4 Combined Drawings_CBPEWI.pdf

PDF 631 KB Posted

Attached to
Council Bluff Primary Electric And Well Improvements
Solicitation number
1240LT26Q0172
Issued by

About this file

This document is a set of technical drawings and specifications for the Council Bluff Primary Electric and Well Improvements project at Wild Boar Ridge Campground on the Mark Twain National Forest in Iron County, Missouri. The project is located in the Potosi-Fredericktown Ranger District (R09 Eastern Region) at coordinates LAT 37.724361°, LONG -90.940618°.

The scope of work includes installation of approximately 12,700 linear feet of new 4/0 AWG aluminum 15kV underground rural distribution (URD) primary electric line in 3-inch HDPE or Schedule 40 PVC conduit. Approximately 9,600 linear feet will be directionally drilled along Missouri State Highway DD, while approximately 3,100 linear feet along the old road corridor can be either directionally drilled or trenched. The contractor must install pull boxes at least every 500 feet along the buried cable and coordinate with utility provider Ameren to extend their primary distribution system, pay all associated utility fees, and upgrade the system to support future infrastructure including a new well house with 200-amp service, 40 RV campsites with 50/30/20-amp pedestals, 2 host sites with similar service, and a septic system with two 230-volt sewage pumps. Additional work includes installation of a new 5HP single-phase 230-volt submersible pump set at approximately 520 feet depth with associated piping, conditioning, and electrical infrastructure. Work is preferred to begin after the Independence Day weekend, and all electrical work must be performed by a Missouri-licensed electrician or apprentices under direct supervision in compliance with the National Electric Code (NFPA 70).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST LOCATION MAP

PROJECT LOCATION MAP

TRAVEL DIRECTIONS:

SHEET OF

United States Department of Agriculture Forest Service

GAOA - COUNCIL BLUFF

FROM THE POTOSI-FREDERICKTOWN RANGER DISTRICT OFFICE (10019 W MO-8, POTOSI, MO 63664):

HEAD SOUTHEAST ON MO-8 E AND TRAVEL FOR 1.4 MILES. TURN RIGHT ONTO THE STATE HIGHWAY P AND TRAVEL FOR 14.0 MILES. TAKE A SLIGHT RIGHT ONTO OLD ROUTE C AND TRAVEL FOR 0.3 MILES.

TURN LEFT ONTO STATE HIGHWAY DD AND TRAVEL FOR 6.8 MILES. TURN LEFT ONTO FOREST ROAD

3001 AND TRAVEL INTO WILD BOAR RIDGE CAMPGROUND.

LAT: 37.724361°

LONG: -90.940618°

PRIMARY ELECTRIC AND WELL IMPROVEMENTS

6/4 /26

:1

2 R

AC

HE

LU

ET

RE

CH

T

C:

\U

SE

RS

\R

AC

HE

LU

ET

RE

CH

T\

BO

X\

R0 9 M

T

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

CO

NT

RA

CT

S

- W

OR

KI

NG

F

IL

ES

\P

OT

FY

CO

UN

CI

L

BL

UF

F

PR

IM

AR

Y

EL

EC

TR

IC

A

ND

W

EL

L

IM

PR

OV

EM

EN

TS

\D

RA

W

IN

GS

A

ND

S

PE

CS

\C

BP

EW

I.D W

G;

MISSOURI

IRON COUNTY

(R09) EASTERN REGION

MARK TWAIN NATIONAL FOREST

POTOSI-FREDERICKTOWN RANGER DISTRICT

INDEX OF SHEETS

SHEET SHEET TITLE DATE

C-00 COVERSHEET

C-01 SITE PLAN

C-02 DETAILS

E

E

E

E

E

E

E

E

E

E

WELL LOCATION

OLD ROAD CORRIDOR

LAT: 37.7288°

LONG: -90.9476°

FOREST ROAD 3002

FOREST ROAD 3001

MO STATE HIGHWAY DD

RIGHT-OF-WAY RANGES

FROM 60-70 FT

EXISTING

OVERHEAD

ELECTRIC

EXISTING WELL

HOUSE/BUNKER

ENTRANCE TO

COUNCIL BLUFF

RECREATION AREA

PROPOSED PRIMARY

ELECTRIC CORRIDOR:

CONTRACTOR TO

DIRECTIONALLY DRILL

LINE ALONG HWY DD.

