Summary of Bibb County School District Roofing Energy Project
This is a set of issued construction drawings for a roofing energy upgrade project by the Bibb County School District covering Skyview Elementary School and Howard Middle School & High School located at 5700 Fulton Mill Road, Lizella, Georgia. The project, identified as Phase 1B (Project No. 26BBEU21RF390), involves preparation and installation of new roof systems across three school facilities. The scope of work includes demolition and preparation of existing modified bitumen roof systems, installation of new mechanically fastened 2-inch polyisocyanurate insulation boards, and application of a new 60-mil white TPO (thermoplastic polyolefin) membrane system. Work also encompasses replacement of existing gutters, downspouts, and sheet metal flashings; removal and replacement of wet insulation; installation of new roof drains with tapered sumps; installation of overflow scuppers; and installation of new metal copings and penetration flashings. The drawings include detailed roof plans, wind uplift zone diagrams indicating pressures ranging from -10.6 psf to -38.5 psf based on ASCE 7-22 standards, tapered insulation plans, and comprehensive construction details for all roof penetrations and edge conditions. Design work must comply with current Georgia Building Code (IBC 2024 with Georgia amendments), IECC 2015 with Georgia supplements, and applicable ASTM standards.
The contractor is required to conduct an independent third-party infrared roof moisture survey per ASTM C1153-97 within 30 days after Notice to Proceed and verify findings using ASTM D7954/D7954M standards. All areas with trapped moisture must be marked and documented with PDF plans and written reports including photographs, with results distributed to Merik, Inc. design professionals. The contractor must verify existing field conditions, document existing conditions prior to work commencement, and notify the design professional via RFI of any errors, omissions, or discrepancies no less than 72 hours before bid submission. All materials must be new unless noted otherwise, and drawings are intended for 24x36 printing with actual dimensions verified in the field. All work shall comply with 2019 NFPA 241 for demolition operations, and construction submittals from contractors, subcontractors, and manufacturers must be submitted within three business days of third-party site visits in Adobe PDF format. The project involves wind uplift zone analysis across multiple roof sections with varying heights (15 feet to 25 feet) and requires confirmation that roof securement patterns meet specified wind uplift values for new roof materials only.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MERIK, INC.
BUILDING CONSTRUCTION CONSULTANTS
MERIK PROJECT NO. 26BBEU21RF390
04/13/26 - ISSUED DRAWINGS
BIBB BOE ENERGY UPGRADE
5700 FULTON MILL ROAD, LIZELLA, GA 31052
SKYVIEW ES/ HOWARD MS & HS - PHASE IB
INDEX OF DRAWINGS
A000 COVER SHEET
A001 PROJECT INFORMATION
A002 KEY PLANS - HOWARD MS & HS
A100 ROOF PLAN - SKYVIEW ES
A101 ENLARGED PLAN - HOWARD MS
A102 ENLARGED PLAN - HOWARD HS
A103 ENLARGED PLAN - HOWARD HS
A150 WIND UPLIFT PLAN - SKYVIEW ES
A151 WIND UPLIFT PLAN - HOWARD MS
A152 WIND UPLIFT PLAN - HOWARD HS
A153 WIND UPLIFT PLAN - HOWARD HS
A200 TAPERED ROOF PLAN - SKYVIEW ES
A201 TAPERED ROOF PLAN - HOWARD MS
A202 TAPERED ROOF PLAN - HOWARD HS
A203 TAPERED ROOF PLAN - HOWARD HS
A250 WET INSULATION PLAN - SKYVIEW ES
A300 DETAILS - MISC.
A301 DETAILS - PERIMETER & DRAINAGE
A302 DETAILS - PERIMETER & DRAINAGE
A303 DETAILS - PENETRATIONS
A304 DETAILS - MISC
VICINITY MAP - SKYVIEW ES
PROJECT LOCATIONGENERAL NOTES:
SYMBOLS:
ENLARGED PLAN OR
DETAIL MARKER
OPP = OPPOSITE HAND
TYP = TYPICAL SECTION
SIM = SIMILAR TO
DRAWING TITLE
ELEVATION MARKER
OPP = OPPOSITE HAND
TYP = TYPICAL SECTION
SIM = SIMILAR TO
SECTION MARKER
OPP = OPPOSITE HAND
TYP = TYPICAL SECTION
SIM = SIMILAR TO
REVISION CLOUD WITH REVISION
NUMBER
DETAIL MARKER
OPP = OPPOSITE HAND
TYP = TYPICAL SECTION
SIM = SIMILAR TO
APPLICABLE CODES AND STANDARDS
WORK SHALL BE IN ACCORDANCE WITH THE CURRENT BUILDING CODE FOR THE
STATE OF GEORGIA, INCLUDING LOCAL AMENDMENTS. THE PUBLICATIONS LISTED
BELOW ARE THE GOVERNING CODES AND STANDARDS AND ARE REFERENCED BY THE
BASIC DESIGNATION. IN THE CASE OF CONFLICTING REQUIREMENTS THE BUILDING
CODE (IBC) SHALL GOVERN.
IBC INTERNATIONAL BUILDING CODE, 2024 WITH GEORGIA AMENDMENTS (2026)
IECC INTERNATIONAL ENERGY CONSERVATION CODE, 2015
WITH GEORGIA SUPPLEMENTS AND AMENDMENTS (2020, 2022, 2023)
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
ASTM ASTM INTERNATIONAL
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
SMACNA SHEET METAL & AIR CONDITIONER CONTRACTOR'S NATIONAL
ASSOCIATION
NRCA NATIONAL ROOFING CONTRACTORS ASSOCIATION
ALL DEMOLITION WORK SHALL COMPLY WITH THE REQUIREMENTS OF 2019 NFPA 241,
"STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION
OPERATIONS".
G000
SCALE
TITLEX
1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE DESIGN
PROFESSIONAL VIA RFI OF ANY ERRORS, OMISSIONS, INCONSISTENCIES,
DISCREPANCIES, AND CONFLICTS WITHIN THE DRAWINGS AND
SPECIFICATIONS AND FIELD CONDITIONS NO LESS THAN 72 HOURS
BEFORE THE BID IS DUE.
2. CONTRACTOR IS TO VERIFY LAYOUT AND DIMENSIONS AND ALL
CONDITIONS IN THE FIELD WHICH MAY AFFECT THEIR BID.
3. THE CONTRACTOR AND SUBCONTRACTORS SHALL BE REQUIRED TO VISIT
THE PREMISES TO INSPECT EXISTING CONDITIONS, BECOME FAMILIAR
WITH LOCAL CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED
AND CORRELATE OBSERVATIONS WITH REQUIREMENTS OF THE DRAWINGS
AND SPECIFICATIONS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TAKING ADEQUATE
PRECAUTIONS TO PROTECT THE BUILDING OCCUPANTS, MATERIALS AND
EXISTING PROPERTY AND FINISHES. EXISTING-TO-REMAIN CONSTRUCTION,
MATERIALS OR EQUIPMENT DAMAGED BY THE CONTRACTOR SHALL BE
RESTORED TO ORIGINAL CONDITION. CONTRACTOR TO DOCUMENT
EXISTING CONDITIONS PRIOR TO THE START OF WORK AND SUBMIT
RECORDS TO OWNER'S REPRESENTATIVE.
