4. Price Proposal Schedule, Attachment A, RFP AA-2027-02.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- AA-2027-02
- Issued by
-
Department of Energy
About this file
This is a Price Proposal Schedule template for RFP AA-2027-02, issued by Lawrence Berkeley National Laboratory (LBNL) on behalf of the University of California for the Department of Energy. The spreadsheet serves as the required pricing submission format for offerors responding to the solicitation for fabricated components for Storage Ring Embedded Floor Plates for the ALS-U (Advanced Light Source Upgrade) project. Offerors must complete and submit this attachment with their proposal by the November 11, 2026 deadline. The template establishes the standardized structure and format that all contractors must follow when submitting their pricing information, ensuring consistency and comparability across all bids received for this fabrication work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6. Past Performance Reference Information Form, Attachment B, AA-2027-02.docx | DOCX document | |
| 4. Price Proposal Schedule, Attachment A, RFP AA-2027-02 Rev. 1.xlsx | XLSX spreadsheet | |
| QA RFP AA-2027-02.docx | DOCX document | |
| 3. ALS-U Supplier Quality Evaluation Survey, RFP AA-2027-02.pdf | ||
| 1. AL-1953-0482C, SOW, SR Embedded Floor Plates.pdf | ||
| 0. RFP AA-2027-02.pdf | ||
| 2. Sample Subcontract, AA-2027-02.pdf | ||
| 5. Rep Cert AA-2027-02.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Proposal Price Proposal Schedule, Attachment A
SR Embedded FloorPlates
RFP AA-2026-09
| Item # | Part Number | Item | First Article or Batch No. | Quantity | UOM | Unit Price | Extended Price | Offeror Delivery Schedule (hard calendar date) | Delivery Schedule (hard calendar date) per SOW AL-1953-0482 Rev. C |
| 1 | AL-1425-2859 | Embedded floor plate type 1 | First Article | 2 | EA | $ - 0 | 1/5/27 | ||
| 2 | AL-1425-2859 | Embedded floor plate type 1 | Batch 1 | 10 | EA | $ - 0 | 2/15/27 | ||
| 3 | AL-1498-3423 | Embedded floor plate type 2 | Batch 2 | 12 | EA | $ - 0 | 3/15/27 | ||
| 4 | AL-1425-2860 | Embedded floor plate type 3 | Batch 3 | 12 | EA | $ - 0 | 3/30/27 | ||
| 5 | AL-1498-3480 | Embedded floor plate type 4 | Batch 4 | 12 | EA | $ - 0 | 4/5/27 | ||
| 6 | AL-1425-2861 | Embedded floor plate type 5 | Batch 5 | 12 | EA | $ - 0 | 4/28/27 | ||
| 7 | AL-1425-2862 | Embedded floor plate type 6 | Batch 6 | 12 | EA | $ - 0 | 5/5/27 | ||
| 8 | AL-1425-2858 | Embedded floor plate type 7 | Batch 7 | 12 | EA | $ - 0 | 6/15/27 | ||
| 9 | AL-1521-1093 | Embedded floor plate type 8 | Batch 8 | 12 | EA | $ - 0 | 7/5/27 | ||
| 10 | AL-1975-5588 | Embedded floor plate type 8 | Batch 9 | 12 | EA | $ - 0 | 7/30/27 | ||
| Total Firm Fixed Price | $ - 0 |
| OPTIONS per section 3.1 and 3.3 of SOW AL-1953-0482 Rev. C | ||||
| Option | Description | Quantity | Unit Price | Extended Price |
| 1 | Fabricate a robust, aluminum or acrylic inspection |
template for each design variant. Generate a complete inspection report that demonstrates the templates’ ability to accurately verify the GD&T dimensions in the
| LBNL drawings | N/A | ||
| 2 | Generate a full, complete inspection report for each |
plateThe report must demonstrate adherence to the LBNL drawings and clearly identify out of tolerance
| items as necessary. | N/A | ||
| 3 | Monthly Storage: Provide secure, environmentally |
controlled storage (documented by photographs and facility description) and the release of completed
| deliverables to support LBNL's schedule. | 1 to 96 (TBD) | |||
| 4 | Machining of additional holes per LBNL provided CAD file. See section 3.3.3 of the SOW for details. | 26 | ||
| 5 | Machining of additional holes per LBNL provided CAD file. See section 3.3.3 of the SOW for details. | 26 |
*Your submission with signature certifies your offered price herein. Please make sure to check Excel formulas for accuracy.
Signed By:
File details come from the government source that posted it. Updated .