This document is a draft appendix related to a federal contract opportunity for the Cedar DxP IRSC project. The key details are:
The Cedar DxP IRSC project aims to reduce the risks of hazardous fuels along important access routes in the 2022 Cedar Creek fire-affected area. The work includes cutting and removing included timber within 100 feet of roads, falling and leaving hazardous fire-killed trees, slash disposal treatment, road reconstruction, road maintenance, and optional suppression repair treatments. The overall project area is estimated at 3,308 acres, with 150,723 tons of sawtimber/biomass in the roadside units and 2,910 tons of biomass in the Waldo Lake units. A pre-solicitation site visit is scheduled for August 9, 2024. The Request for Proposals is anticipated to be issued the week of August 12, 2024, and the contract will be awarded using a best value source selection method as a firm fixed price commercial services contract.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1. Cedar DxP IRSC SOI_ DRAFT.pdf | ||
| 3. Cedar DxP IRSC Appendix B_DRAFT.pdf | ||
| 2. Cedar DxP IRSC Appendix A_DRAFT.pdf | ||
| 5. Cedar DxP IRSC Appendix D_DRAFT.pdf | ||
| 0. Cedar DxP IRSC Presolicitation Letter.pdf | ||
| 6. Cedar DxP IRSC CAM_DRAFT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix C Cedar DxP IRSC
C5.31# -- Road Maintenance Requirements (07/2001)
TABLE PURSUANT TO C5.31# – ROAD MAINTENANCE REQUIREMENTS
Purchaser shall maintain roads in accordance with the following
Contract Road Maintenance Requirements Summary:
Contract Road Maintenance Requirements Summary
Road Termini Miles Applicable Pre haul Road Maintenance Specifications From To T803 T811 T813 T831 T832 T834 T835 T836 T838 T891
1900000 0.00 18.78 18.78 1931000 0.00 8.51 8.51 1934000 0.00 15.54 15.54 1934222 0.00 0.22 0.22 1934233 0.00 1.24 1.24 1934234 0.00 2.30 2.30 1934391 0.00 1.82 1.82 1934735 0.00 1.29 1.29 1934745 0.00 2.30 2.30 1934746 0.00 3.75 3.75 1935000 0.00 1.79 1.79 1935240 0.00 0.11 0.11 2400000 0.00 13.48 13.48 C C C 2400260 0.00 1.08 1.08 2400291 0.00 1.33 1.33 2408000 0.00 6.60 6.60 2408273 0.00 4.25 4.25 2408275 0.00 2.19 2.19 2408278 0.00 1.49 1.49 2408280 0.00 2.95 2.95 2417000 0.00 5.79 5.79 2417000 5.79 6.59 0.80 2418000 0.00 2.98 2.98 2418294 0.00 1.68 1.68 2422000 0.00 1.44 1.44 2424000 0.00 0.24 0.24 5883000 0.00 6.62 6.62 5883378 0.00 2.41 2.41 5883379 0.00 2.17 2.17 5897000 11.35 11.95 0.60 5897000 0.00 11.35 11.35 C C C 5898000 0.00 3.00 3.00 C C C 5898515 0.00 0.25 0.25 C C C
DRAFT
Contract Road Maintenance Requirements Summary Road Termini Miles Applicable During Haul Road Maintenance Specifications
From To T803 T811 T813 T831 T832 T834 T835 T836 T838 T891 1900000 0.00 18.78 18.78 1931000 0.00 8.51 8.51 C C C C 1934000 0.00 15.54 15.54 C C C C 1934222 0.00 0.22 0.22 C C C C 1934233 0.00 1.24 1.24 C C C C 1934234 0.00 2.30 2.30 C C C C 1934391 0.00 1.82 1.82 C C C C 1934735 0.00 1.29 1.29 C C C C 1934745 0.00 2.30 2.30 C C C C 1934746 0.00 3.75 3.75 C C C C 1935000 0.00 1.79 1.79 C C C C 1935240 0.00 0.11 0.11 C C C C 2400000 0.00 13.48 13.48 C C C 2400260 0.00 1.08 1.08 C C C C 2400291 0.00 1.33 1.33 C C C C 2408000 0.00 6.60 6.60 C C C C 2408273 0.00 4.25 4.25 C C C C 2408275 0.00 2.19 2.19 C C C C 2408278 0.00 1.49 1.49 C C C C 2408280 0.00 2.95 2.95 C C C C 2417000 0.00 5.79 5.79 C C C 2417000 5.79 6.59 0.80 C C C C 2418000 0.00 2.98 2.98 C C C C 2418294 0.00 1.68 1.68 C C C C 2422000 0.00 1.44 1.44 C C C C 2424000 0.00 0.24 0.24 C C C C 5883000 0.00 6.62 6.62 C C C C 5883378 0.00 2.41 2.41 C C C C 5883379 0.00 2.17 2.17 C C C C 5897000 11.35 11.95 0.60 C C C C 5897000 0.00 11.35 11.35 C C C 5898000 0.00 3.00 3.00 C C C
Contract Road Maintenance Requirements Summary Road Termini Miles Applicable Post Haul Road Maintenance Specifications
From To T803 T811 T813 T831 T832 T834 T835 T836 T838 T891 1900000 0.00 18.78 18.78 1931000 0.00 8.51 8.51 C C C 1934000 0.00 15.54 15.54 C C C 1934222 0.00 0.22 0.22 C C C 1934233 0.00 1.24 1.24 C C C 1934234 0.00 2.30 2.30 C C C 1934391 0.00 1.82 1.82 C C C 1934735 0.00 1.29 1.29 C C C 1934745 0.00 2.30 2.30 C C C 1934746 0.00 3.75 3.75 C C C 1935000 0.00 1.79 1.79 C C C 1935240 0.00 0.11 0.11 C C C 2400000 0.00 13.48 13.48 C C C 2400260 0.00 1.08 1.08 C C C 2400291 0.00 1.33 1.33 C C C 2408000 0.00 6.60 6.60 C C C 2408273 0.00 4.25 4.25 C C C 2408275 0.00 2.19 2.19 C C C 2408278 0.00 1.49 1.49 C C C 2408280 0.00 2.95 2.95 C C C 2417000 0.00 5.79 5.79 C C C 2417000 5.79 6.59 0.80 C C C 2418000 0.00 2.98 2.98 C C C 2418294 0.00 1.68 1.68 C C C 2422000 0.00 1.44 1.44 C C C 2424000 0.00 0.24 0.24 C C C 5883000 0.00 6.62 6.62 C C C 5883378 0.00 2.41 2.41 C C C 5883379 0.00 2.17 2.17 C C C 5897000 11.35 11.95 0.60 C C C 5897000 0.00 11.35 11.35 C C C 5898000 0.00 3.00 3.00 C C C
C = Contractor Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party
Description of work required by the above listed T-specs is shown in the following ROAD MAINTENANCE REQUIREMENTS SPECIFICATION table, and included in the timber sale contract.
