4-Attachmnet+D+Bid+sheet+Region+4+Cover+Material+Stockpile+Locations+C.Y.+2025.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- UDOT Region 4 Cover Material
- Solicitation number
- UDOT260144CN
- Issued by
- Utah
About this file
This bid sheet is an attachment to the UDOT Region 4 Cover Material Invitation for Bid (IFB) issued by the Utah Department of Transportation (UDOT), Solicitation #UDOT260144CN. The document specifies the locations and estimated quantities of TYPE II CHIPS cover material required at ten stockpile sites across Region 4, with delivery required by May 21, 2026. The stockpile sites are distributed across various state and U.S. highways including SR 96, SR 72, SR 24, SR 161, SR 95, SR 257, and US 6, with estimated cubic yardages ranging from 250 to 1,246 cubic yards per location. The contract will be awarded to the lowest responsive and responsible bidder capable of delivering the cover material to all specified drop points by the deadline.
Bidders are required to submit pricing on a per-yard basis as well as FOB pricing and price per ton-mile for hauling. The total estimated cubic yardages across all ten locations aggregate approximately 8,548 cubic yards. All material must be delivered by May 21, 2026, though the document notes that delivery schedule changes may occur. Interested bidders should contact Kelly Olson at 435-979-4562 or ksolson@utah.gov for further information or clarification regarding the quantities and delivery requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-Attachment+B+Chip+Seal+Coat+Special+Provision+(5).pdf | ||
| 1-Attachment-A-Agency-Terms-and-Conditions-GS.docx | DOCX document | |
| 3-Attachment+C+SOW+Chips+Region+4+(3) (1).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover Material CY 2024
| TYPE II CHIPS | ||||
| Stockpile Site | Estimated Cubic Yards | Price | In Place By | |
| Price Yard | ||||
| SR 96 MP 3.7 | 885 | 5/21/26 | ||
| SR 72 MP 11.44 | 1053 | 5/21/26 | ||
| SR 72 MP 28.54 | 848 | 5/21/26 | ||
| SR 24 MP 20.85 | 807 | 5/21/26 | ||
| SR 161 MP 1.1 | 596 | 5/21/26 | ||
| SR 95 MP 38 | 1246 | 5/21/26 | ||
| SR 257 MP 14.7 | 250 | 5/21/26 | ||
| US 6 MP 6 | 1131 | 5/21/26 | ||
| US 6 MP 18 | 1232 | 5/21/26 | ||
| SR 257 MP 38.8 | 1050 | 5/21/26 |
| FOB Price |
| Price per ton mile to haul |
| The quantities above are estimates |
| Material needs to be delivered by 5/21/ 2026 |
| There may be some changes to the delivered by schedule |
| Contact Kelly Olson 435-979-4562 or ksolson@utah.gov |