5. DRAWINGS ARE INTENDED TO BE PRINTED AT 24x36.
6. ALL MATERIALS TO BE NEW UNLESS NOTED OTHERWISE.
7. DO NOT SCALE DRAWINGS - VERIFY ALL DIMENSIONS IN FIELD.
ABBREVIATIONS:
A
AB ANCHOR BOLT
ABV ABOVE
ADD ADDENDUM
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
ANG ANGLE
APX APPROXIMATELY
ASP ASPHALT
ASPS ASPHALT SHINGLE
AWB AIR AND WATER
RESISTIVE BARRIER
B
BD BOARD
BEL BELOW
BIT BITUMINOUS
BLDG BUILDING
BL BUILDING LINE
BLKG BLOCKING
BM BEAM
B.M. BENCHMARK
BOT BOTTOM
BPL BEARING PLATE
BTJT BUTT JOINT
BUR BUILT-UP ROOFING
BW BOTH WAYS
C
CBD CEMENTITIOUS BOARD
CF CUBIC FOOT
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTER LINE
CMU CONCRETE MASONRY UNIT
CO CLEAN-OUT
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CT CERAMIC TILE
CY CUBIC YARD
D
DIA DIAMETER
DIM DIMENSION
DN DIAMETER NOMINAL
DS DOWNSPOUT
DWG DRAWING
DWG(S) DRAWING/S
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
EQ EQUAL
EQUIP EQUIPMENT
EW EACH WAY
F
FL FLOOR LEVEL
FTG FOOTING
G
GALV GALVANIZED
H
HOR HORIZONTAL
I
ID INSIDE DIAMETER
IE INVERT ELEVATION
IL INVERT LEVEL
IO INSPECTION OPENING
IP INTERSECTION POINT
J
JT JOINT
K
K.J. KEY JOINT
L
LWC LIGHTWEIGHT
INSULATING
CONCRETE
M
MAX MAXIMUM
MFGR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
N
N.I.C. NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
O
OC ON CENTER
OD OUTSIDE DIAMETER
OPT OPTIONAL
OPP OPPOSITE HAND
P
PL PLATE
PLYWD PLYWOOD
PT PRESSURE TTREATED
Q
QTY QUANTITY
R
R RADIUS
RCP REFLECTED CEILING PLAN
REF REFERENCE
REQ'D REQUIRED
REV REVISION
RH RIGHT HAND
S
SAF SELF-ADHERING FLASHING
SIM SIMILAR
SPUF SPRAYED POLYURETHANE FOAM
SQ SQUARE
SS STAINLESS STEEL
SSM STANDING SEAM METAL
STD STANDARD
T
THK THICK
TI TASK ITEM
TO TOP OF
TS TUBE STEEL
TYP TYPICAL
U
U/S UNDER SIDE
UNO UNLESS NOTED OTHERWISE
V
VERT VERTICAL
V.I.F. VERIFY IN FIELD
W
WP WATER PROOF
WRB WEATHER RESISTIVE BARRIER
SPECIAL CHARACTERS
° = DEGREES
Ø = DIAMETER
# = NUMBER
6400 & 6600 FORSYTH ROAD, MACON, GA 31210
VICINITY MAP - HOWARD MS & HS
PROJECT LOCATION -
HOWARD MS
PROJECT LOCATION -
HOWARD HS
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26BBEU21RF390
Issues:
Drawn: TRM/ Approved: MB
SK
YV
IE
W
E S/
H
OW
AR
D
M S
HS
PH
AS
E
IB
BI
BB
B
OE
E
NE
RG
Y
UP
GR
AD
E
F
UL
TO
N M
IL
L
RO
AD
, L
IZ
EL
LA
, G A
04/13/2026 Issued Drawings
FO
RS
YT
H
RO
AD
, M
AC
ON
, G
A
AutoCAD SHX Text
NORTH
AutoCAD SHX Text A300
AutoCAD SHX Text
AutoCAD SHX Text A300
AutoCAD SHX Text
AutoCAD SHX Text A300
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
CLASS S
CLASS M
CLASS N
DRESSING ROOMS
GYM
OPEN TO BELOW
CAREER E CAREER W
GYM
DRESSING
GYM CONN.
MAIN
ENTRANCE 1
EN
TR
AN
C
E
ROOM
MIDDLE SCHOOL
HIGH SCHOOL
KITCHEN
DINING
OFFICE LOWER S
OFFICE
CLASS CONNECTOR
OFFICE
FIELD HOUSE
LOWER S
ROOM
GYM LOW
HALLWAY
(N.I.C.)
(N.I.C.)
(N.I.C.)
(N.I.C.)
(N.I.C.)
(N.I.C.)
(N .I.
C
(N.I.C.)
(N.I.C.)
(N.I.C.) (N.I.C.)
(N.I.C.)
(N.I.C.)
CLASS
(N.I.C.)
A001
PROJECT NOTES:
1. Extent of Work Includes:
SOW-BIBB BOE ENERGY UPGRADE PHASE 1B 26BBEU20RF390
Skyview ES and Howard MS/HS
The scope of work below includes preparation of the existing modified bitumen roof system to receive a new recover roof system. A preliminary IR scan, per ASTM C1153, has been conducted by a third party and results are included in the drawings. An IR scan per ASTM C1153 and verification per ASTM D7954/D7954M shall be conducted as described below. Any wet insulation shall be replaced with new insulation board in a thickness that matches the existing roof system thicknesses. A new mechanically fastened, white, 60-mil TPO roof membrane system is to be installed over new adhered tapered insulation over a 2” thick mechanically fastened polyiso board over the existing sloped roof system.
Demolition
1. Prepare the existing modified bitumen roofs to receive new insulation board and TPO membrane.
2. Slit open membrane blisters and flatten. Vent membrane as required by the new roofing manufacturer.
3. Cut out existing cant strips and secure membrane to receive new perimeter blocking.
4. Remove areas of wet insulation until dry insulation is reached. Prior to filling areas where insulation was removed, examine the metal deck, remove any corrosion with a wire brush and spray galvanizing paint on the brushed area. Fill opening with new insulation board to match the existing roof adjacent roof height.
5. Remove the existing sheet metal perimeter and penetration flashing materials, gutters, downspouts, etc.
6. Coordinate with Bibb County Schools on removal of existing abandoned mechanical equipment, piping, and conduit.
7. Remove existing expansion joints, flashings, carpentry, sheet metal, base flashings, and related existing roof accessories as needed to install the new roof system.
Carpentry
1. Install new roof edge nailers at all gutter and rake edges to the height of the new roof assembly that receive new perimeter metals.
Install tapered edge strips to transition 2x nailers to 2” polyiso insulation board thickness.
2. Install new plywood sheathing and wood nailers at all parapet walls and roof dividing walls to receive new roofing and sheet metal coping.
3. Install new plywood sheathing at all base flashings to receive new roofing and perimeter sheet metal flashings.
4. Install new wood blocking or nailers as necessary at expansion joints, curbs, and sleepers to raise them to 8-inches minimum above new roof surfaces.
Roof Insulation, Cover Board, and Membrane Installation
1. The roof deck and structure slope.
2. Install new mechanically fastened 2” flat stock polyisocyanurate insulation over the existing prepared roof system.
3. Install tapered edge strips at roof perimeters with edge metals and/or gutters to transition the 2” polyiso board down to new 2x wood edge nailers.
4. Install new tapered crickets between primary scuppers, at areas shown on drawings, and at curbs wider than 30”.
5. Install tapered insulation sumps at the existing High School Dressing Room primary roof drainage scuppers.
6. Install new overflow scuppers at the High School Dressing Room roof.
7. Install new mechanically fastened 60-mil TPO roof membrane.
8. Install new TPO membrane flashings at base flashings, gutter edges, equipment sleeper curbs, equipment curbs, expansion joints.
9. Install new TPO clad metal scupper sleeves and drip edges.
10. Install walkway protection pads at rooftop equipment and at the base of the ladders, roof hatch access doors, and in high traffic areas.
11. Install pillow and pipe supports at gas lines and condensate lines.
12. At Skyview Elementary, run downspouts from Gym to closest gutters on lower roofs.
Flashing and Sheet Metal
1. Install new Kynar coated galvanized steel perimeter and penetration sheet metal flashing, counterflashing materials, including edge metals, expansion joints, fascia at perimeters, and two-piece reglet flashings at masonry walls. Match existing sizes and colors. Install stainless steel expansion joint flashings where indicated on the drawings at Skyview Elementary School.
2. Install new Kynar coated galvanized steel gutters, downspouts, and trim. Match existing sizes and colors.
3. Install new Kynar coated galvanized steel copings at all parapet walls. Match existing sizes and colors.
4. Install new TPO clad metal at through-wall scuppers, overflow scuppers, prefinished sheet metal trim, and closure accessories at parapets.