*Aggregate gradation shall conform to the approved Gradation C *” minus and quality requirements of Section 703 of the "Standard Specifications for -Construction of Roads and Bridges on Federal Highway Projects FP-14 U.S.
Customary Units" and FS supplements to the FP-14. All aggregate shall be placed as when conditions warrant or when directed, but no later than when operations in the adjacent units are complete. Purchaser shall provide documentation to the Forest Service to account for the placement of the maintenance rock. Quantity is for in-place, 4” compacted lift of aggregate with a 12’ minimum road width. See attached FP-14 703 Aggregate Specification.
ROAD MAINTENANCE REQUIREMENTS SPECIFICATION TABLE PURSUANT TO
C5.31# - ROAD MAINTENANCE REQUIREMENTS (7/01)
1 2 3 4 5 6 7 8 9
Road No. Termini
Special Spec’s
Travel Way Brushing and Log
Out Surfacing
Dust Abatement
Seasonal Maintenance
Snow Removal
Post Haul
Width X
Slope Comp Product Applic Rate Width Block Treat
1900000 0.00 18.78
1931000 0.00 8.51 EX AI B 110 CY* PR
1934000 0.00 15.54 EX AI B 550 CY* PR
1934222 0.00 0.22 EX AI B 10 CY* PR
1934233 0.00 1.24 EX AI B 40 CY* PR
1934234 0.00 2.30 EX AI B 70 CY* PR
1934391 0.00 1.82 EX AI B 100 CY* PR
1934735 0.00 1.29 EX AI B 40 CY* PR
1934745 0.00 2.30 EX AI B 70 CY* PR
1934746 0.00 3.75 EX AI B 120 CY* PR
1935000 0.00 1.79 EX AI B 70 CY* PR
1935240 0.00 0.11 EX AI B 10 CY* PR
2400000 0.00 13.48 PR
2400260 0.00 1.08 EX AI B 30 CY* PR
2400291 0.00 1.33 EX AI B 50 CY* PR
2408000 0.00 6.60 EX AI B 310 CY* PR
2408273 0.00 4.25 EX AI B 130 CY* PR
2408275 0.00 2.19 EX AI B 60 CY* PR
2408278 0.00 1.49 EX AI B 50 CY* PR
2408280 0.00 2.95 EX AI B 90 CY* PR
2417000 0.00 5.79
2417000 5.79 6.59 EX AI B 270 CY* PR
2418000 0.00 2.98 EX AI B 150 CY* PR
2418294 0.00 1.68 EX AI B 50 CY* PR
2422000 0.00 1.44 EX AI B 240 CY* PR
2424000 0.00 0.24 EX AI B 130 CY* PR
5883000 0.00 6.62 EX AI B 210 CY* PR
5883378 0.00 2.41 EX AI B 80 CY* PR
5883379 0.00 2.17 EX AI B 70 CY* PR
5897000 11.35 11.95 EX AI B 20 CY* PR
5897000 0.00 11.35 PR
5898000 0.00 3.00 PR
5898515 0.00 0.25 PR
ALL 1385
CY**
** The intent of the 1385 Cubic yards of maintenance rock is to repair surface damage resulting from landing sites on roads to restore the road to preoperational conditions. Placement of rock shall be coordinated with the Forest Service.
ROAD MAINTENANCE REQUIREMENTS SPECIFICATION CODES TABLE PURSUANT TO C5.31# -
ROAD MAINTENANCE REQUIREMENTS (07/2001)
Column No. Heading Entry Explanation
Any Blank Except as otherwise described, no entry indicates Purchaser is not authorized or required to perform the work item(s).
Any RC This work requirement applies only when haul of sale related construction materials occurs.
2 Special Project Specification
Number Entry indicates Special Project Specification which applies.
3 Travel Way EX Purchaser shall maintain the traveled way to the width existing upon entry, or at the completion of Specified Road work.
Numbers Purchaser shall maintain the traveled way to the standard width indicated by the entry, plus curve widening, in accordance with Section T-811. If required, the road template shall be shaped to this width and to the designated cross slope before haul and during recurring maintenance.
