4-Attachment C Bid schedule.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- UDOT Circleville Drainage Project
- Solicitation number
- UDOT260080CN
- Issued by
- Utah
About this file
The file "4-Attachment C Bid schedule.xlsx" is associated with the Utah Department of Transportation (UDOT) Circleville Drainage Project, Solicitation #UDOT260080CN. The project involves construction services to remove an existing cross culvert and surface material, install a new trench drain and concrete waterway, reconstruct impacted curb and gutter and asphalt, and construct a sump basin and drop inlet to convey water. The contract will be awarded to the lowest responsive and responsible bidder, with a project completion deadline of November 15th, 2025. UDOT reserves the right to evaluate bidder responsibility based on past MS4 project performance.
The solicitation is issued in accordance with the State of Utah Procurement Code and Utah Administrative Code. The procurement will result in a single contract award, with UDOT's Procurement Services Division serving as the issuing procurement unit and Region 4 as the conducting procurement unit. Bidders must demonstrate capability to complete the project without excessive delays or warranty issues. The contract appears to be competitively bid, with emphasis on prior project performance and timely completion as key evaluation criteria.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-2. Attachment A- Standard Terms and Conditions- with check fields- 09-16-2024 2.docx | DOCX document | |
| 5-Attachment D Plans.pdf | ||
| 3-Attachment B Scope of Work.docx | DOCX document | |
| 2-7. Submittal Form- Vendor Set Up Form 2024-06-27 .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
COST ESTIMATE
US-89; Circleville Drainage Project # S-0089(642)158 | PIN 22934
| Item | Units | Unit Price | Quantity | Cost |
| Mobilization | Lump | 1 | $ 0.00 | |
| Traffic Control | Lump | 1 | $ 0.00 | |
| Granular Borrow (Plan Quantity) | Cu Yd | 17 | $ 0.00 | |
| Separation Geotextile | Sq Yd | 50 | $ 0.00 | |
| Remove Asphalt Pavement | Sq Yd | 94 | $ 0.00 | |
| Remove Existing Curb and Gutter | Feet | 11 | $ 0.00 | |
| Roadway Excavation (Plan Quantity) | Cu Yd | 65 | $ 0.00 | |
| Untreated Base Course (Plan Quantity) | Cu Yd | 9 | $ 0.00 | |
| HMA - 1/2 Inch | Ton | 20 | $ 0.00 | |
| Trench Drain | Feet | 56 | $ 0.00 | |
| Concrete Waterway | Sq Ft | 348 | $ 0.00 | |
| Concrete Curb and Gutter Transition | Feet | 11 | $ 0.00 | |
| 8-inch Pipe | Feet | 28 | $ 0.00 | |
| 5' Storm Drain Manhole | Each | 1 | $ 0.00 | |
| Drain Rock | Cu Yd | 5 | $ 0.00 | |
| TOTAL | $ 0.00 |
File details come from the government source that posted it. Updated .