Miscellaneous
1. New sealants as shown on drawing details.
2. New flashings at all rooftop equipment curbs that are to be installed.
3. All construction submittals and field reports from Contractor, subcontractor, and manufacturers are due within three (3) business days of all third-party site visits. Format is to be in an Adobe PDF format. Deliver one (1) copy of any written third-party inspection report to Chuck Kilgore, ckilgore@merikinc.com.
4. IR Roof Scan: The Contractor is to conduct their own independent third-party roof moisture survey within 30 days after Notice to Proceed. The roof moisture survey shall per ASTM C1153-97, “Standard Practice for Location of Wet Insulation in Roofing Systems Using Infrared Imaging” and verify this survey using ASTM D7954/D7954M, “Standard Practice for Moisture Surveying of Roofing and Waterproofing Systems Using Non-Destructive Electrical Impedance Scanners”. Evaluate all roofs in the scope of work. Mark, with spray paint, areas determined to have indications of trapped moisture on the roof surface. Provide a PDF plan that documents the actual extent and locations of these areas. Provide a written report with photos that documents the locations and extent of moisture. Test result reports are to be copied to Merik, Inc.
employees: Michael Baker, AIA, RRC, mbaker@merikinc.com, Jody Usry, jusry@merikinc.com and Chuck Kilgore, ckilgore@merikinc.com.
5. Wet Area Repairs: Remove existing membrane, insulation, base flashings, and base boards, down to the roof deck and outward until wet insulation is no longer present when evaluated by using a two-pronged moisture meter probe or other approved equipment.
Remove in rectangular areas that can accommodate new polyiso insulation board rectangular shapes. Review the metal roof deck and remove any corrosion by wire brush. Reprime and coat brushed area with a compatible galvanizing paint prior to installing new polyiso insulation board. Install, as loose fill, new polyiso insulation board in two layers in the opening. Flush insulation board out with adjacent roof membrane surface height. Seal any gaps over ¼” with roofing two-part foam urethane. Patch by lapping a modified bitumen cap sheet a minimum of 3” on all sides over the opening.
* SEE SPECIFICATIONS FOR FULL EXTENT OF WORK.
1. Existing structure to remain. Contractor to verify integrity of existing structure and notify owner if any of the proposed new work will adversely affect the existing structure.
2. Protect from damage existing finish work that is to remain in place.
If it becomes damaged during demolition promptly repair damage caused to facilities by demolition.
3. Conduct demolition operations and debris removal to ensure minimum interference with walks, roads, and occupied spaces, and adjacent facilities.
4. Contractor shall verify existing structure prior to submittal of bid and prior to any demolition operations.
5. Contractor to verify all conditions and elements prior to submitting bid.
6. DO NOT SCALE DRAWINGS - VERIFY ALL DIMENSIONS IN
FIELD
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26BBEU21RF390
Issues:
Drawn: TRM/ Approved: MB
SK
YV
IE
W
E S/
H
OW
AR
D
M S
HS
PH
AS
E
IB
BI
BB
B
OE
E
NE
RG
Y
UP
GR
AD
E
F
UL
TO
N M
IL
L
RO
AD
, L
IZ
EL
LA
, G A
04/13/2026 Issued Drawings
FO
RS
YT
H
RO
AD
, M
AC
ON
, G
A
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
KEY PLAN - HOWARD MS & HS
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text A103
AutoCAD SHX Text
AutoCAD SHX Text A101
AutoCAD SHX Text
AutoCAD SHX Text A102
GYM
KITCHEN
CLASS NW
CLASS NE
MAIN
CLASS SW
CLASS SE
OPEN TO BELOW
RD
ENTRY
DS DSDS
DS DSDS
SALVAGE AND REUSE
FACTORY-FABRICATED
RAKE EDGES THAT
ARE NOT DAMAGED EF
V
DS
DS
DSDS DS
DSDS DS
EF
EF
EF
EF
EF
EF
EF
V
DS
DS
DS
DS
SALVAGE AND REUSE
FACTORY-FABRICATED
RAKE EDGES THAT
ARE NOT DAMAGED
EF
EF
V
DS
V
DS
DSDS DS
DS
DS
DS
EF
EF
V
DS
DS
DS
DS
DS
EF EF
EF
V
VV
EF
EF
EF
EF
V
VDS
DS
DS
DS
DS
DS
DS
DS
DS
DS
LADDER
DS
DS
DS
DSDS
DS
DS DS
DS
DS
SL
O
PE
SL
O
PE
RIDGE
RIDGE
SL
O
PE
SL
O
PE
SLOPESLOPE
SLOPESLOPE
R
ID
G
E
RIDGE
SL
O
PE
SL
O
PE
RIDGE
SL
O
PE
SL
O
PE
SLOPESLOPE
R
ID
G E
SLOPESLOPE
SLOPE SLOPE
OS
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EF
HS
EF
V
EF
DS
DS
DS
DS
EF
V V
V
V
EF
V
VV
V
V
HS HS
EF
CURB COVER W/ PIPE
PENETRATIONS
HS
R
ID
G E
V V
V
EF
PP
EF
EF
V
RH
R
ID
G E
CONDENSATE LINE
LEGEND
GAS LINE
CONDUIT
EF (2' SQ. CURB OR LESS)
EXHAUST FAN
V PLUMBING VENT
RD ROOF DRAIN WITH 4' SQ. SUMP
DS GUTTER & DOWNSPOUT
EQUIPMENT SUPPORT RAIL CURB
ROOF ACCESS HATCH
CONDUIT CONNECTION
WALKWAY PAD
V CURBED VENT
HS HOT STACK
EXPANSION JOINTEJ
PP PITCH PAN
RH
HS HOT STACK
A100DO NOT SCALE DRAWINGS - VERIFY
ALL DIMENSIONS IN FIELD
TYPICAL KEY NOTES:
1 Provide a new 60-mil, white, TPO membrane mechanically fastened over new adhered tapered insulation over a new mechanically fastened 2” polyiso board over an existing modified bitumen roof that is over a structurally sloped metal deck.
Provide new edge flashings. Provide a tapered edge strip along the roof edge to transition the new 2” insulation board down to a new 2x wood edge nailer along roof perimeters with edge flashing and/or gutters. See Detail 2/A302.
Remove areas of wet insulation outward until dry insulation is reached at locations shown on Sheet A250 & A251.
Examine the metal deck, remove any corrosion with a wire brush and spray galvanizing paint on the brushed area. Fill areas where insulation was removed with new insulation board to match the existing roof thickness.
Replace existing gutters with new Kynar coated 24 ga.
galvanized steel or aluminum gutters that match existing sizes and colors. See Detail 4/A302.
Replace existing downspouts with new Kynar coated 24
ga. galvanized steel or aluminum downspouts that match existing sizes and colors. Empty onto concrete splashblocks placed over protection membrane or tie into storm drainage connections where applicable.
Install new 16” wide x 6” high overflow scuppers. See Detail 2/A303.
Install new primary drainage scuppers that match existing sizes. Provide an 8' square sump centered on the scupper with ½” slope to transition from new 2” polyiso board to existing scupper opening lip. Reuse existing collector boxes and downspouts. See Detail 1/A303.
Raise existing curbs to 8" above finished roof as needed.
Provide new metal rail caps at existing curb supports. See Detail 3/A305.
Provide new vent pipe penetrations that are a minimum of 8” above finished roof surface. Provide pipe extensions as needed. See Detail 2/A304.
Provide new expansion joints with sawcut reglet at masonry. See Detail 6/A302.
Temporarily displace conduit as needed to install new wall flashings.
Provide new stepped counterflashings that are a minimum of 8” above finished roof surface. Use sawcut reglets with sealant at face brick masonry. Cap ends of counterflashings. Do not cover weepholes. See Detail 3/A302.
Provide new parapet coping cap to wall transition flashings.
See Detail 3/A301.
Provide new parapet wall flashing and metal coping caps.