IS, C, OS, F,
or AI
Cross slopes are designated as:
IS (Inslope), C (Crown), OS (Outslope), F (Flat), AI (As Is).
A or B If compaction is required.
4 Brush and Log Out Numeric & R and or L
Purchaser shall remove brush for specified width on either or both the right (R) side or left (L) side of road.
As Staked Limits of brushing are as staked or marked in the field.
OPT Purchaser may use hand or mechanical means of brushing.
H Only hand brushing may be used.
Road Maintenance T-Specifications for
Cedar Creek IRSC
5/3/2024
T - 800 SPECIFICATION DEFINITIONS
Wherever the following terms or pronouns are used in Specification T-800 the intent and meaning shall be interpreted as follows:
800-1.1 Agreement: Maintenance projects require a mutually acceptable method to resolve the problems which arise when incompatible situations arise between drawings and specifications and actual conditions on the ground to allow orderly and satisfactory progress of the maintenance.
These specifications have been developed in anticipation of those problem areas and have provided that such changes will be by Agreement.
It is intended that drawings and specifications will govern unless "on-the-ground" conditions warrant otherwise, when specifications call for "Agreement", "agreed", or "approval" such Agreement or approval shall be promptly confirmed in writing.
800-1.2 Annual Road Maintenance Plan: A plan prepared by various users of one or several roads. The plan is an Agreement on maintenance responsibilities to be performed for the coming year.
800-1.3 Base Course: Material used to reinforce subgrade or, as shown on drawings, placed on subgrade to distribute wheel loads.
800-1.4 Berm: Curb or dike constructed to prevent Roadway runoff water from discharging onto embankment slope.
800-1.5 Borrow: Select Material taken from designated borrow sites.
800-1.6 Crown, Inslope, and Outslope: The cross slope of the Traveled Way to aid in drainage and traffic maneuverability.
800-1.7 Culverts: A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually entirely below the elevation of the Traveled Way.
800-1.8 Drainage Dip: A dip in the Traveled Way which intercepts surface runoff and diverts the water off the Traveled Way. A Drainage Dip does not block the movement of traffic.
800-1.9 Drainage Structures: Manufactured structures which control the runoff of water from the Roadway including Inslope, overside drains, aprons, flumes, down drains, downpipes, and the like.
800-1.10 Dust Abatement Plan: A table which lists the road, dust palliative, application rates, and estimated number of subsequent applications.
800-1.11 Lead-off Ditches: A ditch used to transmit water from a Drainage Structure or
Drainage Dip outlet to the natural drainage area.
800-1.12 Material: Any substances specified for use in the performance of the work.
800-1.13 Prehaul Maintenance: Road maintenance work which the Purchaser determines must be accomplished to maintain the roads to a satisfactory condition commensurate with the Purchaser's use provided Purchaser's Operations do not damage improvements under B6.22 or National Forest resources and hauling can be done safely. This work will be shown in the Annual Road Maintenance Plan as provided in C/CT5.4.
Prehaul Maintenance work the Purchaser elects to perform will be in compliance with the Road Maintenance T-Specifications.
800-1.14 Roadbed: The portion of a road between the intersection of Subgrade and side slopes, excluding that portion of the ditch below Subgrade.
800-1.15 Road Maintenance Plan: A table which shows applicable road maintenance specifications to be performed by Purchaser on specific roads.
800-1.16 Roadside. A general term denoting the area adjoining the outer edge of the Roadway.
800-1.17 Roadway: The portion of a road within the limits of excavation and embankment.
800-1.18 Shoulder: That portion of Roadway contiguous with Traveled Way for accommodation of stopped vehicles, for emergency use, and lateral support of base and Surface Course, if any.
800-1.19 Slide: A concentrated deposit of Materials from above or on back slope extending onto the Traveled Way or Shoulders, whether caused by mass land movements or accumulated raveling.
800-1.20 Slough: Material eroded from the back slope which partially or completely blocks the ditch, but does not encroach on the Traveled Way so as to block passage of traffic.
800-1.21 – Slump: A localized portion of the Roadbed which has slipped or otherwise become lower than that of the adjacent Roadbed and constitutes a hazard to traffic.
800-1.22 Special Project Specifications: Specifications which detail conditions and requirements peculiar to the individual project.
800-1.23 Subgrade: Top surface of Roadbed upon which Base Course or Surface Course is constructed. For roads without Base Course or Surface Course, that portion of Roadbed prepared as the finished wearing surface.
800-1.24 Surface Course: The Material placed on Base Course or Subgrade primarily to resist abrasion and the effects of climate. Surface Course may be referred to as surfacing.
800-1.25 Surface Treatment Plan: A table which lists the roads and surface treatments to be applied.
800-1.26 Traveled Way: That portion of Roadway, excluding Shoulders, used for the movement of vehicles.
800-1.27 Turnouts: That portion of the Traveled Way constructed as additional width on single lane roads to allow for safe passing of vehicles.
800-1.28 Water Source: A place designated on the Road Maintenance Map for acquiring water for road maintenance purposes.
800-1.29 Water bar: A dip in the Roadbed which intercepts surface runoff and diverts the water off the Roadway. A Water bar is not designed to be traversable by logging trucks.
T-803 - SNOW REMOVAL (05/07)
803.01 Description
This Section provides for removal of snow from roads to facilitate logging operations and safe use.
803.02 Maintenance Requirements
(1) Erect signs required by the Sign Plan in the SUPPLEMENTAL
SPECIFICATIONS.
