]. The cost of the Contractor's actions, supplies, and equipment expended or used on suppressing any such fire, or otherwise provided at the request of Forest Service, shall be credited toward such maximum. If the Contractor's actual cost exceeds the contractor's maximum obligation stated above, the Forest Service shall reimburse the contractor for the excess.
(2) Negligent Fire. A “negligent fire” is a fire caused by the negligence or fault of the Contractor's operations including, but not limited to, one caused by smoking by persons engaged in the Contractor's operations during the course of their employment, or during rest or lunch periods; or if the Contractor's failure to comply with requirements under this contract results in a fire starting or permits a fire to spread. Damages and the cost of suppressing negligent fires shall be borne by the Contractor.
(3) Other Fires on Contract Area. The Forest Service shall pay the Contractor, at firefighting rates common in the area or at prior agreed rates, for equipment or personnel furnished by the Contractor at the request of the Forest Service, on any fire on the contract area other than an operations fire or a negligent fire.
(d) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(e) Performance by the Contractor. Where the Contractor's employees, agents, contractors, subcontractors, or their employees or agents perform the Contractor's operations in connection with fire responsibilities, the Contractor's obligations shall be the same as if performance was by the Contractor.
(f) State Law. The Contractor shall not be relieved by the terms of this contract of any liability to the United States for fire suppression costs recovered in an action based on State law, except for such costs resulting from operations fires. Amounts due to the Contractor for firefighting expenditures on operations fires shall not be withheld pending settlement of any such claim or action based on State law.
(End of Clause)
22. FIRE PRECAUTIONS AND CONTROL
1. Fire Period and Closed Season Specific fire prevention measures are listed below and shall be effective for the period April 1 to October 31 of each year. The Forest Service may change the dates of said period by advance written notice if justified by unusual weather or other conditions. Required tools and equipment shall be kept currently in serviceable condition and immediately available for initial attack on fires.
2. Fire Plan Before starting any operations on the project, the Contractor, Permittee, Licensee, or Purchaser, hereinafter referred to as the "Contractor," shall prepare a fire plan in cooperation with the Contracting Officer providing for the prevention and control of fires in the project area. The Contractor shall certify compliance with fire protection and suppression requirements before beginning operations during the fire period and closed season and shall update such certification when operations change.
3. Substitute Measures The Contracting Officer may by written notice authorize substitute measures or equipment or may waive specific requirements during periods of low fire danger.
4. Emergency Measures The Forest Service may require emergency measures, including the necessary shutting down of equipment or portions of operations in the project area during periods of fire emergency created by hazardous climatic conditions.
5. Fire Control The Contractor shall, independently and in cooperation with the Forest Service, take all reasonable action to prevent and suppress fires in the project area. Independent initial action shall be prompt and shall include the use of all personnel and equipment available in the project area. For the purpose of fighting forest fires on, or in the vicinity of the project which are not caused by the Contractor's operations, the Contractor shall place employees and equipment temporarily at the disposal of the Forest Service. Any individual hired by the Forest Service will be employed in accordance with the Interagency Pay Plan for Emergency Firefighters. The Forest Service will compensate the Contractor for equipment rented at firefighting equipment rates common in the area, or at prior agreed to rates.
6. Compliance with State Forest Laws Listing of specific fire precautionary measures herein is not intended to relieve the Contractor in any way from compliance with the State Fire Laws covering fire prevention and suppression equipment, applicable to operations under this contract, permit or license.
7. Specified Fire Precautions and Emergency Precautions Specific requirements defined within Attachment X – Fire Plan and Appendix B C7.2# and C7.22#.
23. LIST OF ATTACHMENTS
The following attachments are made a part of this solicitation and any resultant contract.
Title Pages
2. Appendix A – Technical Specifications for Service Work Items 16
3. Appendix B – Timber Removal (Scaled) Specifications 35
4. Appendix C – T-Specs 10
5. Traffic Control Plan 4
6. Vicinity Map 1
7. Contract Area Map 1
8. Cruise Summary 36
9. Service Contract Act Wage Determination #1976-1351, Revision #79 dated 5/13/2026 3
24. FAR 52.212-1 INSTRUCTIONS TO OFFERORS— COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (SEP 2023)
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code(s) and small business size standard(s) for this acquisition appear elsewhere in the solicitation.