Terminate membrane at ends of walls with a clad metal closure and sealant. See Detail 1/A302 & 2/A301.
Provide pipe pillow or roller supports at condensate and gas lines. See Detail 1 & 2/A305.
Prepare, prime, and paint exposed metal at roof hatch.
Prepare, prime, and paint ferrous metal gas lines, exposed metal, and piping.
Replace damaged condensate lines and route lines to the nearest roof drainage location (gutter or primary scupper).
Relocate A/C unit and cut-off switch to avoid interference with new counterflashing/expansion joint flashings.
Expansion joint flashing is to terminate at bottom of louver (Rutland MS Dressing to Gym wall).
At Elementary School Gym walls where wings run into Gym walls, route downspouts across the roof and to closest gutter, run a downspout down to grade and empty on a concrete splashblock.
Provide a new drain bowl, clamping ring, bolts, and cast iron strainer. See Detail 3/A303.
TYP.
TYP.
TYP.
TYP.
TYP.
16 18
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
1 3
TYP.
1 3
TYP.
TYP.
TYP.
TYP.
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26BBEU21RF390
Issues:
Drawn: TRM/ Approved: MB
SK
YV
IE
W
E S/
H
OW
AR
D
M S
HS
PH
AS
E
IB
BI
BB
B
OE
E
NE
RG
Y
UP
GR
AD
E
F
UL
TO
N M
IL
L
RO
AD
, L
IZ
EL
LA
, G A
04/13/2026 Issued Drawings
FO
RS
YT
H
RO
AD
, M
AC
ON
, G
A
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
OVERALL ROOF PLAN
AutoCAD SHX Text
SCALE: 1/16" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text
SIM.
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text
SIM.
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
DRESSING
GYM CONN.
ROOM
GYM LOW
(N.I.C.)
DS
DS
DS
DS
EJ DS
DS
DS
EJ
EF
EF
V
DS DS DS DS
TEMPORARILY DISPLACE
DOWNSPOUTS AS NEEDED AND
REPLACE TO AVOID WARRANTY
ISSUES FOR STANDING SEAM ROOFS
EJ
DSDSDS
DSDSDS
EF
V
V
V
OUTLINE OF OVERHEAD
DUCTWORK, TYP.
(N.I.C.)
SLOPE
SLOPESLOPE
R
ID
G E
SL
O
PE
RIDGE
EJ
EJ
SL
O
PE
SLOPE
SLOPE
SL
O
PE
SL
O
PE
RH
CONDENSATE LINE
LEGEND
GAS LINE
CONDUIT
EF (2' SQ. CURB OR LESS)
EXHAUST FAN
V PLUMBING VENT
RD ROOF DRAIN WITH 4' SQ. SUMP
DS GUTTER & DOWNSPOUT
EQUIPMENT SUPPORT RAIL CURB
ROOF ACCESS HATCH
CONDUIT CONNECTION
WALKWAY PAD
V CURBED VENT
HS HOT STACK
EXPANSION JOINTEJ
PP PITCH PAN
RH
HS HOT STACK
A101
DO NOT SCALE DRAWINGS - VERIFY
ALL DIMENSIONS IN FIELD
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
16 18
TYP.
NOTE: FIELD VERIFY ROOF SLOPES
KEY NOTES:
1 Provide a new 60-mil, white, TPO membrane mechanically fastened over new adhered tapered insulation over a new mechanically fastened 2” polyiso board over an existing modified bitumen roof that is over a structurally sloped metal deck.
Provide new edge flashings. Provide a tapered edge strip along the roof edge to transition the new 2” insulation board down to a new 2x wood edge nailer along roof perimeters with edge flashing and/or gutters. See Detail 2/A302.
Remove areas of wet insulation outward until dry insulation is reached at locations shown on Sheet A250 & A251.
Examine the metal deck, remove any corrosion with a wire brush and spray galvanizing paint on the brushed area. Fill areas where insulation was removed with new insulation board to match the existing roof thickness.
Replace existing gutters with new Kynar coated 24 ga.
galvanized steel or aluminum gutters that match existing sizes and colors. See Detail 4/A302.
Replace existing downspouts with new Kynar coated 24
ga. galvanized steel or aluminum downspouts that match existing sizes and colors. Empty onto concrete splashblocks placed over protection membrane or tie into storm drainage connections where applicable.
Install new 16” wide x 6” high overflow scuppers. See Detail 2/A303.
Install new primary drainage scuppers that match existing sizes. Provide an 8' square sump centered on the scupper with ½” slope to transition from new 2” polyiso board to existing scupper opening lip. Reuse existing collector boxes and downspouts. See Detail 1/A303.
Raise existing curbs to 8" above finished roof as needed.
Provide new metal rail caps at existing curb supports. See Detail 3/A305.
Provide new vent pipe penetrations that are a minimum of 8” above finished roof surface. Provide pipe extensions as needed. See Detail 2/A304.
Provide new expansion joints with sawcut reglet at masonry. See Detail 6/A302.
Temporarily displace conduit as needed to install new wall flashings.
Provide new stepped counterflashings that are a minimum of 8” above finished roof surface. Use sawcut reglets with sealant at face brick masonry. Cap ends of counterflashings. Do not cover weepholes. See Detail 3/A302.
Provide new parapet coping cap to wall transition flashings.
See Detail 3/A301.
Provide new parapet wall flashing and metal coping caps.
Terminate membrane at ends of walls with a clad metal closure and sealant. See Detail 1/A302 & 2/A301.
Provide pipe pillow or roller supports at condensate and gas lines. See Detail 1 & 2/A305.
Prepare, prime, and paint exposed metal at roof hatch.
Prepare, prime, and paint ferrous metal gas lines, exposed metal, and piping.
Replace damaged condensate lines and route lines to the nearest roof drainage location (gutter or primary scupper).
Relocate A/C unit and cut-off switch to avoid interference with new counterflashing/expansion joint flashings.
Expansion joint flashing is to terminate at bottom of louver (Rutland MS Dressing to Gym wall).
At Elementary School Gym walls where wings run into Gym walls, route downspouts across the roof and to closest gutter, run a downspout down to grade and empty on a concrete splashblock.
Provide a new drain bowl, clamping ring, bolts, and cast iron strainer. See Detail 3/A303.
TYP.
TYP.
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26BBEU21RF390
Issues:
Drawn: TRM/ Approved: MB
SK
YV
IE
W
E S/
H
OW
AR
D
M S
HS
PH
AS
E
IB
BI
BB
B
OE
E
NE
RG
Y
UP
GR
AD
E
F
UL
TO
N M
IL
L
RO
AD
, L
IZ
EL
LA
, G A
04/13/2026 Issued Drawings
FO
RS
YT
H
RO
AD
, M
AC
ON
, G
A
AutoCAD SHX Text
PARTIAL ENLARGED ROOF PLAN - HOWARD MS
AutoCAD SHX Text
SCALE: 3/32" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A304
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text A302
AutoCAD SHX Text
BELOW
OFFICE LOWER S
EJ
(N.I.C.)
(N.I.C.)
(N.I.C.)
DSDS
DS
EF
V
EF
DS
DS
EJ
DS
DS
DS
EF
V
V
PP
V
V
V
V
V
V
EF
EF
EF
EF
EF
V
V
DS
DS
EF
V
V
V
DS
DS
DS
TEMPORARILY DISPLACE
DOWNSPOUTS AS NEEDED AND
REPLACE TO AVOID WARRANTY
ISSUES FOR STANDING SEAM ROOFS
DS
DS
DS
V
V
V
V V
V
DS
DS DS DS
DS
DS
RELOCATE CUT-OFF SWITCH
AND CONDUITS ON WALL TO
MISS WALL COUNTERFLASHING
PTAC
SLOPER
ID
G E
SLOPE
SL
O
PE
SL
O
PE
RIDGE
SLOPE
SLOPE
R
ID
G E
SLOPE SLOPE
SLOPE
SL
O
PE
EJ
EJ
EJ
RH
EJ
EJEJ
CONDENSATE LINE
LEGEND
GAS LINE
CONDUIT
EF (2' SQ. CURB OR LESS)
EXHAUST FAN
V PLUMBING VENT
RD ROOF DRAIN WITH 4' SQ. SUMP
DS GUTTER & DOWNSPOUT
EQUIPMENT SUPPORT RAIL CURB
ROOF ACCESS HATCH
CONDUIT CONNECTION
WALKWAY PAD
V CURBED VENT
HS HOT STACK
EXPANSION JOINTEJ
PP PITCH PAN
RH
HS HOT STACK
A102
DO NOT SCALE DRAWINGS - VERIFY
ALL DIMENSIONS IN FIELD
KEY NOTES:
1 Provide a new 60-mil, white, TPO membrane mechanically fastened over new adhered tapered insulation over a new mechanically fastened 2” polyiso board over an existing modified bitumen roof that is over a structurally sloped metal deck.