(APPROX. 9,600 LF)

LINE ALONG OLD ROAD

CORRIDOR CAN BE

DIRECTIONALLY DRILLED

OR TRENCHED.

(APPROX. 3,100 LF)

WILD BOAR RIDGE

CAMPGROUND

OE

OE

OE

OE

O E

O E

OE

OE

OE

PROPOSED PULL BOX (TYP.)

TO BE INSTALLED EVERY 500-FT

EXISTING AMEREN

POWER POLE (TYP.)

LAT: 37.7095°

LONG: -90.9609°

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 6/2

6 1 5:

R

AC

HE

LU

ET

RE

CH

T C :\U

SE

RS

\R

AC

HE

LU

ET

RE

CH

T\

BO

X\

R0 9 M

T

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

CO

NT

RA

CT

S

- W

OR

KI

NG

F

IL

ES

\P

OT

FY

CO

UN

CI

L

BL

UF

F

PR

IM

AR

Y

EL

EC

TR

IC

A

ND

W

EL

L

IM

PR

OV

EM

EN

TS

\D

RA

W

IN

GS

A

ND

S

PE

CS

\C

BP

EW

I.D W

G;

(R09)

EASTERN NAME

COUNCIL BLUFF

ELECTRIC AND

WELL

IMPROVEMENTS

MARK TWAIN

NATIONAL FOREST

POTOSI-FREDERICKTOWN

RANGER DISTRICT

SITE PLAN

02/25/2026

R.UET

R.UET

A.WIL

C-01 002 003

SCALE: 1" = 400'

0 800400200

NOTES:

1. WORK IS PREFERRED TO START AFTER INDEPENDENCE DAY (JULY 4TH) WEEKEND.

2. EXISTING UTILITIES TO BE LOCATED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. "MISSOURI ONE CALL SYSTEM"

3. PULL BOXES TO BE LOCATED AT LEAST EVERY 500-FT ALONG BURIED CABLE.

4. CONTRACTOR IS RESPONSIBLE FOR REPAIRING/REPLACING ALL ITEMS DAMAGED OR ANY DISTURBANCE ON THE SITE WHICH IS NOT

PART OF THE IDENTIFIED WORK CONTRACT.

5. BLEND ALL WORK OF THIS CONTRACT SMOOTHLY INTO THE EXISTING CONDITIONS.

6. CONTRACTOR TO COORDINATE WITH PUBLIC UTILITY PROVIDER, AMEREN, TO PAY ALL FEES AND PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT TO EXTEND AMEREN'S PRIMARY DISTRIBUTION SYSTEM NECESSARY TO MEET PROJECT REQUIREMENTS.

7. IN ADDITION TO THE ELECTRICAL WORK SHOWN ON THE DRAWINGS AND SPECIFIED IN THE SPECIFICATIONS, THE CONTRACTOR SHALL PROVIDE ALL MATERIAL, LABOR, AND SUPERVISION, INCLUDING PAYMENT OF ALL FEES, REQUIRED BY THE UTILITY COMPANY FOR PROVIDING PLACEMENT OF THE TRANSFORMERS, PRIMARY DISTRIBUTION OF THE TRANSFORMERS, METERING AND EQUIPMENT AND CONNECTION REQUIRED TO TIE INTO THE MAIN DISTRIBUTION BOARDS. COORDINATION WITH THE UTILITY COMPANY SHALL INCLUDE THE NECESSARY UPGRADING OF THE PRIMARY DISTRIBUTION SYSTEM TO MEET THE ELECTRICAL DEMAND OF THE EXISTING WELL PUMP AND WELL HOUSE AND PROPOSED FUTURE NEEDS (NOT INCLUDED IN THIS PROJECT) TO

INCLUDE:

· NEW WELL HOUSE WITH 200 AMP SERVICE PANEL

· 40 CAMPSITES WITH 50/30/20 AMP RV PEDESTALS

· 2 HOST SITES WITH 50/30/20 AMP RV PEDESTALS

· A SEPTIC SYSTEM INCLUDING 2 - 230V SEWAGE PUMPS

8. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND NOT INTENDED TO SHOW EXACT ROUTING, OR ALL EQUIPMENT, DEVICES, CONNECTIONS, AND MATERIALS THAT ARE REQUIRED. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL ADDITIONAL EQUIPMENT, MATERIALS, AND LABOR NECESSARY TO COMPLETE THE ELECTRICAL SYSTEM AND MAKE IT FULLY OPERATIONAL IN ACCORDANCE WITH THE CONTRACT AND NATIONAL ELECTRIC CODE (NFPA 70) LATEST EDITION.

9. TRANSFORMER, METER/PANEL LOCATIONS, AND FEEDER CORRIDORS SHALL BE STAKED IN THE FIELD AND REVIEWED/APPROVED

BY THE COR PRIOR TO THE START OF ANY ELECTRICAL WORK.

10. ELECTRICAL WORK SHALL BE PERFORMED BY A MISSOURI LICENSED ELECTRICIAN OR APPRENTICES UNDER THE DIRECT SUPERVISION OF A MISSOURI LICENSED ELECTRICIAN. NO ELECTRICAL WORK SHALL BE PERFORMED ONSITE UNLESS A MISSOURI

LICENSED ELECTRICIAN IS ON SITE AND OVERSEEING THE WORK.

11. ANY DISTURBED AREAS SHALL BE RESEEDED ACCORDING TO SPECIFICATION SECTION 329200 - SEEDING AND MULCHING.

12. ALL BURIED ELECTRIC LINE SHALL BE PLACED IN CONDUIT. ELECTRIC LINE ALONG HWY DD TO BE DIRECTIONALLY DRILLED (APPROX.

9,600 LF). ELECTRIC LINE ALONG OLD ROAD CORRIDOR CAN BE DIRECTIONALLY DRILLED OR TRENCHED (APPROX. 3,100 LF).

CONTRACTOR TO INSTALL NEW 4/0 AWG Al 15kV URD PRIMARY ELECTRIC LINE IN 3"

HDPE OR SCHEDULE 40 PVC.

ELECTRIC LINE AND PULL BOXES SHALL BE

INSTALLED ALONG THE EDGE OF THE

CLEARED RIGHT-OF-WAY.

AutoCAD SHX Text W

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text

GROUND SURFACE

PROVIDE PITLESS UNIT

PROVIDE LOCKABLE,

WATERTIGHT CAP WITH

SCREENED AIR VENT;

MONITOR BRAND OR

APPROVED EQUAL.

ADJUSTING ROD FOR PITLESS

PULL COUPLING

SCH 40 PVC CONDUIT THREADED

INTO WELL CAP AND PLUGGED WITH

PLUMBERS PUTTY AROUND WIRES

CHECK VALVES & TORQUE

ARRESTORS TO BE PLACED

EVERY 200' STARTING

ABOVE THE PUMP

1.5" DIA SCH 40 GIP DROP PIPE

TO THE WELL HOUSE

WELL & SUBMERSIBLE PUMP DETAIL

NTS

NEW 5HP, SINGLE PHASE, 230 V PUMP

SET AT APPROXIMATELY 520'.

2' 1'

-6

SCH 40 PVC CONDUIT

AND PUMP WIRE TO THE

WELL HOUSE. BURY

DEPTH OF 18" MINIMUM.

" B

U R

Y D

EP

TH

O F

SU

PP

LY

L

IN

E

FR

O

M

PI

TL

ES

S

AD

AP

TE

R

PUMP WIRING

W

EL

L D

EP

TH

1.5" PUMP CONNECTION TO

SCH 40 GIP DROP PIPE

FINISHED GRADE

4 " TOP SOIL

BACKFILL

MARKER TAPE WITH WORDS

"CAUTION ELECTRIC LINE

BURIED BELOW"

6" M

IN

"M

IN

ELECTRICAL CONDUCTORS IN

NON-METALLIC CONDUIT

6"MIN.