(2) Perform work in a manner to preserve and protect roads and appurtenances, and prevent erosion damage to roads, streams, and other Forest values.
(3) Do not undercut banks. Do not blade gravel or other surfacing material off the road.
(4) Keep roadbed drainage ditches, drain dips, and culverts functional when needed during operations and upon completion of operations.
(5) Control snow removal to identify the usable traveled way having roadbed support.
Reshape over-width plowing as necessary to define the usable width.
(6) Space, construct, and maintain drainage holes in the dike of snow or berm caused by snow removal operations. Place drain holes to obtain surface drainage without discharging on erodible fills.
(7) Close roads to wheeled vehicles at times and in the manner specified in C(T)5.12 or the Road Rules document.
(8) Upon seasonal completion of Purchaser's Operations, effectively block the road by a snow barricade, unless otherwise approved by the Contracting Officer.
(9) Remove snow for either public access or project use as established in the SUPPLEMENTAL SPECIFICATIONS and meet the following requirements:
(a) Removal for Public Access (Method JU) - Remove snow from all of the traveled way, including turnouts, for safe and efficient use for both timber transportation and the public. Remove intruding windfalls, debris, or slough and slide material for the full width of the traveled way and deposit out of drainage’s at locations designated by the Contracting Officer.
(b) Removal for Project Use (Method TS) - Remove snow from all or part of the traveled way, including sufficient turnouts for safe and efficient use for timber transportation and to protect the road. Remove intruding windfalls, debris or slough and slide material and dispose of only as necessary to provide passage for timber transportation. Removed materials may be deposited off the traveled way or outside the traveled way at locations designated by the Contracting Officer.
(10) When directed by the Contracting Officer, replace in kind, within sixty
(60) days after the start of Normal Operating Season, any surfacing material which has been bladed off the road, unless otherwise agreed.
Contracting Officer will notify Purchaser in writing as to the cubic yard equivalent of bladed off material by the start of the normal operating season.
803.03 Equipment
Purchaser may use any type of equipment to remove snow, providing:
a. Type or use of equipment is not restricted in C(T)5.12 or Road Rules document.
b. Equipment is of the size and type commonly used to remove snow and will not cause damage to the road.
c. The use of plows or dozers to remove snow requires written approval by the Contracting Officer. Equip plows or dozers with shoes or runners to keep the dozer blade a minimum of 2 inches above the road surface unless otherwise approved by the Contractor Officer.
803.04 Ice Control
Ice control may be performed by Purchaser when approved by the Contracting Officer in writing. Such approval will include ice control materials, application rates, and any specific requirements of use.
T - 811 BLADING (10/07)
811.01 Description
This work consists of surface blading the traveled way to a condition that facilitates traffic and provides proper drainage. Blading includes shaping the crown or slope of travel way, berms, and drainage dips in accordance with this specification. Compaction is required when shown on the ROAD LISTING.
811.02 Maintenance Requirements
A. Timing - Perform surface blading during the contract period as often as needed to provide conditions stated for the maintenance level of the road.
B. General
1. Blade and shape the existing traveled way and shoulders, including turnouts, to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface, unless otherwise shown in the ROAD LISTING, to at least ½ inch per 1 foot of width, but not more than ¾ inch per 1 foot of width.
Thoroughly loosen surfacing material to no less than 2 inches depth or the depth of potholes or corrugations. Scarification to facilitate cutting to the full depth of potholes or corrugations may be elected, but will be considered incidental to blading. Do not scarify to a depth that will cause contamination of the surfacing.
2. Apply water during blading when sufficient moisture is not present to prevent segregation. Supply, haul, and apply water in accordance with Section T-891.
3. Shape existing native rock or aggregate surfaced drainage dips to divert surface runoff to existing outlet devices, ditches, or discharge locations.
4. Establish a blading pattern which provides a uniform driving surface, retains the surfacing on the roadbed, and provides a thorough mixing of the materials within the completed surface width. Upon final blading, no disturbed rock shall protrude more than 2 inches above the adjacent surface unless otherwise provided in the contract. Remove and place outside the roadbed, material not meeting this dimension so as not to obstruct drainage ways or structures. This material may be scattered off the roadbed if there is free drainage.
5. Where DESIGNATED ON THE GROUND, included in the ROAD LISTING, SHOWN
ON THE DRAWINGS or as ordered by the Contracting Officer invasive species of concern prevention practices shall be followed as listed below.
Invasive Species of Concern Prevention Practices
NA
C. Routine Blading
1. Conform to the dimensions SHOWN ON THE DRAWINGS or designated in the
SUPPLEMENTAL SPECIFICATIONS upon completion of blading.
2. Shape roadbed width in excess of the dimensions shown only as needed to provide drainage away from the traveled way. Do not remove established grasses and other vegetation from the excess width except as incidental to providing drainage or unless otherwise provided in the contract.
D. Compaction
1 Roads requiring compaction will be included in the ROAD LISTING.
2. Unless Compaction Method B is designated in the ROAD LISTING, all traveled ways requiring compaction may be compacted by Method A. Compaction shall commence immediately following blading.
Compaction methods are:
Compaction Method A: Breaking track while operating equipment on the traveled way.
Compaction Method B: 7-10 ton pneumatic, steel, or equivalent vibratory roller, operated to cover the full width two (2) times.
E. Undercutting - Undercutting roadway back slope is not permitted.
F. Intersections
At intersections, blade the roadbeds of side roads which are not closed or restricted from vehicular use to ensure smooth transitions.
