Cost Submittal for UDOT Region 2 Temporary Traffic Control
This document is a cost submittal spreadsheet for the Utah Department of Transportation (UDOT) Region 2 Temporary Traffic Control services contract (Solicitation #UDOT260175CN). The solicitation seeks a contractor to provide temporary traffic control services across multiple counties in Utah's Region 2, with the potential for a five-year contract term. The cost sheet itemizes twelve base contracted services including mobilization for Salt Lake County, Summit County, Tooele County East, and Tooele County West; traffic control maintainer hours; traffic plan design hours; construction signs; plastic barrels; Type II and Type III barricades; advance warning arrow stationary equipment; and changeable message boards. Estimated quantities for base items range from 20 to 65,000 units depending on the line item, with mobilization lump sums and hourly or daily rates for services and equipment.
The cost submittal also includes eight non-binding pricing items submitted "for contractual purposes only," which are subject to UDOT's price reasonableness review, including truck-mounted impact attenuators, light plants, speed monitoring devices, flagging services, water-filled barriers, portable traffic signals, trench plates, and temporary portable rumble strips. Bidders must enter pricing only in designated blue fields, with totals automatically calculated for the base bid comprised of Items 1 through 12. Award will be issued to the lowest responsive and responsible bidder based on the total base bid amount calculated from Table 1, with actual payment made based on actual quantities and work performed at the stipulated unit prices. The State reserves the right to increase or decrease actual quantities as required during contract performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-7. Submittal Form- Vendor Set Up Form 2024-06-27 .pdf | ||
| 2-Agency-Contract-GoodsServices-Combined-9.16.24 (2).docx | DOCX document | |
| 3-Attachment B ScopeTemporary Traffic Control-.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Insert Company Name Here | |
| Cost submittal-UDOT Region Two: Temporary Traffic Control | Enter Bid Values in Blue Fields Only |
| Table 1: Contracted Items and Estimated Quantities | ||||||
| Item # | Item Description | UoM | Estimated Quantity | Submitted Cost per UoM | Cost | |
| 1 | Mobilization/Salt Lake County | Lump | 50 | $ - 0 | ||
| 2 | Mobilization/Summit County | Lump | 20 | $ - 0 | ||
| 3 | Mobilization/Tooele County East (East of I-80 MP 74) | Lump | 20 | $ - 0 | ||
| 4 | Mobilization/Tooele County West (West of I-80 MP 74) | Lump | 20 | $ - 0 | ||
| 5 | Traffic Control Maintainer | Hour | 2,000 | $ - 0 | ||
| 6 | Traffic Plan Design | Hour | 200 | $ - 0 | ||
| 7 | Construction Sign | Ft²*d | 65,000 | $ - 0 | ||
| 8 | Plastic Barrels | Dev*d | 25,000 | $ - 0 | ||
| 9 | Barricades Type II | Dev*d | 1,000 | $ - 0 | ||
| 10 | Barricades Type III | Dev*d | 8,000 | $ - 0 | ||
| 11 | Advance Warning Arrow | |||||
| Type C Stationary | Hour | 6,000 | $ - 0 | |||
| 12 | Changeable Message Board | Hour | 3,000 | $ - 0 | ||
| Table 1 cost | $ - 0 | |||||
| Table 2: Evaluation of Non-Binding Pricing Pricing submitted under "FOR CONTRACTUAL PURPOSES ONLY" is subject to a price reasonableness review by UDOT. If submitted pricing is deemed inconsistent with prevailing market rates or other competitive bids, UDOT reserves the right to flag these items for further discussion. UDOT may provide the Contractor an opportunity to adjust such items to a reasonable price; however, failure to provide fair and reasonable pricing may be grounds for bid rejection. | ||||||
| No. | Item Description | UoM | Estimated Quantity | Submitted Cost per UoM | Cost | |
| 13 | Truck Mounted Impact Attenuator | Hour | 500 | $ - 0 | ||
| 14 | Light Plant | Hour | 250 | $ - 0 | ||
| 15 | Speed Monitoring Device | Hour | 200 | $ - 0 | ||
| 16 | Flagging Services (only) | Hour | 200 | $ - 0 | ||
| 17 | Triton Water-Filled Barrier End Treatment with Feet | Price per Day | 3 | $ - 0 | ||
| 18 | Portable Traffic Signals | Day | 5 | $ - 0 | ||
| 19 | Trench Plates (4’x6’, 8’x10’,8’x16’) | Price per Day | 3 | $ - 0 | ||
| 20 | Temporary Portable Rumble Strip | Dev*d | 3 | $ - 0 | ||
| Catalog discount on any related items % off | ||||||
| Discount on services or installation on related products % off |
| Total Project Cost Summary Table | Total |
| Base Bid (Items 1-12 contracted Items) | $ - 0 |
| Fields in this table will automatically populate based on bids. |
| Basis of Award |
| The Contract shall be awarded to the responsible Bidder submitting the lowest responsive Total Base Bid, as calculated from the aggregate project costs set forth in Table 1. The quantities enumerated therein are estimates provided for bidding purposes only; the Owner reserves the right to increase or decrease actual quantities as required, and payment shall be made based on actual work performed at the stipulated unit prices |