1. Cedar DxP IRSC SOI_ DRAFT.pdf
PDF 762 KB Posted
- Attached to
- Cedar DxP IRSC Federal contract opportunity
- Solicitation number
- 12363N24R4022
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a draft Schedule of Items for the Cedar DxP IRSC federal contract opportunity. It details the mandatory and optional work activities required, including cutting and removing timber, non-commercial danger tree felling, slash disposal, road reconstruction, and other related tasks. The overall project area is estimated at 3,308 acres with 150,723 tons of sawtimber/biomass in the roadside units and 2,910 tons of biomass in the Waldo units.
The related federal contract opportunity is a pre-solicitation for the Cedar DxP IRSC project on the Willamette National Forest, with a planned period of performance through October 15, 2029. The solicitation will be issued the week of August 12, 2024, and will be awarded using a best value source selection method as a firm fixed price commercial services contract. Bonding requirements apply only to the road construction work items. The contracting agency is the USDA Forest Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2. Cedar DxP IRSC Appendix A_DRAFT.pdf | ||
| 5. Cedar DxP IRSC Appendix D_DRAFT.pdf | ||
| 3. Cedar DxP IRSC Appendix B_DRAFT.pdf | ||
| 4. Cedar DxP IRSC Appendix C_DRAFT.pdf | ||
| 0. Cedar DxP IRSC Presolicitation Letter.pdf | ||
| 6. Cedar DxP IRSC CAM_DRAFT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cedar DxP IRSC Willamette National Forest Page 1 of 4 Middle Fork Ranger District
SCHEDULE OF ITEMS
MANDATORY WORK ACTIVITIES:
ITEM
NO.
DESCRIPTION OF
MANDATORY WORK ACTIVITIES UNIT
ESTIMATED
QUANTITY
UNIT
PRICE TOTAL
Cut and Remove Included Timber (Roadside Units) Units 2, 5a, 5b, 6, 7, 8, 9, 12, 15, 16, 17, 18, 23, 24, 25, 26, 27, 28, 30, 32, 34, 36, 40, 43, 48, 49, 50, 53, 54, 57
Acre 1,297 N/A N/A
Non-Commercial Danger Tree Felling Within 100 feet From Road Edge (Roadside Units) Units 2, 5a, 5b, 6, 7, 8, 9, 12, 15, 16, 17, 18, 23, 24, 25, 26, 27, 28, 30, 32, 34, 36, 40, 43, 48, 49, 50, 53, 54, 57
Acre 1,297 $ $
Danger Tree Felling Beyond 100 feet From Road Edge (Roadside Units) Units 2, 5a, 5b, 6, 7, 8, 9, 12, 15, 16, 17, 18, 23, 24, 25, 26, 27, 28, 30, 32, 34, 36, 40, 43, 48, 49, 50, 53, 54, 57
Acre 684 $ $
Cut and Remove Included Timber & Slash Disposal (Waldo Units) Units Waldo1, Waldo2, Waldo3, Waldo4, and Waldo5
Acre 80.3 $ $
Slash Disposal 0-30 Feet From Road Edge (Roadside Units) Units 2, 5a, 5b, 6, 7, 8, 9, 12, 15, 16, 17, 18, 23, 24, 25, 26, 27, 28, 30, 32, 34, 36, 40, 43, 48, 49, 50, 53, 54, 57
Acre 411 $ $
6 Road Reconstruction of Haul Routes (114.1 Miles)
a) Mobilization (15101) LS ALL $ $
b) Construction Survey And Staking, Method
1, Tolerance A (15201) LS ALL $ $
c) Clearing And Grubbing, Disposal Of Tops And Limbs (F), Logs (I), Stumps (F) (20103)
Miles 75.50 $ $
d) Selective Clearing, Disposal Method (F)
(20201) LS ALL $ $
e) Removal Of Culvert, Disposal Method (A) (20302a) EA 205 $ $
f) Removal Of Jersey Barrier (20302b) EA 7 $ $
g) Removal Of Existing Asphalt, Disposal
Method (A) (20304)
SQ.
YD 21920.3 $ $
h) Roadway Excavation (20407) CY 11624 $ $
DRAFT
Page 2 of 4 Middle Fork Ranger District
i) Unclassified Borrow Excavation (20411) CY 942 $ $
j) Drainage Excavation, Type Culvert Outlet Ditch (20424) FT 870 $ $
k) Drainage Excavation, Type Reconstruct Culvert Catch Basin (20425) EA 65 $ $
l) Waste, Slide Debris (20429a) CY 7965 $ $
m) Waste, Culvert Inlet Cleaning (20429b) CY 135 $ $
n) Earthwork Geosynthetics, Type Iv-B (20701)
SQ.