Signing, cross ditching in the road surface (traveled way), earth berms, or other devices placed to discourage or eliminate use by passenger cars, are field evidence of road closure or restriction. Roads listed for work under Sections T-835, T-836, T-838, and T- 839 shall be considered restricted.
Side roads listed for work under this Section are not restricted.
G. Cleaning of Structures - Do not allow materials resulting from work under this Section to remain on or in structures, such as bridges, culverts, cattle guards, or drainage dips.
H. Berms - Maintain existing berms to the condition of adjacent segments. Do not create new berms.
I. Smooth Blading - Smooth blading may be used as an interim measure to remove loose surfacing material from the wheel paths, and store removed materials in a recoverable windrow, until blade processing as described in this section is feasible.
Watering will not be required for smooth blading. Accomplish smooth blading without distorting the existing cross-slope or crown of the traveled way.
Move and store loose surfacing materials on the high side of super-elevated curves and sections with uniform inslope or outslope. In crowned sections, store the material on either or both sides as elected. Windrow and place stored materials to provide not less than 12 feet of smooth traveled way on one-lane segments, or 20 feet of smooth traveled way on two-lane segments, or segments with turnouts. Cut holes through windrows, which may collect water on the road, for drainage at least every 500 feet.
T - 813 SURFACING (10/07)
813.01 Description
This work consists of placing surface aggregate as DESIGNATED ON THE GROUND, or as ordered by the Contracting Officer. It includes preparing the area, furnishing, hauling, and placing all necessary materials and other work necessary to blend with the adjacent road cross section.
813.02 Materials
Materials will be Government-furnished when stated in the supplemental specifications.
Materials furnished by the Purchaser shall conform to the gradation and quality requirements of Section 703 of the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03 U.S. Customary Units" and FS supplements to the FP-03.
All materials transported onto National Forest System land shall be free of invasive species of concern. Written documentation of methods used to determine the invasive species of concern free status of any and all materials furnished by the Purchaser shall be submitted to the Contracting Officer before transport of any materials onto National Forest System land.
The Contracting Officer shall have 5 days, excluding weekends and Federal holidays, to review the methods and inspect the materials after the required written documentation is provided by the Purchaser. After satisfactory review and inspection or after such 5 day period, the Purchaser may transport the material onto National Forest System land.
Material or methods appropriate for establishing invasive species of concern free status for the particular invasive species of concern are listed below.
Invasive Species of Concern and Acceptable Methods specific to this project:
Invasive Species of Concern Acceptable Methods
NA NA
813.03 Maintenance Requirements
A. Thoroughly loosen the area to be surfaced to a minimum depth of 1 inch prior to placement of aggregate.
B. Mixing and Placing
When scheduled coincidentally with work under Section T-811, and included in the SUPPLEMENTAL SPECIFICATIONS, mix surfacing and existing aggregate with water until a uniform mixture is obtained prior to final shaping and compaction.
Otherwise, spread the material on the prepared area in layers no more than 4 inches in depth. When more than one (1) layer is required, shape and compact each layer before the succeeding layer is placed. Upon completion, the surfacing shall reasonably conform to the adjacent cross section and provide smooth transitions in the road profile.
Compaction Methods
Compaction Method A: Breaking track while operating equipment on the traveled way.
Compaction Method B: 7-10 ton pneumatic, steel, or equivalent vibratory roller, operated to cover the full width two
(2) times.
Either Method A or B may be used unless Method B is designated in the ROAD
LISTING.
T - 831 DITCH MAINTENANCE (10/07)
831.01 Description
This Section provides for routine maintenance of various types of ditches to provide a waterway which is unobstructed, as shown on the ROAD LISTING or DESIGNATED ON
THE GROUND.
831.02 Maintenance Requirements
A. Maintain ditches by removing rock, soil, wood, and other materials. Maintained ditches shall function to meet the intent of the original design.
B. Undercutting back slopes during removal operations is not permitted.
C. Suitable material up to 4 inches in greatest dimension removed from the ditches may be blended into existing native road surface and shoulder or placed in designated berm.
D. Do not blend material from ditch cleaning operations into aggregate surfaced roads. Do not blade material across aggregate or bituminous surfaced roads, unless approved in writing by the Contracting Officer.
E. Haul material in excess of 831.02 D or subject to 831.02 E to a designated waste area under Section T-832. Remove excess materials temporarily stored on the ditch slope or edge of the shoulder daily.
F. Remove limbs and wood chunks in excess of 12 inches in length or 3 inches in diameter from ditches and place outside the roadway.
G. Clean paved surfaces of all materials resulting from ditch maintenance work.
Shape lead-off ditches to drain away from the traveled way.
Where DESIGNATED ON THE GROUND, included in the ROAD LISTING, SHOWN
T - 832 REMOVE AND END HAUL MATERIALS (05/07)
832.01 Description
Work consists of loading, hauling, and placing of slide, slough, or excess materials such as rock, soil, vegetation, and other materials to designated disposal sites.
832.02 Maintenance Requirements
A. Remove, end haul, and dispose of excess materials generated by work under other Sections of this contract.
B. Remove the slide and slough materials in the area extending approximately 6 feet vertically above the road surface and not more than 3 feet down slope from the roadbed.
Dispose of material at designated sites as SHOWN ON THE DRAWINGS, identified in SUPPLEMENTAL SPECIFICATIONS, or as ordered by the Contracting Officer.
Reshape the slope which generated the slide material as nearly as practical to its original condition by equipment operating from road surface. Reshaping of roadside ditches in slide area shall be in accordance with Section T-831.
