3-Attachment B Scope of Work.docx
DOCX document 14 KB Posted
- Attached to
- UDOT Circleville Drainage Project
- Solicitation number
- UDOT260080CN
- Issued by
- Utah
About this file
The document is a Scope of Work (Attachment B) for the Utah Department of Transportation (UDOT) Circleville Drainage Project, Solicitation #UDOT260080CN. The project involves construction services to remove an existing cross culvert and surface material, install a new trench drain and concrete waterway, reconstruct impacted curb and gutter and asphalt, and construct a sump basin and drop inlet to convey water. The project must be completed by November 15th, 2025, with UDOT reserving the right to award the contract to the lowest responsive and responsible bidder based on past MS4 project performance.
The solicitation is issued in accordance with the State of Utah Procurement Code and Utah Administrative Code, with a focus on selecting a contractor who can successfully complete the drainage infrastructure improvements. UDOT will evaluate bidders based on their previous project completions, specifically looking at timely completion and absence of warranty issues. The contract will result in a single award to the most qualified bidder, with UDOT's Procurement Services Division serving as the issuing procurement unit and Region 4 as the conducting procurement unit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-2. Attachment A- Standard Terms and Conditions- with check fields- 09-16-2024 2.docx | DOCX document | |
| 5-Attachment D Plans.pdf | ||
| 2-7. Submittal Form- Vendor Set Up Form 2024-06-27 .pdf | ||
| 4-Attachment C Bid schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work
The Utah Department of Transportation (UDOT) is receiving bids from qualified contractors to: Remove existing cross culvert and surface material. Install new trench drain and concrete waterway, reconstructing impacted curb and gutter and asphalt. Construct sump basin & drop inlet to convey water to the new basin. See plan set for detailed scope of work.
It is anticipated that this IFB will result in a single award to the lowest responsive and responsible bidder.
Location: US 89 and Center Street in Circleville Utah.
Project Completion: Project must be completed by Nov 15th 2025.