This is a cost sheet for a roof replacement project at Gateway Preparatory Academy, a charter school located in Enoch, Utah. The project encompasses comprehensive roofing system replacement including removal and disposal of the existing roofing system, installation of tapered insulation for drainage (1-1/4" minimum), installation of a membrane roofing system with 80 mil minimum TPO or equivalent with reinforced seams, installation of a new insulation layer for energy efficiency, weather-resistant detailing including edge protection and flashing, installation of new supports for rooftop mechanical and gas utility lines, and restoration or replacement of exterior finishes. A mandatory pre-bid conference is scheduled for February 27th, 2026 at 10:00am at 201 E Thoroughbred Way, Enoch, UT 84721, with site visits required to be attended in person by authorized representatives. The deadline for submitting questions is March 2nd, 2026 at 5:00pm, and proposals are due March 6th, 2026 at 5:00pm. All communications should be directed to Adam Bealer at adambealer@gpacharter.org.
The cost sheet provides line items for labor and materials but does not specify individual pricing amounts. The comprehensive roofing system warranty is preferred for 30 years, indicating a long-term performance expectation. The cost sheet includes provisions for additional costs to be specified by bidders, suggesting flexibility for unforeseen conditions or site-specific requirements. Gateway Preparatory Academy, as the issuing office, is responsible for conducting this procurement independent of the state Division of Purchasing, and the contract award will be determined directly by the Academy rather than posted on the state purchasing website.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gateway Preparatory Academy Cost Sheet
Item Cost Removal and disposal of the existing roofing system Installation of new tapered insulation for drainage (1-1/4" tapered insulation) Installation of a membrane roofing system (80 Mil minimum TPO or equivalent) with reinforced seams Installation of a new layer of insulation for energy efficiency Inclusion of weather-resistant detailing such as edge protection, flashing, and terminations Installation of new supports for rooftop mechanical and gas utility lines.
Restoration or replacement of any exterior finishes or materials (including stucco or sealant joints) Provision of a comprehensive roofing system warranty (30 years preferred) Cost of labor
Additional costs (specify below)