C. When approved by the Contracting Officer, fill slumps by compacting selected materials into roadway depressions. Compaction is by Method 2.
D. Place all materials in disposal sites as specified in the SUPPLEMENTAL
SPECIFICATIONS, as SHOWN ON THE DRAWINGS, or as ordered by the Contracting Officer.
1. Method 1 - Side Casting and End Dumping. Material may be placed by side casting and end dumping. Where materials include large rocks, provide a solid fill by working smaller pieces and fines into voids. Shape the finished surfaces to drain.
2. Method 2 Layer Placement - Step or roughen surfaces on which materials are to be placed prior to placing any material. Place materials in approximately horizontal layers no more than 12 inches thick. Compact each layer by operating hauling and spreading equipment over the full width of each layer.
E. Repair any damage to existing aggregate or pavement surfaces.
T - 834 DRAINAGE STRUCTURE MAINTENANCE (10/07)
834.01 Description
This work consists of cleaning and reconditioning culverts and other drainage structures.
834.02 Maintenance Requirements
A. Clean drainage structures, inlet structures, culverts, catch basins, and outlet channels specified in the SUPPLEMENTAL SPECIFICATIONS. Clean catch basins by removing the material within the area SHOWN ON THE DRAWINGS.
B. Clean the transition from the ditch line to the catch basin a distance of 10 feet from the catch basin. Clean outlet channels and lead-off ditches a distance of 6 feet. Remove and place debris and vegetation so as to not enter the channel or ditch, or obstruct traffic.
Haul debris and vegetation to a designated disposal area in accordance with Section T- 832.
C. Hydraulic flushing of drainage structures is not allowed unless provided for in the
SUPPLEMENTAL SPECIFICATIONS.
Cleaning and reconditioning are limited to the first 3 feet of inlet and outlet, determined along the top of the structure. Recondition culvert inlet and outlet by field methods such as jacking out or cutting away damaged metal which obstructs flow. Treat cut edges with a zinc rich coating, in accordance with AASHTO M 36M and
ASTM A 849.
E. Where DESIGNATED ON THE GROUND, included in the ROAD LISTING, SHOWN
T - 835 ROADWAY DRAINAGE MAINTENANCE (05/07)
835.01 Description
This work consists of providing post haul drainage on roads.
835.02 Maintenance Requirements
A. Drainage
1. Upon completion of work, shape the roadway to provide for the removal of surface water. The roadway need not be passable to vehicles. Repair and reinstall water bars, barriers or berms existing prior to the Purchaser's operation. Areas where water is ponded by existing centerline profile sags in through cuts may be left untreated.
2. Continuous blade shaping of the roadbed is not required under this specification.
3. Work to be done at staked locations shall be as indicated on the stake and/or stated in
SUPPLEMENTAL SPECIFICATIONS:
4. Any of the following methods are acceptable for use at eroded or rutted locations:
Method A: Out-sloping the roadbed at not less than ½ inch per yard of width.
Method B: In-sloping the roadbed at not less than ½ inch per yard of width.
Method C: Water bar roadbed at locations staked on the ground and construct as
SHOWN ON THE DRAWINGS or as included in SUPPLEMENTAL
SPECIFICATIONS.
5. Drainage structures located in through fills and natural watercourses shall be fully functional without obstructions, including inlet and outlet channel within 20 feet of the structure.
T - 836 MAINTENANCE FOR LIMITED USE (05/07)
836.01 Description
This work consists of making limited use roads passable for joint use by Purchaser and high clearance vehicles, and providing drainage from the traveled way and roadbed.
836.02 Maintenance Requirements
A. Traveled Way
Purchaser may smooth or fill existing cross ditches and water bars and by agreement modify existing road junctions to enable vehicle access. Prior to beginning haul and resumption of haul after an extended stoppage:
1. Remove brush, fallen trees, rocks, and other debris from traveled way, including turnouts, turnarounds, and other locations that interfere with needed maintenance as follows:
a. No object extending over 4 inches above the road surface shall remain within the 12 feet usable traveled way and 10 feet turnout widths. Center the usable width on the roadbed or position away from the fill slope.
b. Cut and remove standing or down trees, logs, brush, and limbs from within the area described in 1 a. above. Remove all encroaching limbs to a height of 14 feet above the traveled way surface. Scatter material not meeting utilization standards outside and below the roadbed on the fill side. Limb and remove timber which meets utilization standards or deck at agreed locations.
c. Place all removed materials away from drainages.
d. During use, maintain drainage structures, including dips, ditches and culverts in a useable condition.
2. Clean and recondition drainage facilities in accordance with: Section T-831 and T-834.
B. Slough and Slides
1. Slough and slides may be left in place, provided surface drainage is provided and at least 12 feet of width is available for vehicle passage.
2. Purchaser may reposition or ramp over slides and slough when the traveled way width is less than 12 feet providing the material is capable of supporting vehicles. Limit out slope to no more than six percent.
3. Reposition slough or slide materials on the roadbed which are not capable of supporting a vehicle to provide the 12 foot width. When directed by the Contracting Officer, slough or slide material will be removed under Section T-832.
C. Slumps and Washouts
1. Drain the roadbed immediately upgrade of slumps and longitudinal cracks to prevent water from entering slump area.
2. Slumps and longitudinal cracks at the edge of the roadbed shall not be considered a part of the usable width. Usable width may be reduced to 10 feet in the area of the slump.