YD 2186 $ $
o) Keyed Riprap, Class 2 (25104a) CY 4 $ $
p) Keyed Riprap, Class 4 (25104b) CY 1257 $ $
q) Mechanically Stabilized Earth Wall, Type Welded Wire (25501)
SQ.
YD 3001.3 $ $
r) Reinforced Soil Slope, Geogrid Category 4 (26101)
SQ.
FT 15810 $ $
s) Low Density Cellular Concrete, Class Iii
(26201) CY 1700 $ $
t) Aggregate Base, Grading D, Compaction Method (B) (30103a) CY 2366 $ $
u) Subbase, Grading A, Compaction Method
(B) (30109) CY 7050 $ $
v) Aggregate Surface Course, Grading F, Compaction Method (B) (30115) CY 5020 $ $
w) Pit Run Maximum Size 3", Method (B)
(30201) CY 30 $ $
x) Road Reconditioning, Ditch (30301) MI 48.48 $ $
y) Roadway Reconditioning, Compaction Method 2 (30315) MI 66.25 $ $
z) Asphalt Concrete Oregon State Dot, Type
1/2" Dense Gradation, Level Ii Hmac, Asphalt Grade Pg 64-22 (40304)
TON 1423.08 $ $
aa) 18-Inch Corrugated Aluminized Steel Pipe, 0.064-Inch Thickness, Method 2 (60201a) FOOT 6175 $ $
bb) 24-Inch Corrugated Aluminized Steel Pipe, 0.064-Inch Thickness, Method 2 (60201b) FOOT 1716 $ $
cc) 30-Inch Corrugated Aluminized Steel Pipe, 0.079-Inch Thickness, Method 2 (60201c) FOOT 155 $ $
dd) 36-Inch Corrugated Aluminized Steel Pipe, 0.079-Inch Thickness, Method 2 (60201d) FOOT 471 $ $
ee) Spillway Assembly, 36-Inch Drop Inlet, Corrugated Aluminized Steel Pipe, Gage 12 (60601)
EA 11 $ $
ff) Reconditioning Drainage Structures, Jack Open Pipe Inlet And/Or Outlet (60710a) EA 21 $ $
Page 3 of 4 Middle Fork Ranger District
gg) Reconditioning Drainage Structures, Bevel Cut Inlet (60710b) EA 1 $ $
hh) Reconditioning Drainage Structures, Reconnect Spillway Pipe (60710c) EA 1 $ $
ii) Cleaning Culverts In Place (60713) MI 83.08 $ $
jj) Seeding And Mulching, Dry Method
(62552) LS ALL $ $
kk) Delineator, Type Carsonite (63308) EA 2 $ $
ll) Temporary Traffic Control (63501) LS ALL $ $
7 Remove & Deliver 7,000 Fish Logs to Deck Locations on the 1934 road Logs 7000 $ $
Total All Mandatory Service Items $
OPTIONAL WORK ACTIVITIES:
ITEM
NO.
DESCRIPTION OF
OPTIONAL WORK ACTIVITIES UNIT
ESTIMATED
QUANTITY
UNIT
PRICE TOTAL
Slash Disposal 30 to 100 Feet From Road Edge (Roadside Units) Units 2, 5a, 5b, 6, 7, 8, 9, 12, 15, 16, 17, 18, 23, 24, 25, 26, 27, 28, 30, 32, 34, 36, 40, 43, 48, 49, 50, 53, 54, 57
Acre 886 $ $
Fall and Leave Hazard Trees 100 Feet From Road Edge (Fall and Leave Units) Units 1, 2a, 4, 9a, 10, 11, 13, 18a, 19, 20, 21, 22, 26a, 29, 32a, 33, 34a, 37, 38, 39, 40a, 41, 42, 43a, 44, 46, 56, 59
Acre 1037 $ $
Dozer Line Rehabilitation (Suppression Repair Units) Dozer Line Repair, See Table in Appendix A for the 9 units. Dozer Line Rehabilitation 1-9
Mile 9.2 $ $
Log Landing Repair (Suppression Repair Units) Log Landings Repair, approximately
0.5 acre units each. See Table in
Each 8 $ $
Page 4 of 4 Middle Fork Ranger District
Appendix A for the 8 units. Log Landing Repair 1-8
Slash Disposal- 0-30 feet From Road Edge (Suppression Repair Units) Slash Disposal, See Table in Appendix A for the 10 units.
Suppression Repair Slash Disposal 1-10.
Acre 206.8 $ $
Total All Optional Service Items $
SCHEDULE OF ITEMS