4-Attachment 3- Evaluation Scoring Matrix.docx

DOCX document 35 KB Posted

Attached to
3202600107 Mopac Print Shop Upgrades Services
Solicitation number
3202600107
Issued by
Travis County, Austin City, Texas

About this file

This is an Evaluation Scoring Matrix for a state contract opportunity issued by the Texas Workforce Commission (TWC) for upgrades to the Mopac Print Shop facility located at 12312 North MoPac Expressway, Austin, Texas. The project encompasses the provision and installation of a heating, ventilation and air conditioning (HVAC) Energy Recovery Ventilator (ERV), ceiling tiles, flooring tiles, and ductwork modifications at the TWC Mopac Building. The evaluation criteria and scoring weights are established to assess and rank proposals submitted in response to this solicitation.

The evaluation scoring matrix allocates 100 total points across multiple criteria: Cost accounts for 40 points, Respondent's Past Project Performance (three projects maximum at 10 points each) comprises 30 points, Project Milestone Schedule is worth 20 points, and Pre-Proposal Conference Attendance carries 10 points. Additional evaluation factors are scored on a Pass/Fail basis, including Financial Questionnaire, Completed HUB Subcontracting Plan, Execution of Response, Written Narrative of Qualifications, and Letter of Bonding Capacity. Respondents must meet all Pass/Fail requirements to be eligible for consideration under the point-based scoring categories.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3202600107 Mopac Print Shop Upgrades Services Attachment 3 Evaluation Scoring Matrix Project Criteria

Criteria
Points
A. Cost
40 pts
B. Respondent’s 3 Past Project Performance (each project is worth 10 points max)
30 pts
C. Project Milestone Schedule
20 pts
D. Pre-Proposal Conference Attendance
10 pts
E. Financial Questionnaire
Pass/Fail
F. Completed HUB Subcontracting Plan
Pass/Fail
G. Execution of Response
Pass/Fail
H. Written Narrative of Qualifications
Pass/Fail
I. Letter of Bonding Capacity
Pass/Fail
Total
100 pts

image1.jpeg

File details come from the government source that posted it. Updated .