Provide new edge flashings. Provide a tapered edge strip along the roof edge to transition the new 2” insulation board down to a new 2x wood edge nailer along roof perimeters with edge flashing and/or gutters. See Detail 2/A302.
Remove areas of wet insulation outward until dry insulation is reached at locations shown on Sheet A250 & A251.
Examine the metal deck, remove any corrosion with a wire brush and spray galvanizing paint on the brushed area. Fill areas where insulation was removed with new insulation board to match the existing roof thickness.
Replace existing gutters with new Kynar coated 24 ga.
galvanized steel or aluminum gutters that match existing sizes and colors. See Detail 4/A302.
Replace existing downspouts with new Kynar coated 24
ga. galvanized steel or aluminum downspouts that match existing sizes and colors. Empty onto concrete splashblocks placed over protection membrane or tie into storm drainage connections where applicable.
Install new 16” wide x 6” high overflow scuppers. See Detail 2/A303.
Install new primary drainage scuppers that match existing sizes. Provide an 8' square sump centered on the scupper with ½” slope to transition from new 2” polyiso board to existing scupper opening lip. Reuse existing collector boxes and downspouts. See Detail 1/A303.
Raise existing curbs to 8" above finished roof as needed.
Provide new metal rail caps at existing curb supports. See Detail 3/A305.
Provide new vent pipe penetrations that are a minimum of 8” above finished roof surface. Provide pipe extensions as needed. See Detail 2/A304.
Provide new expansion joints with sawcut reglet at masonry. See Detail 6/A302.
Temporarily displace conduit as needed to install new wall flashings.
Provide new stepped counterflashings that are a minimum of 8” above finished roof surface. Use sawcut reglets with sealant at face brick masonry. Cap ends of counterflashings. Do not cover weepholes. See Detail 3/A302.
Provide new parapet coping cap to wall transition flashings.
See Detail 3/A301.
Provide new parapet wall flashing and metal coping caps.
Terminate membrane at ends of walls with a clad metal closure and sealant. See Detail 1/A302 & 2/A301.
Provide pipe pillow or roller supports at condensate and gas lines. See Detail 1 & 2/A305.
Prepare, prime, and paint exposed metal at roof hatch.
Prepare, prime, and paint ferrous metal gas lines, exposed metal, and piping.
Replace damaged condensate lines and route lines to the nearest roof drainage location (gutter or primary scupper).
Relocate A/C unit and cut-off switch to avoid interference with new counterflashing/expansion joint flashings.
Expansion joint flashing is to terminate at bottom of louver (Rutland MS Dressing to Gym wall).
At Elementary School Gym walls where wings run into Gym walls, route downspouts across the roof and to closest gutter, run a downspout down to grade and empty on a concrete splashblock.
Provide a new drain bowl, clamping ring, bolts, and cast iron strainer. See Detail 3/A303.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
NOTE: FIELD VERIFY
ROOF SLOPES
BELOW
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26BBEU21RF390
Issues:
Drawn: TRM/ Approved: MB
SK
YV
IE
W
E S/
H
OW
AR
D
M S
HS
PH
AS
E
IB
BI
BB
B
OE
E
NE
RG
Y
UP
GR
AD
E
F
UL
TO
N M
IL
L
RO
AD
, L
IZ
EL
LA
, G A
04/13/2026 Issued Drawings
FO
RS
YT
H
RO
AD
, M
AC
ON
, G
A
AutoCAD SHX Text
PARTIAL ENLARGED ROOF PLAN - HOWARD HS
AutoCAD SHX Text
SCALE: 1/16" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text
BELOW
AutoCAD SHX Text A301
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
PROJECT
DRESSING ROOMS
OFFICE
LOWER S
EJ
EJ
(N.I.C.)
(N.I.C.)
(N.I.C.)
(N.I.C.)
(N.I.C.)
OPEN TO BELOW
DSDS
OPEN TO BELOW
DS DS
TEMPORARILY DISPLACE
DOWNSPOUTS AS NEEDED FROM
STANDING SEAM ROOF SYSTEM -
MAINTAIN WARRANTY COMPLIANCE.
DOWNSPOUTS WILL HAVE TO BE
SHORTENED DUE TO INCREASE IN
NEW ROOF HEIGHT AT THIS LOCATION
V
DSDSDSDS
V
V
EF
EF
EF EF
V
SC
OS
SC
OS
SC
OS
SC
OS
EF
V
SC
OS
SC
OS
V
OUTLINE OF OVERHEAD
DUCTWORK, TYP.
OUTLINE OF OVERHEAD
DUCTWORK, TYP.
SL
O
PE
SL
O
PE
SLOPE
SLOPE
SLOPE
CLASS
CONNECTOR
EJ
EJEJ
EJ
(N.I.C.)
EJ
EJ
EJ
EJ
EJ
EJ
DS
SLOPE
RH
CONDENSATE LINE
LEGEND
GAS LINE
CONDUIT
EF (2' SQ. CURB OR LESS)
EXHAUST FAN
V PLUMBING VENT
RD ROOF DRAIN WITH 4' SQ. SUMP
DS GUTTER & DOWNSPOUT
EQUIPMENT SUPPORT RAIL CURB
ROOF ACCESS HATCH
CONDUIT CONNECTION
WALKWAY PAD
V CURBED VENT
HS HOT STACK
EXPANSION JOINTEJ
PP PITCH PAN
RH
HS HOT STACK
A103
DO NOT SCALE DRAWINGS - VERIFY
ALL DIMENSIONS IN FIELD
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
NOTE: FIELD VERIFY ROOF SLOPES
TYPICAL KEY NOTES:
1 Provide a new 60-mil, white, TPO membrane mechanically fastened over new adhered tapered insulation over a new mechanically fastened 2” polyiso board over an existing modified bitumen roof that is over a structurally sloped metal deck.
Provide new edge flashings. Provide a tapered edge strip along the roof edge to transition the new 2” insulation board down to a new 2x wood edge nailer along roof perimeters with edge flashing and/or gutters. See Detail 2/A302.
Remove areas of wet insulation outward until dry insulation is reached at locations shown on Sheet A250 & A251.
Examine the metal deck, remove any corrosion with a wire brush and spray galvanizing paint on the brushed area. Fill areas where insulation was removed with new insulation board to match the existing roof thickness.
Replace existing gutters with new Kynar coated 24 ga.
galvanized steel or aluminum gutters that match existing sizes and colors. See Detail 4/A302.
Replace existing downspouts with new Kynar coated 24
ga. galvanized steel or aluminum downspouts that match existing sizes and colors. Empty onto concrete splashblocks placed over protection membrane or tie into storm drainage connections where applicable.
Install new 16” wide x 6” high overflow scuppers. See Detail 2/A303.
Install new primary drainage scuppers that match existing sizes. Provide an 8' square sump centered on the scupper with ½” slope to transition from new 2” polyiso board to existing scupper opening lip. Reuse existing collector boxes and downspouts. See Detail 1/A303.
Raise existing curbs to 8" above finished roof as needed.
Provide new metal rail caps at existing curb supports. See Detail 3/A305.
Provide new vent pipe penetrations that are a minimum of 8” above finished roof surface. Provide pipe extensions as needed. See Detail 2/A304.
