4. Blank Cost Estimate.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- Repair Base Supply Enclosure & Windows, B402 Federal contract opportunity
- Solicitation number
- FA557525B0015
About this file
The document is an Independent Government Estimate (IGE) Cost Estimate Breakdown for a construction project at Moron Air Base, Spain. The project involves repairing and renovating the Base Supply Enclosure & Windows (Building 402), with specific work including window removal, installation of new windows, masonry work, and painting. The cost estimate details demolition tasks such as removing existing windows, A/C units, and metal panels, followed by architectural work like installing galvanized steel flashing, aluminum subframes, anodized aluminum windows, and surface repairs.
The associated federal contract opportunity (Solicitation Number FA557525B0015) is specifically for local Spanish contractors, with a project value between $25,000 and $100,000. Key dates include a pre-proposal conference/site visit on 30 July 2025, a question submission deadline of 6 August 2025, and bid submission deadline of 14 August 2025 at 10:00 hours local time. The solicitation emphasizes using Spanish materials, labor, and equipment, and is issued by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa. Notably, funds are not currently available, and the government reserves the right to cancel the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers_QUUG 25-1009.pdf | ||
| 1. Drawings.pdf | ||
| 5. Schedule of Material Submittals.xlsx | XLSX spreadsheet | |
| 2. Specifications (Eng).pdf | ||
| 3. Specifications (Spa).pdf | ||
| Solicitation - FA557525B0015.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGE 25-1009
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR Base Supply Enclosure & Windows | 0.00 € | $0.00 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 25-1009 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| TRABAJOS DE DEMOLICIÓN |
TRABAJOS DE DEMOLICIÓN
| 1 | Install polyethylene screen and catways for building protection. | |
| Instalar pantalla de polietileno y pasarelas para proteger edificio existente. | JOB | |
| 2 | Removal of existing windows and subframes | |
| Desmontar ventanas existentes y premarcos | EA | |
| 3 | Disconnect and remove wndows A/C unit and delivery to the Gov. | |
| Desconectar y desmontar equipos de A/C de ventana y entregar al Govierno. | EA | |
| 4 | Removal of metal and wood panel from the Com. room windows. | |
| Desmontar paneles metálicos y de madera de las ventanas del cuarto de comunicaciones. | JOB | |
| 5 | Cut masonry trim from window openings as indicated. | |
| Cortar recercados de ventanas como se indica. | JOB | |
| 6 | Reduce the thickness of the window drip sills. | |
| Reducir el espesor de los alfeízares de ventana. | JOB | |
| 7 | Separate, select and treat the material from demolition. | |
| Separar, seleccionar y tratar el material procedente de la demolición. | JOB | |
| 8 | Load, transport and delivery the waste material from demolition to authorized dump or recycle plant. | |
| Cargar, transportar y enviar el material procedente de la demolición a vertedero autorizado o planta de reciclaje. | JOB | |
| STANDARD DEMOLITION WORKS TOTAL |
TOTAL TRABAJOS DE DEMOLICIÓN ESTÁNDAR
ARCHITECTURAL WORKS
OBRA DE ARQUITECTURA
| 9 | Install galvanized steel flashing below the window drip sills. | |
| Instalar remate de acero galvanizado bajo los alfeízares de ventana. | EA | |
| 10 | Close the joint panel-sill with sealant and metal flashing. | |
| Cerrar la junta panel-alfeízar con sellante y remate metálico. | EA | |
| 11 | Repair window lintel, sill and notch and install aluminum subframe | |
| Reparar dintel, alfeízar y mochetas de Ventana e instalar premarco . | EA | |
| 12 | Install 2 cm thick synthetic resin window drip sill | |
| Instalar alfeízar sintético de ventana de 2 cm de espesor. | EA | |
| 13 | Install turn & tilt anodized aluminum window | |
| Instalar ventana oscilobatiente de aluminio anodizado. | EA | |
| 14 | Close window opening to match the surronded area | |
| Cerrar hueco de ventana hasta igualar la superficie de alrededor. | EA | |
| 15 | Seal window and flashing joints | |
| Sellar ventanas y juntas de rematería | EA | |
| 16 | Paint the comnplete walls of interior surface affected by humidity | |
| Pintar superf completa de paredes interiores afectada humedad. | SM | |
| 17 | Paint all the exterior surface of the southern façade | |
| Pintar toda la superficie de la fachada sur. | Ea | |
| ARCHITECTURAL WORKS TOTAL |
TOTAL TRABAJOS DE ARQUITECTURA
WORK SUMMARY
RESUMEN TRABAJOS
DEMOLITION WORKS
TRABAJOS DE DEMOLICION
ARCHITECTURAL WORKS
OBRA DE ARQUITECTURA
GRAND TOTAL
GRAN TOTAL
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
| TOTAL DIRECT COSTS | |
| FIRM NAME: | |
| OVERHEAD |
SUBTOTAL
PROFIT
| TOTAL PROJECT EUROS | ||
| $1 | 0.9249 | euros |
| TOTAL PROJECT US$ |
DATE: FIRM NAME:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"CONSTRUCTION COST BREAKDOWN &"Times New Roman,Bold"F &"Times New Roman,Regular"Page &P of &N