4.3.1 S3155-cost-schedule.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- On Call HVAC- Eastern Region
- Solicitation number
- 70CNR-S3306
- Issued by
- Elko County, Nevada
About this file
The file is a cost schedule spreadsheet (4.3.1 S3155-cost-schedule.xlsx) for an On-Call HVAC contract in the Eastern Region of Nevada, designed for vendors to complete pricing details. The spreadsheet provides a template for vendors to input pricing for up to 16 line items, along with estimated travel costs, with the intent of calculating a total estimated project value. The document indicates that travel costs are billable at current GSA rates and references the GSA website (gsa.gov) for rate information.
The cost schedule appears to be part of a competitive bidding process, with vendors required to carefully complete the shaded areas and ensure accurate calculations. While specific pricing details are not filled in, the spreadsheet suggests this is a structured procurement approach for HVAC services, likely for multiple sites or potential service scenarios. The document allows for flexible pricing across different line items and includes provisions for travel expenses, which indicates this may be a comprehensive service contract with potential multi-year or renewable terms. The estimated project value will be determined by the vendor's proposed pricing and projected usage.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Quote Instructions.pdf | ||
| 4.1.2 Scope of Work S3306.doc | DOC document | |
| 4.2.1 Standard form contract.pdf | ||
| 4.3.2 Certification-regarding-lobbying.pdf | ||
| 4.1.1 Terms-and-conditions-for-services.pdf | ||
| S3306-request for proposal.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost schedule
| S3155 cost schedule | |||||
| Vendor | |||||
| Please complete shaded areas with proposed pricing. Vendor is responsible for ensuring calculations are correct. | |||||
| Line | Description and term | Type | Price | Est. Usage | Extended |
| 1 | $ - 0 | ||||
| 2 | $ - 0 | ||||
| 3 | $ - 0 | ||||
| 4 | $ - 0 | ||||
| 5 | $ - 0 | ||||
| 6 | $ - 0 | ||||
| 7 | $ - 0 | ||||
| 8 | $ - 0 | ||||
| 9 | $ - 0 | ||||
| 10 | $ - 0 | ||||
| 11 | $ - 0 | ||||
| 12 | $ - 0 | ||||
| 13 | $ - 0 | ||||
| 14 | $ - 0 | ||||
| 15 | $ - 0 | ||||
| 16 | Estimated travel costs | per year | 4 | $ - 0 | |
| Estimated project value | $ - 0 | ||||
| Travel is allowed as a billable costs of this contract, at then current GSA rates. | |||||
| gsa.gov |
&"Times New Roman,Italic"&10Page &P of &N http://www.gsa.gov/
File details come from the government source that posted it. Updated .