Provide new expansion joints with sawcut reglet at masonry. See Detail 6/A302.
Temporarily displace conduit as needed to install new wall flashings.
Provide new stepped counterflashings that are a minimum of 8” above finished roof surface. Use sawcut reglets with sealant at face brick masonry. Cap ends of counterflashings. Do not cover weepholes. See Detail 3/A302.
Provide new parapet coping cap to wall transition flashings.
See Detail 3/A301.
Provide new parapet wall flashing and metal coping caps.
Terminate membrane at ends of walls with a clad metal closure and sealant. See Detail 1/A302 & 2/A301.
Provide pipe pillow or roller supports at condensate and gas lines. See Detail 1 & 2/A305.
Prepare, prime, and paint exposed metal at roof hatch.
Prepare, prime, and paint ferrous metal gas lines, exposed metal, and piping.
Replace damaged condensate lines and route lines to the nearest roof drainage location (gutter or primary scupper).
Relocate A/C unit and cut-off switch to avoid interference with new counterflashing/expansion joint flashings.
Expansion joint flashing is to terminate at bottom of louver (Rutland MS Dressing to Gym wall).
At Elementary School Gym walls where wings run into Gym walls, route downspouts across the roof and to closest gutter, run a downspout down to grade and empty on a concrete splashblock.
Provide a new drain bowl, clamping ring, bolts, and cast iron strainer. See Detail 3/A303.
11 11
TYP.
TYP.
TYP.
1 3
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26BBEU21RF390
Issues:
Drawn: TRM/ Approved: MB
SK
YV
IE
W
E S/
H
OW
AR
D
M S
HS
PH
AS
E
IB
BI
BB
B
OE
E
NE
RG
Y
UP
GR
AD
E
F
UL
TO
N M
IL
L
RO
AD
, L
IZ
EL
LA
, G A
04/13/2026 Issued Drawings
FO
RS
YT
H
RO
AD
, M
AC
ON
, G
A
AutoCAD SHX Text
PARTIAL ENLARGED ROOF PLAN - HOWARD HS
AutoCAD SHX Text
SCALE: 1/16" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A301
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A301
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
AutoCAD SHX Text
AutoCAD SHX Text A302
CLASS NW
CLASS NE
MAIN
CLASS SW
CLASS SE
OPEN TO BELOW
ENTRY
ZONE 3
ZONE 1
ZONE 2
ZONE 1'
(15' HIGH ROOF)
ZONE 3
ZONE 1
ZONE 2
ZONE 3
ZONE 3
ZONE 1
ZONE 2
ZONE 1'
(15' HIGH ROOF)
ZONE 1
ZONE 2
ZONE 3
ZONE 3
ZO
N
E
ZO
N
E
ZONE 3
ZONE 3 ZONE 3
ZO
N
E
ZO
N
E
(18' HIGH ROOF)
ZONE 1'ZONE 1'
ZONE 1
ZONE 2
ZONE 1'
ZONE 1'
ZONE 1'
ZONE 1
ZONE 2
ZONE 1'
(15' HIGH ROOF)
(15' HIGH ROOF)
ZONE 1
ZONE 2
ZONE 1'
ZONE 1
ZONE 2
ZONE 1'
ZONE 3ZONE 3
ZO
N
E
ZO
N
E
ZO
N
E
ZO
N
E
ZONE 1'
ZONE 3
ZONE 3ZONE 3
ZO
N
E
ZONE 3
(25' HIGH ROOF)
ZO
N
E
ZONE 3
ZONE 1
ZONE 2
ZONE 3 ZONE 3
ZONE 2
ZONE 1
ZONE 1' (18' HIGH ROOF)ZONE 3
ZONE 2
ZONE 3
ZONE 2
ZONE 2
ZONE 2
A150
The wind uplift forces are in accordance with the current ASCE 7-22 Standard and are used for the resistance of the designed roofing systems to resist these forces. The analysis of the structures to resist these forces is not included nor a part of this scope of work.
Wind pressures shown are allowable wind pressures and are to be used for the design of the roof assembly. These wind pressures are based on ultimate wind pressures reduced by a factor of 0.6 for wind and increased by a safety factor of 2.0.
Risk Category III Exposure Category B Basic Wind Speed = 115 mph
WIND UPLIFT ZONES AND PRESSURES
ZONE 1' -12.3 psf -10.6 psf
ZONE 1 -21.4 psf -18.5 psf
ZONE 2 -28.3 psf -24.4 psf
ZONE 3 -38.5 psf -33.3 psf
(pounds per square foot - psf)
Note: The basis-of-design is a recover reroof assembly.
The roof securement pattern shall be designed to meet the wind uplift values stated above for the new roof materials only. The Design Professional shall determine if enhancements to the existing roof material securement are needed.
GYM LOW ROOFS, MAIN, KITCHEN
(NO PARAPET) (NO PARAPET)
25' HEIGHT 15' HEIGHT
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26BBEU21RF390
Issues:
Drawn: TRM/ Approved: MB
SK
YV
IE
W
E S/
H
OW
AR
D
M S
HS
PH
AS
E
IB
BI
BB
B
OE
E
NE
RG
Y
UP
GR
AD
E
F
UL
TO
N M
IL
L
RO
AD
, L
IZ
EL
LA
, G A
04/13/2026 Issued Drawings
FO
RS
YT
H
RO
AD
, M
AC
ON
, G
A
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
10'-10" TYP.
AutoCAD SHX Text
10'-10" TYP.
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
15'-0" TYP.
AutoCAD SHX Text
15'-0" TYP.
AutoCAD SHX Text 15'-0"
AutoCAD SHX Text
10'-9" TYP.
AutoCAD SHX Text
10'-9" TYP.
AutoCAD SHX Text 10'-9"
AutoCAD SHX Text
10'-10" TYP.
AutoCAD SHX Text
WIND UPLIFT PLAN
AutoCAD SHX Text
SCALE: 1/16" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
ROOM
GYM LOW
(N.I.C.)
(N.I.C.)
ZONE 3
(15' HIGH ROOF)
ZO
N
E
ZONE 2
(15' HIGH ROOF)
ZONE 1
ZONE 2
ZONE 2
ZONE 3
(15' HIGH ROOF)
ZONE 2
ZONE 1
ZONE 1'
ZONE 1
ZONE 2
ZONE 3
ZONE 3
A151
The wind uplift forces are in accordance with the current ASCE 7-22 Standard and are used for the resistance of the designed roofing systems to resist these forces. The analysis of the structures to resist these forces is not included nor a part of this scope of work.
Wind pressures shown are allowable wind pressures and are to be used for the design of the roof assembly. These wind pressures are based on ultimate wind pressures reduced by a factor of 0.6 for wind and increased by a safety factor of 2.0.
Risk Category III Exposure Category B Basic Wind Speed = 115 mph
WIND UPLIFT ZONES AND PRESSURES
ZONE 1' -12.3 psf -10.6 psf
ZONE 1 -21.4 psf -18.5 psf
ZONE 2 -28.3 psf -24.4 psf
ZONE 3 -28.3 psf -33.3 psf
(pounds per square foot - psf)
Note: The basis-of-design is a recover reroof assembly.
The roof securement pattern shall be designed to meet the wind uplift values stated above for the new roof materials only. The Design Professional shall determine if enhancements to the existing roof material securement are needed.
DRESSING ROOM GYM CONN. & GYM LOW
(W/ PARAPET) (NO PARAPET)
25' HEIGHT 15' HEIGHT
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26BBEU21RF390
Issues:
Drawn: TRM/ Approved: MB
SK
YV
IE
W
E S/
H
OW
AR
D
M S
HS
PH
AS
E
IB
BI
BB
B
OE
E
NE
RG
Y
UP
GR
AD
E
F
UL
TO
N M
IL
L
RO
AD
, L
IZ
EL
LA
, G A
04/13/2026 Issued Drawings
FO
RS
YT
H
RO
AD
, M
AC
ON
, G
A
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
PARTIAL ENLARGED WIND UPLIFT PLAN - HOWARD MS
AutoCAD SHX Text
SCALE: 3/32" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
(N.I.C.)
