3-Attachment B Scope of Work.docx

DOCX document 14 KB Posted

Attached to
UDOT Circleville Drainage Project
Solicitation number
UDOT260080CN
Issued by
Utah

About this file

The document is a Scope of Work (Attachment B) for the Utah Department of Transportation (UDOT) Circleville Drainage Project, Solicitation #UDOT260080CN. The project involves construction services to remove an existing cross culvert and surface material, install a new trench drain and concrete waterway, reconstruct impacted curb and gutter and asphalt, and construct a sump basin and drop inlet to convey water. The project must be completed by November 15th, 2025, with UDOT reserving the right to award the contract to the lowest responsive and responsible bidder based on past MS4 project performance.

The solicitation is issued in accordance with the State of Utah Procurement Code and Utah Administrative Code, with a focus on selecting a contractor who can successfully complete the drainage infrastructure improvements. UDOT will evaluate bidders based on their previous project completions, specifically looking at timely completion and absence of warranty issues. The contract will result in a single award to the most qualified bidder, with UDOT's Procurement Services Division serving as the issuing procurement unit and Region 4 as the conducting procurement unit.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work

The Utah Department of Transportation (UDOT) is receiving bids from qualified contractors to: Remove existing cross culvert and surface material. Install new trench drain and concrete waterway, reconstructing impacted curb and gutter and asphalt. Construct sump basin & drop inlet to convey water to the new basin. See plan set for detailed scope of work.

It is anticipated that this IFB will result in a single award to the lowest responsive and responsible bidder.

Location: US 89 and Center Street in Circleville Utah.

Project Completion: Project must be completed by Nov 15th 2025.