2 CBPEWI_SOI.pdf
PDF 170 KB Posted
- Solicitation number
- 1240LT26Q0172
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items for a federal contract opportunity with the Mark Twain National Forest, Potosi-Fredericktown Ranger District for Council Bluff Primary Electric and Well Improvements. The project comprises five line items, each priced as a lump sum (LS) with a quantity of one unit.
The required work includes: (1) mobilization; (2) installation of an electrical system from an existing Ameren power pole to Council Bluff Wild Boar Ridge Campground, encompassing all cable, conduit, drilling, trenching, transformers, pull boxes, and related appurtenances; (3) well house transformer and service connection; (4) replacement of the existing well pump, drop pipe, drive box, pitless adaptor, and well cap, including pump testing and related appurtenances; and (5) water analysis testing. The PRICE column is blank, indicating that bidders are expected to submit pricing for each line item, with a total contract price to be calculated upon award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0001 Mobilization LS 1
Installation of electrical system from existing Ameren power pole to Council Bluff Wild Boar Ridge Campground (Includes all cable, conduit, drilling, trenching, transformers, pull boxes, and other related appurtenances)
LS 1
Well house transformer and service connection
LS 1
Replacement of existing well pump, drop pipe, drive box, pitless adaptor, and well cap (Includes pump testing and other related appurtenances)
LS 1
0005 Water analysis testing LS 1
TOTAL
SCHEDULE OF ITEMS
Mark Twain National Forest Potosi-Fredericktown Ranger District
Council Bluff Primary Electric and Well Improvements
ITEM
NUMBER
DESCRIPTION UNIT QTY PRICE