3. Unless the Contractor Officer agrees to material being placed on slumps, ramp the slumps on both ends into undisturbed roadbed to provide at least 10 feet usable width. Use removed materials to guide vehicles to the ramp location or to aid in draining the area.
4. Washouts may be filled with suitable material.
D. Post haul
At the end of hauling or prior to entering into seasonal shutdowns or a period of extended inactivity:
1. Shape the traveled way and disturbed roadbed to provide functional drainage.
2. Reinstall removed cross ditches and water bars and provide any additional drainage structures necessary to offset changes caused through use and maintenance.
3. Leave roads useable for high clearance vehicles. Remove or reshape purchaser modifications at road junctions to leave the entrance as it was before use, or as agreed at the time of improvement.
T - 838 MAINTENANCE FOR HIGH CLEARANCE VEHICLE
USE (05/07)
838.01 Description
This work consists of making limited use roads passable for project use by Purchaser and providing drainage from the traveled way and roadbed.
838.02 Maintenance Requirements
A. Traveled Way
Purchaser may smooth or fill existing cross ditches and water bars and as approved by the Contracting Officer modify existing road junctions to enable vehicle access. The Purchaser may perform the following work prior to beginning haul and resumption of haul after an extended stoppage:
1. Remove brush, fallen trees, rocks, and other debris from traveled way, including turnouts, turnarounds, and other locations that interfere with needed maintenance as follows:
a. No object extending over 4 inches above the road surface shall remain within the 12 feet usable traveled way. Center the usable width on the roadbed or position away from the fill slope.
b. Cut and remove standing or down trees, logs, brush, and limbs from within the area described in 1(a). Remove all encroaching limbs to a height of 14 feet above the traveled way surface. Scatter material not meeting utilization standards outside and below the roadbed on the fill side. Limb and remove timber that meets utilization standards or deck at locations approved by the Contracting Officer.
c. Place all removed materials away from drainages.
d. During use, maintain drainage structures including dips, ditches and culverts in a usable condition.
2. Clean and recondition drainage facilities in accordance with Section T-831 and T-834.
B. Slough and Slides
1. Slough and slides may be left in place, provided surface drainage is provided and at least
12 feet of width is available for vehicle passage.
2. Purchaser may reposition or ramp over slides and slough when the traveled way width is less than 12 feet providing the material is capable of supporting vehicles. Limit out slope to no more than six percent.
3. Reposition slough or slide materials, which are not capable of supporting a vehicle, on the roadbed to provide the 12 feet width. When directed by the Contracting Officer, slough or slide material will be removed under Section T-832.
C. Slumps and Washouts
1. Drain the roadbed immediately upgrade of slumps and longitudinal cracks to prevent water from entering slump area.
2. Slumps and longitudinal cracks at the edge of the roadbed shall not be considered a part of the usable width. Usable width may be reduced to 10 feet in the area of the slump.
3. Unless the Contracting Officer approves material being placed on slumps, ramp the slumps on both ends into undisturbed roadbed to provide at least 10 feet usable width.
Use removed materials to guide vehicles to the ramp location or to aid in draining the area.
4. Washouts may be filled with suitable material.
D. Post haul
At the end of hauling or prior to entering into seasonal shutdowns or a period of extended inactivity:
1. Shape the traveled way and disturbed roadbed to provide functional drainage.
2. Reinstall removed cross ditches and water bars and provide any additional drainage structures necessary to offset changes caused through use and maintenance.
3. Leave roads useable for high clearance vehicles. Remove or reshape purchaser modifications at road junctions to leave the entrance as it was before use, or as agreed at the time of improvement.
T - 891 WATER SUPPLY AND WATERING (5/07)
891.01 Description
This work consists of providing facilities to furnish an adequate water supply, hauling and applying water.
891.02 Materials
If the Purchaser elects to provide water from other than designated sources, the Purchaser is responsible to obtain the right to use the water, including any cost for royalties involved.
Suitable and adequate water sources available for Purchaser's use under this contract are designated as follows:
All water sources are designated by the Timber Sale Administrator
891.03 Equipment
A. Positive control of water application is required. Equipment shall provide uniform application of water without ponding or washing.
B. An air gap or positive anti-siphon device shall be provided between the water source and the vehicle being loaded if the vehicle has been used for other than water haul, if the source is a domestic potable water supply, or the water is used for tank mixing with any other materials.
C. The designated water sources may require some work prior to their use. Such work may include cleaning ponded areas, installing temporary weirs or sandbags, pipe repair, pump installation or other items appropriate to the Purchaser's operations. Flowing streams may be temporarily sandbagged or a weir placed to pond water, provided a minimum flow of 10 cu. ft/sec is maintained. Obtain approval from the Contracting Officer on improvements for sandbags or weirs prior to placement.
TRAFFIC CONTROL PLAN AND SPECIFICATIONS PURSUANT TO B6.33 SAFETY
Part I. Signing and Other Warning Methods:
Unless otherwise agreed, the following measures are required to provide adequate warning of hazards for users of roads and trails adjacent to Purchaser's Operations.
(a) Signs - The following signs are required when Purchaser's Operations are in progress adjacent to or on Forest Service controlled roads and trails:
MINIMUM LETTER SIZE &
LEGEND MINIMUM SIZE & SHAPE
WHEN AND WHERE REQUIRED
1. LOGGING
OPERATIONS
NEXT <> MILES
(4" letters)
24" (rectangle) 36"
Min. 100 ft. outside of any continuous work areas, on roads listed in C5.31# and trails listed in Part II.