(N.I.C.)
(N.I.C.)
ZONE 3
(15' HIGH ROOF) ZONE 2
ZONE 1'
ZONE 1
ZONE 3
ZONE 1ZONE 2
ZONE 2 ZONE 1 ZONE 1'
ZONE 3
ZONE 3
ZONE 3
ZONE 1'
(15' HIGH ROOF)
ZONE 2 ZONE 1
ZONE 1'
ZONE 2ZONE 1
A152
The wind uplift forces are in accordance with the current ASCE 7-22 Standard and are used for the resistance of the designed roofing systems to resist these forces. The analysis of the structures to resist these forces is not included nor a part of this scope of work.
Wind pressures shown are allowable wind pressures and are to be used for the design of the roof assembly. These wind pressures are based on ultimate wind pressures reduced by a factor of 0.6 for wind and increased by a safety factor of 2.0.
Risk Category III Exposure Category B Basic Wind Speed = 115 mph
WIND UPLIFT ZONES AND PRESSURES
ZONE 1' -10.6 psf
ZONE 1 -18.5 psf
ZONE 2 -24.4 psf
ZONE 3 -33.3 psf
(pounds per square foot - psf)
Note: The basis-of-design is a recover reroof assembly.
The roof securement pattern shall be designed to meet the wind uplift values stated above for the new roof materials only. The Design Professional shall determine if enhancements to the existing roof material securement are needed.
KITCHEN, OFFICE - LOWER S
(NO PARAPET)
15' HEIGHT
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26BBEU21RF390
Issues:
Drawn: TRM/ Approved: MB
SK
YV
IE
W
E S/
H
OW
AR
D
M S
HS
PH
AS
E
IB
BI
BB
B
OE
E
NE
RG
Y
UP
GR
AD
E
F
UL
TO
N M
IL
L
RO
AD
, L
IZ
EL
LA
, G A
04/13/2026 Issued Drawings
FO
RS
YT
H
RO
AD
, M
AC
ON
, G
A
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
PARTIAL ENLARGED WIND UPLIFT PLAN - HOWARD HS
AutoCAD SHX Text
SCALE: 1/16" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
LOWER S
(N.I.C.)
(N.I.C.)
(N.I.C.)
(N.I.C.)
(N.I.C.)
OPEN TO BELOW OPEN TO BELOW
ZONE 3
(15' HIGH ROOF)
ZONE 1'
ZONE 2
ZONE 1
ZONE 2
ZONE 1
ZONE 3
(15' HIGH ROOF)
ZONE 1'
ZONE 1'
ZONE 2
ZONE 2
ZONE 1
CLASS
CONNECTOR
(N.I.C.)
ZONE 1'
ZO
N
E
ZO
N
E
A153
The wind uplift forces are in accordance with the current ASCE 7-22 Standard and are used for the resistance of the designed roofing systems to resist these forces. The analysis of the structures to resist these forces is not included nor a part of this scope of work.
Wind pressures shown are allowable wind pressures and are to be used for the design of the roof assembly. These wind pressures are based on ultimate wind pressures reduced by a factor of 0.6 for wind and increased by a safety factor of 2.0.
Risk Category III Exposure Category B Basic Wind Speed = 115 mph
WIND UPLIFT ZONES AND PRESSURES
ZONE 1' -10.6 psf
ZONE 1 -18.5 psf
ZONE 2 -24.4 psf
ZONE 3 -33.3 psf
(pounds per square foot - psf)
Note: The basis-of-design is a recover reroof assembly.
The roof securement pattern shall be designed to meet the wind uplift values stated above for the new roof materials only. The Design Professional shall determine if enhancements to the existing roof material securement are needed.
DRESSING ROOM, OFFICE LOWER S
(NO PARAPET)
15' HEIGHT
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26BBEU21RF390
Issues:
Drawn: TRM/ Approved: MB
SK
YV
IE
W
E S/
H
OW
AR
D
M S
HS
PH
AS
E
IB
BI
BB
B
OE
E
NE
RG
Y
UP
GR
AD
E
F
UL
TO
N M
IL
L
RO
AD
, L
IZ
EL
LA
, G A
04/13/2026 Issued Drawings
FO
RS
YT
H
RO
AD
, M
AC
ON
, G
A
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
9'-0" TYP.
AutoCAD SHX Text
PARTIAL ENLARGED WIND UPLIFT PLAN - HOWARD HS
AutoCAD SHX Text
SCALE: 1/16" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
TAPERED DESIGN AT
DRAIN SUMPS IS 1/2"
PER FOOT SLOPE
TAPERED DESIGN AT
DRAIN SADDLES IS 1/4"
PER FOOT SLOPE
TAPERED DESIGN AT
DRAIN CRICKETS IS
1/4" PER FOOT SLOPE
NOTE 1:
MODIFY TAPERED LAYOUT AND
INSULATION LAYERS AS NEEDED
TO PROVIDE UNOBSTRUCTED
VALLEYS IN DRAINAGE SYSTEM
LEGEND:
DENOTES LOCATION OF
TAPERED INSULATION SYSTEM
KITCHEN
CLASS NW
CLASS NE
MAIN
CLASS SW
CLASS SE
OPEN TO BELOW
ENTRY
SL
O
PE
SL
O
PE
RIDGE
RIDGE
SL
O
PE
SL
O
PE
SLOPESLOPE
SLOPESLOPE
R
ID
G E
RIDGE
SL
O
PE
SL
O
PE
RIDGE
SL
O
PE
SL
O
PE
SLOPESLOPE
R
ID
G E
SLOPESLOPE
R
ID
G E
R
ID
G E
SLOPE SLOPE
A200
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26BBEU21RF390
Issues:
Drawn: TRM/ Approved: MB
SK
YV
IE
W
E S/
H
OW
AR
D
M S
HS
PH
AS
E
IB
BI
BB
B
OE
E
NE
RG
Y
UP
GR
AD
E
F
UL
TO
N M
IL
L
RO
AD
, L
IZ
EL
LA
, G A
04/13/2026 Issued Drawings
FO
RS
YT
H
RO
AD
, M
AC
ON
, G
A
AutoCAD SHX Text
14 XX
AutoCAD SHX Text X
AutoCAD SHX Text
12 XX
AutoCAD SHX Text X
AutoCAD SHX Text
RD
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text
TYPICAL TAPERED SUMP, SADDLE, AND CRICKET DETAILS
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
TAPERED INSULATION PLAN
AutoCAD SHX Text
SCALE: 1/16" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
ROOM
GYM LOW
(N.I.C.)
SLOPE
SLOPESLOPE
R
ID
G E
SL
O
PE
RIDGE
(N.I.C.)
SL
O
PE
SLOPE
SLOPE
SL
O
PE
SL
O
PE
TAPERED DESIGN AT
DRAIN SUMPS IS 1/2"
PER FOOT SLOPE
TAPERED DESIGN AT
DRAIN SADDLES IS 1/4"
PER FOOT SLOPE
TAPERED DESIGN AT
DRAIN CRICKETS IS
1/4" PER FOOT SLOPE
NOTE 1:
MODIFY TAPERED LAYOUT AND
INSULATION LAYERS AS NEEDED
TO PROVIDE UNOBSTRUCTED
VALLEYS IN DRAINAGE SYSTEM
LEGEND:
DENOTES LOCATION OF
TAPERED INSULATION SYSTEM
A201
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26BBEU21RF390
Issues:
Drawn: TRM/ Approved: MB
SK
YV
IE
W
E S/
H
OW
AR
D
M S
HS
PH
AS
E
IB
BI
BB
B
OE
E
NE
RG
Y
UP
GR
AD
E
F
UL
TO
N M
IL
L
RO
AD
, L
IZ
EL
LA
, G A
04/13/2026 Issued Drawings
FO
RS
YT
H
RO
AD
, M
AC
ON
, G
A
AutoCAD SHX Text
14 XX
AutoCAD SHX Text X
AutoCAD SHX Text
12 XX
AutoCAD SHX Text X
AutoCAD SHX Text
RD
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text
PARTIAL ENLARGED TAPERED INSULATION PLAN - HOWARD MS
AutoCAD SHX Text
SCALE: 3/32" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
TYPICAL TAPERED SUMP, SADDLE, AND CRICKET DETAILS
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
(N.I.C.)
