4-BidTabulationReport Untitled Pricing Sheet BT-10VQ 1788894196.6691542.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- IFB for HVAC Equipment Replacement
- Solicitation number
- DF26-31
- Issued by
- Tooele County, Utah
About this file
This is a Bid Tabulation Report for an Invitation for Bid (IFB) issued by Tooele County, Utah, for HVAC Equipment Replacement at The Peak Sports & Entertainment Complex. The project encompasses replacement of two rooftop HVAC units serving the Indoor Arena and one air-cooled chiller serving the Conference Center. Six contractors submitted bids for the base bid and alternate pricing: Air Systems, Air Temperature Solutions HVAC, Inc., BCS Mechanical, Commercial Mechanical Systems and Service, LLC, Johnson Controls Building Solutions LLC, and Rocky Mountain Mechanical. The IFB required sealed bids from qualified and licensed HVAC contractors, with pricing guaranteed for sixty days. The procurement was structured to result in a single firm-fixed-price award to the responsive and responsible vendor with the lowest bid.
The bid tabulation identifies two pricing components: a Base Bid (Item #0-1) and Alternate I (Item #0-2). Total costs for the base bid ranged from $60,675.00 to $156,168.45, while Alternate I costs ranged from $115,737.00 to $173,000.00. Johnson Controls Building Solutions LLC submitted the lowest base bid at $60,675.00, followed by Rocky Mountain Mechanical at $66,510.00. Two bidders submitted no bids for the base bid component. The tabulation does not specify award selection, funding sources, or contract term details within the visible data.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-DF26-31 Addendum 1.docx | DOCX document | |
| 2-DF26-31 The Peak HVAC Replacement.docx | DOCX document | |
| 1-Tooele County Service Contract.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| Air Systems | Air Temperature Solutions HVAC, Inc. | BCS Mechanical | Commercial Mechanical Systems and Service, LLC | Johnson Controls Building Solutions LLC | Rocky Mountain Mechanical | ||||
| Total Cost | $302,949.10 | $239,500.00 | $156,168.45 | $203,362.00 | $186,675.00 | $201,189.00 | |||
| # | Items | Quantity | |||||||
| Required | Unit | ||||||||
| Price | Total | ||||||||
| Cost | Unit | ||||||||
| Price | Total | ||||||||
| Cost | Unit | ||||||||
| Price | Total | ||||||||
| Cost | Unit | ||||||||
| Price | Total | ||||||||
| Cost | Unit | ||||||||
| Price | Total | ||||||||
| Cost | Unit | ||||||||
| Price | Total |
Cost
| No Basket: Totals | $0.00 | $239,500.00 | $0.00 | $203,362.00 | $186,675.00 | $201,189.00 | ||||||||
| #0-1 | Base Bid | 1 | No Bid | No Bid | $66,500.00 | $66,500.00 | No Bid | No Bid | $87,625.00 | $87,625.00 | $43,380.90 | $60,675.00 | $66,510.00 | $66,510.00 |
| #0-2 | Alternate I | 1 | No Bid | No Bid | $173,000.00 | $173,000.00 | No Bid | No Bid | $115,737.00 | $115,737.00 | $70,302.60 | $126,000.00 | $134,679.00 | $134,679.00 |