2. LOGGING
OPERATIONS
(3" letters)
24" (diamond) 24"
To be used in conjunction with "Logging Operations Next <> Miles" and where work area is not continuous.
3. FOR LOGGING
USE ONLY
(3" letters) 24" (diamond) 24"
Required where roads listed in C5.31# and temporary roads intersect with C5.31# roads.
Install a cross ditch to discourage use when sign is covered or removed for extended periods.
4. TRUCKS
(4" letters) 24" (diamond) 24"
At critical intersections on roads listed in C5.31# when traffic is heavy or otherwise exceeds volumes stated in Part II below. Remove or cover when the sign is not applicable.
5. END
LOGGING
OPERATIONS
(4" letters)
24" (rectangle) 36"
Use in conjunction with "Logging Operations Next <> Miles" and
"Logging Operations."
6. TREE
FELLING
AHEAD
(3" letters)
24" (diamond) 24"
Required 200 feet in advance of danger area where timber is being felled adjacent to all roads, including temporary roads, and trails.
7. ROAD
MACHINERY
AHEAD
(3" letters)
24" (diamond) 24"
Required at least 200 feet in advance of Purchaser road maintenance operations on roads listed in Schedule C5.31#.
TRAFFIC CONTROL PLAN AND SPECIFICATIONS – B6.33 Safety(continued)
All signs shall meet requirements as specified in Parts I and VI of the Manual of Uniform Traffic Control Devices (MUTCD).
Sign borders and lettering shall be black. Borders are 1/2 inch wide, inset 1/2 inch from outside edge of sign. All sign backgrounds shall be orange, except signs #1 and 5 which shall be reflectorized orange.
Signs shall be installed on posts, with a 5 foot minimum ground clearance, or on temporary supports complying with MUTCD standards.
All signs are to be removed or covered when operations are interrupted for seasonal nonuse or other extended periods.
Purchaser shall furnish flag personnel and advance warning signs when cable or helicopter logging above roads or trails, felling adjacent to roads or trails, where logs being bucked may roll into roads or trails, and in areas where fallout from blasting may occur. On roads listed in C5.31# and temporary roads, Purchaser may temporarily block the road in lieu of furnishing flag personnel.
(b) Barricades - On roads listed in C5.31#, if Purchaser's Operations cause the traveled way or road shoulders to be constricted overnight, or longer, by such obstructions as decked logs, parked equipment, or piled slash, Purchaser shall place barricades on both sides of the encroaching obstruction to safely channel traffic around such obstructions. Barricades shall remain in place until the obstruction is removed.
Barricades shall be Type II and meet specifications in MUTCD, Part VI. Barricades must be at least 3 feet high. Rails must be at least 2 feet long. Striping shall be alternating orange and white, sloping at a 45 degree angle, and reflectorized. For rails 2 feet to 3 feet long, striping shall be 4 inches wide.
For rails longer than 3 feet, striping shall be 6 inches wide.
Two rails, 8-12 inches in width, must face each direction.
Barricades shall be equipped with warning lights which shall be Type A low intensity flashing and shall be maintained so as to be capable of being visible on a clear night from a distance of 3,000 feet.
(c) Other Traffic Control Methods. The posting of CB channel signs may be authorized.
On roads listed in C5.31#, Purchaser may be authorized to install temporary gates, barricades (except cables), or natural barriers.
The devices must be installed with the necessary hazard markers, be reasonably passable by Forest Service, and be removed prior to acceptance of the subdivision being served by the road.
TRAFFIC CONTROL PLAN AND SPECIFICATIONS – B6.33 SAFETY(continued)
Part II. Specific Requirements:
<Flaggers will required on FS road 5897000 during operations.
All roads will have signs posted in both directions during operations.>
Purchaser and Forest Service agree to the above stated requirments of the Traffic Control Plan:
Name Name
Title Title
Date Date
| T - 800 SPECIFICATION DEFINITIONS |
| T-803 - SNOW REMOVAL (05/07) |
| T - 811 BLADING (10/07) |
| 811.01 Description |
| 811.02 Maintenance Requirements |
| Compaction Method A: Breaking track while operating equipment on the traveled way. |
| Side roads listed for work under this Section are not restricted. |
| T - 813 SURFACING (10/07) |
| 813.02 Materials |
| Materials will be Government-furnished when stated in the supplemental specifications. |
| Either Method A or B may be used unless Method B is designated in the ROAD LISTING. |
| T - 831 DITCH MAINTENANCE (10/07) |
| 831.02 Maintenance Requirements |
| Shape lead-off ditches to drain away from the traveled way. |
| T - 832 REMOVE AND END HAUL MATERIALS (05/07) |
| 832.02 Maintenance Requirements |
| T - 834 DRAINAGE STRUCTURE MAINTENANCE (10/07) |
| This work consists of cleaning and reconditioning culverts and other drainage structures. |
| 834.02 Maintenance Requirements |
| ASTM A 849. |
| T - 835 ROADWAY DRAINAGE MAINTENANCE (05/07) |
| T - 836 MAINTENANCE FOR LIMITED USE (05/07) |
| 836.02 Maintenance Requirements |
| T - 838 MAINTENANCE FOR HIGH CLEARANCE VEHICLE USE (05/07) |
| T - 891 WATER SUPPLY AND WATERING (5/07) |
| This work consists of providing facilities to furnish an adequate water supply, hauling and applying water. |
| 891.02 Materials |
| All water sources are designated by the Timber Sale Administrator |
| TRAFFIC CONTROL PLAN AND SPECIFICATIONS PURSUANT TO B6.33 SAFETY |