GENERAL ELECTRICAL TRENCHING DETAIL (TYP.)

Cross Section View No Scale

GROUND

4" SAND BEDDING MATERIAL

BENEATH CONDUIT

TRENCHING NOTES:

1. FOR EXISTING ROADS AND CAMPING SPURS,

TRENCH CUTS WILL NOT BE PERMITTED. USE

DIRECTIONAL DRILLING OR OTHER METHODS

APPROVED BY COR.

2. CARE SHALL BE TAKEN WHEN BACKFILLING,

PLACING AND PULLING CONDUCTORS TO AVOID

DAMAGE AND COSTLY REPAIR COSTS DURING

MEGGER TESTING.

TYPICAL UTILITY PAD-MOUNT

TRANSFORMER 240V/120V

SECONDARY

UTILITY PRIMARY

CONDUCTORS

N G

GROUND BAR

NEUTRAL BAR TYPICAL PANEL OR ENCLOSED

BREAKER PER PLANS 240V/120V 1Ø

SYSTEM BONDING JUMPER

(NOT BONDED @ SUBPANELS)

NEAREST GROUNDING

ELECTRODE

FINISHED GRADE

NOTE: TYPICAL SERVICE GROUNDING/BONDING PER NEC

ARTICLE -250. ALL WIRE NOT INDICATED SHALL BE SIZED

PER NEC

GROUNDING/BONDING DETAIL

NTS

SEE ADJACENT DETAIL (GROUND ROD

INSTALLATION) FOR GROUNDING LOOP

AND OTHER GROUNDING RODS.

TYPICAL GROUNDING AT ELECTRICAL

DISTRIBUTION STRUCTURE

#2 AWG TO UTILITY METER (IF

REQUIRED BY UTILITY)

#2 AWG TO DISTRIBUTION

GROUND BUS

ELECTRICAL TYPICAL

DISTRIBUTION STRUCTURE

#2 AWG BARE COPPER

GROUND WIRE MIN 12" BELOW

FINISHED GRADE

4"Ø X 10FT LONG Cu WELD

GROUND ROD, EXOTHERMIC

CONNECTION TO GROUND

LOOP (TYP. FOR 4)

BOND TO REBAR IN

CONCRETE SLAB

IRON COVER

10"Ø CONCRETE

PIPE BODY

4" Ø X 10" GROUND ROD

LONG COPPER CLAD STEEL

GROUND ROD CLAMP

#2 CU GROUND

BUS

GROUND ROD INSTALLATION

NTS

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 6/2

6 1 5:

R

AC

HE

LU

ET

RE

CH

T C :\U

SE

RS

\R

AC

HE

LU

ET

RE

CH

T\

BO

X\

R0 9 M

T

BU

IL

DI

NG

SS

TR

UC

TU

RE

S\

BU

IL

DI

NG

SF

AC

IL

IT

IE

S\

CO

NT

RA

CT

S

- W

OR

KI

NG

F

IL

ES

\P

OT

FY

CO

UN

CI

L

BL

UF

F

PR

IM

AR

Y

EL

EC

TR

IC

A

ND

W

EL

L

IM

PR

OV

EM

EN

TS

\D

RA

W

IN

GS

A

ND

S

PE

CS

\C

BP

EW

I.D W

G;

(R09)

EASTERN NAME

COUNCIL BLUFF

ELECTRIC AND

WELL

IMPROVEMENTS

MARK TWAIN

NATIONAL FOREST

POTOSI-FREDERICKTOWN

RANGER DISTRICT

DETAILS

06/16/2026

R.UET

R.UET

A.WIL

C-02 003 003

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text

CBPEWI-COVERSHEET.pdf
Sheets and Views
COVERSHEET
OLE1
CBPEWI-C-01.pdf
Sheets and Views
C-01
OLE1
CBPEWI-C-02.pdf
Sheets and Views
C-02
OLE1

File details come from the government source that posted it. Updated .