(N.I.C.)
(N.I.C.)
SLOPER
ID
G E
SLOPE
SL
O
PE
SL
O
PE
RIDGE
SLOPE
SLOPE
R
ID
G E
SLOPE SLOPE
SLOPE
SL
O
PE
TAPERED DESIGN AT
DRAIN SUMPS IS 1/2"
PER FOOT SLOPE
TAPERED DESIGN AT
DRAIN SADDLES IS 1/4"
PER FOOT SLOPE
TAPERED DESIGN AT
DRAIN CRICKETS IS
1/4" PER FOOT SLOPE
NOTE 1:
MODIFY TAPERED LAYOUT AND
INSULATION LAYERS AS NEEDED
TO PROVIDE UNOBSTRUCTED
VALLEYS IN DRAINAGE SYSTEM
LEGEND:
DENOTES LOCATION OF
TAPERED INSULATION SYSTEM
A202
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26BBEU21RF390
Issues:
Drawn: TRM/ Approved: MB
SK
YV
IE
W
E S/
H
OW
AR
D
M S
HS
PH
AS
E
IB
BI
BB
B
OE
E
NE
RG
Y
UP
GR
AD
E
F
UL
TO
N M
IL
L
RO
AD
, L
IZ
EL
LA
, G A
04/13/2026 Issued Drawings
FO
RS
YT
H
RO
AD
, M
AC
ON
, G
A
AutoCAD SHX Text
14 XX
AutoCAD SHX Text X
AutoCAD SHX Text
12 XX
AutoCAD SHX Text X
AutoCAD SHX Text
RD
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text
PARTIAL ENLARGED TAPERED INSUALATION PLAN - HOWARD HS
AutoCAD SHX Text
SCALE: 1/16" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
TYPICAL TAPERED SUMP, SADDLE, AND CRICKET DETAILS
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
LOWER S
(N.I.C.)
(N.I.C.)
(N.I.C.)
(N.I.C.)
(N.I.C.)
OPEN TO BELOW
SL
O
PE
OPEN TO BELOW
SL
O
PE
SLOPE
SLOPE
SLOPE
CLASS
CONNECTOR
(N.I.C.)
SLOPE
TAPERED DESIGN AT
DRAIN SUMPS IS 1/2"
PER FOOT SLOPE
TAPERED DESIGN AT
DRAIN SADDLES IS 1/4"
PER FOOT SLOPE
TAPERED DESIGN AT
DRAIN CRICKETS IS
1/4" PER FOOT SLOPE
NOTE 1:
MODIFY TAPERED LAYOUT AND
INSULATION LAYERS AS NEEDED
TO PROVIDE UNOBSTRUCTED
VALLEYS IN DRAINAGE SYSTEM
LEGEND:
DENOTES LOCATION OF
TAPERED INSULATION SYSTEM
A203
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26BBEU21RF390
Issues:
Drawn: TRM/ Approved: MB
SK
YV
IE
W
E S/
H
OW
AR
D
M S
HS
PH
AS
E
IB
BI
BB
B
OE
E
NE
RG
Y
UP
GR
AD
E
F
UL
TO
N M
IL
L
RO
AD
, L
IZ
EL
LA
, G A
04/13/2026 Issued Drawings
FO
RS
YT
H
RO
AD
, M
AC
ON
, G
A
AutoCAD SHX Text
14 XX
AutoCAD SHX Text X
AutoCAD SHX Text
12 XX
AutoCAD SHX Text X
AutoCAD SHX Text
RD
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text
PARTIAL ENLARGED TAPERED INSULATION PLAN - HOWARD HS
AutoCAD SHX Text
SCALE: 1/16" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
TYPICAL TAPERED SUMP, SADDLE, AND CRICKET DETAILS
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
CLASS NW
CLASS NE
MAIN
CLASS SW
CLASS SE
OPEN TO BELOW
ENTRY
A250
LEGEND:
AREA OF MOISTURE
DETECTED IN ROOF SYSTEM
NOTES:
1. IR Roof Scan: The Contractor is to conduct their own roof independent thrid-party moisture survey within 30 days after Notice to Proceed. The roof moisture survey shall per ASTM C1153-97, “Standard Practice for Location of Wet Insulation in Roofing Systems Using Infrared Imaging and verify this survey using ASTM D7954/D7954M, "Standard Practice for Moisture Surveying of Roofing and Waterproofing Systems Using Non-Destructive Electrical Impedance Scanners”. Evaluate all roofs in the scope of work. Mark, with spray paint, areas determined to have indications of trapped moisture on the roof surface. Provide a PDF plan that documents the actual extent and locations of these areas. Provide a written report with photos that documents the locations and extent of moisture. Test result reports are to be copied to Merik, Inc. employees:
Michael Baker, AIA, RRC, baker@merikinc.com Jody Usry, jusry@merikinc.com and Chuck Kilgore, ckilgore@merikinc.com.
2. Wet Area Repairs: Remove existing membrane, insulation, base flashings, and base boards, down to the roof deck and outward until wet insulation is no longer present when evaluated by using a two-pronged moisture meter probe or other approved equipment. Remove in rectangular areas that can accommodate new polyiso insulation board rectangular shapes. Review the metal roof deck and remove any corrosion by wire brush. Reprime and coat brushed area with a compatible galvanizing paint prior to installing new polyiso insulation.
Install, as loose fill, new polyiso insulation board in two layers in the opening. Flush insulation board out with adjacent roof membrane surface height. Seal any gaps over ¼” with roofing two-part foam urethane. Patch by lapping a modified bitumen cap sheet a minimum of 3” on all sides over the opening.
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26BBEU21RF390
Issues:
Drawn: TRM/ Approved: MB
SK
YV
IE
W
E S/
H
OW
AR
D
M S
HS
PH
AS
E
IB
BI
BB
B
OE
E
NE
RG
Y
UP
GR
AD
E
F
UL
TO
N M
IL
L
RO
AD
, L
IZ
EL
LA
, G A
04/13/2026 Issued Drawings
FO
RS
YT
H
RO
AD
, M
AC
ON
, G
A
AutoCAD SHX Text
WET INSULATION PLAN
AutoCAD SHX Text
SCALE: 1/16" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
MOVING WEATHERSEAL
KEY POINTS:
1. DIMENSION A AND B MUST BE AT LEAST 1/4".
2. RATIO OF A:B SHOULD BE 2:1 MINIMUM.
3. JOINT SURFACE TOOLED CONCAVE.
4. DIMENSION B SUGGESTED MAXIMUM = 3/8"
5. DIMENSION A MAXIMUM CONSULT SEALANT
MANUFACTURER.
CONCERNS:
1. A DEEP SEALANT JOINT WILL NOT HAVE THE SAME
MOVEMENT CAPABILITY AS A PROPERLY DESIGNED
JOINT
2. SLOW CURE DUE TO EXCESSIVE SEALANT DEPTH.
CL
CL
ACCEPTABLE JOINT PROFILE UNACCEPTABLE JOINT PROFILE
FIELD
8 FASTENERS / BD. (1:4 FT2)
PERIMETER
16 FASTENERS / BD. (1:2 FT2)
CORNERS
32 FASTENERS / BD. (1:1 FT2)
MOVING CORNER JOINT
BOND BREAKER
TAPE
KEY POINTS:
1. DIMENSION A AND B MUST BE AT LEAST 1/4".
2. A BOND BREAKER TAPE OR BACKER ROD MUST BE
PRESENT IF JOINT MOVEMENT IS ANTICIPATED.
3. JOINT MUST BE TOOLED INTO A CONCAVE SURFACE.