However, the small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition—
(1) Is set aside for small business and has a value above the simplified acquisition threshold;
(2) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or
(3) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show—
(1) The solicitation number;
(2) The time specified in the solicitation for receipt of offers;
(3) The name, address, and telephone number of the offeror;
(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
https://www.gsa.gov/forms-library/solicitationcontractorder-commercial-items
(5) Terms of any express warranty;
(6) Price and any discount terms;
(7) "Remit to" address, if different than mailing address;
(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);
(9) Acknowledgment of Solicitation Amendments;
(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and
(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information or reject the terms and conditions of the solicitation may be excluded from consideration.
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers unless another time period is specified in an addendum to the solicitation.
(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender’s request and expense, unless they are destroyed during pre-award testing.
(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with FAR subpart 4.10), or alternative commercial products and commercial services for satisfying the requirements of this solicitation. Each offer submitted will be evaluated separately.
(f) Late submissions, modifications, revisions, and withdrawals of offers. (1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.
(2) (i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and-
(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or https://www.acquisition.gov/far/52.212-3#FAR_52_212_3 https://www.acquisition.gov/far/52.212-3#FAR_52_212_3 https://www.gsa.gov/forms-library/solicitationcontractorder-commercial-items https://www.acquisition.gov/far/subpart-4.10#FAR_Subpart_4_10
(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or
(C) If this solicitation is a request for proposals, it was the only proposal received.
(ii) However, a late modification of an otherwise successful offer, which makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(5) Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers. Oral offers in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile offers, offers may be withdrawn via facsimile received at any time before the exact time set for receipt of offers, subject to the conditions specified in the solicitation concerning facsimile offers. An offer may be withdrawn in person by an offeror or its authorized representative if, before the exact time set for receipt of offers, the identity of the person requesting withdrawal is established and the person signs a receipt for the offer.
(g) Contract award (not applicable to Invitation for Bids). The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror’s initial offer should contain the offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.
(h) Multiple awards. The Government may accept any item or group of items of an offer, unless the offeror qualifies the offer by specific limitations. Unless otherwise provided in the Schedule, offers may not be submitted for quantities less than those specified. The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit prices offered, unless the offeror specifies otherwise in the offer.
(i) Availability of requirements documents cited in the solicitation.
(1) (i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101–29, and copies of Federal specifications, standards, and product descriptions can be downloaded from the ASSIST website at https://assist.dla.mil.
https://assist.dla.mil/
(ii) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained from the address in paragraph (i)(1)(i) of this provision.
(2) Most unclassified Defense specifications and standards may be downloaded from the ASSIST website at https://assist.dla.mil.
(3) Defense documents not available from the ASSIST website may be requested from the Defense Standardization Program Office by—
(i) Using the ASSIST feedback module ( https://assist.dla.mil/feedback); or
(ii) Contacting the Defense Standardization Program Office by telephone at 571–767–6688 or email at assisthelp@dla.mil.
(4) Nongovernment (voluntary) standards must be obtained from the organization responsible for their preparation, publication, or maintenance.
(j) Unique entity identifier.(Applies to all offers that exceed the micro-purchase threshold and offers at or below the micro-purchase threshold if the solicitation requires the Contractor to be registered in the System for Award Management (SAM).) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation "Unique Entity Identifier" followed by the unique entity identifier that identifies the Offeror's name and address. The Offeror also shall enter its Electronic Funds Transfer (EFT) indicator, if applicable. The EFT indicator is a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the Offeror to establish additional SAM records for identifying alternative EFT accounts (see FAR subpart 32.11) for the same entity. If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for unique entity identifier establishment directly to obtain one. The Offeror should indicate that it is an offeror for a Government contract when contacting the entity designated at www.sam.gov for establishing the unique entity identifier.
(k) [Reserved]
(l) Debriefing. If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(1) The agency’s evaluation of the significant weak or deficient factors in the debriefed offeror’s offer.
(2) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(3) The overall ranking of all offerors when any ranking was developed by the agency during source selection.
(4) A summary of the rationale for award;
(5) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.
https://assist.dla.mil/ https://assist.dla.mil/feedback mailto:assisthelp@dla.mil https://www.acquisition.gov/far/subpart-32.11#FAR_Subpart_32_11 http://www.sam.gov/ http://www.sam.gov/
(6) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
(End of provision)
ADDENDUM TO FAR 52.212-1: Paragraph (c) is revised to reflect increased period for acceptance of offers as follows:
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers unless another time period is specified in an addendum to the solicitation.
25. INSTRUCTIONS FOR SUBMISSION OF OFFERS AND OTHER INFORMATION
(a) General Instructions – Proposals submitted in response to this solicitation shall be furnished in the following format:
(1) Proposals shall be submitted as two separate documents - a technical proposal and a price proposal.
Each part shall be separate and complete so that evaluation of one may be accomplished independently of the other.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .